VOLUME V (REVISION-D) (WITH CHANGE-5), JOINT FLEET MAINTENANCE MANUAL VOLUME V QUALITY MAINTENANCE

COMUSFLTFORCOMINST 4790.3 · CHAPTER 19, SECTION 1, 19, SECTION 17. APP D, 19, SECTION 2

CHAPTER 19-1 – NAVAL AIR FORCES

p. 14

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 xiv 19-1.6.4 3-M Assessment ..................................................................................... VI-19-1-57 19-1.6.5 3-M Inspections ..................................................................................... VI-19-1-60 19-1.7 Engineering Trouble Call ................................................................................... VI-19-1-64 19-1.7.1 Purpose .................................................................................................... VI-19-1-64 19-1.7.2 Background ............................................................................................. VI-19-1-64 19-1.7.3 Policy ...................................................................................................... VI-19-1-64 19-1.7.4 Duties and Responsibilities ..................................................................... VI-19-1-64 19-1.8 Repair Service Organization ............................................................................... VI-19-1-67 19-1.8.1 Purpose .................................................................................................... VI-19-1-67 19-1.8.2 Background ............................................................................................. VI-19-1-67 19-1.8.3 Aircraft Carrier CNO Availability Repair Teams ................................... VI-19-1-68 19-1.8.4 Engineering Repair Mission ................................................................... VI-19-1-68 19-1.8.5 Meetings .................................................................................................. VI-19-1-68 19-1.8.6 Maintenance Screening and Repair Organization................................... VI-19-1-69 19-1.8.7 Program Assessment ............................................................................... VI-19-1-73 Appendices A 3-MTT Grade Sheets............................................................................. VI-19-1-A-1 B 3-M Inspection Criteria ......................................................................... VI-19-1-B-1 C Zone Inspection Deficiency List, Zone Inspection Material Guide and Flow Charts .................................................................................... VI-19-1-C-1 D SKED 3.2 Settings and Preferences ...................................................... VI-19-1-D-1 E Format for Reporting 3-M Inspections ..................................................VI-19-1-E-1 CHAPTER 19-2 – NAVAL EXPEDITIONARY COMBAT COMMAND 19-2.1 Roles and Responsibilities .................................................................................... VI-19-2-1 19-2.2 Qualifications ........................................................................................................ VI-19-2-9 19-2.3 Planned Maintenance ............................................................................................ VI-19-2-9 19-2.3.1 Minimum Standards ................................................................................ VI-19-2-9 19-2.3.2 Functional Components ......................................................................... VI-19-2-11 19-2.3.3 Related Maintenance ............................................................................. VI-19-2-13 19-2.3.4 Inactive Equipment Maintenance .......................................................... VI-19-2-14 19-2.3.5 Scheduling ............................................................................................. VI-19-2-16 19-2.3.6 SKED ..................................................................................................... VI-19-2-17 19-2.3.7 Accomplishing PMS .............................................................................. VI-19-2-18 19-2.3.8 Non-Accomplished PMS Categories ..................................................... VI-19-2-18 19-2.3.9 Accountability ....................................................................................... VI-19-2-19 19-2.3.10 Force Revision Implementation ............................................................ VI-19-2-19 19-2.3.11 Planned Maintenance System Feedback Reports .................................. VI-19-2-24 19-2.3.12 Assessment Procedure MRCs ............................................................... VI-19-2-32 19-2.4 Maintenance and Material Management Afloat and Ashore Evaluation Criteria ............................................................................................................................ VI-19-2-32 19-2.4.1 Self Assessments ..................................................................................... VI-19-2-32 19-2.4.2 Inspections .............................................................................................. VI-19-2-35

CHAPTER 19-2 – NAVAL EXPEDITIONARY COMBAT COMMAND

p. 15

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 xv Appendices A 3-M Inspection Criteria ......................................................................... VI-19-2-A-1 B Format for Reporting 3-M Inspections ................................................. VI-19-2-B-1 CHAPTER 19-3 – NAVAL INFORMATION FORCE 19-3.1 Roles and Responsibilities .................................................................................... VI-19-3-1 19-3.2 Qualifications ...................................................................................................... VI-19-3-10 19-3.3 Planned Maintenance .......................................................................................... VI-19-3-12 19-3.3.1 Minimum Standards .............................................................................. VI-19-3-12 19-3.3.2 Functional Components ......................................................................... VI-19-3-15 19-3.3.3 Related Maintenance ............................................................................. VI-19-3-16 19-3.3.4 Inactive Equipment Maintenance .......................................................... VI-19-3-17 19-3.3.5 Scheduling ............................................................................................. VI-19-3-20 19-3.3.6 SKED ..................................................................................................... VI-19-3-21 19-3.3.7 SKED Server Failure ............................................................................. VI-19-3-22 19-3.3.8 Accomplishing PMS .............................................................................. VI-19-3-22 19-3.3.9 Non-Accomplished Categories .............................................................. VI-19-3-23 19-3.3.10 Accountability ....................................................................................... VI-19-3-24 19-3.3.11 Force Revision Implementation ............................................................ VI-19-3-24 19-3.3.12 Planned Maintenance System Feedback Reports .................................. VI-19-3-29 19-3.3.13 Assessment Procedure MRCs ............................................................... VI-19-3-37 19-3.4 Maintenance and Material Management Afloat and Ashore Evaluation Criteria ............................................................................................................................ VI-19-3-37 19-3.4.1 Self Assessments ..................................................................................... VI-19-3-37 19-3.4.2 Inspections .............................................................................................. VI-19-3-43 19-3.4.3 Programmatics ........................................................................................ VI-19-3-46 19-3.4.4 Inspections and Training Assist Visits .................................................... VI-19-3-47 Appendices A Inspection Criteria ................................................................................. VI-19-3-A-1 B Division Inactive Equipment Maintenance (IEM) Plan ........................ VI-19-3-B-1 C Format for Reporting 3-M Inspections ................................................. VI-19-3-C-1 CHAPTER 19-4 – NAVAL INSTALLATION COMMAND 19-4.1 Roles and Responsibilities .................................................................................... VI-19-4-1 19-4.2 Qualifications ........................................................................................................ VI-19-4-9 19-4.3 Planned Maintenance ............................................................................................ VI-19-4-9 19-4.3.1 Minimum Standards ................................................................................ VI-19-4-9 19-4.3.2 Functional Components ......................................................................... VI-19-4-10 19-4.3.3 Related Maintenance ............................................................................. VI-19-4-14 19-4.3.4 Inactive Equipment Maintenance .......................................................... VI-19-4-15 19-4.3.5 Scheduling ............................................................................................. VI-19-4-17 19-4.3.6 SKED ..................................................................................................... VI-19-4-18 19-4.3.7 SKED Server Failure ............................................................................. VI-19-4-19

CHAPTER 19-4 – NAVAL INSTALLATION COMMAND

p. 16

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 xvi 19-4.3.8 Accomplishing PMS .............................................................................. VI-19-4-19 19-4.3.9 Non-Accomplished Categories .............................................................. VI-19-4-20 19-4.3.10 Accountability ....................................................................................... VI-19-4-21 19-4.3.11 Force Revision Implementation ............................................................ VI-19-4-21 19-4.3.12 Planned Maintenance System Feedback Reports .................................. VI-19-4-25 19-4.3.13 Assessment Procedure MRCs ............................................................... VI-19-4-33 19-4.4 Maintenance and Material Management Evaluation Criteria ............................. VI-19-4-33 19-4.4.1 Self-Assessments .................................................................................... VI-19-4-33 19-4.4.2 Inspections .............................................................................................. VI-19-4-35 Appendices A Inspection Criteria ................................................................................. VI-19-4-A-1 B Division Inactive Equipment Maintenance (IEM) Plan ........................ VI-19-4-B-1 C Format for Reporting 3-M Inspections ................................................. VI-19-4-C-1 CHAPTER 19-5 – NAVAL SUBMARINE FORCES 19-5.1 Applicability ......................................................................................................... VI-19-5-1 19-5.2 Roles and Responsibilities .................................................................................... VI-19-5-2 19-5.3 Qualifications ...................................................................................................... VI-19-5-12 19-5.4 Planned Maintenance .......................................................................................... VI-19-5-13 19-5.4.1 Minimum Standards .............................................................................. VI-19-5-13 19-5.4.2 Functional Components ......................................................................... VI-19-5-14 19-5.4.3 Submarine Safety, Scope of Certification, Flight Critical Components and Survivability and Escape ........................................... VI-19-5-17 19-5.4.4 Related Maintenance ............................................................................. VI-19-5-18 19-5.4.5 Inactive Equipment Maintenance .......................................................... VI-19-5-20 19-5.4.6 Scheduling ............................................................................................. VI-19-5-23 19-5.4.7 SKED ..................................................................................................... VI-19-5-24 19-5.4.8 SKED Server Failure ............................................................................. VI-19-5-24 19-5.4.9 Accomplishing PMS .............................................................................. VI-19-5-25 19-5.4.10 Non-Accomplished PMS Categories ................................................... VI-19-5-26 19-5.4.11 Accountability ...................................................................................... VI-19-5-26 19-5.4.12 Force Revision Implementation ........................................................... VI-19-5-27 19-5.4.13 Planned Maintenance System Feedback Reports ................................ VI-19-5-31 19-5.4.14 Transferring Dry Deck Shelter............................................................. VI-19-5-40 19-5.4.15 Planning Board for Maintenance ......................................................... VI-19-5-40 19-5.4.16 Assessment Procedure MRCs .............................................................. VI-19-5-41 19-5.5 Maintenance and Material Management Afloat and Ashore Evaluation Criteria ................................................................................................................ VI-19-5-41 19-5.5.1 Self-Assessment ...................................................................................... VI-19-5-41 19-5.5.2 Inspection ................................................................................................ VI-19-5-45 Appendices A Format for Reporting 3-M Inspections ................................................. VI-19-5-A-1 B Inspection Criteria ................................................................................. VI-19-5-B-1

CHAPTER 19-5 – NAVAL SUBMARINE FORCES

p. 17

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 xvii C Format for Reporting K-MRC End-of-Quarter Resolution .................. VI-19-5-C-1 D Division IEM Plan for Fleet and CNO Availabilities ........................... VI-19-5-D-1 CHAPTER 19-6 – NAVAL SURFACE FORCES 19-6.1 Applicability ......................................................................................................... VI-19-6-1 19-6.2 Purpose .................................................................................................................. VI-19-6-1 19-6.3 Roles and Responsibilities .................................................................................... VI-19-6-1 19-6.4 Shipboard Maintenance ...................................................................................... VI-19-6-10 19-6.4.1 Preventative Maintenance System ......................................................... VI-19-6-10 19-6.4.2 SKED Program Failure And Restoration .............................................. VI-19-6-10 19-6.4.3 Minimum Standards .............................................................................. VI-19-6-11 19-6.4.4 Functional Components ......................................................................... VI-19-6-12 19-6.4.5 3-M Coordinator .................................................................................... VI-19-6-14 19-6.4.6 Related Maintenance ............................................................................. VI-19-6-16 19-6.4.7 Inactive Equipment Maintenance .......................................................... VI-19-6-17 19-6.4.8 Assessment Procedures MRCs .............................................................. VI-19-6-19 19-6.4.9 Scheduling ............................................................................................. VI-19-6-20 19-6.4.10 Accomplishing PMS ............................................................................ VI-19-6-22 19-6.4.11 Non-Accomplished Categories ............................................................ VI-19-6-23 19-6.4.12 Accountability ...................................................................................... VI-19-6-23 19-6.4.13 Force Revision Implementation ........................................................... VI-19-6-24 19-6.4.14 Planned Maintenance System Feedback Reports ................................ VI-19-6-25 19-6.4.15 PMS Spot Check Program ................................................................... VI-19-6-35 19-6.4.16 Corrective Maintenance ....................................................................... VI-19-6-38 19-6.4.17 Life Cycle Of A Work Candidate ........................................................ VI-19-6-41 19-6.4.18 Key Component Of A Work Candidate ............................................... VI-19-6-41 19-6.4.19 NTCSS Failure And Recovery............................................................. VI-19-6-43 19-6.4.20 Equipment Validations......................................................................... VI-19-6-43 19-6.5 Planning Board For Maintenance ....................................................................... VI-19-6-45 19-6.5.1 PB4M Meeting ...................................................................................... VI-19-6-45 19-6.5.2 PE Responsibilities ................................................................................ VI-19-6-45 19-6.5.3 PB4M Timing, Periodicity, And Agenda .............................................. VI-19-6-45 19-6.6 3M 365 Continuous Monitoring ......................................................................... VI-19-6-45 19-6.6.1 Pillars Of Performance .......................................................................... VI-19-6-45 19-6.6.2 Periodic Reports .................................................................................... VI-19-6-46 19-6.6.3 CSMP Reconciliation Report (OMMS) ................................................ VI-19-6-52 19-6.6.4 CSMP Reconciliation Report ................................................................ VI-19-6-55 19-6.6.5 CSMP Self-Sufficiency Report ............................................................. VI-19-6-59 19-6.6.6 3-M 365 Program Validation ................................................................ VI-19-6-62 19-6.6.7 Spot check Program ............................................................................... VI-19-6-63 19-6.6.8 CSMP Management Pillar ..................................................................... VI-19-6-63

CHAPTER 19-7 – MAINTENANCE DATA SYSTEM AFLOAT AND ASHORE GENERAL REQUIREMENTS

CHAPTER 19-7 – MAINTENANCE DATA SYSTEM AFLOAT AND ASHORE GENERAL

p. 18

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 xviii 19-7.1 Purpose .................................................................................................................. VI-19-7-1 19-7.2 Specific Requirements and Policy ........................................................................ VI-19-7-1 19-7.3 Configuration Data Manager ................................................................................ VI-19-7-3 19-7.4 Configuration Worthy Item................................................................................... VI-19-7-3 19-7.5 Databases .............................................................................................................. VI-19-7-3 19-7.6 Data ....................................................................................................................... VI-19-7-4 19-7.7 Reporting............................................................................................................... VI-19-7-5 19-7.8 Configuration Change Form OPNAV 4790/CK ................................................... VI-19-7-6 19-7.9 Maintenance Action Form OPNAV 4790/2K or Work Candidate ....................... VI-19-7-9 19-7.10 Current Ship’s and Station’s Maintenance Project ............................................ VI-19-7-15 Appendices A Standard Work Center Codes for Master Job Catalog Items ................ VI-19-7-A-1 B Job Originator Values ........................................................................... VI-19-7-B-1 C Preparation Instructions Configuration Change Form (OPNAV 4790/CK) .............................................................................. VI-19-7-C-1 D Preparation Instructions Maintenance Action Form (OPNAV 4790/2K) ............................................................................... VI-19-7-D-1 E Preparation Instructions Supplemental Form (OPNAV 4790/2L).........VI-19-7-E-1 F Shipyard Alteration Certification Letter Example ................................. VI-19-7-F-1 G Ship’s First Endorsement On Alteration Certification Letter Example VI-19-7-G-1 H Work Candidate and JSN Log Example ............................................... VI-19-7-H-1 CHAPTER 20 - WEIGHT AND MOMENT CONTROL FOR SUBMARINES 20.1 Purpose ........................................................................................................................ VI-20-1 20.2 Ballast Changes ........................................................................................................... VI-20-2 20.2.1 Naval Sea Systems Command Notification .................................................. VI-20-2 20.2.2 Ballast Types ................................................................................................. VI-20-2 20.3 Unusual Conditions ..................................................................................................... VI-20-3 Appendices A Sample Ship Message to ISIC Concerning Removal or Reinstallation of Cargo Ballast ......................................................................................... VI-20A-1 B Sample Ship Message to ISIC Concerning Audit of Cargo Ballast Documentation ........................................................................................... VI-20B-1 CHAPTER 21 – (Reserved for Future Use) CHAPTER 22 - TRIDENT SYSTEM AND EQUIPMENT MAINTENANCE PLANS 22.1 Purpose ........................................................................................................................ VI-22-1 22.2 TRIDENT System and Equipment Maintenance Plans .............................................. VI-22-1 22.2.1 TRIDENT Planned Equipment Replacement ............................................... VI-22-1

CHAPTER 19

p. 243

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2 b. Any departure from the policies, procedur es or responsibilities delineated in the 3-M Manual are not authorized without prior Naval Sea Systems Command approval and Chief of Naval Operations concurrence. c. This chapter does not apply to: (1) Fleet Ballistic Missile system s under the cognizance of Strategic Systems Programs Office. (2) Nuclear power plants and associ ated test equipment under the cognizance of Naval Sea Systems Command Nuclear Propulsion Directorate (NAVSEA 08). (3) Aeronautical equipment used in support of the aviation maintenance mission. (4) Civilian operated and maintained ships, small boats, and service craft, unless specifically included in a base operating contract or another similar document. (5) Navy Expeditionary Combat Command damage control equipment. In instances where damage control equipment is not under contract for maintenance from civil entities and falls under the responsibility of a given work center, it must be maintained per command-generated instruction.

p. 244

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-1 VOLUME VI CHAPTER 19-1 NAVAL AIR FORCES REFERENCES. (a) NAVSEAINST 4790.8 - Ships’ Maintenance and Material Management (3-M) Manual (b) COMNAVAIRFORINST 4700.23 - Aircraft Carrier Maintenance Support Centers (MSC) (c) NAVSEA T-9630-AB-MMD- 010/ALL USN HULLS - Corrosion Control Assessment and Maintenance Manual (d) NAVEDTRA 43241 - Personnel Qualification Standard for Ship’s Maintenance and Material Management (3-M) System (e) NAVEDTRA 43523 - Personnel Qualificati on Standard for Quality Maintenance Program (f) NAVSEA S0400-AD-URM-010/TU M – Tag-Out Users Manual (g) OPNAVINST 3120.32 - Standard Organiza tion and Regulations of the U.S. Navy (SORM) (h) Ship’s Force Resource Manual for Aircraft Carrier Availability Planning Management Guide - Resource Manual from Aircraft Carrier Team One Portal (i) CNAL/CNAP OMMS-NG Users Guide – Po werPoint Presentation April 2016 Ver 7 LISTING OF APPENDICES. A 3-MTT Grade Sheets B 3-M Inspection Criteria C Zone Inspection Deficiency List, Zone Inspection Material Guide and Flow Charts D SKED 3.2 Settings and Preferences E Format for Reporting 3-M Inspections 19-1.1 APPLICABILITY. This section is a joint Commander, Naval Air Force Pacific and Commander, Naval Air Force Atlantic (COMNAVAIRLANT) instruction. 19-1.2 ROLES AND RESPONSIBILITIES. a. Type Commander. The Type Co mmander (TYCOM) exercises primary responsibility for the effective operation and support of the Ships’ Maintenance and Material Management (3-M) System. Areas of responsibility include but are not limited to the following: (1) Afloat Maintenance Data System (MDS). (a) Organizational Maintenance Management System (OMMS). (b) R-Admin, R-Supply, Organizati onal Maintenance Management System – Next Generation (OMMS-NG). (c) Mission Readiness Assessment System. (2) Ashore MDS.

CHAPTER 19-1

p. 245

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-2 (a) Maintenance Figure of Merit Family of Systems. (b) Advanced Industrial Management for Regional Maintenance Centers. (c) Regional Maintenance Automated Information System. This will be replaced by Validation, Screening and Brokering. (d) Maintenance Resource Management System. (3) Planned Maintenance System (P MS) Scheduling (SKED) software. (4) Alteration Management System. (a) Navy Data Enterprise. (b) Type Commander Alteration Management System. (5) Current Ship’s Maintenance Project (CSMP). (6) Master Job Catalog (MJC). (7) The screening and processing of Feedback Reports (FBR). (8) Maintaining an inspection data file per paragraph 19-1.6.5.i of this chapter. (9) Providing program enhancement requirements to the respective Fleet Commander via N43. (10) Ensuring ships and units are manned with Navy Enlisted Classification (NEC) qualified 3-M Coordinators (3MC). (11) Analyzing 3-M Inspection (3MI) and self-assessment data, identifying common concerns, conducting problem root cause analysis with the development and implementation of solutions. (12) Ensuring TYCOM inspection team me mbers are qualified to inspect assigned areas. b. TYCOM 3-M Officer. Commander, Naval Air Force Pacific N436 and Commander, Naval Air Force Atlantic N436 are the Force 3-M Officers (3MOs) and responsible for administration of the 3-M system within the TYCOMs. The 3MO is the single point of contact for shipboard 3-M matters. c. TYCOM 3-M Team. The 3-M Team cons ists of the N436 3MO, senior enlisted personnel of appropriate technical ratings, and N432 MDS subject matter experts. This team is responsible for: (1) Assisting and advising commands in administration of the 3-M system. (2) Conducting reviews of Pl anned Maintenance System (PMS) feedback reports and responses. (3) Conducting 3-M system traini ng, assists, and inspections. (4) Monitoring overall implementation and effectiveness of the 3-M system on all aircraft carriers. (5) Reviewing self-assessment results to identify trends and providing prompt support to ships as required.

p. 246

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-3 (6) Training the ship’s 3- M Training Team (3-MTT). (7) Maintaining liaison with Commander, Fleet Forces Command, Commander, Pacific Fleet, Naval Sea Logistics Center (NSLC), and other commands on 3- M matters. (8) Providing onboard and off-ship assistance or training in OMMS-NG operations. (9) Conducting OMMS-NG and Propulsi on – Organizational Maintenance Management System (P-OMMS) evaluations and software grooms in conjunction with scheduled 3-M assists and inspections. (10) Coordinating OMMS-NG and P-OMMS external source inputs to ship's CSMP to ensure quality of information. (11) Coordinating and providing applicati on administrator training for OMMS-NG Functional Area Supervisors (FAS). (12) Coordinating and providi ng CSMP management training. (13) Assisting and providing suppor t for TYCOM CSMP validations. (14) Ensuring 3-M Inspections are current. (15) Ensuring subordinate commands co nduct rigorous quarterly 3-M Self- Assessments and report results to the TYCOM 3-M Coordinator (3MC). (16) Monitoring the status of troubled systems and Top Management Attention items using the quarterly 3-M Self-Assessment. (17) Ensuring subordinate commands comp ly with standard work center (WC), division, and department structure. (18) Tracking and monitoring 3-M ma jor milestones and training events, overseeing, and providing inspection teams and conducting 3-M spot checks. d. TYCOM Maintenance Logistics Branch Ma nagers (N432). To enhance the operation and effectiveness of OMMS-NG, Commander Naval Air Force Atlantic and Commander Naval Air Force Pacific N432s will: (1) Conduct MDS evaluations in conjunction with 3-M inspections. (2) Provide onboard and off-ship user and administrative assistance or training in the operations of the ship’s Maintenance Support Center (MSC). (3) Conduct MSC assist and audit evaluations yearly. e. Commanding Officer. The Commanding Officer (CO) is responsible for establishing an aggressive Self-Assessment Program that validates the administration and execution of maintenance and detects improperly conducted maintenance or falsely reported accomplishments. In addition, the CO is overall responsible for the ship’s Zone Inspection Program and will participate in zone inspections as an inspector. Whenever possible, the CO will inspect a different zone during each inspection to ensure that they inspect the whole unit within a reasonable period. COs should assure

p. 247

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-4 themselves that zone inspections are being conducted and the correction of deficiencies is being satisfactorily pursued. f. Executive Officer: (1) The Executive Officer (XO) is the command’s 3-M System manager responsible to the CO for the overall management of the 3-M Program. The XO will: (a) Brief the CO on the status of 3-M. (b) Designate in writing the 3MC (NEC qualified) and an officer to be the ship’s 3MO. (c) Chair quarterly 3-M System mee tings with Department Heads (DH), Ship’s Maintenance Manager (SMM), Reactor Maintenance Officer (RMO), 3MO, Repair Officer, 3MC(s), and 3-MTT. (d) Integrate 3-M System training into the command’s training and qualification program. (e) Ensure personnel receive adequate and effective 3-M System training. (f) Ensure the effectiveness of the command’s 3-M Self-Assessment Program. (g) Act as the final review officer for shifts of maintenance responsibility between departments. (h) Lead the 3-MTT. (2) The XO also has overall responsibilit y for execution of the ship’s Zone Inspection program. In this capacity the XO will: (a) Schedule and publish zone inspec tion dates and times and designated zones to be inspected. (b) Assign DHs, Division Officers (DIVO) , Chief Petty Officers, or other senior officers as inspecting officers. (c) Participate in zone inspections as an inspector. (d) Review reports of discrepanc ies and corrective actions and make appropriate reports to the CO. (e) Maintain an auditable record indicating that all spaces have been inspected by zone at least once a quarter. This record should be maintained to show all inspections for the last 12 months. (f) Train Officers and Chief Petty Officers in the conduct of zone inspections. g. 3-M Training Team. The 3-MTT will: (1) Monitor and observe weekly spot-checks performed by designated spot checkers. Critique spot checker and maintenance personnel performance upon completion using Appendix A, Section I of this chapter. The

p. 248

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-5 maintenance check should include at least one of the following: (a) Working aloft. (b) Tag-out. (c) Hazardous Material (HAZMAT). (d) Personal protective equipment (PPE). (2) Evaluate spot checkers based on adhe rence to and knowledge of directives required to complete the maintenance action. (3) Provide divisional training and Personal Qualification Standard (PQS) qualification support as requested, or as directed by the 3MO based on 3- MTT trend data. (4) Support the 3MO in conducting 3-M self-assessments or audits. (5) Meet monthly (at a minimum) to discuss performance trends, performance improvement recommendations and strategies and to conduct training of 3- MTT members. (6) Conduct quarterly 3-M training for E-7 and above. Training topics should focus on mitigating negative trend data. (7) Provide training attendance sheets fo r all training that 3-MTT members provide. Training must be documented and retained for 24 months by the 3MO. Attendance sheets will have the following information: (a) Lecturer (b) Attendees (c) Date of training (d) Topics covered (e) Senior member present at the training (f) Location and length of training (8) Conduct CSMP review to ensure comp liance with the standards set forth in this chapter. (9) Conduct OMMS-NG or P-OMMS Practical Exams. h. 3-M Officer. (1) The 3MO acts as the XO’s principal assistant regarding 3-M matters. The 3MO will: (a) Coordinate all administra tive facets of the 3-M Program. (b) Evaluate command’s 3-M program and keep the XO advised of operational effectiveness. (c) Monitor the Spot Check Program and report program’s effectiveness weekly to the XO.

p. 249

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-6 (d) Manage 3-MTT and mainta in designation letters. (e) Coordinate, maintain, trai n, and monitor the performance of the 3- MTT. (f) Maintain a weekly 3-M report that will display both ship’s Spot Check Accomplishment Rate (SCAR) and 3-MTT SCAR as separate columns for comparison. (g) Provide 3-M Program advice and assistance to DHs, DIVOs, Departmental 3-M Assistants (D3MA), Leading Chief Petty Officers (LCPO) and Work Center Supervisors (WCS). (h) Maintain a file of current 3-M in structions and directives (may be electronic); disseminate changes. (i) Ensure timely submission of FBRs. (j) Maintain a master file of submitted FBRs, Responses, Advance Change Notices (ACN) and Document Information Transmittals. (k) Conduct 3-M Self-Assessments. (l) Coordinate and conduct 3-M tr aining. (Weekly at a minimum.) (m) Coordinate and conduct 3-M qualification program. (n) Ensure that PMS improvement plans are prepared and executed. (o) Ensure that a Scheduling and Ex ecution Effectiveness Review (SEER) is completed and maintained for 24 months for every WC upon implementation of a Force Revision (FR). Reviewers (E-7 or above) are to utilize the SEER worksheet from Appendix B section I-A. (2) The 3MO is also directly responsible to the XO for deck-plate execution of Zone Inspections and the annual review of the Zone Inspection Program instruction. The 3MO will: (a) Designate the zones, zone boundari es, number of zones, and spaces assigned to each zone subject to the review of appropriate DHs and XO approval. (b) Coordinate assignment of inspectors and escorts with the XO and departmental LCPOs. (c) Muster and brief zone inspectors, escorts, and recorders prior to inspections. (d) Furnish the inspecting party with binders containing blank Zone Inspection Deficiency Lists (ZIDL) (Appendix C Section I), Zone Inspection Material Guide (Appendix C Section II) and a copy of the last four inspection ZIDLs. (e) Collect and maintain completed ZIDLs:

p. 250

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-7 1 Ensure all ZIDLs are entered into Maintenance Onboard Data Exchange System (MODES) module located in the Total Ship Information Management System (TSIMS) by Departmental 3MAs. 2 Ensure Departmental 3MAs assist in correcting unsatisfactory conditions noted on inspection reports for their departments. 3 Forward the MODES and the zone inspection discrepancy report to the XO, DHs, Damage Control Assistant (DCA), Electrical Officer and Safety Officer. (f) Maintain the ZIDL database in th e MODES module to include accurate up-to-date space ownership assignments. (g) After XO approval, distribute zone inspection discrepancy reports to DHs, DIVOs, and department LCPOs. Report will contain at a minimum any space that is inspected (UNSAT) and a list of all repair, “level one” category discrepancies. (h) Maintain an auditable record indicating that all spaces have been formally inspected by zone at least once every quarter. It will be maintained to show all zone inspections and assessment reports for the last year (the ZIDL Metrics Report generated in MODES is used for this purpose). (i) Monitor an active, self-critical assessment program and report program effectiveness quarterly to the XO per paragraph 19-1.5.8 of this chapter program assessment and Appendix B Section IV-D, Zone Inspection Program Check Sheet. i. Safety Officer. The Safety Officer in support of zone inspections will: (1) Review MODES and all zone inspecti on discrepancy reports sent out by the 3MO for safety related discrepancies after each zone inspection. (2) Assist and track immediat e correction of safety violations or issues arising from zone inspections and make recommendations as appropriate to the CO and XO concerning any trends or major safety issues. (3) Provide zone inspection safety discrepa ncy “lessons learned” at Safety Petty Officer, Safety Committee and Safety Council training meetings. (4) Verify discrepancies originated by safety department remain open until corrected. Verify discrepancies are corrected and close out entries in either MODES, the CSMP or both. (5) Ensure a safety department representa tive, E-7 or above, is present to brief inspectors and DIVOs on ship wide safety hazard concerns prior to commencement of the zone inspection. (6) Utilize the term “SAFO” as the rate when entering Safety Department walk through discrepancies into MODES.

p. 251

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-8 j. Electrical Officer. The Electrical Officer in support of zone inspections will: (1) Review MODES and all zone inspecti on discrepancy reports sent out by the 3MO for electrical safety related discrepancies after each zone inspection. (2) Assist and track immediat e correction of electrical safety violations and issues arising from zone inspections through the trouble call MODES database per 19-1.7 of this chapter and make recommendation(s) as appropriate to the Chief Engineer (CHENG) concerning trends or major safety issues. (3) Ensure an electrical division representa tive, E-7 or above, is present to brief inspectors and DIVOs on ship wide electrical safety concerns prior to commencement of the zone inspection. k. Repair Officer. The Repair Officer in support of zone inspections will: (1) Provide assistance and advice to all levels of the Chain Of Command (CoC) for correcting discrepancies that require organizational level TA-4 engineering attention. (2) Verify, assist, and track immediate corre ction of all repair “level one” safety violations or issues arising from zone inspections through the trouble call MODES database. l. Command Master Chief. The Command Master Chief (CMC) will: (1) Attend the XO’s quarterly 3-M System meetings providing senior enlisted feedback. (2) Conduct PMS Spot Checks following the command’s policy to ensure required maintenance is being properly performed and documented. m. Command 3-M Coordinator. The 3MC re ports to the 3MO on all 3-M matters. The 3MC will: (1) Support the ship’s 3MO in management of the 3-M program. (2) Maintain copies of the current FR NAVY PMS Digital Video Disk (DVD), List of Effective Pages (LOEP) for every WC, changes issued between FRs in their original format and classified Maintenance Requirement Cards (MRC). Digital copies are allowed unless there have been changes between FRs. (3) Manage PMS Master File per the requ irements of this document, maintain a locater card for all primary and secondary classified MRCs as part of the PMS Master File. (4) Advise, monitor, and assist DHs , DIVOs, LCPOs and WCS in matters concerning the 3-M System. (5) Monitor the Ship’s 3-M PQS Program and maintain an auditable record of personnel qualified in 3-M PQS. (6) Maintain a master accountability log of all PMS changes. (7) Develop and maintain a Split Ma intenance Index Page (MIP) Log.

p. 252

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-9 (8) Administer the configur ation management program onboard the ship or unit. (9) Supervise the command’s 3-M Self-Assessment program and provide a weekly status to the 3MO. (10) Develop and administer the Ship or Unit’s PMS Spot Check Program. (11) Maintain a matrix to select and track spot-checks to be performed at the executive level by the following personnel: (a) CO (b) XO (c) 3MO (d) 3MC (e) 3-MTT (f) CMC (12) Serve as 3-MTT Coordinator. Ensure all 3-MTT members are fully qualified. Maintain a roster and qualification record of all 3-MTT members. (13) Coordinate weekly general administ rative duties and spot check requirements for the ship’s 3-MTT. (14) Maintain a current rost er of all D3MAs and WCSs. (15) Ensure corrective actions are take n on all unsatisfactory PMS Spot Checks and report same to the 3MO as part of weekly PMS reporting. (16) Ensure backups of SKED database are produced daily and maintained in Automated Data Processing (ADP). (17) Ensure ship’s Maintenance Outlook Report is generated weekly for a minimum of 60 days out. (18) Ensure Global Events are trigge red in SKED and completed based on unit events such as flight quarters, drills, or underway replenishment. (19) Ensure that Global Stat es and Triggers are properly set at the Command level. (20) Screen all FBRs, verify content, va lidity, serialize and forward within seven days of origination. (21) Maintain accountability of all submitted FBRs and actions taken until corrected or new PMS documentation is received. (22) Ensure the FBR originator and all ap plicable WCs are apprised of action taken and that changes or corrections are implemented when received. (23) Ensure 3-M documents such as Ship’s Maintenance Action Form OPNAV 4790/2K, Ship’s Configuration Change Forms OPNAV 4790/CK, etc. that require forwarding to a data processing activity are forwarded within seven days of origination or as operationally feasible. (24) Validate 3-M MDS data elements fo llowing the 3-M validation specifications.

p. 253

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-10 (25) Ensure 3-M documents returned fo r the correction of data are promptly revised and resubmitted. (26) Track the reporting of completed main tenance actions related to an alteration or because of a configuration change with timely processing of Automated Shore Interface (ASI) configuration and logistic data. (27) Report up-line CSMP maintenance tr ansactions and command equipment file corrections at least once a week. (28) Maintain any outstanding paper copi es of message work candidates and 2- Limas, either paper or electronic. n. Reactor Maintenance Officer. The RMO has cognizance of the Reactor Plant. The RMO will: (1) Notify the SMM of cross boundary maintenance. (2) Coordinate all facets of shipboard corrective maintenance. (3) Coordinate industrial and shipboard maintenance during availabilities. (4) Coordinate with and aid the 3MO a nd 3MC in monitoring the Configuration Validation Program. Ensure all departments are aware that equipment validation forms and configuration or logistic support problems must be submitted to the MSC for review, research, and input into OMMS-NG per reference (b). (5) Ensure all documentation deferring maintenance on newly created, unreported Job Control Numbers (JCN) is reviewed and approved in a timely manner by the responsible DH. Time from work candidate origination to DH approval will not exceed seven working days. (6) Monitor the operation of MDS. (7) Act as the Immediate Unit Comma nder (IUC) representative for IUC screening and programming. o. Ship’s Maintenance Manage r. The SMM has cognizance over topside maintenance. The SMM will: (1) Notify the RMO of cross boundary maintenance. The SMM has cognizance of the material condition of the ship except for the Reactor Plant. (2) Coordinate all facets of shipboard corrective maintenance. (3) Coordinate industrial and shipboard maintenance during availabilities. (4) Coordinate with and aid the 3MO a nd 3MC in monitoring the Configuration Validation Program. Ensure all departments are aware that equipment validation forms and configuration or logistic support problems must be submitted to the MSC for review, research, and input into OMMS-NG per reference (b).

p. 254

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-11 (5) Ensure all documentation deferring maintenance on newly created, unreported JCNs is reviewed and approved in a timely manner by the responsible DH. Time from work candidate origination to DH approval will not exceed seven working days. (6) Monitor the operation of MDS. (7) Act as the IUC representative for IUC screening and programming. (8) In support of zone inspections: (a) Provide assistance and advice to a ll levels of the CoC for correcting discrepancies that require outside repair activity assistance. (b) Coordinate with the Ship’s Repair Officer, CNAL/CNAP N43 Maintenance Program Manager (MPM) and the PMS312, Carrier Planning Activity for all depot level Corrosion Control Information Management System conditions 2 through 4 per reference (c). p. 3-M Functional Area Supervisor. The FAS will be designated in writing by the CHENG or RMO, hold the 3MC NEC (811A) and be a Chief Petty Officer or above. Functional Area Supervisors report directly to the SMM or RMO on all 3-M MDS matters. Primary responsibilities include the proper operation and maintenance of the OMMS-NG and P-OMMS systems, as well as training of users. The FAS will: (1) Coordinate all administrative facet s of the 3-M MDS program per current directives. (2) Support the SMM and RMO in th e management of the program. (3) Serve as 3-MTT Coordinator for all MDS matters. Ensure all 3-MTT members are fully qualified in MDS. (4) Produce updated OMMS-NG documents (CSMP up-line reports, ASI reports, etc.) to TYCOM as required. (5) Process customer feedba ck files from the TYCOM. (6) Monitor and process all external interf ace transactions. Process bulk load files into OMMS-NG. Forward a copy of the Bulk Load Report to the CNAL/CNAP N43 MDS specialist. (7) Coordinate use of OMMS-NG to support Strike Force Intermediate Maintenance Activity (SFIMA). (8) Act as primary point of contact for off ship training provided by CNAL/CNAP N43. (9) Train Ship’s Force personnel at the appropriate level for the billet in which they are serving. (10) Maintain a “Ship Availability Listing” for distribution to Ship’s Force personnel. Ensure availability listing is co-located with the WC CSMP MJB516 (CSMP Detail Listing by Job Sequence Number (JSN)) report. (11) Monitor and correct work candidates in the OMMS-NG import correction

p. 255

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-12 queue. (12) Maintain OMMS-NG site parameters per TYCOM directives. (13) Process OMMS-NG system utilities and data alignment programs as required. (14) Maintain tracking of Board of Insp ection and Survey discrepancies in OMMS- NG. (15) Maintain a log tracking significant OMMS-NG down time. (16) Ensure all work candidates assigned to the “REJ” availability, rejected, or requiring more information from TYCOM, are processed, and returned to the TYCOM MPM. (17) Maintain a log of submitted OMMS-NG trouble reports and change proposals. (18) Maintain a log to track OMMS-NG up line reporting. (19) Conduct review and approval screening of all open and completed work candidates. Ensure all “New” not previously reported work candidates are approved by OMMS-NG FAS within seven working days. (20) Ensure, in support of the Automated Consolidated Shipboard Allowance List Improvement Program, only MSC personnel are given access to order repair parts using the “Parts Not Listed” ordering capability in OMMS-NG. q. Maintenance Support Center. The MSC will support the ship’s Configuration Validation Program. Specific responsibilities include: (1) Assign problem worksheet numbers and use problem worksheets to track configuration database changes. (2) Update the ship’s configuration da tabase with additions and changes as identified through validation efforts. (3) Assist departments in identifica tion of configuration items requiring validation. (4) Conduct research on requests for the ordering of parts not listed on an Allowance Parts List (APL) or Allowance Equipage List and take action as required. Action will include placing the part on order for the WC as a part not listed on the APL or Allowance Equipage List. r. Command Maintenance Availability Coordinator. The Command Maintenance Availability Coordinator will be responsible for the coordination of all Fleet Maintenance Activity (FMA) repairs and coordinate closely with the 3MC. The Command Maintenance Availability Coordinator will also provide a single working level point of contact and coordinate the command’s requirements with the requirements of the FMA. These duties include: (1) Technical review of work requests submitted for FMA accomplishment. (a) Ensure readability a nd technical correctness.

p. 256

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-13 (b) Prevent duplication of work requests for ship alterations, and other MJC originated deferrals. (c) Collect supplemental 2-LIMA re quests for routine work (i.e., lagging, painting, label plates, tiling, etc.) from all WCs and prepare an integrated priority list for each type of routine work to maximize the FMA’s effectiveness. (2) Ensuring command preparations for an FMA availability are conducted per Volume II, Part I, Chapter 4 of this manual. (3) Meeting daily, during an av ailability, with the assigned ship superintendent to discuss the status of all active jobs. (4) Attending all FMA production, night work and management meetings. (5) Providing a daily FMA job status to each DH, DIVO and Leading Petty Officer (LPO). (6) Establishment of a Planning Board for Maintenance. s. Department Head. (1) The DH is responsible to the XO for the operation and execution of the 3-M System within the department. Delegating review and approval authority does not relieve the DH of his or her duties and responsibilities in maintaining an effective 3-M program. The DH will: (a) Ensure all Principal Assistan ts (PA), D3MAs, DIVOs, LCPOs and WCSs are fully qualified and designated in writing. (b) Ensure all maintenance personnel are fully qualified. (c) Delegate review and approval authority, if desired, to a 3-M Principal Assistant. The 3-M Principal Assistant must be an officer, with the same 3-M qualifications as the DH, designated in writing, and provides oversight and assistance to the DH. (d) Ensure maintenance is prioritiz ed to facilitate accomplishment. (e) Review and approve all depart ment PMS schedules and revisions. (f) Review maintenance action annotations. (g) Review weekly PMS alerts. (h) Implement a Self-Assessment Program within the department to validate properly accomplished and reported maintenance. (i) Take corrective action on all “Unsatisfactory” PMS Spot Checks and report to the 3MO via 3MC as part of weekly PMS reporting. (j) Ensure all material deficienci es are documented and promptly reported. (k) Review and verify the content a nd validity of all FBRs, digitally sign FBRs within four days of origination.

p. 257

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-14 (l) Ensure the Configuration Manage ment Database accurately reflects equipment changes whether the action is performed by command personnel or outside activities. (m) Authorize placement of equipm ent into an Inactive Equipment Maintenance (IEM) status, ensure PMS scheduling is annotated accordingly. (n) Review and approve department wo rk candidates within four days of creation; ensure completeness, accuracy, and the correct assignment of priority. (o) Review all work candidates in th e departmental CSMP every 90 days. (p) Ensure that no classified data or Navy Nuclear Propulsion Information is reflected on 3-M documents designated for off-hull distribution. (q) Conduct quarterly meetings with DIVOs, LCPOs and WCSs and provide status of departmental 3-M System to the 3MO. (2) In support of the ship’s zone inspection program, the DH will: (a) Ensure on time participation of a ll required zone inspectors, escorts, recorders, and space presenters. (b) Ensure Department LCPOs review the weekly zone plan and assign qualified inspectors. Provide names of qualified substitutes when required to the 3-M Office one day prior to the zone inspection. (c) Ensure DIVOs prepare and report divisional spaces ready for inspection prior to the time published for zone inspection. (d) Review MODES and the zone insp ection discrepancy report sent out by the 3MO after each zone inspection and follow up on all reported discrepancies. Ensure repair “level one” safety discrepancies are resolved immediately by the division responsible for the space or corrected per paragraph 19-1.7 of this chapter and reported to the XO and 3MO within 24 hours. (e) Keep the XO apprised by ensuring discrepancies in the MODES database are routinely updated to reflect the status of corrective action. The MODES database is to be updated no later than the week following the previous week’s zone inspection. (f) Ensure D3MA submits a complete d maintenance action without prior deferral into OMMS-NG or P-OMMS to document the total man- hours expended in the accomplishment of the zone inspection deficiencies for the entire month. One JCN will be submitted for the entire department under the department administrative work center. The “Zone Inspection Program” XSYSTEMITEM APL will be used. For example:

p. 258

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-15 APL HSC EFD ESD XSYSTEMITEM 13011SFZIP Zone Inspection Program Zone Inspection t. Departmental 3-M Assistant. The D3MA s should be E-7 or above. Stellar E-6s (except for Weapons, Combat, Air, Reactor and Engineering departments) may be considered but must be approved in writing by the XO. The D3MA will: (1) Assist the DH in coordinating and supe rvising all administrative aspects of the department’s 3-M Program. (2) Serve as the department’s 3-M Pr ogram technical expert and advisor. (3) Assist the 3MC in the proper execu tion of the 3-M Program within the department. (4) Supervise and coordinate quarterly departmental 3-M Self-Assessments. (5) Assist the 3MO and 3MC in administering an effective 3-M Certification Program for the qualification of 3-M personnel. (6) Assist in the development and ex ecution of the short and long-range 3-M training plan. (7) Assist the 3MC in maintaining a high-quality Spot Check Program. (8) Generate a weekly PMS spot check a ssignment matrix for officers, CPOs, and designated supervisory personnel. (9) Monitor the department’s CSMP for accuracy and effectiveness, review, and report job status to the DIVO and DH. (10) Coordinate repair activities within th e department to ensure timely resolution of material deficiencies. (11) Provide the DH with a weekly status of the department’s: (a) 3-M Self-Assessment Program. (b) CSMP. (c) PMS Performance Report (from SKED). (d) Equipment file validations (as scheduled by MSC). (12) Use SKED’s Revision Editor to ensu re that all PMS changes have been properly annotated and applied to the schedule prior to DH review and finalization. (13) Oversee and assist WCSs in the impl ementation of FRs, updates and changes. (14) Review each WC’s lineouts and a ll 3-M documentation supporting PMS and MDS prior to submission to the DH. (15) Ensure all equipment changes, adds and removals, regardless of whether the action is performed by command personnel or outside activities, is reflected in

p. 259

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-16 the Configuration Management Database; if not, report via 4790/CK to the Configuration Data Manager (CDM) and utilize a PMS FBR to affect LOEP changes. (16) Manage the departmental TSIM S and MODES program requirements. u. Department Leading Chief Petty Officer. The department LCPO is responsible for the proper operation of the 3-M System within their department. The department LCPO will: (1) Provide 3-M System guidance and training to DIVOs and division LCPOs within their department. (2) Participate in quarterly Self-Assessments. (3) Review all quarterly Self-Assessments and promptly correct discrepancies found within the department. (4) Support the DH with Zone Inspection responsibilities. v. Division Officer. (1) The DIVO is responsible to the DH for the execution of maintenance within the division. The DIVO will: (a) Ensure all PMS scheduling change s have been properly annotated and applied prior to DH review and finalization. (b) Review the 13-Week Accountabilit y Log at the beginning of the PMS week and sign at the end of the week (if not using electronic accountability in SKED or when SKED is not available). (c) Review and verify the content a nd validity of PMS FBRs within three days of origination. (d) Ensure 3-M documents generated within the division are complete, accurate and promptly submitted to the DH. (e) Conduct 3-M Self-Assessments as directed by the command’s policy. (f) Provide weekly updates to the DH concerning the status of the 3-M System within the division. (g) Incorporate 3-M System training into the Divisional Training Plan. (h) Review divisional work candida tes and the CSMP for validity and accuracy. (i) Conduct monthly briefings for the DH on the status of all work candidates. (j) Acknowledge weekly PMS Alerts. (2) In support of the ship’s zone inspection program, the DIVO will:

p. 260

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-17 (a) Ensure zone inspection escorts and space presenters are familiar with locations of their assigned areas. Space presenters will normally be the individuals responsible for the space. (b) Ensure zone inspection escorts and recorders attend training with department LCPO the day prior to the inspection and be knowledgeable of the spaces to be inspected. (c) Ensure applicable compartments, gear lockers, drawers, stowage lockers, and other enclosures are unlocked and accessible for inspections. (d) Maintain a zone inspection folder for each space within their division containing ZIDLs (Appendix C Section I) from the last four inspections. (e) Ensure spaces assigned are ready for zone inspection, paying particular attention to safety, damage control, material condition, preservation, and cleanliness. Report results to the DH and ensure divisional CSMP reflects current material condition of all spaces. (f) Review MODES and the zone insp ection discrepancy report sent out by the 3MO after each zone inspection and follow up on all reported discrepancies. Ensure repair “level one” safety discrepancies are resolved immediately by the division responsible for the space or corrected per paragraph 19-1.7 of this chapter and reported to the DH and 3MO within 24 hours. (g) Ensure discrepancies that are wi thin the division’s capability that cannot be corrected by the division within 30 days, are submitted by originating WC with a JCN. Discrepancies that cannot be completed by the division responsible for the space, but within Ship’s Force capability, must have a Ship’s Force organizational JCN submitted. Discrepancies that are beyond Ship’s Force capability must have an outside activity JCN assigned. JCNs that require parts or cannot be completed by the originating WC must be submitted within seven days via the CSMP. (h) Keep the DH apprised by ensuring zone inspection discrepancies in the MODES database are routinely updated to reflect the status of corrective action. The MODES database is to be updated no later than the week following the previous week’s zone inspection. w. Division Leading Chief Petty Officer. The division LCPO is responsible for the proper operation of the 3-M System within their division. The division LCPO will: (1) Supervise WCSs in the execution of daily maintenance. (2) Ensure WCSs are properly trained, equipped and are knowledgeable of all WC divisional equipment maintenance requirements.

p. 261

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-18 (3) Ensure divisional personnel are pr operly trained and qualified to conduct maintenance. (4) Verify all divisional WC equipment is covered by PMS. (5) Ensure PMS is properly scheduled and conducted, including all underway and special evolution situational “R” checks. (6) Review WC PMS records (e.g., FRs, ACNs and PMS FBRs and Responses), approve all lineouts and additions on the LOEP, MIP, and PMS schedules prior to DIVO and DH reviews. Ensure proper justification is noted on each lineout. (7) Review and approve non-applicable procedural steps lined-out on MRCs. (8) Review and sign the 13-Week Accountab ility Log at the end of the PMS week and ensure checks added that week are hand-written into the blank accountability log. (if not using electronic accountability in SKED or when SKED is not available). (9) Review the PMS Scheduling Forecasti ng Report to ensure that all Tools, Parts, Material and Test Equipment (TPMTE) are available to support upcoming maintenance actions. (10) Provide the DIVO a weekly status of the division’s Self-Assessment Program, CSMP and PMS. (11) Ensure the Configuration Manageme nt Database reflects current ship’s configuration. (12) Ensure FBRs are submitted reques ting LOEP changes to reflect system, equipment and component installs or removals. (13) Review and verify the content and va lidity of PMS FBRs within two days of origination. (14) Ensure the divisional CSMP accu rately reflects material conditions. (15) Review and approve work candidates, act as the second point of contact for work candidates and provide the DIVO a weekly brief on the status of all work candidates in the CSMP. (16) Ensure proper testi ng and inspection of work done by outside activities prior to job acceptance. (17) Coordinate repair activ ities within the division. (18) Review, approve, and close out weekly schedules. This closeout of the previous week’s schedules must occur on the first day of the following week (i.e., Monday). (19) Review Check Notes for required and updated information. (20) Write PMS Alert details to include why planning allowed loss of periodicity and the plan to complete PMS.

p. 262

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-19 (21) Support the DIVO with Z one Inspection responsibilities. x. Work Center Supervisor. The WCS must be an E-6 or above unless waived in writing by the XO. The WCS of a 40 series work center must be Damage Control Petty Officer (DCPO) qualified and recommended in writing by the DCA. The WCS will: (1) Record all equipment deficiencies within their WC, utilizing OMMS-NG and P-OMMS to ensure all required 3-M System documents are submitted to the division LCPO. (2) Ensure work center personnel have completed 3-M PQS training commensurate with position held. (3) Ensure PMS covers all maintenance worthy equipment in the WC. (4) Maintain an accurate and current LOEP. (5) Ensure 3-M System WC files and pu blications are complete, current, and available to WC personnel. (6) Ensure WC initiated 3-M documentation is correct, legible, promptly prepared and submitted. (7) Maintain a 13-Week Accountability Log containing the current and previous 13-Week Log (if not using electronic accountability in SKED or when SKED is not available). (8) Prepare weekly WC schedule, obtai n required approval, assign maintenance personnel, and update schedule to reflect status. (9) Ensure equipment changes, adds and removals are reflected in the Configuration Management Database and, if not, report via 4790/CK to the CDM. (10) Ensure FBRs are submitted whenever: (a) Maintenance requirements are not fully understood. (b) Errors are believed to exist. (c) Entries in the TPMTE block are wrong or inadequate. (d) Additional coverage is needed. (e) Performance of the maintenance requirement would cause a hazardous condition to exist. (11) Ensure prompt reporting of all material deficiencies and completed maintenance actions. (12) Ensure test and measurement equi pment or other portable support equipment is delivered for test or calibration as scheduled. (13) Ensure the DIVO and division LCPO or LPO are advised of all 3-M System activity within the WC.

p. 263

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-20 (14) Review the PMS Scheduling Forecasti ng Report to ensure that all TPMTE is available to support upcoming maintenance actions. (15) Ensure all WC weekly schedules are updated daily. (16) Ensure WC personnel make necessary preparations and ensure presenters and spaces are ready for zone inspection. y. Damage Control Assistant. (1) The DCA will be the principal advisor to the XO for all matters pertaining to damage control maintenance including scheduling, performance, and the technical aspects of planned maintenance for all Damage Control (DC) equipment. The DCA will: (a) Provide a comprehensive weekly training and qualification program for DCPOs. (b) Schedule and control the performance of planned and corrective maintenance of DC equipment requiring outside or off hull assistance. (c) Advise DHs of scheduled dates for maintenance actions requiring coordination between departments or throughout the ship. (d) Coordinate PMS on DC gear not assigned to a WC, division, or department. (2) In support of the ship’s zone inspection program, the DCA will: (a) Review MODES and all zone inspection discrepancy reports sent out by the 3MO for damage control related discrepancies after each zone inspection. (b) Assist and track immediate correction of damage control violations or issues arising from zone inspections. DCA will make recommendation(s) as appropriate to the CO, XO via the CHENG concerning any trends or major safety issues. (c) Report serious or long-sta nding repair or firefighting discrepancies to the CHENG and XO. Additionally, provide these “lessons learned” at DCPO training. (d) Track corrections of damage control discrepancies with the ship’s Fire Marshall (FM). (e) Ensure a damage control divisi on representative, E-7 or above, is present to brief inspectors and DIVOs on ship wide damage control concerns prior to commencement of the zone inspection. (f) Utilize “Duty FM” as the rate when entering Duty Fire Marshall walk through discrepancies into MODES. This is to allow for easier identification when reviewing the system- generated reports.

p. 264

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-21 z. Maintenance Personnel. Maintenance Personnel will perform all PMS as assigned utilizing PMS documents in SKED and ensure “Check Notes” contain amplifying information and tagout identifiers as required. Maintenance personnel will: (1) Perform assigned maintenance. (2) Notify the WCS when: (a) An MRC is not fully understood, ap pears to be incorrect or cannot be accomplished as written. (b) There are issues with the TPMTE block of the MRC. (c) The technician has doubts concerning his or her ability to perform the maintenance. (d) Equipment deficiencies or casualties are discovered. (e) Factors exist which would make performance of the maintenance unwise or dangerous. (3) Initiate FBRs when discrepancies ar e discovered during the performance of an MRC. (4) Inform the WCS when planned main tenance requirements are complete. (5) Annotate PMS schedule to reflec t accomplishment of maintenance. (6) Sign 13-Week Accountability Log. (If not using electronic accountability in SKED or when SKED is not available). aa. Zone Inspectors. Zone Inspectors will: (1) Provide their individual flashlight and PPE. (2) Inspect assigned spaces expeditiously a nd completely. Annotate results on the ZIDL forms (Appendix C Section I of this chapter) and ensure the escort and recorder: (a) Clearly understands what is being reported (b) Annotates discrepancies (c) Understands repair “level one” safe ty discrepancies must be corrected by the division or corrected per paragraph 19-1.7 of this chapter and reported to the DIVO and 3MO within 24 hours. (3) Contact responsible DIVO or LCPO immediately when repair “level one” unsafe conditions are found and remain on station until sufficient action is taken or other personnel arrive to resolve the unsafe condition. bb. Zone Inspector Escorts and Recorders. Zone inspector escorts and recorders will: (1) Attend training per this section with th e department LCPO the day prior to the inspection and be knowledgeable of the spaces to be inspected. (2) Plan an efficient route for the in spection and make sure all spaces are unlocked. Record all information into the inspection binder.

p. 265

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-22 cc. Zone Inspection Space Presenters. Space presenters will: (1) Be knowledgeable of the spaces to be inspected and have keys or combinations to applicable compartments, gear lockers, drawers, stowage lockers and other enclosures. The space presenter should be the individual responsible for the cleanliness and maintenance of the space. (2) Present both, a current CSMP (Autom ated Work Request or 516 Report) and a MODES report identifying existing deficiencies to the inspector and have the divisional space ZIDL folder containing the last four ZIDLs for each space. (3) Route completed ZIDL forms via the CoC. 19-1.3 QUALIFICATIONS. All personnel assigned to billets associated with the 3-M system must be 3-M PQS qualified for the assigned billet per reference (d). a. Evidence of qualification in support of 3- M requirements must be maintained by the command in an auditable fashion. In addition to 3-M PQS qualifications, all personnel assigned to accomplish 3-M related maintenance on systems listed in Volume V, Part 1, Chapter 2 paragraph 2.2.1 of this manual, must be qualified per reference (e).” Table 19-1-1 reflects the PQS qualifications required to fill 3-M billets. Table 19-1-1 - Required PQS Qualifications 3-M Coordinator PQS-307 3-M Assistant PQS- 305 Department Head PQS-306 Department LCPO PQS-305 3-MTT Members PQS-304 Division Officer PQS-304 Division LCPO PQS-304 Work Center Supervisor PQS-303 Repair Parts Petty Officer PQS-302 or RPPO Continuing Training and Qualifications Software Maintenance Personnel PQS-301 b. Personnel checking into the command w ith a 3-M qualification obtained from a previous command may be required to re-qualify. They may re-qualify directly to the highest level previously obtained and they do not have to re-qualify at lower levels. Prerequisites, however, for all qualifications must be documented in Relational Administration (RADM). 19-1.4 PLANNED MAINTENANCE. 19-1.4.1 Minimum Standards. MRC accomplishment is critical for maintaining equipment in a ready state and achieving expected service life. The maintenance tasks directed by MRCs are the

p. 266

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-23 minimum standards for organizational, shipboard planned maintenance, and therefore equipment degradation can be assumed if maintenance is deferred. The following provisions are provided to maximize on time performance of PMS and provide increased fleet latitude in maintaining equipment. a. MRCs are prepared as instructions to complete a maintenance task based upon the premise that the personnel assigned to perform the task have sufficient knowledge of the rate listed on the card and are qualified to perform maintenance as directed by the MRC. The MRC will be accomplished in sequential order, adhering to all Warnings, Cautions and Notes. Routine sub-steps (e.g., fastener removal, steps to don and remove PPE, turning on a vacuum) may or may not be included in the MRC and their absence should not prevent the maintainer from completing the maintenance task. b. Per Naval Sea Systems Command (NAVSEA), procedures are written at a level of detail based on the assumption maintenance personnel are trained, qualified, and supervised by experienced leadership to execute the maintenance consistently and expertly. They exist to provide a common standard, specify acceptance criteria, communicate warnings, and cautions specific to the maintenance and provide proven maintenance practices. They are not intended to: (1) Supplement or duplicate rules and pr ocedures that must be followed for hazards generally associated with the equipment (Hazardous Material Handling, Electrical Shock Risk Management, etc.) but not specifically associated with a step of the procedure. (2) Identify every process and every wa rning associated with the maintenance environment of the component being maintained (aloft, in tanks, near an active flight deck, in a heat stress area, etc.) (3) Specify every possible action of the maintainer. c. Leadership will uphold standards for comply ing with maintenance procedures. This standard does not mean the maintainer is expected to robotically follow the MRC word-by-word. Leadership, trainers, monitors, auditors, and inspectors should not expect it. The key word here is intent. The objective is to perform the intent of each step, not necessarily step-by-step performance. d. If a step is missing that is necessary to complete the task, and that step is not obvious to the maintenance person, an FBR should be submitted. e. MRC completion status is dependent on the accomplishment of all procedural steps on all the equipment listed on the MRC or its accompanying Location Guide List. f. The performance of additional rational ac tions during the accomplishment of an MRC is authorized. Examples of such actions include turning on and off items utilized during the performance of the MRC (vacuum cleaners, test equipment, etc.) and general housekeeping (cleaning up or containing spilled fluids or dirt). g. The substitution of any tools, materials or test equipment not held by the activity should be considered prior to deciding to defer the maintenance until the exact tools, materials or test equipment listed on the MRC are procured. This is especially critical for frequently required maintenance where several performance cycles can be missed

p. 267

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-24 while waiting for supply to provide the correct items. Substitution requirements are provided by reference (a) and other technical documents. 19-1.4.2 Functional Components. a. PMS Master File. The Master File, maintained by the units 3MC, contains information relative to PMS requirements that are specific to equipment for which the command is responsible. The Master File provides for duplicate issue of missing MIPs and MRCs, contains supplementary information provided by NSLC Detachments Norfolk or San Diego and serves as a repository for changes received between FR distributions, which must be retained on file until the changes are reflected in a subsequent FR. Master File content is delineated in Appendix B, Section I-B, Command Level Effectiveness Review (CLER) . b. Work Center PMS File. The WC File provides a ready reference of planned maintenance requirements and information to be retained in the working area for use by the WCS and maintenance personnel. The WC File contains only the documents and information applicable to a specific WC. The content of the WC File is delineated in Appendix B Section I-A of this chapter (SEER). (1) CNAL and CNAP require documenting qualifications within the WC File with a RADM PQS finder, by watch station print out, showing WC personnel qualification dates for all required qualifications necessary for completion of WC maintenance. (2) The following additional qualifications may be required in some WCs: (a) Safety Petty Officer (SPO). (b) DCPO. (c) Quality Assurance (QA) craftsman. (d) Any qualification or NEC designation specified by the MIP or MRC. In SPO required maintenance, for example, the M P must be SPO (NAVEDTRA 43460 series) watch station 301 and 3-M 301 MP qualified. (3) Designation letters for the PA (i f assigned), DIVO, D3MA, LCPO and WCS must be in the WC File and include designated individual’s signature and initials. (4) Printed copies of MRCs used by th e WC on a routine basis (specifically quarterly, monthly, weekly, and daily) will be maintained. All applicable situational maintenance requirements (R-checks) will also be included. (5) If a WCS or higher position is turn ed over, all line outs within the WC File for that position will be reviewed and re-initialed as soon as possible or no later than implementation of the next FR.

p. 268

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-25 c. PMS Administrative Requirements. In lie u of a WC or a Master File the following should be retained: (1) Work Center (a) Current classified MRCs. (b) Current Tailored Force Revision (TFR) reports. (2) 3MO (a) SKED 3.2 Help file. (b) Split MIP Tracking Log, updated to current FR. (c) Applicable 3-M Instructi ons, both Ship and TYCOM. (d) Current 3-M messages and guidance. (e) Current 3MC TFR Reports. (f) Master classified MRCs. (g) Current SKED Database back-up files on DVD or CD-R and an Excel spread sheet from the SKED report Checks and Maintenance Outlook Report of all WCs, for the current and next future quarter. (h) 3-M Program short and long range training plan approved by the XO. d. Interim MRC Procedures. The ship may develop interim MRC procedures based on experience and applicable technical manuals in support of equipment or systems without PMS coverage until formal documentation is received. Before scheduling preliminary MIP requirements, the WCS and the DH must verify their applicability to installed equipment. e. Weekly Status Report. The weekly PMS monitoring status reports will be retained, electronically if desired, by the 3MC for the current and previous quarter. These reports from the 3MC to the 3MO will contain, as a minimum, the information cited in paragraphs 19-1.4.2.d.(1) through (6) of this chapter. (1) Completed Spot-Check a nd Monitored MRC results. (2) Completed WC audits and results. (3) The number of FBRs over 7 days old th at have not been reviewed by the CoC. (4) Abatement and corrective actions comp leted because of a monitoring program finding. (5) IEM Details Summary Report. (6) Overdue (Alerting) MRCs a nd plan of corrective action. f. Change Service Accountability Log. The Change Service Accountability Log (CSAL), Figure 19-1-1 of this chapter, provides a definitive record of all changes to a command’s 3-M program. Whenever a change to a command’s 3-M program is directed, be it from an FR, FBR, TYCOM direction, etc., the change will be routed to

p. 269

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-26 the concerned WCS via a memorandum. Whenever such a memorandum is issued, it must be recorded in the CSAL. Once the WCS reports the directed change has been completed, the 3MC will file the WCS’s response and annotate in the CSAL that the action is complete. (1) The CSAL is comprised of the actual l og sheet, a copy of all memos routed to the WCS and the memo from the WCS to the 3MC indicating completion. (2) The importance of the CSAL cannot be overstated. Basically, it provides for a day-to-day, year-to-year record of changes to a command’s planned maintenance program. It is also a turnover document at deployment sites, allowing a current command to quickly identify all changes from a previous command. Finally, it will be inspected during all command 3-M assessments and inspections, providing visibility as to how well a command manages 3-M from one inspection to another.

p. 270

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-27

Figure 19-1-1 - Change Service Accountability Log FR Change Number or Authority Date RCVD Cognizant Dept. or WC Date Cover Sheet Issued Date Cover Sheet Returned Date Master File Updated or Item Closed Summary of Change

g. 3-M Training Team. The 3-MTT is formed to enhance and maintain a peak level of PMS and MDS performance by providing focused training and evaluation of the ship’s 3-M program. (1) The 3-MTT will be a minimum of 30 members led by the XO with the 3MO and 3MC(s) serving as primary assistants. Team membership will be comprised of officers, CPOs, and D3MAs. The 3-MTT will have representation from all departments but should be proportionally represented by the four major departments which are identified as Reactor, Engineering, Combat Systems and Air. (2) Each week, one third of the 3-M TT will conduct maintenance person spot checks, one third of the 3-MTT will conduct spot check the spot checker and one third will complete administrative 3-M duties as assigned by 3MC.

p. 271

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-28 (3) The OMMS-NG and P-OMMS FASs will provide evaluation and training for all matters related to MDS to the 3-MTT. (4) 3-MTT members must be 3-M (304 ) DIVO PQS qualified, E-7 or above and have extensive experience in administering and monitoring the 3-M program. All 3-MTT members will be designated in writing and the 3MO will maintain designation letters. (5) 3-MTT objectives: (a) Elevate level of PMS and MD S performance and sustain PMS and MDS proficiency through self-critical evaluation and deck-plate involvement. (b) Monitor spot-check performance and provide feedback to spot- checkers and maintenance personnel. (c) Provide data to support establishment and tracking of trend data by the 3-M Office. (d) Ensure compliance with CSMP re quirements and the standards set forth in this manual. (e) Ensure personnel have sufficient knowledge of maintenance software to perform assigned duties. 19-1.4.3 PMS Functional Operations. a. PMS Documentation Verification. The WCS will ensure that all WC MIPs and MRCs are verified against installed equipment. The WCS’s signature on the Records of Changes Page indicates review of the LOEP, MIPs and MRCs has been completed. Any line-out of an MRC or a MIP requires the scheduling aid, approved FBR response, Document Information Transmittals, ACN number or split MIP annotation to be recorded with the line-out. b. Date Format. All PMS recording docu ments (i.e., 13-Week Accountability Log, Carbon Dioxide (CO2) or Aqueous Film Forming Foam record sheets, electrical safety checks, battery service life) must utilize the following format for recording dates: DD, MMM, YYYY (i.e., 11 OCT 2020). This will ensure correct interpretation of dates. c. Tag Out. Reference (f) will be the sole source for tag-out procedural guidance. Commands will not generate local instructions. All personnel must strictly adhere to reference (f) procedures and those called out in this manual. Electronic tag-out is currently installed on all carriers relieving the administrative burden of tag-outs; therefore, laminated PMS danger tags are not authorized for use. Commands may generate local guidance to define qualifications and designate administrative responsibilities. (1) Tag-Out Logs. The following depart ments are authorized to maintain a Department Tag-Out Log as identified in Figure 19-1-2 in the location specified:

p. 272

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-29 Figure 19-1-2 - Tag-Out Logs Department Space Prefix Code Air V-2 Office or V-4 Office AIR Combat Systems CS Maintenance Office CS Engineering Damage Control Central ENG Weapons Weapons Elevator Shop WEP Reactor 1 and 2 EOS 1R eactor or 2Reactor

(2) Tag-Out Use. Figure 19-1-3 is a breakdown of departments indicating which Tag-Out Logs to be used: Figure 19-1-3 - Tag-Out Log Usage Department Tag-Out Log Air Air Combat Systems, Navigation, Operations, Embarked Staff Combat Systems Engineering, DCPOs, Aircraft Intermediate Maintenance Department (Advanced Industrial Management Department), Supply, Admin, Dental, Medical, Deck, Training, Command Religious Ministries Department, Legal, Media and all others not listed. Engineering Weapons Weapons Reactor, In-Plant DCPO Reactor

p. 273

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-30

19-1.4.4 Related Maintenance. Related maintenance, so designated by the In Service Engineering Activity (ISEA) or Technical Warrant Holder, is determined from the MIP. The ”RELATED MAINT” column of the MIP reflects related maintenance requirements. Related requirements are positioned on the MIP to line up directly across from the MRC to which they are related. Related maintenance requirements are also identified in the TPMTE section of the MRC under “MISCELLANEOUS”. NOTE: MANDATORY RELATED REQUIREMENTS MUST BE LINKED IN SKED TO BE AUTOMATICALLY SCHEDULED. a. Related Maintenance Categories. (1) Mandatory Related. Mandatory relate d maintenance requirements are those maintenance actions that must be accomplished concurrently with another maintenance requirement. The mandatory relationship is indicated with the use of the # sign. If the mandatory related maintenance resides on the same MIP, it will be reflected in the RELATED MAINT column as “periodicity#” (e.g., M-3#). If the related maintenance resides on another MIP, it will be reflected as “MIP:periodicity#” (e.g., IC-013/033:M-4#). Mandatory related maintenance requirements are automatically scheduled by SKED. (2) Convenience Related. Convenience related maintenance requirements are those maintenance actions that can be accomplished concurrently with another maintenance requirement to save time (preliminary steps and tag-outs already accomplished) or for work force considerations. If the convenience related maintenance resides on the same MIP, it will be reflected in the RELATED MAINT column as “Periodicity” (e.g., M-5). If the related maintenance resides on another MIP, it will be reflected as “MIP:periodicity” (e.g., EL- 010/001:M-4)). In both cases, the # symbol is omitted. The WCS manually schedules convenience related requirements. (3) Conditional Related. Conditional related maintenance requirements are those maintenance actions that are performed when specific conditions are present or specified parameters are not met on the referencing MRC. Conditional related maintenance will appear on the MIP in the same manner as convenience related maintenance. The WCS manually schedules conditional related requirements. (4) None. No related maintenance is reflected as “None” in the RELATED MAINT column. b. Work Center Supervisors Actions. WCSs are encouraged to review their schedules on a regular basis for opportunities to perform other PMS when an equipment or system has maintenance actions scheduled. Rescheduling of PMS to take advantage of other system maintenance if convenience related is highly recommended. (1) If an MRC has related maintenance fr om another MIP, review the related MIP and MRC and determine if it requires assistance from another WC.

p. 274

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-31 (2) If the related MIP and MRC does not require assistance from another WC and is not on the lead WC LOEP, submit an FBR to have it added to the LOEP. (3) If the related MIP and MRC requires assistance or completion by another WC and is mandatory, convenience or conditional related then it should also be on the lead WC LOEP. If it is not on the lead WC LOEP, submit an FBR to have it added to the LOEP. If the related MRC requires technical assistance, a special NEC, or another rating that is not part of the lead WC, then the person with the technical training, special NEC or required rating should be temporarily added to the lead WC “Crew List” and assigned the related maintenance in either an assist or performance role. All WCSs involved will collaboratively plan the required maintenance and may adjust schedules based upon individual workload. When the maintenance is completed, the lead WCS will mark the MRC as completed. 19-1.4.5 Inactive Equipment Maintenance. a. Inactive Equipment. A piece of equipm ent or system intentionally placed in a hibernated state for a specific period with the intention of reactivating that equipment or system at the end of that period. (1) Status I. Equipment that will: (a) Remain onboard. (b) Is not scheduled for corrective maintenance or overhaul. (c) Will be inactive during extended shutdown periods and maintenance availabilities as determined by the DH. (2) Status II. Equipment that is inactive and: (a) Subject to corrective maintenan ce, overhaul, or removal for safe storage. (b) Temporarily transferred to another activity for maintenance responsibility for extended shutdown periods as determined by the DH. (c) When system(s) components are scheduled for replacement. b. Implementation and Responsibility. Wh ile inactive, minimum maintenance is performed to ensure the success of the reactivation. The IEM section of the MIP will cover this maintenance. However, consideration should also be given to active PMS maintenance checks (e.g., M-1, Q-1, A-1) that can be manually added and performed during this period of inactivity. (1) The ship will develop an IEM pl an for all inactive equipment during availabilities lasting 21 days or longer. The plan will include reason for inactivation, duration, impact to division maintenance schedule and reflect integration with the Lead Maintenance Activity work schedule and operational recovery. DH approval of this plan will be documented in the SKED IEM remarks.

p. 275

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-32 (2) Carriers in availabilities will negotia te operational control requirements with the maintenance activity at the arrival conference, to define responsibility for IEM. IEM periodic maintenance requirements (PM-1, PM-2, PM-3) and any applicable active PMS maintenance checks (M-1, Q-1, S-1) must be added manually at the appropriate frequency. (3) To implement procedures for the accomplishment of PMS for equipment declared in an inactive status, current PMS schedules are modified to annotate the requirements listed in the IEM section of the MIP. For advance planning and scheduling of maintenance to take place, it is necessary to determine and identify the extent to which unit or Ship’s Force personnel will conduct PMS during an inactive period. MIPs in each WC will be reviewed to determine if equipment has IEM coverage (e.g., Lay-up (LU), Periodic Maintenance (PM), Start-up (SU) and Operational Test, if the coverage is adequate, and what procedures to follow if there is no IEM coverage on the MIP or provided coverage appears inadequate. The DH is responsible for determining equipment IEM status. When placing a system or equipment in IEM status, the DH will also determine the IEM start date to be reflected in SKED. The IEM end date will not be applied in SKED until the system or equipment is ready to be brought out of IEM status. All periodic PMS that would have been scheduled during the IEM period should be reviewed for applicability, with applicable maintenance accomplished prior to operating equipment. (4) IEM procedures are listed on MIPs and separated from operational PMS by a horizontal line. The IEM section is titled “Inactive Equipment Maintenance” and is prefaced by the following statement: “The following requirements will be scheduled when equipment is inactivated for periods of prolonged idleness.” When there are no IEM requirements the words “None required” will appear under the IEM section of the MIP. When IEM procedures are inadequate, submit an FBR. The unit or ship should consider all factors that affect equipment deterioration and take necessary precautionary measures. These factors include environmental conditions, equipment location, susceptibility to damage or other factors that cannot be anticipated when IEM procedures were originally developed by the cognizant ISEA or design activity. (5) The lack of IEM requirements on a MI P does not prohibit placing that system or equipment into an inactive state. Additionally, certain locations require precautions and maintenance not required force-wide. The unit or ship should consider all factors that affect equipment deterioration and take necessary precautionary measures. The WCS or LCPO is responsible for identifying factors that are inadequate and may require additional preparation and maintenance of the inactive equipment while reporting same to the DH for approval. Factors may include environmental conditions, equipment location or susceptibility to damage. For those actions that are recurring in nature, the WCS should submit an FBR for possible MRC development.

p. 276

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-33 c. IEM Scheduling. SKED provides the capability to perform IEM scheduling. (1) Status I. The scheduling of main tenance for Status I inactive equipment utilizes conventional PMS scheduling techniques. LU checks will automatically be added to the schedule at the beginning of IEM by SKED. PM checks will be manually added to the schedule by the WCS for the period of IEM following the guidelines of the MIP. At the conclusion of IEM, SU checks and routine PMS will automatically be added to the schedule by SKED. SU checks must be accomplished the week IEM ends. All periodic checks added at the end of IEM, can be moved to the right, not to exceed the allowable date range. Since the MRC date range cannot be applied to the left (into the IEM period), the MRC date range can only be moved to the right and therefore only the plus value of the specific range, i.e., the date range for a monthly is 21-41 days. The requirement can only be moved (scheduled) 10 days to the right and will not go into “alert” until after the 10th day. This allows the MP or WCS scheduling flexibility within the plus side of the date range of the MRC. (2) Status II. The scheduling of main tenance for Status II inactive equipment utilizes conventional PMS scheduling techniques, however, not all scheduled IEM PMS may need to be accomplished by the unit or Ship’s Force. LU checks will automatically be added to the schedule at the beginning of IEM by SKED and may be marked “N/A” if the LU check did not support the equipment being removed from the ship or unit or “Accomplished by Higher Authority” symbol if completed by the intermediate or depot level maintenance activity. PM checks may be required to be schedule during the IEM period. At the conclusion of IEM, SU checks and routine PMS will automatically be added to the schedule by SKED. SU checks must be accomplished the week IEM ends and may be marked with the “Accomplished by Higher Authority” symbol if they were completed by the Intermediate or depot level maintenance activity. Routine PMS added at the end of IEM may also be marked with the “Accomplished by Higher Authority” symbol if they were completed by the intermediate or depot level maintenance activity. All periodic checks added at the end of IEM, can be moved to the right, not to exceed the allowable date range. Since the MRC date range cannot be applied to the left (into the IEM period), the MRC date range can only be moved to the right and therefore only the plus value of the specific range, i.e., the date range for a monthly is 21-41 days. The requirement can only be moved (scheduled) 10 days to the right and will not go into “alert” until after the 10th day. This allows the MP or WCS scheduling flexibility within the plus side of the date range of the MRC. NOTE: WHERE THE GOAL OF 100% ACCOMPLISHMENT CANNOT BE REACHED, THE UNIT’S COC MUST BE KEPT INFORMED OF THE

p. 277

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-34 CIRCUMSTANCES THAT PREVENT ACCOMPLISHMENT OF SCHEDULED MAINTENANCE. 19-1.4.6 Scheduling. PMS is a portion of the command’s 3-M program that provides, in one authoritative system, the scheduling information and technical procedures governing planned maintenance. PMS provides a simple method for scheduling and documenting the execution of planned maintenance procedures. Fleet policy is listed in paragraph 19A.2 with the scope identified in paragraph 19A.3 of this chapter. a. Situational maintenance scheduling will be managed utilizing the tools provided by the computer based PMS scheduling software employed by the activity. All event driven situational requirements will be “triggered” when required and performed per reference (a). b. The creation and use of generic crew me mbers such as “Engineering Laboratory Technicians” is not authorized. For those instances where the watch-stander performs the MRC, the senior watch-stander’s name will be indicated in SKED. c. The MP will be assigned prior to co mmencing the week and must complete the maintenance as directed. If a different person is required, the WCS will reassign the PMS accordingly. d. Check Notes are required in SKED under the following circumstances. (1) When PMS is marked as “lost”. (2) When PMS is marked as not applicable. (3) When PMS is marked with the ‘¢ ’ symbol, “satisfied by Higher Level Maintenance.” (4) When PMS requires a tag-out, the tag-out program of record identifier will be entered. e. Alert Notes will be in th e format of paragraph 19-1.4.10. f. After the FR is approved, the 3MC will conduct quarter archival to maintain one completed quarter, one current quarter, and at least two future quarters. This permits the ability to review past records and forecasting of upcoming maintenance actions. 19-1.4.7 SKED. The use of SKED version 3.2 or subsequent versions for PMS Scheduling constitutes full compliance with all administrative provisions of the 3-M Manual. a. Guidance for use of SKED is provided vi a the SKED users guide with help menus, and wizards associated with SKED functionality. b. The Navy PMS DVD or CD-ROM is used to update the command or unit’s SKED PMS data. c. The SKED program uses days to schedule and keep track of calendar periodicities. MRCs are displayed as out of periodicity when they fall outside the established date ranges in the SKED program. These date ranges are as reflected in Table 19-1-2: d. Appendix D provides SKED 3.2 User Se ttings, Global Preferences and UIC Preferences.

p. 278

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-35 Table 19-1-2 - SKED Periodicity – Date Ranges Periodicity Date Range Daily None 2D None 3D None Weekly None 2W 9 - 19 days 3W 14 - 28 days Monthly 21 - 41 days 2M 41 - 83 days Quarterly 61 - 121 days 4M 83 - 165 days Semi-Annually 121 - 243 days 8M 165 - 331 days 9M + or - 90 days from scheduled date Annual + or - 90 days from scheduled date Multi-month after annual + or - 90 days from scheduled date

19-1.4.8 SKED Server Failure. In the event of a SKED server failure, operation of PMS performance and tracking is as follows: a. Retrieve most recent Maintenance Outlook Report. b. The WCS or LCPO will maintain the a ssignment of PMS with the Maintenance Outlook Report until server is restored. c. Document and retain accomplished main tenance on printed blank 13-Week Reports that are in the documents folder on the FR DVD. d. When the server is restored, update SKED based on accomplished maintenance documented on 13-Week Reports. 19-1.4.9 Accomplishing PMS. Maintenance personnel use MRCs to accomplish assigned planned maintenance as described in subparagraphs 19-1.4.9.a through 19-1.4.9.h of this chapter. a. From SKED “My Task” view , review the 13-Week Report. b. Determine maintenance tasks assigned. c. Determine when the maintenance task(s) are due. d. Determine what tools, parts, material, te st equipment or supplies are needed. For MRCs that contain inspections and then maintenance actions based upon the

p. 279

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-36 inspection findings, the TPMTE needed to perform the follow-on maintenance caused by the inspection findings does not need to be obtained prior to performing the MRC but rather, may be obtained as needed. e. Perform the maintenance on schedule. f. Notify the WCS immediately whenever one or more of the following conditions exist: (1) Anything on an MRC is not fully understood, appears to be incorrect or cannot be accomplished as written. (2) TPMTE prescribed by the MRC is not av ailable, is not correct or questions about substitutions arise. (3) Any doubt exists about your capabilit y, training, or experience to properly perform the maintenance requirement as prescribed. (4) Factors exist which would make perf ormance of the maintenance requirement unwise or dangerous (e.g., disassembly of equipment needed for operations, radiation when prohibited, situations causing safety hazard to exist, etc.). (5) Equipment deficiencies or casualties are discovered. (6) Any provisions or requirements on the MRC cannot be accomplished as prescribed. See paragraph 19-1.4.1 of this chapter for clarification. g. If an MRC can be completed step by step as written, then the maintenance action can be signed off as completed. Report completed planned maintenance actions to the WCS, update the PMS schedule to reflect the completed maintenance, annotate and sign the 13-Week Report (if used). If multiple maintenance personnel are assigned to a single maintenance action, the most senior person assigned must update the PMS schedule, annotate, and sign the 13-Week Report or Check Note if using SKED 3.2 electronic accountability. h. If inspection criteria or a threshold insp ected by the MRC does not meet the intended criteria, then those maintenance actions cannot be signed off as completed until the discrepancies are corrected. The only allowable maintenance actions that can be signed off as complete are those discrepancies where the PMS documents (MRC or MIP) have an actual statement that directs a CSMP, Material Condition Assessment Process (MCAP), or Equipment Deficiency Log (EDL) entry to be made if there are discrepancies. The statement to inform the WCS of discrepancies, by itself, is not sufficient to sign the maintenance action as complete when discrepancies exist. Maintenance actions not fully completed will be reported to the WCS. However, if material deficiencies or casualties, which are unrelated to that MR, are discovered, the MR can be checked off (provided the MR was fully completed) but the discrepancy must be reported via MDS. 19-1.4.10 Non-Accomplished PMS Categories. The WCS or LCPO will add a brief description for each Alert Note for non-accomplished categories using subparagraphs 19-1.4.10.a through 19-1.4.10.g of this chapter.

p. 280

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-37 a. System or Equipment Failure. System or equipment is not operational or in a reduced operational status thus preventing maintenance from being accomplished. CSMP Job Sequence Number (JSN) required in additional text description. b. Inadequate Maintenance Procedures. MRC procedure or steps cannot be accomplished to a point where the maintenance can be considered accomplished. FBR number required in additional text description. c. Ship Operational Requirements. Operat ions prevent the maintenance from being accomplished. Requires additional text description. d. System or Equipment Operational Require ments. Required operation of system or equipment prevents maintenance from being accomplished. Requires additional text description. e. Lack of Hazardous Material. Corre ct HAZMAT not available at the time maintenance was to be performed. CSMP JSN required in additional text description. f. Missing or Incorrect TPMTE. Correct or calibrated TPMTE was not available at the time maintenance was to be performed. CSMP JSN required in additional text description. g. Other. Requires additi onal text description. 19-1.4.11 Accountability. The credibility of the Navy PMS program relies heavily on the individual accomplishing the maintenance. The required dedication and integrity of that individual cannot be overstressed. a. To maintain accountability, personnel ar e required to sign for the completion of assigned maintenance in an Accountability Log if used. The WCS is required to review and sign the Accountability Log weekly to verify the accuracy and completeness of entries. Accountability sheets will be maintained in the WC PMS File for a period of not less than 13 weeks. b. Electronic accountability will be utili zed by ships employing SKED 3.2. When an individual updates the disposition of a check, this is the same as signing and dating a check completion on a 13-Week Accountability Sheet. The disposition of a check will become permanent when the weekly closeout is performed. All PMS maintenance assigned to a MP is presented to them immediately upon SKED 3.2 log- on; and CoC review can be tracked on the Weekly Closeout Signature Sheet. Therefore, there is no need to print and sign the 13-Week Accountability Form. 19-1.4.12 Force Revision Implementation. In addition to the requirements of reference (a), the following steps ensure the most efficient and thorough implementation of an FR: a. MRC deletions on MIPs will be marked to indicate the reason for deletion: (1) Scheduling Aids (SA). Indicate ap plicable scheduling aid “(e.g., SA-.”). (2) Split MIP. Indicate responsible WC (e.g., “EA01”) if the MRC is applicable to the ship, the responsible WC designation will be used versus a scheduling aid.

p. 281

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-38 (3) “Other” includes approved responses to FBRs, ACNs (e.g., “NSWC ltr Ser 4790.005.”), Message Date Time Group (e.g., “NUWC R124535Z AUG 05.”), dual periodicity. Indicate guiding notation for deletion such as “SA-1” or “Note 1”, configuration change number. b. The FR will be completed on or before th e first Monday of the new calendar quarter. When operational schedules do not provide adequate time to implement the revision prior to the start of the quarter, the XO may direct an alternate implementation date. This deferred FR will be reported to the TYCOM. If two or more FRs were not available while the unit was deployed, only the most recent FR will be installed and implemented. c. It is advisable to complete the FR process through DH approval before conducting quarterly audits by a chief or more senior. d. The 3MC will: (1) Update PMS and TFR data into SKED prior to routing the change documentation to WCs. (2) Route the FR to WCS for implemen tation. See Figure 19-1-4 and Figure 19- 1-5 of this chapter for an example of a routing memorandum and an FR implementation checklist) (3) Delete SKED FBRs after reflection within the FR. e. The WCS, upon receipt of the ch ange document from the 3MC, will: (1) Make the appropriate entr y in the WC of Change Log. (2) Make appropriate LOEP, MIP, MRC, etc. changes to the WC PMS File. (3) Apply changes to the WC PMS sche dule utilizing SKED Revision Editor. (4) Route revision changes to division LCPO for review and concurrence. f. The division LCPO will: (1) Verify that all PMS changes have be en properly applied to the WC schedule utilizing SKED Revision Editor. (2) Review line outs on LOEPs, MIPs and MRCs. Initial all such line-outs to indicate concurrence. (3) Submit PMS schedule to the DIVO for review and concurrence. g. The DIVO will: (1) Verify that all PMS changes have be en properly applied to the WC schedule utilizing SKED Revision Editor. (2) Submit PMS schedule to DH for review and approval. h. The DH will: (1) Verify that all PMS changes have be en properly applied to the WC schedule utilizing SKED Revision Editor.

p. 282

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-39 (2) Review and approve WC PMS Schedules. i. The WCS makes final entries in the WC Record of Change Log, completes the PMS Change Documentation Routing Memorandum, and returns it to the 3MC. j. The 3MC updates the CSAL and notifies the XO that the FR has been installed after receiving all FR PMS Change Documentation Routing Memorandums from the WCs.

Figure 19-1-4 - Force Revision Routing Memorandum MEMORANDUM From: 3-M Coordinator To: __________ Work Center Supervisor Subj: FORCE REVISION PACKAGE X-XX Encl: (1) Force Revision Implementation Checklist (2) List of Effective Pages (LOEP) 1. Force Revision Serial: X-XX has arrived from NSLC. 2. The SKED Force Revision (FR) update is complete. Begin your work center FR implementation using enclosures (1) and (2); complete through your Department Head no later than (Day Month Year). 3. Corrections, including those to LOEP, MIP and MRC, should be made immediately. Make certain ACNs and FBR responses are reflected in the FR. If not, maintain the copies and changes to your MIP(s) and MRC(s) until reflected in a subsequent FR. 4. MRCs with procedural line-outs previously approved by the LCPO must again be reviewed by the LCPO to confirm they continue to meet the requirements of the JFMM Volume VI, Chapter 19. Specifically, in the procedure block, Work Center Supervisors may line-out the non-applicable line items or alternate procedures that do not pertain to current equipment or configuration when the step includes the words “if applicable” or a note identifies steps to be omitted. These items must be reviewed and approved by the division LCPO. As these changes are work center and maintenance item specific, submission of an FBR is not required.

R/

3MC

p. 283

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-40 Figure 19-1-5 - Force Revision Implementation Checklist MEMORANDUM From Work Center Supervisor To: 3-M Coordinator Subj: FORCE REVISION IMPLEMENTATION CHECKLIST COMPLETION 1. The following actions have been accomplished in SKED to implement Force Revision X-XX. Task Description Initial Verified all equipment is listed under each MIP. Verified new or changed MRCs (green or yellow) are added to the correct Maintenance Item (equipment).

Verified all applicable MRCs for each piece of equipment are active. Verified all MRC’s have associated “Related Maintenance” attached. Verified that Safety of Ship is toggled to “YES” if applicable. Verified that all MIP lineout’s have a technical reason documented for deletion. (Select the “Pencil” Icon on top row)

Verify Maintenance Item Serials & Locations are correct. Upon completion of implementation Marked Complete for digital approval by: LCPO, Division Officer and Department Head. LCPO DIVO DH 2. After DH approval: LCPO run SKED report PMS Documents and Customized MRCs – Line-outs. Verify each procedural lineout meets the requirements of paragraph 19-1.4.13.k of this manual.

WCS create an excel spread sheet from the Maintenance Outlook Report as a minimum electronic backup forecasting as many quarters in advance as available and store it on your hard drive (not a LAN drive) in the event of the LAN crashing.

WCS select “Work Center” from the upper menu and “Update Unassigned Slots.” Initially, any MRC without ownership will be assigned to the WCS. Reassignment by the WCS or LCPO will follow.

3. Printing requirements for MRCs are determined by individual command policy. Printed MRCs must come from “PMS Documents” (not PMS Viewer). 4. The only required documents in the WC PMS File are: a. Classified MRCs. b. MRCs required by the command. c. MRCs with pen & ink changes authorized by ACNs or answered FBRs. 5. Approval Signatures: Position Signature LCPO DIVO DH 3MC

p. 284

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-41 19-1.4.13 Planned Maintenance System Feedback Reports. PMS FBRs are used to identify problems with PMS documentation or to request the addition or deletion of PMS coverage. Issues with the periodicity, rates, man-hours, TPMTE and procedure may all be reported via an FBR. An FBR is also used to request copies of classified MRCs, request the addition or deletion of an MRC to or from a MIP, splitting a MIP between WCs, shifting of maintenance responsibility or to request PMS coverage for newly installed systems or equipment. Paragraphs 19-1.4.13.a through 19-1.4.13.j of this chapter provide amplifying information dealing with the issues that may prompt the submission of an FBR. a. Periodicity. An FBR can be used to reque st the increase or decrease in the frequency of a maintenance action, i.e., an MRC. However, the originator needs to keep in mind that the ship or unit has the prerogative to increase the frequency because of harsh weather, unusual operating conditions or corrective maintenance and associated testing requirements. A 726 Class submarine submitted an FBR requesting the frequency of cleaning a specific electronics cabinet filter be increased from quarterly to monthly. Research revealed this MRC was applicable to all 726 Class units and no other ship had submitted a similar request. In fact, two other units had requested the frequency be decreased to semi-annual. It was determined that the submitting unit was in an extended upkeep period and increased foot traffic by shipyard personnel near the electronic cabinet was the most likely cause of the filter becoming clogged. The ship was authorized to increase the frequency to support the extended upkeep period and the periodicity of the MRC was not changed. b. Rates. The Rates block on the MRC repr esents the developer’s recommendation of the skill level (rate and rank) best suited to accomplish the maintenance action. The key word is recommendation. Qualified personnel other than the rate and ranking specified may be assigned. When an NEC is assigned or DCPO or Safety Petty Officer (SPO), substitution of other personnel is not allowed other than those exceptions as noted in reference (a). An FBR requesting the rate on an MRC be changed from an ET2 to an FT2 will probably not pass TYCOM screening, yet an FBR requesting the addition or deletion of personnel will generally pass to the cognizant technical activity for review. c. Man-hours. The MRC reflects the average time per equipment, per person. It does not reflect or account for gathering and putting away tools, tag-outs or time removing and replacing interferences. From a maintainer’s perspective, this is not an accurate representation of the time required to accomplish the maintenance action. The Future of PMS initiative will attempt to do a better job of accounting for this additional time but until then, FBRs should be submitted only when the allotted time per equipment is significantly out of synch with the actual time required. For example, an MRC calls out 0.5 man-hours per equipment, but it takes 1.0 man-hours. d. Tools, Parts, Material and Test Equipm ent. TPMTE FBRs should be submitted when the procedure calls for an item not listed in the TPMTE block or when the TPMTE block lists an item not called out in the procedure. Updating the MRC to reflect common hand tools, administrative or office supplies and basic housekeeping items is addressed in paragraph 19-1.4.13.k.(1) of this chapter.

p. 285

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-42 e. Procedure. Procedures are written at a level of detail based on the assumption maintenance personnel are trained, qualified, and supervised by experienced leadership to execute the maintenance consistently and expertly. MRCs exist to provide standardized proven procedures, specify consistent acceptance criteria and to communicate warnings and cautions relative to the specific maintenance action. They are not intended to specify every possible action of the maintainer. There may be instances where an obvious typographical error exists on the MRC (example: Turn switch to ON; however, switch may already be ON and the intent of the step is to turn unit off, the card should read Turn switch to OFF). This type of error should not prevent the scheduling or performance of maintenance. However, in this situation, the accomplishment of the MRC is not possible until the WCS reviews the error and concurs that it is safe to proceed. A temporary notation including the reason for the correction must be made on the MRC, initialed by the WCS and an FBR submitted. Extreme caution will be taken when reviewing MRCs for this type of error. Errors must be obvious typographical errors and a PMS FBR must be submitted immediately upon discovered. Do not permanently alter the MRC until authorized by the applicable Systems Command, ISEA or NSLC Detachment. If a step is missing that is necessary to complete the task, and that step is not obvious to the MP, submit an FBR to have it added. An FBR submitted to request procedural changes should include the originators contact information and supporting rationale or justification. If, however, a step is missing that is clearly obvious (a ladder was used to install a fixture, but steps were not provided to put the ladder back in stowage) an FBR only serves to overload a process that should be focused on more technical issues. f. Duplicate MRCs. Unclassified MIPs a nd MRCs are now available from the DVD. Copies of classified MRCs still require an FBR request due to handling requirements. g. Addition or Deletion of an MRC. During the life cycle of a system, equipment, or component it may become necessary to add a maintenance action to prevent an age- related functional failure or to delete a maintenance action due to inherent reliability not foreseen during maintenance development. An FBR submitted to request the addition or deletion of an MRC should include the originator’s contact information and supporting rationale or justification. h. Newly Installed or Removed Equipment. While an FBR request for PMS coverage will provide initial maintenance coverage or deletion of a MIP because of equipment removal, submission of an OPNAV 4790/CK is still required to initiate the rest of the logistic support change process. This point cannot be overstressed; the submission of the FBR does not relieve the ship or unit from initiating a CK. The CK initiates supply support, CDMD-OA changes, ship selected record drawing updates and class maintenance plan updates. i. Splitting a MIP. There are instances in which a MIP includes MRCs for more than one WC to perform. When this occurs, a decision is required by the command as to whether the MIP will be split or will be scheduled singly by one WC. Only the XO can authorize the splitting of a MIP if an MRC requires another WC to perform the entire maintenance action. If the decision is made not to split the MIP, then the MRs will be accomplished through the coordination of WCSs.

p. 286

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-43 (1) If the MIP is split, the following procedures apply: (a) Submit to the XO a non-technical PMS FBR requesting approval to split the maintenance responsibility. (b) Upon receipt of the XO’s concurrence, the 3MC will make an annotation in the remarks block of the FBR stating, “XO concurs with splitting MIP maintenance responsibility”. (2) Upon receipt of the FBR approval: (a) Utilizing the SKED Revision Edito r, delete the MRC from the MIP and show the reason for deletion as the designation of the WC assuming responsibility (e.g., EE01). (b) If the WC assuming responsibil ity does not reflect the MIP and maintenance items, utilize the SKED Revision Editor to add them. Schedule only the MRC(s) that pertain to the WC. Reflect remaining as deleted with the reason for deletion the designation of the parent (lead) WC (e.g., EA01). (3) If the situation occurs where a WC removes a split MIP, the following procedures apply: (a) Submit an XO approved, non-technical PMS FBR reporting the decision to remove the split maintenance responsibility. Upon receipt of the XO’s concurrence, the 3MC will make an annotation in the remarks block of the FBR “XO concurs with removing split MIP maintenance responsibility”. (b) Upon receipt of FBR approval, utilize the SKED Revision Editor, remove the MIP, MRC(s) and maintenance item(s) from the WC no longer involved. Ensure that the lead WC assumes full responsibility for the MIP and MRC(s) and annotates their schedules accordingly. j. Shift of Maintenance Responsibility. Individual ships sometimes consider it necessary to shift maintenance responsibility from one WC to another, to combine two or more existing WCs or to split an existing WC. These requests for changes of PMS maintenance responsibility require XO concurrence and may require final approval by the applicable TYCOM. Due to the considerable administrative burden, requests for this type of change should not be submitted to accommodate a temporary situation such as short-term assignment of two (2) WCs to one supervisor. (1) The following factors should be carefully considered before submitting such requests: (a) Composition of WCs by size and ratings. (b) Scope of maintena nce responsibilities. (c) WC workload. (d) Ease of administration of a WC as a cohesive maintenance group.

p. 287

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-44 (e) Importance of WC Grouping to equipment maintenance responsibilities, PMS scheduling, MDS reporting, and CSMP listings. (2) When changes in maintenance respon sibility are considered necessary, the following procedures apply: (a) Submit a PMS FBR (non-technical) . Indicate from which WC(s) equipment is to be deleted and to which it is to be transferred. Upon receipt of the XO’s concurrence, the 3MC will make an annotation in the remarks block of the FBR “XO concurs with the shift of maintenance responsibility.” (b) WC or equipment changes will also be reported in the OMMS-NG system via a configuration change request (4790/CK) through the CSMP up-line reporting process. (3) Upon receipt of the FBR approval, perform the following actions: (a) The PMS Master File is updated to reflect deletion of the MIP from one WC and addition to the WC receiving the responsibility. The originating FBR serial number is annotated on the affected line item on the LOEP for both WCs. The PMS Master File must contain a record of deleted equipment until the change is reflected in a future FR. (b) Utilizing the SKED Revision Editor, load the affected MIP(s) and MRC(s) to the WC receiving maintenance responsibility. Delete the MIP(s) and MRC(s) from WC shifting responsibility. (c) Utilizing SKED, perform a revisi on to move the equipment from the original WC’s current schedule to the WC receiving the maintenance responsibility. Data is exported from one and imported to the other maintaining equipment history. k. MRC Changes Not Requiring Feedback Reports. The only MRC modifications shipboard or unit personnel may make without submitting a PMS feedback report are as listed in subparagraphs 19-1.4.13.k.(1) and (2) of this chapter. (1) TPMTE Block. (a) Common hand tools, administra tive or office supplies and basic housekeeping items may be substituted or added by the WCS. The WCS may add notes to the MRC to reflect these substitutions. In the case where specific common tools are called out by description, substitutions are not authorized. For example, substitutions such as using synthetic fiber brushes in place of animal hairbrushes or rags and paper towels in place of lint free cloths are not allowed. (b) Approved parts, materials and miscellaneous item substituted from the supply system, technical manual, or Military Specification, etc., which meet or exceed the requirements may be used. Ensure that substitutions satisfy both the basic maintenance and safety

p. 288

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-45 requirements of the MRC. If there is any doubt, a PMS FBR should be submitted specifying substitution desired and reason. (c) Test equipment or certified tools, which meet or exceed the Sub- Category code requirement, may be used. (d) When an MRC pertains to multiple configurations of equipment and the TPMTE block contains tools, parts, test equipment and materials for each unique configuration, the TPMTE block may be tailored for the unit’s specific configuration by lining out the items that do not pertain to equipment held. (e) Exception to TPMTE block change: If an item listed in the TPMTE block is not called for in the procedures block, submit an FBR explaining the circumstances. Conversely, if a tool, piece of test equipment, part or material is called for in the procedure block and is not listed in the TPMTE block an FBR should be submitted. (2) In the procedure block, WCSs may lin e-out the non-applicable line items or alternate procedures that do not pertain to current equipment or configuration when the step includes the words “if applicable” or a note identifies steps to be omitted. These items must be reviewed and approved by the division LCPO. As these changes are WC and maintenance item specific, submission of an FBR is not required. If a step or steps in the procedure block have been lined out and tools, parts, material, and test equipment in the TPMTE block pertain only to that step or steps, then they will be lined out as well with a reference to the step or steps lined out and approved by the division LCPO. Warnings, cautions, and notes associated with the lined out step or steps will also be lined out. l. Types of Feedback Reports. There are two types of FBRs, Technical and Non- Technical. (1) Technical. These FBRs are used to report technical discrepancies inhibiting PMS performance. Technical feedbacks, normally adjudicated by an ISEA responsible for the system or equipment covered by the PMS documentation, require all the supporting information the originator can provide. The originator should identify the issue, providing as much supporting technical information (APL, Reparable Identity Code, drawing or Hierarchical Structure Code (HSC)) as available and a proposed response or solution if known. Most importantly, provide Point Of Contact information, including name and phone number, so that the ISEA can contact the originator should they have questions. Bottom line, the FBR must be accurate and complete to “stand alone”, that is, the FBR will be understood without additional explanation. The better the FBR describes the problem, the more likely the originator will receive a timely response. There are two sub-categories of technical FBRs: (a) Routine. An FBR will be consid ered routine when it relates to the technical requirements of PMS. It is used to report technical discrepancies or request clarification of procedures.

p. 289

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-46 (b) Urgent. An FBR will be considered urgent when it relates to the technical requirements of PMS and involves safety of personnel, safety of ship or the potential for equipment damage. Urgent FBRs will be forwarded by naval message containing a PMS FBR serial number, to both NSLC Detachments Norfolk and San Diego, with info to the cognizant Systems Command, TYCOM and the Naval Safety Center. The message must describe the unsafe procedures or conditions, must identify the MIP and MRC involved and reflect the serial number of the FBR generated in SKED or Planned Maintenance System – Management Information System (PMS-MIS). Once the message has been sent, include the date time group of the message in the FBR and submit. (2) Non-technical. These FBRs are intende d to support PMS requests that do not require technical review, including WC changes and shift of maintenance responsibility. Non-technical FBRs are submitted to request classified or other PMS documentation which cannot be obtained locally or to request clarification of issues not of a technical nature. m. Feedback Report Submission. All SKED users will submit FBRs via SKED using the Feedback Report Wizard. Non-SKED users may submit FBRs via PMS-MIS web site at https://algol.pmsmis.navy.mil/PMSMIS by selecting the Feedback Tab and Feedback Report Wizard from the drop-down tab. Non-SKED users accessing this web site for the first time will need to request an account. Click on File Manager and select New User Account Request. This displays options to select a form and readme file, which can be downloaded, filled out and sent via e-mail as directed in the readme file. An e-mail will be sent confirming your account and providing access to the main screen. The Anchor Desk web site can also be used to submit FBRs. n. Feedback Report Screening (Shipboard or Activity). (1) Initial screening is accomplished by th e originator or WCS who is responsible for ensuring all data is accurate and complete. (2) The division LCPO or DIVO accomp lishes the second level screening and verifies the content and validity of the FBR within three days of origination. (3) The DH, next to screen the FBR, is responsible for verifying the content and validity of the FBR and digitally signing FBRs within five days of origination. (4) The 3MC is responsible for screen ing, serializing, and forwarding FBRs within seven days of origination. The 3MC will also: (a) Maintain accountability for all PM S FBRs submitted and actions taken until updated PMS documentation is received. (b) Ensure that the originator and all applicable WCs are kept apprised of action taken and ensure the originating and other applicable WCSs implement the changes or corrections when received.

p. 290

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-47 o. Feedback Report Screening (External to Hu ll or Activity). FBRs are next processed by the TYCOM. The TYCOM will verify the content and validity of the FBR and either return the document to the originator or pass it on for further processing and resolution p. Feedback Processing Activities. (1) The central control points for processing FBRs are the Planned Maintenance System Coordinating Activity (PMSCA). Depending on the type of FBR and level of technical authority necessary to answer the FBR, the PMSCA will either respond to the originator with a resolution or forward the FBR to the appropriate technical authority for action. (2) ISEAs are those activi ties designated by NAVSEA as the technical experts for specific systems or equipment. Naval Surface Warfare Center, Philadelphia Detachment is the ISEA for the majority of non-nuclear hull, mechanical and electrical equipment installed on most ships. ISEAs under the direction of the NAVSEA Technical Warrant Holder adjudicate the FBR request and forward the response to the PMSCA. The PMSCA provides the final response to the originator and updates the PMS database to reflect ISEA changes. PMS changes are issued with the next available FR. NOTE: IT IS POSSIBLE AN FBR RESP ONSE MAY NOT MAKE A SPECIFIC FR BASED ON THE DATE THE RESPONSE WAS RECEIVED BY NAVSEALOGCEN. PROCESSING TIME AND HANDLING MAY CAUSE THE REVISED DOCUMENTATION TO MISS AN FR CUTOFF DATE. HOWEVER, SINCE ALL FRS ARE NOW RECEIVED QUARTERLY, IF A REVISION MISSES THE CURRENT FR CUTOFF WINDOW, THE REVISED DOCUMENTATION WILL BE AVAILABLE WITHIN THE NEXT THREE (3) MONTHS. q. Feedback Processing. FBRs are processed per NAVSEA policy: (1) Urgent FBRs. (a) The PMSCA will provide a message response to all Urgent FBRs within one (1) working day of receipt. If the FBR is forwarded to a Design Activity or ISEA for resolution, then the Design Activity or ISEA will provide a message response informing the originator of specific actions or required changes because of the adjudication of the FBR within one working day of receipt. This message response must be addressed to the originator and distributed to all TYCOMs of units holding the affected documentation. TYCOMs will forward this message to all commands that could be affected by the PMS change. (b) The PMSCA will distribute revised PMS documentation to all affected users within 30 calendar days of receipt of the FBR, via special issue or ACN. (2) Routine FBRs.

p. 291

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-48 (a) The PMSCA will perform technical reviews, research, and provide a response to routine FBRs where resolution does not require technical authority action. (b) FBRs that the PMSCA cannot resolve will be sent to the cognizant Design Activity or ISEA. The cognizant Design Activity or ISEA will provide the response to the appropriate PMSCA describing the action taken. The PMSCA will provide the response to the originator by electronic means. (c) Distribution of the revised MRC to the originator and other affected users will be accomplished via ACN or the next available FR. (d) NAVSEA’s existing policy calls fo r Technical Review Activities and ISEAs to provide FBR responses in less than 21 working days from time of receipt. In addition, NAVSEA has established a goal of providing answers to FBRs in one day. While some FBRs will require extensive research and days, weeks or in some cases months to resolve, the vast majority of FBRs can and should be answered much sooner. One day may be overly optimistic, but the intent is to put the emphasis back on the timely resolution of FBRs. (e) If no revision to PMS documenta tion is required, pertinent comments will be provided in the response to the PMSCA. When not concurring with the feedback report, the rationale for the non-concurrence must be provided to the PMSCA. r. Feedback Response Implementation. Units will implement responses to FBRs based on the category and content as determined by the unit’s 3MC. (1) Urgent FBR. Within 24 hours of receipt of FBR response. (2) Urgent FBR with an ACN. With in 24 hours of receipt, the ship will implement an administrative change to incorporate the new PMS documentation. These revised documents will be utilized to conduct maintenance until the revised PMS document is incorporated into the next FR. (3) Routine FBR: (a) Technical. The response deals wi th content such as a revision to technical specifications, tolerances, test equipment, materials, acceptance criteria or the sequence of procedural steps. These changes need to be implemented within two weeks of receipt of the FBR response or prior to the next scheduled accomplishment date should that date fall within the two-week window. (b) Administrative. The response deals with issues that do not affect the technical content or procedural steps. Administrative changes might be added steps to provide a better degree of clarity, formatting revisions to tables or figures that do not change technical content, or updating of Notes, Warnings or Cautions that do not impact the

p. 292

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-49 performance of the MRC. These changes do not need to be implemented prior to receipt of the next FR. If the next FR does not reflect the revised documentation, implementation is required before the next scheduled accomplishment date of the MRC. (4) Routine FBR with an ACN: (a) Technical. These changes need to be implemented via an administrative change within two weeks of receipt of the FBR response or prior to the next scheduled accomplishment date should that date fall within the two-week window. These revised documents will be utilized to conduct maintenance until the revised PMS document is incorporated into the next FR. (b) Administrative. These changes do not need to be implemented prior to receipt of the next FR. If the next FR does not reflect the revised documentation, implementation is required via an Administrative Change before the next scheduled accomplishment date of the MRC. 19-1.4.14 Assessment Procedure MRCs. Assessment Procedure (AP) MRCs need not be scheduled within SKED, but they will be maintained “active” through the FR and TFR process. AP MRCs need only be printed on an “as needed” basis for use by assessment personnel or Ship’s Force. The record of completed AP MRCs by off-ship personnel is recorded on the work candidate and Ship’s Force participation is recorded in their completion remarks of that work candidate. There is no need for recording Ship’s Force participation in an assessment event on their PMS schedule within SKED. FBRs submitted requesting deletion of a MIP that only contains AP MRCS will be disapproved and returned to the originator. 19-1.4.15 Self-Assessments. The ability of an activity to perform critical self-assessments is instrumental to the success of the command’s PMS program. The PMS Self-Assessment Program needs to address all aspects of 3-M. a. TYCOM Self-Assessment Polices. Each ship must perform a quarterly Self- Assessment utilizing the shipboard 3 MTT and onboard 3-M organization personnel per Appendix B. Additionally, assessments are to be conducted as determined necessary by ship’s 3-M organization, 60 days prior to a scheduled 3MA or 3MI and when directed by the TYCOM. The completed report will be retained by the 3MO for 12 months and provided to CNAL or CNAP 3-M Team one week prior to arrival for the conduct of a 3MA or 3MI, or 14 days after completion of a TYCOM directed assessment. The XO via the 3MO will ensure that personnel performing the audits have adequate 3-M knowledge to ensure a thorough review. The CO will receive a formal briefing of the findings of the Self-Assessment and intended corrective actions. Self-assessment results will be documented via message format provided by the TYCOM. b. Self-Assessment Elements. The major program elements of a Self-Assessment include an evaluation of the PMS Performance Rate (PPR) and CSMP Validity, monitoring MRC performance, monitored MRC, and conducting PMS Spot-Checks, WC audits, and deficiency abatement. 3MCs will retain monitored PMS results, Spot

p. 293

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-50 Checks and WC audits from the last completed quarter in either hard copy or digital format for review supporting the self-assessment. (1) Monitored MRC. Supervisory pers onnel must periodically monitor the performance of PMS to provide feedback and training to maintenance personnel and to enforce command maintenance standards. This w ill b e conducted by the LCPO or LPO of each work center. Personnel charged with monitoring must be System Matter Experts for the system, equipment, or component for which the MRC applies. Concerns and recommendations from monitored maintenance actions will be turned in to the D3MA for analysis and training. Monitored checks can be used for on-the-job training to teach the “right way” to conduct maintenance. These monitored MRCs will be documented as a monitored evolution and findings will be provided to the WC’s CoC for inclusion into training and deficiency abatement. The value of monitor maintenance cannot be overstated, and commands are encouraged to establish a robust monitored maintenance program. (a) Every work center will have at a minimum one monitored maintenance action per week when maintenance is scheduled and if it has not already been monitored. (b) Monitored maintenance should only be accomplish once per quarter on a specific MRC per maintenance person, to avoid repetition. (2) PMS Spot Check. PMS Spot Checks are utilized to validate that previously scheduled and accomplished MRCs were performed and the degree to which they were performed. The checklist contained in Appendix B Section II of this chapter, is the tool supervisory personnel utilize to determine the accomplishment status of a completed MRC. Deficiencies noted and the final grade will be provided to the WC’s CoC for abatement. The WCS will record the Spot Check grade into SKED to generate the SCAR for the quarterly PMS Performance Report. Spot Checks will involve all elements of the CoC to include the CO, CMC, XO, 3MC, DHs, DLCPOs, DIVOs, divisional LCPOs, and first-class petty officers. By following the checklist, the inspector can determine if the sailor is competent, the maintenance was accomplished, required TPMTE was available and used, and safety precautions were followed. The focus should be less on administration and more on the condition of the gear. (a) Avoid Spot-Checks of MRCs with insufficient complexity. Performing a Spot-Check on a 3 or 5 step MRC does not provide the CoC an accurate picture of the health of the command’s maintenance program. Selected MRCs should be of sufficient content to provide the auditor with evidence of satisfactory performance (e.g., tag-outs, QA packages, parts required, off-hull reporting, test equipment, safety equipment, etc.). (b) Spot-Checks evaluated as “below standards” will require immediate training and re-performance as determined by the 3MO. Any re-

p. 294

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-51 accomplishment of the MRC must be monitored by the LCPO to ensure noted deficiencies are not repeated. (c) The spot-checker or monitor wi ll ensure that the Spot-Check or monitored data is immediately entered into SKED. When applicable, a brief synopsis of any deficiencies resulting from the Spot-Check will be indicated within the Spot Check. (d) The minimum number of Spot-check s is reflected in Table 19-1-3 of this chapter.

Table 19‐1‐3 ‐ Aircraft Carrier Spot Checks Management Level Number of Checks Interval CO 1 Weekly XO 1 Weekly CMC 1 Weekly DH* 1 Weekly DLCPO 1 Weekly 3MO 1 Weekly 3MC** 1 Weekly 1/3 of 3-MTT 1 Weekly DIVO 1 Weekly * If the department has a designated 3-M PA, th en the PA will be assigned a spot check along with the DH. The DH cannot delegate the weekly spot check requirement. ** The number of spot checks to be conduc ted by the 3MC is set by the number of 3MCs assigned to the 3-M Office.

(e) The 3-M Office will establish, and track spot-check trend data records for the following areas: Maintenance Person Knowledge and Performance, Tag-out, Safety, HAZMAT and PPE. This data will be kept for a minimum of 24 months. (3) Work Center Audits. Each WC must receive an audit once per quarter by a supervisory individual, Chief Petty Officers or above. Deficiencies noted from this audit will be reported to the WC’s CoC for abatement. The 3MC will report recurring deficiencies to the XO for further investigation and corrective action. (4) Deficiency Abatement. The status of discovered deficiencies will be kept current within the monitoring program. Recurring deficiencies must be reported to the XO for further investigation and corrective action. Deficiencies that have been reported as corrected will be subject to follow-up

p. 295

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-52 monitoring to ensure corrective action was effective and results of the follow up monitoring will be reported to the XO. The ship’s 3-M Abatement Program will include the previous quarter’s audits, Spot-Checks, monitored evolutions and CSMP validity audits noting trends and corrective actions. 19-1.5 ZONE INSPECTION PROGRAM. 19-1.5.1 Purpose. To set forth the responsibilities and procedures for the Zone Inspection Program. Reference (g) requires every command to conduct periodic zone inspections to ensure proper measures are taken to keep machinery, spaces, and equipment operational, clean and in a satisfactory state of preservation. Each space will be formally inspected at least once per calendar quarter. 19-1.5.2 Background. a. Zone inspections will emphasize safet y, preservation, damage control readiness, material condition, cleanliness, and specific items of interest. They will be structured to ensure rapid correction of major discrepancies that could cause injury to personnel, damage to equipment or constitute a fire hazard. Special emphasis must be placed on the elimination of fire hazards, safety hazards and the proper stowage of hazardous materials. To ensure documentation and standardization, the ZIDL, Appendix C Section I of this chapter, will be used and must be entered into the MODES module located in the TSIMS Program. b. The reactor officer is responsible for conducting MCAP inspections inside main propulsion spaces per nuclear note. The reactor officer will keep the XO apprised of results of these inspections. c. Reference (c) states the following spa ces will not be under the Zone Inspection Program: all tanks, voids, sponson voids, catapult trough wing voids, aircraft electrical service stations, catwalks, bilges, underwater hull, freeboard, and the exterior surface of the island, ventilation plenums, and cold weather openings and closures for supply and exhaust systems. Inspection results will be entered into the Corrosion Control Information Management System database. Inspection results provide Carrier Planning Activity and CNAL/CNAP N43 the proper tools for planning future availabilities. 19-1.5.3 Zone Designation. a. To accomplish the inspection of all spaces each quarter, the 2,000-plus available spaces must be divided up into zones to coincide with 13-week quarters. A different zone will be inspected each week on a rotating basis. They are further sub-divided into smaller sets within each zone. b. The number of inspectors and escorts from a given department is determined by the number of groups each department has within a given zone. c. Zone inspection deficiencies will be en tered and tracked in MODES module accessed through the TSIMS Program. 19-1.5.4 Zone Space Assignment. The responsibility for each space of the ship will be assigned to a specific division and WC per space database maintained by the 3MO. This will normally be

p. 296

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-53 the WC located in or responsible for maintaining the majority of the equipment in the space. Spaces are to be grouped into inspection zones according to WC cognizance whenever possible, rather than in geographical slices from several WCs. The designated WCS, or group supervisor if utilized, will retain overall responsibility for the space and for the proper administration of inspection deficiencies. 19-1.5.5 Procedures. a. Department LCPOs will be notified by the 3-M Office each week identifying the zone scheduled for inspection the following week and are responsible to provide the 3-M Office qualified inspectors. b. Department LCPOs will provide replacement names of qualified zone inspector substitutes (when required) to the 3-M Office one day prior to the zone inspection. c. Zone inspection escorts will attend traini ng per this section with the Department LCPO the day prior to the inspection and be knowledgeable of the spaces to be inspected. Escorts will be provided a list of the spaces that they will be responsible for. Training will be given on escort responsibilities to include the expectation that escorts will find all the spaces on their list and plan a logical and efficient route for the inspection. d. Thirty minutes prior to the scheduled time of the zone inspection, escorts and inspectors will assemble at the designated muster location for zone inspection administrative instructions. e. Zone Inspectors will include the CO, XO, CMC, DHs, PAs, Limited Duty Officers, Chief Warrant Officers, DIVOs and all CPOs. Inspectors will be trained in requirements of this section. All officers and CPOs must be qualified PQS-304, DHs to PQS 306 and all need to be knowledgeable of damage control space requirements. Other officers or CPOs may be assigned as assistant inspectors to gain experience and assist in identifying discrepancies. f. Zone inspectors will receive specific di rection on safety, damage control and other inspection criteria or points of interest from the XO or his designated representative. g. Zone inspection escorts and recorders will provide a folder that will contain a list of spaces to inspect, blank ZIDL forms and inspection guidelines. h. Zone inspectors will meet their assi gned escort and commence a thorough and expeditious inspection of their assigned spaces. Zone inspection escorts will guide the zone inspector through department spaces. i. Space presenters will be standing by the en trance to each space and be equipped with clipboard and black ink pen. The space presenter will greet the inspector and present the space by saluting and saying, "Good morning or afternoon Sir or Ma'am. (Rank), (Last Name), compartment (number), (number) Division, standing by for zone inspection.” Presenters will also have the division’s space ZIDL folder containing the last four ZIDLs. j. All spaces will be open and ready for in spection. Locked spaces are unacceptable and require immediate action by the CoC for inspection to proceed.

p. 297

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-54 k. Embarked air wing personnel will comply with zone inspection program as set forth in this instruction and work with primary space owners to correct material deficiencies. l. Zone inspectors will ensure ZIDL forms are filled out correctly. A mark of “NA” will be given for all active discrepancies identified on previous inspections if the space presenter provides a current MODES database or CSMP report identifying existing deficiencies to the inspector. m. At the conclusion of an inspection, the in spector and escort must sign the ZIDL and ensure the zone inspection folder is immediately returned to the 3-M Office. n. The 3-M Office will collect, review, and main tain completed ZIDLs. The 3-M Office will ensure all ZIDLs are entered into MODES module located in the TSIMS program by the D3MA for appropriate action by the departments and divisions. o. The 3MO will forward the weekly zone inspection discrepancy report summarizing the results of the week’s inspection to the XO, copy to DHs, PAs, and department LCPOs. Report will contain at a minimum any space that is inspected UNSAT and a list of all repair “priority one” category discrepancies. p. DHs, PAs, and department LCPOs will review MODES and the zone inspection discrepancy report sent out by the 3-M Office after each zone inspection and follow up on all reported discrepancies. (1) Ensure repair “level one” safety disc repancies are resolved immediately by the division responsible for the space or corrected per paragraph 19-1.7. of this chapter and reported to the XO and 3-M Office within 24 hours. (2) All discrepancies generated by Safety Department will be documented in the TSIMS via MODES for one shipboard deficiency list. Discrepancies originated by the Safety Department will remain open in MODES until completed. These discrepancies may have dual documentation in MODES and the CSMP. They will remain open until closed and verified by the Ship’s Safety Officer. These JCNs are excluded from the 30-day policy but will be a discrepancy if there is not a corresponding work candidate in OMMS-NG after 30 days. Properly managed safety discrepancies will not be counted or included as part of the 5% delinquent threshold. (3) All discrepancies originated by the FM or Duty FM will be documented in MODES for one shipboard deficiency list. The ship’s FM discrepancies will remain open until completed. These discrepancies may have dual documentation in MODES and the CSMP and will remain open until closed and verified by the Ship’s FM. These JCNs are excluded from the 30-day policy but will be a discrepancy if there is not a corresponding work candidate in OMMS-NG after 30 days. Properly managed DC discrepancies will not be counted or included as part of the 5% delinquent threshold. (4) Discrepancies that are within a divi sion’s capability to correct but cannot be corrected by the division within 30 days, must have an originating WC JCN established. Discrepancies that cannot be completed by the division

p. 298

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-55 responsible for the space, but the discrepancies are within Ship’s Force capability, must have a Ship’s Force organizational JCN established per paragraph 19-1.8 of this chapter. Discrepancies that are beyond Ship’s Force capability must have an outside activity JCN established. JCNs that require parts or cannot be completed by the originating WC must be submitted within seven days via the CSMP. (5) Additionally, safety and damage cont rol zone inspection discrepancies should be entered in the departmental 8 o’clock reports as appropriate. (6) Any discrepancy that results in a gr ade of “UNSAT” will be corrected on the day of the inspection. Any safety or damage control discrepancy not corrected on the day of the inspection will be reported by the DH to the XO via the 3MO for further transmission to the CO. NOTE: FOR EXCELL ENT AND SATISFACTORY GRADES, LARGE SPACES NEED TO BE TAKEN INTO CONSIDERATION FOR NUMBER OF MINOR REPAIR “PRIORITY 2” DISCREPANCIES SUCH AS THE SIZE OF A SMALL CLEANING GEAR LOCKER TO A LARGE HANGER BAY. IF THE SPACE PRESENTER PROVIDES A CURRENT JCN FOR A PREVIOUSLY DOCUMENTED DISCREPANCY THAT REQUIRES OUTSIDE ASSISTANCE, THE DISCREPANCY IS NOT TO BE RECORDED. 19-1.5.6. Inspection Criteria. Zone inspection parties should use Appendix C Section II of this chapter, the zone inspection material guide, as a minimum requirement. Each space will be assigned an objective grade on each ZIDL, Appendix C Section I of this chapter as follows: a. Outstanding. Space has no discrepancies in any repair priority category and space gives immediate impression of continuous maintenance with cleanliness above standards. Presenter has good working knowledge of space. b. Excellent. Space has one minor repair “pri ority 2” discrepancy, no discrepancies in repair “priority 1” category and a good history of maintenance. Presenter has good working knowledge of space. c. Satisfactory. Space has multiple minor repair “priority 2” discrepancies, no discrepancies in repair “priority 1” category and space is clean but not exceptional. Presentation of space is poor. d. Unsatisfactory (UNSAT). Any major repair “priority 1” discrepancy or previously documented discrepancies that could have been corrected but were not handled at divisional level. After an UNSAT, a re-inspection with DH and department LCPO will be conducted within seven days. 19-1.5.7 Repair Priorities. Repair priorities are defined as follows: a. Repair Priority 1. Immediate danger to personnel or equipment. b. Repair Priority 2. Presenting a hazard aff ecting crew health, safety, or having a direct impact on the ship’s mission. c. Repair Priority 3. Mi nor material deficiency.

p. 299

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-56 19-1.5.8 Program Assessment. a. Zone inspection assessments will be used to determine the performance level of the ship’s zone inspection program. They will also provide data that will be used to develop an improvement plan to address Zone Inspection Program weaknesses per the Zone Inspection Program Check Sheet, Appendix B Section IV-D of this chapter. b. Ship’s Force assessments will be conducted per Appendix B of this chapter on the following occasions: (1) Quarterly or when determined necessary by the ship’s 3MO. (2) Sixty days prior to a schedul ed CNAL or CNAP Team visit. (3) When directed by the TYCOM. c. Ship’s Force assessment and reports will be maintained for one year. Results that reveal areas where performance did not meet established standards will drive the development of an improvement plan. After implementing the corrective actions developed in the improvement plan, Ship’s Force will conduct follow up assessment to determine effectiveness of corrective actions. Ship’s Force will maintain the last four Zone Inspection Program assessments. d. If an evaluation is conducted off site, Sh ip’s Force will provide in electronic format, the following documentation to the 3-M Team the 1st and 3rd quarter of the year (January and July), before the 10th day of the month: (1) Completed Ship’s Force assessments as per Appendix B of this chapter. (2) The last six months MODES ZIDL Program export report. (ZIDL, TC and ZIDL Metric) (3) If a TYCOM 3-M Team evaluation is conducted onboard, the 3-M Team will brief the scheduled sequence of events with the XO and 3MO. (a) N432 MDS Specialist will check MODES and OMMS-NG to ensure conformity with TYCOM direction. (b) The 3-M Team will assess a ship Zone Inspection Program per Appendix B Section IV-D. The 3MO will provide to the 3-M Team the time, the zone, list of spaces to be inspected and a list of zone inspectors. (c) Assessment results will be submitted to the 3-M Team Leader, CNAL or CNAP and an official copy to the ship. 19-1.6 3-M ASSISTS, TRAINING, ASSESSMENTS, AND INSPECTIONS. 19-1.6.1 Accommodations and Transportation. The team in the scheduling message will request transportation assistance. Adequate working space for team members is required, with tables, desks, and chairs. Wardrooms, wardroom lounges, mess decks if not in use and large classrooms are usually adequate. E-mail accounts and tier one internet access may be required for team

p. 300

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-57 members. A message will be provided to the ship with a detailed listing of accommodations required for the visit. If flying on or off the ship, team members will be categorized as Priority 1. 19-1.6.2 3-M Assist Visit. 3-M Assist visits (3-MAT) are an opportunity to train personnel in specific areas of 3-M. The purpose of the assist visit is to identify areas where improvements may be made. Prior to the arrival of the 3-M Team, the ship will respond appropriately to identify areas that need attention and ascertain the type of assistance desired. The CO will be debriefed on the visit results prior to departure. The report will be provided to the cognizant CNAL or CNAP Assistant Chief of Staff for Maintenance and Materiel (N43) for review. There will be at least one assist visit between formal inspections. Since the primary focus of the assist visit is training, no assist visit will be upgraded to an inspection. Ships will routinely have one 3- MAT prior to or at the beginning of a major CNO availability and an additional 3-MAT close to the end of an availability. Routine visits will be coordinated by the ship’s 3MO and the TYCOM 3-M team. Assist visits will not be scheduled within 90 days of an inspection. NOTE: ALL ASSESSED GRADING CRI TERIA DURING THE SHIP’S 3-MTT WILL BE USED IN CALCULATING PURPLE-E POINTS FOR THE CALENDAR YEAR. 19-1.6.3 3-MTT Training Visit. 3-MTT Training Visits provide an opportunity for evaluation and training of the ship’s 3-MTT. a. The TYCOM 3-M Team will evaluate the effectiveness of 3-MTT members in conducting and evaluating spot checks using Appendix A Section I of this chapter. b. The 3-M Team will evaluate the overall effectiveness of the 3-M training organization using Appendix A Sections I and II of this chapter. c. The 3-M Team will provide training for th e ship’s 3-MTT concerning their duties and responsibilities as a 3-MTT member. d. The 3-M Team will provide spot check tr aining. This training may be classroom oriented, deck-plate oriented (i.e. monitored maintenance), or a combination of both. e. At the conclusion of the training visit, the ship will be provided a written report detailing findings, a summary of the 3-M Team training provided and any recommendations for improvement. f. The 3-MTT will be considered below standards if the ship fails to achieve a 3-MTT SCAR of 85 percent or greater. 19-1.6.4 3-M Assessment. A 3MA will be scheduled and conducted by the TYCOM 3-M Team. Commands will receive notification of their 3MA prior to the arrival of the 3-M team. Coordination with the TYCOM staff will eliminate conflicts with other major evolutions. Internal ship evolutions will be coordinated with the team leader on arrival, normally, a four day in-port visit. a. Required Documents. Required docume nts provided upon arrival of the assessment team: (1) Shipboard Instructions: (a) 3-M Instruction.

p. 301

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-58 (b) Hazardous Material Instruction. (c) Personnel Working Aloft Instruction. (d) Electrical Safety Instruction. (2) Ship’s last quarter report. (3) WC PMS file. (4) List of WCs to include: (a) WC noun name. (b) WC designation. (c) Location. (d) Telephone number. (e) Name of WCS. (5) List of WCs that have no PMS responsibilities. (6) Copy of the ship ’s split MIP log. (7) Current roster of D3MAs. (8) List of zone inspectors. (For that week’s zone inspection) b. 3MA Grade Computation. (1) Maintenance Accomplishment Rate. Maintenance Accomplishment Rate (MAR) is the ratio of accomplished (both situational and periodic), lost, alerted, and omitted maintenance requirements over the ship’s last reported quarter. Periodic Accomplishment Rate (PAR) and Situational Accomplishment Rate (SAR) values are provided via SKED. MAR =PAR COMP + SAR COMP ÷ PAR COMP + SAR COMP + ALERTS + LOST + OMITTED (2) Spot Check Accomplishment Rate. SC AR is the ratio of total points earned and the total points available of all spot checks completed following Appendix B, Section II of this chapter. TYCOM inspectors will select and conduct approximately 100 spot checks. SCAR = TOTAL POINTS EARNED ÷ TOTAL POINTS AVAILABLE NOTE: THE ZONE INSPECTION PR OGRAM IS EVALUATED AS PER APPENDIX B, SECTION IV-D (ZONE INSPECTION PROGRAM CHECK SHEET). FINAL GRADE IS NOT APPLIED FOR 3MA SCORING.

p. 302

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-59 (3) Zone Inspection Program Evaluatio n. Zone Inspection Program Evaluation (ZIPE) determines the ship’s ability to conduct thorough space inspections, and document and fix deficiencies. ZIPE is defined by the following formula: ZIPE =Total Number of Satisfactory Questions X 4 Points ÷ Total Number of Points Available (100) NOTE: SRE PROGRAM IS EVALUATED AS PER APPENDIX B SECTION IV-B (SELF REPAIR EFFICIENCY FORM). THREE AREAS ARE EVALUATED: TROUBLE CALL PROGRAM (TCP), SHIP SELF- REPAIR PROGRAM (SSRP) AND PRACTICAL EXAMINATIONS (PRAT). FINAL GRADE IS NOT APPLIED FOR 3MA SCORING. (4) Self-Repair Efficiency. Self-Repair Efficiency (SRE) determines the ship’s ability to self-assess and conduct ship repair operations. SRE is defined by the following formula: SRE = (TCP x .30) + (SSRP x .50) + (PRAT x .20) (5) CSMP Validity Factor. CSMP Validity Factor (CVF) is the overall qualitative measure of the accuracy and completeness of ship’s material deficiencies and deferred corrective maintenance as represented by the complete CSMP. CVF is defined by the following formula: CVF =Total Number of Valid Entries ÷ Total Number of Entries Sampled CVF will be evaluated following the guidelines of Appendix B Section IV-A of this chapter. (a) 10 percent of entries (minimum of 2, maximum of 15) per WC are selected from the Ship’s Force generated CSMP. In addition, all Casualty Report (CASREP) JCN’s for the ship will be validated. (b) Selected entries from the CSMP are verified utilizing the Work Candidate Evaluation Sheet in Appendix B, section IV-A, CSMP Validity Factor Form. (c) All jobs in Ship’s Force Work List (SFWL) Programs, which are over 30 days old, will be entered into OMMS-NG or P-OMMS. SFWL programs include EDL, MCAP, TSIMS and MODES. All SFWL jobs over 30 days old not entered in either OMMS-NG or P-OMMS will be counted as invalid work candidates during the 3MA. An exception to the 30-day requirement will be made for MCAP and EDL deficiencies identified from the Pre-Availability Materiel Condition Assessment Inspection prior to a Planned Incremental Availability (PIA) or Drydocking Planned Incremental Availability (DPIA) and through the end of the PIA or DPIA, which do not require the ordering of repair parts or the writing of a control work package. Thirty days after the

p. 303

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-60 PIA or DPIA, all open MCAP and EDL deficiencies over 30 days old and not documented in either OMMS-NG or P-OMMS will be counted as invalid. All SFWL items identified and entered because of the duty FM or safety department evaluation are excluded from the 30-day policy and will be maintained in the SFWL program as open until completed. After 30 days these deficiencies still require entry into the CSMP. Final grade is not applied for 3MA scoring. NOTE: ALL ASSESSED GRADING CRI TERIA THAT ARE NOT FIGURED INTO THE SHIP’S 3MA SCORE ARE FOR CALCULATING PURPLE-E POINTS FOR THE CALENDAR YEAR. (6) Below Standards Criteria. The 3MA will be considered below standards if: (a) Ship does not meet the minimum for SCAR (85 percent) assessed by TYCOM. (b) Greater than five percent omitted maintenance is discovered by TYCOM. (c) The difference between the ship’s evaluated SCAR and that assessed by the TYCOM is greater than 15 percent of the TYCOM value. (d) A Plan of Action and Milestones will be submitted to the TYCOM within 30 days for all discrepancies noted in TYCOM’s final report. 19-1.6.5 3-M Inspections. The goal of the 3MI is to evaluate the effectiveness of the ship’s 3-M program. It is critical that the inspection be conducted in a similar fashion in every homeport and across the force. Inspections will be completed once commenced. Early below-standards indications will not be used to change an inspection into an assistance visit. Commands will receive notification of their 3-M Inspection prior to the arrival of the 3-M team. Coordination with the TYCOM staff will eliminate conflicts with other major evolutions. Internal ship evolutions will be coordinated with the team leader on arrival. Normally conducted in-port. a. Frequency of Inspections. The TYCOM w ill conduct a complete inspection of each command under their cognizance as follows: (1) When deemed necessary by the TYCOM. (2) Not to exceed 36 months. The 36-month requirement can be waived by TYCOM on a case-by-case basis, normally when a ship is in a CNO availability longer than six months. (3) Time spent in CNO Maintenance Availabilities will be counted when determining when inspections are to be scheduled. However, the availability of maintenance data required for review purposes needs to be considered prior to scheduling an inspection b. Inspection Team Composition. (1) Senior Member. The senior me mber will be the TYCOM 3-M OIC. (2) Team Leader. The inspection team leader will be the TYCOM 3-M Representative who will concur with the assignment of inspection team

p. 304

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-61 members. The team leader will ensure inspection attributes are evaluated in a manner consistent with current guidance and directives provided by Commander, Naval Air Force and provide guidance to the inspection team members to ensure a common process. (3) Team Members. Team members w ill consist of the assigned Commander, Naval Air Force 3-M Mobile team who are adequately trained in the area to which they are assigned to assess. They will report findings to the Team Leader. c. Required Documentation. To be provi ded upon arrival of the inspection team. (1) Shipboard Instructions: (a) Command 3-M directives. (b) Hazardous Material Instruction. (c) Personnel Working Aloft Instruction. (d) Electrical Safety Instruction. (e) Tag-out instruction. (2) Ship’s most recent Self-Assessment. (3) PMS alert details from SKED 3.2 for the designated 13-week period. (4) SKED 3.2 back-up file on dates sele cted by TYCOM for selection of spot checks. This item may be requested earlier to facilitate spot check selection and coordination. (5) Schedule promulgated by the ship for CSMP review and DIVO practical exams. (6) List of WCs to include: (a) WC noun name, (b) WC designation, (c) Location, (d) Telephone number (e) Name of WCS. (7) List of WCs that have no PMS responsibilities. (8) Copy of current CSMP (MJB516 Detailed CSMP Report with RPPO Log) and Ship Availability Listing. These reports will be kept with the work centers and brought with them to the CSMP review. Reactor department will also include a current copy of the MCAP log sorted by date, displaying the JCN field. This requirement can also be fulfilled by reviewing this report on-line prior to the CSMP review. (9) Copy of the ship ’s split MIP log.

p. 305

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-62 (10) Current roster of D3MAs. (11) List of zone inspectors. (F or that week’s zone inspection) d. Formula Acronyms. Acronyms used in the various formulas are defined as follows: (1) CLER = Command Level Effectiveness Review (2) CTS = Command Total Score (3) CVS = CSMP Validity Factor (4) DTS = Department Total Score (5) MAR = Maintenance Accomplishment Rate (6) MDS = Maintenance Data System (7) MPR = MDS Performance Rate (8) PAR = Periodic Accomplishment Rate (9) PPR = PMS Performance Rate (10) SAR = Situational Accomplishment Rate (11) SEER = Scheduling and Ex ecution Effectiveness Review (12) SCAR = Spot Check Accomplishment Rating (13) SRE = Self Repair Efficiency (14) ZIDL = Zone Insp ection Deficiency List e. Final Grade Computation. (1) Approximately 250 spot checks are accomplished during a 3MI (100 of those are DCPO “40 Work Center” type checks). Every WC gets at least one (1) spot check. The CNAL or CNAP inspection team determines the number of spot checks to be conducted per WC based on PAR and SAR reports exported from the ship prior to inspection. Numbers reflect the WC accomplishment load. The five “majors” (Weapons, Combat, Air, Reactor and Engineering) receive the most while the rest are spread out according to the numbers. (2) CTS Formula: CTS = Average of DTS DTS = Average of Work Center Score Work Center Score= (PPR X .50) + (MPR X .50) PPR = MAR X SCAR ÷ 100 MPR = MCF 20% + CVF 30% + RAF 5% + SRE 20% + ZIDL 25% (3) Ranking Standards. (a) Commands and WCs will be evalua ted as “Above Standards” overall in 3-M if the unit’s total score is 90% or higher. (b) Commands and WCs will be evaluate d as “At Standards” overall in 3- M if the unit’s total score is between 85% and 89.99%.

p. 306

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-63 (c) Commands and WCs will be evalua ted as “Below Standards” overall in 3-M if the unit’s total score is less than 85%. (d) All calculations will be rounded to two decimal places. (4) A ship that scores “below standards” for a 3MI will be awarded zero Purple-E points for that quarter in which the 3MI place. f. Below Standards Criteria. The 3MI will be considered below standards if: (1) Ship does not achieve an overall fina l grade (CTS) of 85 percent or greater. (2) Ship does not meet the overall mi nimum for MAR (85 percent), SCAR (85 percent), MPR (85 percent) or greater. (3) Two major departments fail to recei ve minimum MAR, SCAR or MPR. Major departments are Air, Combat Systems, Engineering and Reactor. (4) Ship does not meet the overall minimum SCAR (85 percent) for damage control. (5) Departmental Failure Criteria: (a) Department does not achieve a DTS of 85 percent or greater. (b) Department does not meet the overall minimum grade for MAR (85 percent), SCAR (85 percent) or MPR (85 percent) or greater. (c) A department that fails a 3MI will not be eligible for their departmental awards for the calendar year of the failure. g. Inspection Reporting. Significant defici encies and numerical assessments are reported to the assessed unit’s CO, and TYCOM using the format shown in Appendix E of this chapter. Reporting may be accomplished on the entire unit or on a departmental basis. h. Re-Inspection Criteria. (1) A ship that fails to meet minimum requirements for overall command or damage control criteria or both will require a re-inspection in the failed areas. (2) If a ship fails due to two or more major departments failing to meet minimum requirements, only the major departments that failed will be re-inspected in the failed areas. (3) 3-M performance graded as “Below St andards” will be re-inspected, not to exceed six months, following the completion of corrective actions. Subsequent repeat “Below Standards” will include a CO summary discussing the inadequacy of applied corrective action in correcting the deficient area. (4) If a ship or department is re-inspect ed in an area that failed to meet the minimum criteria, then that area will only receive the minimum passing score for departmental award calculation.

p. 307

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-64 i. Inspection Data Retention. CNAL and CNAP are to maintain an inspection data file for each unit. As each command is evaluated, the individual evaluation standards and calculated values identified will be recorded in the data file with a copy of the inspection report provided to the inspected command. Sections I through VI of Appendix B of this chapter provide specific criteria to be used in the assessment of each command. 19-1.7 ENGINEERING TROUBLE CALL. 19-1.7.1 Purpose. To set forth the responsibilities and procedures for the trouble call program. 19-1.7.2 Background. Zone inspection discrepancies and trouble calls are the first lines of defense in eliminating small repairs. Seventy percent of trouble calls can be validated and completed when noted within 24 hours. Twenty percent are discrepancies that can be completed during SF Self Repair Program. Five percent are deferred and re-screened as beyond SF capable that need multiple skills and are material TA 1, 2 or 3 work candidates. The remaining five percent are found to be invalid. 19-1.7.3 Policy. The repair officer or a designated representative will assign qualified engineering personnel as Engineering Trouble Call Watch (ETCW). The ETCW will act on behalf of the repair officer in all trouble call matters and will be responsible for the security and proper functioning of the trouble call computer, logbook and records and materials in the space the watch is posted. The ETCW will know and understand the trouble call program and procedures and be able to correctly receive and distribute trouble calls. The ETCW will normally only perform the tasks specified in this section while in an on-watch status. 19-1.7.4 Duties and Responsibilities. a. Engineering Trouble Call Watch. The ETCW will be located in damage control central or MSC and will be manned continuously. The repair officer and his or her representatives are always available for assistance. The general duties and responsibilities of all ETCWs are set forth below but are not all encompassing. Good judgment is always expected to be exercised. (1) The ETCW will document all trouble cal ls into the MODES module located in the TSIMS program. Leaving this area requires a formal watch relief. The watch may be temporarily secured for the following reasons: (a) General Quarters. (b) In-port emergency team called aw ay when the watch stander is a member of the response team. (c) Training team briefs when the watch stander is a member of the training team. Briefs are normally planned well in advance therefore the watch bill should be written to avoid this case if possible. (2) Answer the phone in a professional manner as the engineering department representative for trouble calls. (3) When receiving a trouble call, ask ques tions per flow charts for lighting and power, AC and ventilation, fan room flooding and toilets in Appendix C

p. 308

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-65 Section III of this chapter. Record the following information per the MODES trouble call database: (a) Name, rank, WC and J-dial of person placing the trouble call. (b) Equipment description and location. (c) Priority and safety if required. (d) A detailed problem descri ption of the trouble call. (e) The trouble call watch will process th e trouble call to an engineering WC for correction or deferral. (4) Immediately call and forward trouble cal ls to the responsible repair shop for action. (5) Inform Chief of the Watch (COW) a nd Engineering Duty Officer (EDO) of repair “priority 1”, critical trouble calls (e.g., issues that are a danger to personnel or equipment). Critical trouble calls require immediate attention and are defined as trouble calls made by any of the following: (a) Immediate danger to life or health. (b) Ship’s CO or their representative s (i.e. ship’s secretary, administration officer, CO’s galley staff). (c) Flight deck issues affecting the ship’s ability to launch or recover aircraft when underway. (d) Engineering issues that impact nor mal routine or ship’s ability to perform the mission. (6) Inform COW or EDO of repair “pri ority 2”, urgent trouble calls. Urgent priority is defined as trouble calls received requiring immediate attention due to hazards affecting crew health, safety, or having a direct impact on the ship’s mission. Examples include: (a) Major habitability issues. (b) Galley issues affecting sanita tion or ability to serve meals. (c) Ship’s laundry. (d) Medical or dental issues that impact normal routine. (7) Repair “priority 3”, routine trouble calls. Routine priority is defined as trouble calls made by an E-5 or above that present a minor material deficiency in a head, lighting, air conditioning, heat, or general habitability issue. Routine trouble calls will still receive prompt service. Examples include: (a) One water closet (t oilet) or sink clogged. (b) Rack light or a passage-way light out. (c) Ventilation to non-vital space not operating.

p. 309

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-66 (8) When informing the cognizant repair WC of a trouble call, relay the nature and priority accurately. Print trouble call ticket and give to the repair WC that picks up the trouble call ticket. (9) Minimize the amount of time the watch station phone is in use. (10) When the repair WC has complete d and returns the signed off trouble call ticket, the watch will: (a) Close out the ticket, document to tal amount of hours taken and update the trouble call database ticket with all appropriate information. (b) Enter signed trouble call ticket into divisional WC completed binder. (11) Report any problems with the troubl e call computer or MODES trouble call program to the COW/EDO, repair officer, or repair officer designated representative. (12) Maintain the division al trouble call binders in a neat and organized manner. (13) Conduct a daily audit of all open trouble call tickets; inform repair WCs of trouble calls older than seven days per this section. Report completion to the COW or EDO and annotate the audit in the watch station logs (i.e., daily audit entry in the Engineering Log indicating “An audit of the open engineering trouble calls was completed this date and time. A total of # trouble calls were completed and there are # of trouble calls seven days old.”). (14) The first trouble call watch for th e oncoming duty section will update the contact information for that day’s Duty A, DC, E, R, and the COW/EDO. (15) Conduct watch relief in a formal manne r. Any issues should be resolved prior to the oncoming watch relieving. Issues that cannot be resolved will be brought to the attention of the COW or EDO. b. Chief of the Watch and Engineering Duty Officer. The COW and EDO will conduct a daily audit of all open and closed trouble call tickets in MODES and in the divisional trouble call binders. Annotate the audit in the trouble call index sheet. c. Repair Officer. Every six months the repa ir officer or designated representative will e-mail the CNAL or CNAP N43 MDS Team a TYCOM report. This report is created through MODES trouble call reports. This report will be used by CNAL or CNAP N43 MDS Team for the off site assessment of the ship’s trouble call program that runs concurrent with the Carrier Maintenance Efficiency Award. The repair officer must maintain a copy of this report for one year. d. Division Technical Assistan ts. Every Friday: A, DC, E, and R Division technical assistants will conduct an audit of the open trouble calls for their respective divisions. This audit will be annotated on the trouble call log index sheet. For trouble calls outstanding for more than seven working days: (1) Notify originating WC to submit a job through OMMS-NG. (2) Direct the watch to close the troubl e call in the MODES database, detailing the reason it was not completed and that the originating WC was instructed to

p. 310

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-67 submit a job through OMMS-NG or P-OMMS. The WC should provide a JCN to the watch for entry into MODES when closing the trouble call. (3) Make an entry in the watch stati on logs that the audit was completed. e. Repair Work Centers. All repair WCs must document expended total man-hours on accomplished trouble calls every month. To do this a completed maintenance action item without prior deferral is entered into OMMS-NG with the repair WC as a lead or assist JCN. (1) Table 19-1-4 identifies APLs created to assist the trouble call WC when entering these work candidates in OMMS-NG.

Table 19-1-4 APL HSC EFD ESD XSYSTEMITEM 89751SFADP ADP TROUBLE CALL DESK TROUBLE DESK XSYSTEMITEM 89751SFALR ALRE TROUBLE CALL DESK TROUBLE DESK XSYSTEMITEM 89751SFCSS COMBAT SYSTEM TROUBLE CALL DESK TROUBLE DESK XSYSTEMITEM 89751SFENG ENGINEERING TROUBLE CALL DESK TROUBLE DESK XSYSTEMITEM 13011SFZIP ZONE INSPECTION PROGRAM ZONE INSPECTION (2) When a call is found to be beyond Ship ’s Force capabilities, the repair WC responding will assist the submitting WC on how to properly write the work candidate. 19-1.8 REPAIR SERVICES ORGANIZATION. 19-1.8.1 Purpose. To set forth the responsibilities and procedures for the aircraft carrier repair services program. 19-1.8.2 Background. a. To support carrier self-sufficiency and carrier SFIMA capabilities, this section standardizes maintenance screening procedures to be followed by CNAL and CNAP activities. b. In addition to those listed in references (a) through (k) the objectives of MDS are to provide aircraft carriers the tools and resources to accurately assess and report ship’s material condition while performing corrective maintenance at the lowest echelon level. c. The shipboard MDS system is unique within the structure of the naval organization in that it is a program which encompasses the most junior personnel up to and including

p. 311

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-68 senior directors. Overall fleet readiness can be directly affected by changes within MDS and how readily they are implemented. d. Command involvement, process awareness and TYCOM oversight are driving factors in a successful program. The key components of a successful program are: (1) Vibrant Ship’s Force Self- Repair Program, driven by an engaged repair officer. (2) Standardized work candidate scre ening process and clear communication by the SMM, RMO, repair organization and TYCOM. (3) Recurring shipboard training progra m conducted by the SMM office in areas of OMMS-NG usage and CSMP management. e. The ability of a ship to self-repair requir es a continuous screening process. The repair officer develops a master repair schedule. The repair schedule provides a specific time frame for focusing on each department’s needs approximately three times per year. Supply department typically is reviewed every quarter due to the volume of spaces and the fact that everyone uses their facilities for quality of life (i.e., messing, heads & beds, laundry, and other service spaces). Departmental emergent and or safety related work candidates outside of the master repair schedule are handled case by case and scheduled through the repair officer. 19-1.8.3Aircraft Carrier CNO Availability Repair Teams. SMM screening of work candidates is designed to allow for the development of a CNO Availability, Ship’s Force work package. Screening work candidates for the teams is continuous and concurrent with the Ship’s Force Self Repair Availability Program. As the SMM conducts IUC screening, work candidates are categorized such as vent cleaning, door repair, and habitability using the local work candidate status drop down list. CNO team leaders review these deficiencies, tagged by the SMM. As the CNO availability draws closer, these lists can be exported into an Excel spreadsheet. The team leader checks and provides feedback to the SMM on any work candidate beyond Ship’s Force capabilities. If found to be within team capability, the team leader assigns a specific PMXX WC as an assist WC code per reference (h). 19-1.8.4 Engineering Repair Mission. The mission of the Engineering Repair Organization is to provide facilities for accomplishment of high-quality maintenance onboard aircraft carriers and to provide repair services to conventionally powered surface ships while deployed. Aircraft carriers are equipped to provide organizational and intermediate level maintenance and services for almost all of their own requirements and those of surface ships including repair and maintenance of machinery and electrical and electronic equipment. 19-1.8.5 Meetings. The repair officer routinely holds the following meetings for respective department’s repair period: a. Self-Repair Arrival Confer ence. The repair officer conducts the conference, at a minimum, two weeks prior to the start of a department’s repair availability period. The repair officer will provide a CSMP file from OMMS-NG of all organizational level work three weeks prior to the department’s repair availability period. The department scheduled for the repair period will bring a copy of their eight o’clock report and a prioritized list of work to be accomplished. Personnel from each of the

p. 312

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-69 WCs that are knowledgeable of their CSMP, usually PAs, LCPO or LPO and 3MA, and engineering repair organizations such as repair officer, repair division technicians and repair division LPOs will be present to discuss particular job needs, manpower, WC support and other items of interest to ensure job accomplishment. b. Production Meetings. The repair officer will conduct production meetings daily for integration issues during the availability. c. Departure Report. The repair officer at the end of each repair period will provide a completion report to the department. Work candidates which are not accomplished are deferred to a future repair period or re-screened to an external maintenance activity with IUC comments explaining reason that Ship’s Force cannot accomplish. These comments allow a better understanding of the work that is to be re-screened and continue communications between the Ship’s Force repair officer, SMM and the TYCOM MPM. d. Daily Status and Liaison. Repair technician s routinely liaise with the repair officer on specific status of any work integration problems. 19-1.8.6 Maintenance Screeni ng and Repair Organization. a. CNAL or CNAP MDS Team. The MDS Team assists in the following: (1) Advising commands in the administration of Ship’s Force Continuous Maintenance Screening Program. (2) Conducting review of work candidate pr ocessing in support of the continuous maintenance screening process. (3) Conducting Ship’s Force continuous ma intenance screening training, assists, installations, and assessments. (4) Monitoring the overall implementation a nd effectiveness of the Ship’s Force Continuous Maintenance Screening Program on all aircraft carriers. (5) Reviewing Ship’s Force assessment re sults to identify trends and provide prompt support to ships as required. b. Commanding Officer. The CO has overa ll responsibility for ensuring that maintenance of equipment and systems is accomplished per 3-M procedures contained in reference (a). The CO will ensure a program review conducted by the ship’s repair officer is in place to effectively monitor the command’s program. c. Chief Engineer. The CHENG is responsible to the CO for execution and management of the Repair Service Organization. The CHENG will: (1) Ensure maintenance personnel receive adequate Ship’s Force continuous maintenance screening training. (2) Conduct regular meetings with the XO, SMM, repair officer and DHs to discuss Ship’s Force Self-Repair Continuous Maintenance Screening Program and provide necessary guidance and coordination. (3) Ensure a program review conducted by th e ship’s repair officer is in place to effectively monitor the command’s program.

p. 313

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-70 d. Ship’s Maintenance Manager. The SMM is directly responsible to the CHENG. Responsibilities are assigned in writing. The SMM will: (1) Monitor operation of the MDS to ensu re correct documentation procedures are followed. (2) Coordinate industrial maintenance during designated CNO Availabilities. (3) Ensure all documentation deferring maintenance for outside assistance is reviewed and approved in a timely manner per the requirements of this manual. (4) Conduct IUC screening. e. Repair Officer. The repair officer is normally a senior surface chief warrant officer or limited duty officer who is directly responsible to the CHENG. The repair officer works together with the SMM for all authorized screening, planning, scheduling, accomplishment, and inspection of Ship’s Force self-repair periods and for ensuring timely and satisfactory completion of engineering repair work per prescribed methods and standards. The repair officer is also responsible for upkeep and maintenance of all Industrial Plant Equipment (IPE) and those spaces supporting the repair capabilities within the repair organization. The ship’s repair officer will: (1) Review all work candidates screened by the SMM. These work candidates are evaluated and either sent to the repair technicians – departmental LCPO or rejected back to the SMM. Rejected work candidates are accompanied by remarks documenting reason for rejection and will be rescreened to the TYCOM for accomplishment by an outside repair activity. A screened work candidate must be accepted or rejected by a ship’s repair organization within seven working days. (2) Coordinate all administrative face ts of the Ship’s Force Continuous Maintenance Screening Program (i.e., Trouble Call Program, SFIMA and Ship’s Force Self-Repair Program) per TYCOM directives. (3) Evaluate command’s use of the Sh ip’s Force Continuous Maintenance Screening Program and keep the CHENG advised of its operational effectiveness. (4) Monitor an active, self-critical assessment program and report program effectiveness monthly to the SMM per self-assessment evaluation sheet. (5) Advise and assist DHs , DIVOs, D3MAs and WCSs in matters concerning the Ship’s Force Continuous Maintenance Screening Program including coordination and conduct of training and proper documentation of material deficiencies. (6) Ensure planning list reports are gene rated prior to execution of the inactive utility in OMMS-NG. Reports will be submitted to CNAL or CNAP MDS Team upon request and retained onboard for a period of one year. CNAL or CNAP MDS Team will provide format.

p. 314

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-71 f. Engineering and Deck Repair Technicians. Billeted in auxiliary, deck, electrical and repair divisions, the repair technicians are responsible to the repair officer for all authorized non-nuclear screening, accomplishment, and inspection of repairs and for ensuring timely and satisfactory completion of engineering repair work per prescribed methods and standards. Duties include: (1) Assign work candidates to repair WC s and coordinate with other technical assistants when multiple WCs are involved. Those work candidates found to be beyond Ship’s Force capabilities are sent back to the SMM via the ship’s repair officer with remarks per the requirements of this manual. A screened work candidate must be accepted or rejected by a ship’s repair organization within seven working days. (2) Continuously ensure their divisiona l repair WCs complete assigned work candidates and properly close out each item at the end of departmental repair periods. (3) Serve as the primary liaison between their division and the applicable department or ship. g. Hull Repair Division. As per reference (i). h. Electrical Repair Division. As per reference (i). i. Outside Auxiliary Machinery Repair Division. As per reference (i). j. Deck Repair Division. As per reference (i). k. Lead Work Center Planners. Lead Wo rk Center (LWC) planners work in the engineering department and are responsible for planning repairs to machinery, components and associated systems and preparing Controlled Work Packages and Formal Work Packages. The division works with the MSC in researching drawings and technical manuals. Functions include: (1) Ship-checking, planning man-hours and developing detailed worksheets and ordering of propulsion plant non-nuclear work. Nuclear level work is not included in this process. (2) Upon ship-checking the job, work candi date information will be verified. (3) Evaluate all jobs as to work packag e requirements, such as Work Packages and Formal Work Packages, and identify the proper procedure to be used or develop one if necessary. (4) Responsible for submitting Steam Plan t Action Requests to obtain technical resolution after LWC or division composes. l. Maintenance Division. The MSC provides ship’s maintenance technicians with the logistics support elements required to effectively plan, manage, and perform maintenance. MSC functions include: (1) Managing and maintaini ng the ship’s equipment configuration database via OMMS-NG. Additionally, MSC maintains the ship’s technical documentation libraries, such as ship’s drawing indexes, equipment

p. 315

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-72 installation drawings, technical specifications and manuals, shipyard process instructions and technical repair standards. (2) Providing customer assistance and support to research or troubleshoot Integrated Logistics Support issues or problems involving carrier maintenance requirements. m. Quality Assurance Division. The QA Di vision, led by the ship’s QA officer, is responsible to the XO for directing and administering the QA Program. The division performs Non-Destructive Testing services and provides QA training for supervisors and oversees divisional QA craftsman for ship’s personnel. Services include: (1) Non-Destructive Testing T Lab. Perfor ms visual, ultrasonic, magnetic particle and dye penetrate testing of materials per applicable standards and specifications. (2) QA Shop. Performs inspections, in-pro cess surveillances, training, and audits to ensure that materials, workmanship, and testing are per plans, specifications, and technical directives. This shop supervises overall QA processes for all repair work and oversees LWC or divisional Quality Assurance Inspectors. n. CNO Availability Team Lead ers. Responsibilities are noted in the Aircraft Carrier Availability Planning Guide for Ship’s Force resources. Work candidates are categorized using the Local Work Candidate Status drop down list. Process is documented in reference (a). Assignment to one of these categories enables the SMM to build the Ship’s Force authorized work package. o. Safety and Industrial Hygiene. The Sa fety Department provides comprehensive occupational health and safety support to the aircraft carrier and supports requests from accompanying ships. Services provided include: (1) Industrial hygiene assessments. (2) Navy Occupational Safety and Health Program Reviews. (3) Sound level surveys. (4) Asbestos identification. (5) Respirator fit testing and training. It is imperative that personnel are medically qualified to wear respirators before fit testing is requested. (6) Navy Occupational Safety and Health training. (7) Ventilation measurement. (8) Occupational safety and h ealth technical assistance. p. Safety Office. The Safety Office is manned during regular working hours. After working hours, questions or concerns should be forwarded to the Command Duty Officer. q. Asbestos Analysis Laboratory. The asbest os analysis laboratory provides asbestos identification and fiber counting services to the aircraft carrier and tended ships. The

p. 316

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-73 laboratory maintains ongoing proficiency through participation in Research Triangle Institute and Proficiency Analytical Testing programs. 19-1.8.7 Program Assessment. SRE assessments will be used to determine performance level of the Ship’s Force Continuous Maintenance Screening Program. They will also provide data that will be used to develop an improvement plan to address program weaknesses per the CNAL and CNAP Aircraft Carrier Self Evaluation Check Sheet and Practical Exam. a. Frequency. Ship’s Force assessments will be conducted on the following occasions: (1) Semi-annually or when determined necessary by the ship’s repair office. (2) One month prior to a scheduled C NAL or CNAP N43 MDS Team visit. (3) When directed by TYCOM. b. Improvement Plan. Ship’s Force asse ssment results that reveal areas where performance did not meet established standards will drive an improvement plan. After implementing the corrective actions developed in the improvement plan, Ship’s Force will conduct another assessment to determine effectiveness of corrective actions. c. N43 MDS Team Assessment. Two N43 MDS assessments will be conducted each year. SRE assessments will be scheduled and conducted by the CNAL or CNAP N43 MDS team to run concurrent with the Carrier Maintenance Efficiency Award off-site program assessment. If there is a 3-M assessment or inspection conducted during the calendar year, then one of two scheduled N43 MDS evaluations will be conducted onboard in conjunction with the 3-M assessment or inspection. (1) If the N43 MDS evaluation is conducted off site, Ship’s Force will provide in electronic format: (a) Completed Ship’s Force assessments as per paragraph 19-1.8.7 of this chapter. (b) The last six months MODES CNAL or CNAP Ship Trouble Call Program export report by the 1st and 3rd quarter of the year (January and July), before the 15th day of the month. (c) Planning list reports as di rected by CNAL or CNAP N432. (2) No practical examinations will be required. Items that are unable to be evaluated off site will receive maximum points allowed during the evaluation. Ship’s Force should still conduct practical exams to verify repair personnel maintain proficiency. (3) If the MDS evaluation is conducte d onboard, CNAL or CNAP N43 MDS Team will meet with the SMM and repair officer to first evaluate the proper usage of the Ship Trouble Call and Self Repair programs. N43 MDS specialist will check tables and drop down lists in OMMS-NG to ensure conformity with CNAL or CNAP direction. CNAL or CNAP Aircraft Carrier Evaluation Check Sheet and Practical Examinations will be conducted during the assessment. The SMM and repair officer will provide the N43 MDS Team

p. 317

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-74 a list of repair organization personnel and a schedule of where and when each member’s practical examination will be administered. (4) Assessment results will be submitted to CNAL or CNAP N43 MDS Team Leader.

p. 318

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-A-1 APPENDIX A APPENDIX A 3-MTT GRADE SHEETS

p. 319

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-A-2 APPENDIX A APPENDIX A SECTION I 3-MTT SPOT CHECKER FORM Planned Maintenance System (PMS) 3-MTT, CNAL or CNAP Spot Check Form Ship Depart Equipment Work Center Date Performed MIP MRC

3-MTT Member Spot Check Date: *If attributes are evaluated as unsatisfactory, all subsequent attributes will be graded as "0". +If major safety violation (loss of life, limb, eyesight) deduct 5 pts and all subsequent attributes will be graded as "0". For minor safety violation, only deduct 5 pts. NOTE: ASSESSMENT ATTRIBUTES WILL BE GRADED ZERO OR FULL VALUE. NO PARTIAL VALUE. Assessment Attribute Value Grade Notes 1 Observe the 3-MTT member conducting the spot check and determine the following by questions and personal observation. * a. 3-MTT member verified the MP PQS qualified to perform the MR? 2

b. 3-MTT member verified the MP presented the correct tools, Personal Protective Equipment (PPE) parts (NSN), material (Military Specification (MILSPEC) and test equipment (Calibrated). 3

c. 3-MTT member verified the MP identified the equipment (location, equipment validation). 4

d. 3-MTT member verified there were not any unauthorized changes or corrections to the MRC? 3

e. 3-MTT member verified the correct MRC for the equipment maintained? 3 2* Observe all steps of MR including all notes, warnings and cautions according to the MRC. * a. 3-MTT member verified the MP followed all steps of the MRC. 5 * b. 3-MTT member verified the equipment Tagout. 5 + c. 3-MTT member verified all safety precautions. 5 3 Verify the equipment condition reflects accomplishment of the MRC?

a. 3-MTT member assessed that maintenance was performed recently. 10

b. 3-MTT member observed proper use and disposal of Hazardous Material. 3

c. 3-MTT member verified the MRC was within the capability of the assigned individual to perform as written. 5

4 Verify PMS Reporting

a. 3-MTT member verified the Maintenance person reported the status of the MR to the WCS if Completed or Not Fully Accomplished and makes appropriate updates. 2

b. 3-MTT member reviewed TFBR for any problem with MRC. (if applicable) 2

p. 320

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-A-3 APPENDIX A

c. 3-MTT member verified material deficiencies detected by the PMS action were recorded in MDS. (if applicable) 2

Totals (Attributes) evaluated as NA are not calculated

3-MTT (SCAR) (Grade = Points Awarded ÷ Points Available)

Above Standards (90% or greater) At Standards (85-89.99%) Below Standards (less than 85%)

Points Available Points Awarded SAT or UNSAT

____________________________________________________ ______________ CNAL or CNAP INSPECTOR (PRINT) DATE

ADDITIONAL COMMENTS:

p. 321

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-A-4 APPENDIX A APPENDIX A SECTION II 3-MTT ORGANIZATION EFFECTIVENESS CHECK SHEET Ship: Date: Planned Maintenance System Administration # Assessment Attribute Value Grade Notes 1 Does the ship's XO serve as the 3-MTT Leader? 3 2 Does the ship's 3-M Officer (3MO) serve as manager of the 3-MTT and designate members in writing? 3

3 Does the ship's 3MO maintain copies of 3-MTT designation letters on file? 5

4 Does the 3-M Coordinator (3MC) serve as the 3-MTT Coordinator? 5 5 Does the 3MC maintain a matrix to select and track spot checks to be performed by the 3- MTT? 5

6 Does the 3-M office track spot check trend data for Hazmat, PPE, Tagout, Safety, and keep this data for 24 months? 5

7 Is the 3-MTT led by the XO with the 3MO and 3MC as primary assistants? 4

8 Is the 3-MTT composed of a minimum of 30 members from officers, chiefs, and departmental 3-M Assistants? 6

9 Are there a proportionate number of members from the 4 major departments? 4 10 Are 3-MTT members qualified 3-M 304 LCPO or DIVO, and designated in writing? 7 11 Do 3-MTT members provide divisional training and PQS support as requested or directed by the 3MO based on 3-MTT trends? 16

12 Does the 3-MTT support the 3MO in conducting self-assessments? 5 13 Does the 3-MTT meet monthly to discuss performance trends, improvement recommendations, and conduct training? 16

14 Does the 3-MTT conduct quarterly training for the E-7 and above? 16 Totals (Attributes evaluated as NA are not calculated.) 100 Above Standards (90-100%) At Standards (85-89.99%) Below Standards (<85%)

Additional Remarks:

p. 322

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-A-5 APPENDIX A

p. 323

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-B-1 APPENDIX B APPENDIX B 3-M INSPECTION CRITERIA

p. 324

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-B-2 APPENDIX B APPENDIX B SECTION I-A SCHEDULING AND EXECUTION EFFECTIVENESS REVIEW (SEER) Complete the SEER checklist below for each WC. Enter a numeric evaluation of each inspection attribute and provide amplifying information to describe the deficiencies driving point deductions on the “Remarks” page provided. Significant deficiencies will be reported via the final inspection report.

Command Department Division Work Center Date General Attributes Value Points 1. Does the WC PMS file contain: a.* Current Service Brief? 1 b.* Current and applicable 3-M messages and notices? 2 2. Do MIPs and MRCs accurately reflect equipment configuration; are non- applicable MRCs correctly lined out and are applicable MRCs active? (May be MIP standardization violations) 10 3. * Does the WC retain an auditable r ecord of personnel PMS qualifications and designation letters? 5 Maintenance Requirement Card (MRC) Deck 4. * Is the WC deck of MRCs, includ ing classified MRC locator cards, complete and current? (Per TYCOM direction) 2 5. Are classified MRCs complete and current? 3 6. Are blanks requiring Ship's Force data filled in prior to use? 3 Chain of Command SKED Administration 7. Are all administrative changes approv ed at the appropriate level? a. Is the FR approved by DH? (Verify using journal tab.) 2 b. Are weekly Closeouts performed by COB on the first day of the week at the appropriate level? 2 c. All lineouts and MRC customization approved at the appropriate level. 2 d. Check notes reviewed and al erts approved by the DIVO? 2 Location Guide Lists 8. a.* Do LGLs contain required inform ation (e.g., equipment name, equipment location, equipment serial number or unique identifier)? 3 b.* Are maintenance items in SKED associated to the existing equipment configuration? 3 Situational Requirements 9. * Are all situational (states, triggers , metered) events being scheduled and executed in SKED? 8 PMS Execution and Accountability 10. Are check note entries accurate, valid, and complete? 3 11. * Was maintenance assigned only to qualified maintenance personnel? 4

p. 325

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-B-3 APPENDIX B 12. Was currently scheduled, previously completed, situational requirements and unscheduled maintenance entered into SKED? 10 13. Is a unique identifier or tag-out serial number recorded in “check notes” for maintenance actions marked as complete that required Tag-outs? 2 14. Have the minimum number of spot checks and monitored checks been accomplished? 3 FBR File 15. Are FBRs being tracked in SKED, “A ction Taken” block update by WCS? 2 Inactive Equipment Maintenance (IEM) 16. Is the start of an inactive period co rrectly annotated and approved by DH? 2 17. Are IEM requirements properly scheduled? 5 18. Is the completion of the inac tive period correctly annotated? 2 Totals (Attributes evaluated as “NA” are not calculated) Total Points Available: 81 Total Points Awarded _______

SAT UNSAT Inspector Name and Command (Print and Sign)

* Electronic Versions Acceptable Sat = 85 percent or better Attribute Scoring: > 85% = Satisfactory = Full Credit < 85% = Unsatisfactory = No Credit Example - Attribute 17: If 85% or better of IEM requirements were properly scheduled, points awarded would be five (5). If less than 85% of IEM requirements were properly scheduled, points awarded would be zero (0).

p. 326

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-B-4 APPENDIX B SEER REMARKS Provide amplifying information to describe the deficiencies driving point deductions. Significant deficiencies must be reported via the final inspection report. Attribute # Amplifying Information

Print Name: Signature: Command: Date:

p. 327

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-B-5 APPENDIX B APPENDIX B SECTION I-B COMMAND LEVEL EFFECTIVENESS REVIEW (CLER) Using the attributes and grading criteria described here, conduct the CLER for the ship. Provide amplifying information for deficiencies causing point reduction on the remarks page. Command: Date: General Attributes Value Points 1. Does the 3MC: maintain: a. A Change Accountability Log? 2 b. * A log (approved by the XO) tracking the assignment of MRCs from split MIPs to ensure all applicable MRCs are assigned? 3 c. A master classified MRC file? 2 d. * A current PMS (and where applicable TFR) DVD or downloaded file? 3 2. Does the command have a reliable system for backing up MDS and PMS data? 5 3. * Does the 3MC have an effective system in place to track, route, and explain externally provided PMS changes? 3 4. Is there an effective system in use (Spot Check Program) whereby supervisory personnel periodically and routinely monitor PMS performance? 8 5. Have all FBRs entered in SKED been properly reviewed by the CoC and submitted off hull within seven (7) days? 3 6. * Does the ship or activity conduct internal audits (Quarterly Self- Assessments) of all WC? (Retain latest copies of deficiencies, corrections, and abatement for current and previous quarter) 15 7. * Does the 3MC provide weekly status reports to the XO per specific TYCOM directive? 3 8. * Does the 3MC have an approved master copy of 3-M PQS specifically tailored for the command? 3 9. * Does the 3MC maintain an auditable record of PMS PQS for the command (e.g., copy of service record entries, signed copy of PQS cover letter, officer verified divisional training record, RADM)? 3 10. Does the 3MC maintain the status of command FBRs, responses and follow up actions taken in SKED? 3 11. Does the 3MC track assessment MRCs (800/AP series) and verify completion with the local agency? 10 12. Is the 3MC triggering GLOBAL events and STATES across the unit? Does the 3MC have an updated major event listing? 10 13. Does the ship or activity conduct 3-M program training per directives? 8 3-M Training Team

p. 328

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-B-6 APPENDIX B 14. Does the ship's 3MO serve as manager of the 3-MTT and designate members in writing? 3 15. Does the ship's 3MO maintain copies of 3-MTT designation letters on file? 3 16. Does the 3MC serve as the 3-MTT Coordinator? 3 17. Does the 3MC maintain a matrix to select and track spot checks to be performed by the 3-MTT? 4 18. Does the 3-M office track spot check trend data for Hazmat, PPE, Tag-out, Safety, and keep this data for 24 months? 4 19. Is the 3-MTT led by the XO with the 3MO and 3MC as primary assistants? 3 20. Is the 3-MTT composed of a minimum of 30 members from officers, chiefs, and departmental 3-M Assistants? 5 21. Are there a proportionate number of members from the 4 major departments? 4 22. Are 3-MTT members qualified 3-M 304 LCPO or DIVO, and designated in writing? 7 23. Do 3-MTT members provide divisional training and PQS support as requested or directed by the 3MO based on 3-MTT trends? 10 24. Does the 3-MTT support the 3MO in conducting self-assessments? 5 25. Does the 3-MTT meet monthly to discuss performance trends, improvement recommendations, and conduct training? 10 26. Does the 3-MTT conduct quarterly training for the E-7 and above? 10 Totals (Attributes evaluated as “NA” are not calculated) Total Points Available 155 Total Points Awarded

SAT UNSAT Inspector Name and Command (Print and Sign)

* Electronic Version Acceptable Sat = 85 percent or better Attribute Scoring: All scoring will be done in a “yes” or “no” format. Example: If yes to the block all points will be awarded. If no to the block, zero points will be awarded.

p. 329

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-B-7 APPENDIX B CLER REMARKS Provide the attribute number and amplifying information describing the deficiency that has caused a deduction of points. Attribute # Amplifying Information

Print Name: Signature: Command: Date:

p. 330

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-B-8 APPENDIX B APPENDIX B SECTION II-A SPOT CHECK ACCOMPLISHMENT RATING (SCAR) Using the basic definitions and guidelines described, determine the PMS Spot Check Accomplishment Rating (SCAR) for each WC. Enter the values determined on the SCAR Check Sheet, section II-A of this Appendix. Approximately 250 spot checks are accomplished during a 3MI (100 of those are DCPO “40 Work Center” type checks). Every WC gets at least one spot check. The CNAL/CNAP inspection team determines the number of spot checks to be conducted per WC based on PAR and SAR reports exported from the ship prior to inspection. Numbers reflect the WC accomplishment load. The five “majors” (Weapons, Combat, Air, Reactor and Engineering) receive the most while the rest are spread out according to the numbers. 1. Complete an MRC evaluation, SCAR Check Sheet , section II-A of this Appendix, for each MRC selected. Based on the results, evaluate the overall effectiveness of the accomplishment of each MR selected. Enter a numeric evaluation of each assessment attribute (zero or full credit) and provide amplifying information to describe the deficiencies. Significant deficiencies must be reported via the final inspection report. 2. The SCAR Check Sheet is a series of inspec tion attributes to determine the accomplishment status of an MRC that had previously been reported as accomplished. Although the sheet may be used as a reference for conducting a real time monitored MRC evaluation, for the purposes of conducting a 3MI, all spot checks will be conducted on accomplished (historic) MRCs. 3. Due to the nature of MRC completion, suppor ting programs such as Tag-Outs and HAZMAT are encountered. Care should be taken to avoid expanding the spot check to a review of the processes of those programs thereby preventing the assessor from determining the accomplishment status of the MRC under review. 4. The following is expanded guidance for comp letion of the SCAR Check Sheet. Best practices or other policies not supported by source documentation must not be included in evaluating compliance: a. (1.a) Determine if the MP is qualified to perform the maintenance task. PQS 301 is required for all MRCs but attention should also be paid to other qualifications required such as Quality Maintenance. See Volume 5, Part I, Chapter 3, paragraph 3.4 of this manual or graduation from a required school such as gage calibration technician. b. (1.b) Determine if the correct TPMTE were used during the performance of the MRC. If the MP did not have the required TPMTE, it is unlikely that they would have been able to complete all the procedural steps of the MRC as required. If an item of TPMTE was required to perform a conditional step and that step was not required to be accomplished, it is not considered deficient. If the required test equipment required calibration, ensure that the calibration is within date and the equipment is of sufficient scale to accomplish the MRC.

p. 331

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-B-9 APPENDIX B c. (1.c) Determine if the MP maintained the correct equipment. d. (1.d) Examine the MRC to determine that any locally applied changes are authorized by procedural notes, external correspondence or allowed by reference (a). e. (1.e) Determine applicability of the M RC to the component that the MP signed for completion. NOTE: IF A PROCEDURAL S TEP WAS NOT COMPLETED, THE MRC SHOULD NOT HAVE BEEN REPORTED AS COMPLETE AND THEREFORE THE ATTRIBUTE GRADE SHOULD BE ZERO AND ALL SUBSEQUENT ATTRIBUTES SHOULD ALSO BE ZERO, EFFECTIVELY “FAILING” THE SPOT CHECK. f. (2.a) From a variety of potential techniques, determine if the MP performed all the required steps of the MRC. This may be accomplished via re-enactment, or re- performance. The inspector should come away with a clear impression that all the steps of the MRC were either fully accomplished or not. NOTE: IF A REQUIRED TAG-OUT WAS NOT CONDUCTED IN SUPPORT OF ACCOMPLISHING THE MRC, THE MRC SHOULD NOT HAVE BEEN CONDUCTED AND REPRESENTS A SERIOUS SAFETY VIOLATION. THEREFORE, THE ATTRIBUTE GRADE SHOULD BE ZERO AND ALL SUBSEQUENT ATTRIBUTES SHOULD ALSO BE ZERO, EFFECTIVELY “FAILING” THE SPOT CHECK. g. (2.b) If required by the MRC, verify th at a tag-out was hung before the maintenance was performed. Ensure the isolation boundaries were appropriately identified and correctly positioned to ensure complete isolation of the maintained equipment. If no tag-out was required, write NA on the sheet. NOTE: FAILURE TO ADHERE TO A SAFETY PRECAUTION PROVIDED ON THE MRC CONSTITUTES A SERIOUS SAFETY VIOLATION AND THE FAILURE TO PERFORM THE MRC AS WRITTEN. THE ATTRIBUTE GRADE WILL BE ZERO AND ALL SUBSEQUENT ATTRIBUTES WILL ALSO BE ZERO, EFFECTIVELY “FAILING” THE SPOT CHECK. h. (2.c) Determine compliance with all specifi c safety precautions listed on the MRC. If no safety requirements were invoked, write NA on the sheet. i. (3.a) By physical examination of the maintained equipment, determine if maintenance of the nature required by the MRC had been performed. Take note of fasteners that would have had to be disturbed, dirt in filters, fresh oil, etc., to make a judgment as to whether the maintenance has been performed. j. (3.b) Determine through questioning and record verification that HAZMAT was properly used and disposed of as a means of determining whether the MRC was accomplished. Once the inspector has determined that the HAZMAT was used and disposed of correctly, this attribute is considered fulfilled. If no HAZMAT was required to be utilized, write NA on the sheet.

p. 332

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-B-10 APPENDIX B k. (3.c) Determine if the MP could have performed the MRC from a standpoint of being trained and proficient in the tasks called out for by the procedure. l. (4.a) Determine if the MP filled out the 13-Week Accountability Log or annotated proper disposition of maintenance in SKED correctly for the accomplished MRC with the appropriate accomplishment date. Ensure if a tag-out isolation was used, the tag serial number is recorded in the space allowed or as a check note in SKED. Ensure that the printed name and legal signature of the MP who performed the maintenance is recorded or, in case of group performed PMS, the MP in charge of the group. m. (4.b) From reviewing th e discussions and findings during the spot check, determine if an FBR had been submitted if required. If no FBR was required, write NA on the sheet. n. (4.c) Determine if a material deficiency was noted during the PMS; if so, examine the CSMP to ensure the deficiency was documented. If no material deficiency was noted, write NA on the sheet. If material discrepancies are properly documented in the CSMP attribute graded as a two (2). Material discrepancies that are not documented in the CSMP will receive an automatic grade of zero. 5. When a Spot Check is determined to be below standards, the command undergoing inspection is likely to have numerous questions. To facilitate root cause analysis and the formulation of an effective corrective action plan, care should be taken to clearly identify factors contributing to deficiencies that led to the conclusion that the MRC was not conducted as written or not conducted at all.

p. 333

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-B-11 APPENDIX B APPENDIX B SECTION II-B SPOT CHECK ACCOMPLISHMENT RATING (SCAR) CHECK SHEET Planned Maintenance System (PMS) 3-M Spot Check Form SHIP DEPARTMENT EQUIPMENT WORK CENTER DATE PERFORMED MIP EVALUATED MRC EVALUATED

Maintenance Person: Spot Check Date:

NOTES: “*” is evaluated as unsatisfactory, all subsequent attributes will be graded as "0". “+” If major safety violation (loss of life, limb, eyesight) deduct 5 pts and all subsequent attributes will be graded as “0”. For minor safety violation, only deduct 5 pts. Inspection Attributes will be graded zero or full value. No partial value. Inspection Attributes that are Not Applicable will be marked NA and no value given.

Inspection Attribute Value Grade Notes Contact the MP assigned responsibility for the accomplishment of the MRC, have the individual deliver MRC, and determine the following by questions, personal observation, or both. 1. a.* Is the MP qualified (PQS) to perform the MR? 2

b. Did the MP present the correct tools, Personal Protective Equipment (PPE), parts (NSN), material (Military Specification) and calibrated test equipment? 3

c. Did the MP properly identify the equipment (location, equipment validation)? 4

d. Are there unauthorized changes or corrections to the MRC? 3 e. Is the MRC correct for the equipment maintained? 3 Demonstrated all steps of MR including all Notes, Warnings and Cautions according to the MRC. 2. a.* Followed all steps of the MRC. 5 b.* Correctly performed equipment Tag- Out. 5 c.+ Followed all safety precautions. 5 Does the equipment condition reflect accomplishment of the MRC? 3. a. Is it apparent that maintenance was performed recently? 10 b. Correctly demonstrat ed use and disposal of Hazardous Material. 3 c. Was the MRC within the capability of the assigned individual? 5 PMS Reporting 4. a. MP reported status of MR to the WCS if Completed or Not Fully Accomplished and made appropriate updates. 2

p. 334

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-B-12 APPENDIX B b. WC generated FBR for any problem with MRC. 2 c. Material deficiencies detected by the PMS action were recorded in MDS. 2

Attributes Evaluated as “NA” are not Calculated Total Points Available: Total Points Awarded: Spot Check (SCAR) (Grade = Points Awarded ÷ Points Available): SCAR = Above Standards (90% or greater) At Standards (85-89.99%) Below Standards (less than 85%) Above Standards At Standards Below Standards Below Standard grade requires immediate accomplishment (if 3-M Manager determines re- performance is required) monitored by a Chief Petty Officer Additional Remarks: Printed Name: ________________________________ Signature: ___________________________________ Command: __________________________________________________ Date: _________________________

p. 335

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-B-13 APPENDIX B APPENDIX B SECTION III MAINTENANCE ACCOMPLISHMENT RATE (MAR)

1. The Maintenance Performance formula capture s maintenance that was not scheduled. 2. The PAR and SAR reports are au tomatically generated by SKED. 3. The MAR grade will be determined utilizing th e formula reflected in a specified date range.

PAR COMP + SAR COMP M A R = ÷ PAR COMP + SAR COMP + ALERTS + LOST + OMITTED

4. “Omitted” is defined as any maintenance acti on that should have been performed on any and every maintenance item and no matter the reason did not get scheduled. For example: a. Situational or state maintenance that did not get scheduled when the situation dictated. b. Improperly lined out periodic checks. c. Non-accomplished IEM checks. d. Non-accomplished maintenance added via ACN, FBR, Preliminary PMS, etc.

p. 336

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-B-14 APPENDIX B APPENDIX B SECTION IV-A CURRENT SHIP’S MAINTENANCE PROJECT VALIDITY FACTOR (CVF) WORK CANDIDATE WORKSHEET WC JSN EQUIP CASREP MCAP 1 2 3 4 5 6 7 8 9 10 11 12 Score

C V F T o t a l s Reference: CNAL or CNAP OMMS-NG Users Guide. Automatic Failure – Active CASREPs – Does the associated JCN reflect the CASREP and have the related data filled in? Automatic Failure – SFWL (MCAP-MODES). Program logs reviewed, those found not per COMFLTFORCOMINST 4790.3 Volume VI Chapter 19-7 will be used as part of the total JSNs to be evaluated for the WC.

CSMP was reviewed with the following results: Deduct 1. Problem description inadequate. 10 2. Recommended solution inadequate. 10 3. Write up does not match maintenance level requested by the originating WC. 10 4. 1 st and 2nd contacts incorrect. 2 5. CSMP summary incorrect (does not state problem). 2 6. Configuration item does not match equipment in the narrative. 20 7. Equipment Operational Code (EOC) does not match description in the narrative. 15 8. Safety code (if used) incorrect or not described in narrative. 5 9. Deferral reason code incorrect. 2 10. Deadline date invalid or missing for TA 2 or TA 3. 2 11. Priority code incorrect. 2 12. Ship’s Force did not demonstrate knowledge of deficiency or current status. a. Not familiar with JCN and current repair status. 2 b. Could not identify what “Maintenance Level” was originally requested by WC. 2 c. Did not know who conducts the IUC and TYCOM screening and what the codes represent. 2 d. Did not know where the availability code is listed on the CSMP report and what it represents. 2 e. Did not have the ship’s availability listing to use as a reference tool. 2 f. MJB516 CSMP report printed incorrectly, missing information or did not have RPPO Log. (MJB512 Report or parts status included on MJB516) 2 g. Was not aware of any IUC or TYCOM remarks on CSMP report. 2

p. 337

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-B-15 APPENDIX B h. Was not aware that a lead or assist WC had been assigned. 2 i. Was not proactive in seeking repair (an extend ed period on the CSMP with no action taken). 2 j. No parts on order for Ship’s Force JSN within a reasonable amount of time. (1 week) 2

Notes: (1) TYCOM Off-Site Evaluation: Items 1 – 11 apply to each JCN evaluated. (2) TYCOM On-Site Evaluation: Items 1 – 12 apply to each JCN evaluated.

Ships Force - Name and Rank

Work Centers: _______ _______ _______ _______ _______ _______

This is a targeted review of shipboard CSMP entries - 10 percent of every WC’s CSMP (minimum of 2, maximum of 15 JCNs) and accomplished ashore prior to a visit by TYCOM MDS specialists. Targeted JCNs consist of TA 1, 2 and 3, Safety and EOCs of 2, and TA 4s. As per the items listed on the CVF form, the TYCOM inspection team shall check for accuracy to include problem description, recommended solution blocks, does the maintenance level requested match the write up, EOC and Safety codes match write up, etc. Finally, for each JCN selected, the ship is required to demonstrate knowledge of the deficiency and status. This is accomplished by asking a series of questions to all WCS and DIVO as listed on the CVF form. The answers to these questions (presented as an open book practical exam) are listed on the CSMP, MJB516 report, Repair Parts Petty Officer (RPPO) log or ships availability listing.

CSMP Validity Factor (CVF). CVF is the overall qualitative measure of the accuracy and completeness of ship’s material deficiencies and deferred corrective maintenance as represented by the complete CSMP. CVF is defined by the following formula:

Total Number of Valid Entries CVF = ÷ Total Number of Entries Sampled

All jobs in Ship’s Force Work List (SFWL) Programs, which are over 30 days old, will be entered into OMMS-NG or P-OMMS. SFWL programs include Equipment Deficiency Log (EDL), Material Condition Assessment Process (MCAP) and TSIMS/MODES. All SFWL jobs over 30 days old not entered in either OMMS-NG or P-OMMS will be counted as invalid work candidates during the 3-M inspection. An exception to the 30-day requirement will be made for MCAP and EDL deficiencies identified from the Pre-Availability Materiel Condition Assessment Inspection prior to a PIA or DPIA and through the end of the PIA or DPIA, which do not require the ordering of repair parts or the writing of a control work package. Thirty days after the PIA or DPIA, all open MCAP and EDL deficiencies over 30 days old and not documented in either OMMS-NG or P-OMMS will be counted as invalid. All SFWL items identified and entered because of the Duty FM or Safety Department evaluation are excluded from the 30-day policy and will be maintained in the SFWL program as open until completed. After 30 days these deficiencies still require entry into the CSMP. CSMP Validity Factor (CVF) grade sheets are subject to change as new versions of automated maintenance management systems are implemented on-line.

p. 338

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-B-16 APPENDIX B APPENDIX B SECTION IV-B SELF-REPAIR EFFICIENCY (SRE) REVIEW

ADMINISTRATIVE SECTION GUIDELINE FOR PROGRAM EVALUATION: Trouble Call Program (TCP) 30% Points Available Points Awarded 1. Total Number of trouble calls submitted from last evaluation _________ Total Number of trouble calls completed from last evaluation _________ 20

NOTE: TCP – THE CONVERSION OF DELINQUENT TROUBLE CALL DISCREPANCIES MUST NOT EXCEED 5 PERCENT OF THE TOTAL OPEN TROUBLE CALL DISCREPANCIES EVALUATED DURING THE INSPECTION PERIOD PER 4790.1 INST, GUIDELINES.

2. Are any trouble calls older than 7 days? 20 3. Are repair technicians creating a work candidate at least monthly to account for trouble call hours? (Repair officer maintains 6 months) 20 4. Are repair technicians reviewing open and completed trouble calls in MODES daily? 20 5. Are EDOs conducting daily audits? 10 6. TC MODES database has adequate information describing the deficiency or problem of the equipment. Fields display the correct type of information required. 10 TCP

Ship Self Repair Periods (SSRP) 50% 1. Are JCNs completed at ship level appr oval with lead and assist hours taken? 15 2. Are JCNs in the repair organizations queue, reviewed within 7 days of SHIP level approval? 15 3. Are WC codes (SHOP) listed on the planning list, correct? 15 4. Are completed work candidates signed and kept by repair organization for one quarter? 5 5. Is there a long-range master repair schedule developed? 5 6. Are repair period EXCEL spreadsheets kept by the repair officer for one quarter? 5 7. Is the repair officer conducting arrival conferences two (2) weeks prior to the start of a department’s availability period that includes training on proper documentation of material deficiencies and assigning priority to the work request? 20

8. Is the repair officer conducting daily production meetings with departments in avail to include discussions of scheduling of work, parts status, completion, and acceptance of work? 20

SSRP NOTES:

Practical (PRAT) 20% 1 2 3 4 5 6 7 8 9 10

p. 339

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-B-17 APPENDIX B ADCA or Fire Marshall 1 0 0 A - T e c h 1 0 0 E - T e c h 1 0 0 R - T e c h 1 0 0 Deck Bos'n or Tech 1 0 0 E A R e p a i r W o r k C e n t e r 1 0 0 E E R e p a i r W o r k C e n t e r 1 0 0 E R R e p a i r W o r k C e n t e r 1 0 0 PRAT 1. Create list of assigned JCNs using the Maintenance Assignment filter. 10 2. Process JCNs utilizing the Maintenance Assignment drop down list. 10 3. Add, update and complete lead and assist WC data. 10 4. Reject JCNs with rejection remarks. 10 5. Generate and print single and multiple AWRs 10 6. Create planning list based on repair WC assigned. 10 7. Export a planning or work candidate list. 10 8. Utilize Variations Tab to add planning information when creating list. 10 9. Identify ship level approved, completed JCN's with no task total MN-HRS documented. 10 10. Utilize Parts Tab to review part status. 10

SRE Total = (TCP x .3) + (SSRP x .5) + (PRAT Avg. x .2) SRE = _________

ADMINISTRATIVE SECTION GUIDELINE FOR PROGRAM EVALUATION: EFFECTIVE: PROGRAM IS WORKING CORRECTLY WITH FEW MINOR DEFICIENCIES AND IS ADMINISTERED BY PERSONNEL COMPLETELY FAMILIAR WITH THEIR RESPONSIBILITIES. (GRADE > 90%) PARTIALLY EFFECTIVE: PROGRAM HAS A FEW SIGNIFICANT DEFICIENCIES BUT IS MEETING THE BASIC GOAL OF THE PROGRAM. (GRADE 85 – 89.99%) NOT EFFECTIVE: PROGRAM HAS NOT BEEN PROPERLY IMPLEMENTED; A PROGRAM THAT HAS THE APPROPRIATE DIRECTIVES PUBLISHED WITH SHIPBOARD INFRASTRUCTURE IN PLACE, BUT NOT CORRECTLY EXECUTED, OR A PROGRAM WITH SIGNIFICANT DEFICIENCIES. (GRADE < 85%)

Ships Information Management System. Within this program is a module called MODES. MODES is a program on the ships LAN that provides command wide visibility and tracks all shipboard trouble calls through a central watch. This watch prescreens all trouble calls, and if determined to be valid, is entered into MODES and farmed out to a repair WC for disposition. If trouble calls cannot be rectified within 30 days, they must be entered on the CSMP. TSIMS tracks material deficiencies by displaying past repairs that would not normally be entered in the CSMP (SFWL). Man-hours are captured by entering a man-hour roll up at the end of the month, utilizing special XSYSTEMITM APLs created by CNAL and CNAP. This input to the CSMP is captured and graded using an SRE grading form.

p. 340

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-B-18 APPENDIX B APPENDIX B SECTION IV-C REPORTING AND ASI PROCESSING CONFIDENCE FACTOR (RAF) REVIEW

OMMS-NG OR P-OMMS SYSTEM MAINTENANCE REVIEW Points Availabl e Points Awarde d 1. Is the Import Correction queue empty? 5 2. Has Archive been run in the last 15 days? 5 3. Has Inactive been run in the last 15 days? 5 4. Have work candidates been removed from past availabilities C+30 days? 5 5. Is the REJ availability used to track jobs rejected or questioned by the TYCOM TRIAD empty? 5 6. Have old availabilities been re moved from OMMS-NG or P-OMMS? 5 7. Is a current, up to date, Ship Availability Listing readily available to the ship? 5 8. Does FAS have a tracking system for up-line reporting? Is last 13 weeks of .uru and .pts on file? 5 9. Does FAS have a tracking system for bulk loaded MM0001 files? Is last 13 weeks of bulk loads on file? 5 10 . Does FAS have a tracking system for customer feedback files? Is last 13 weeks of feedbacks on file? 5 11 . Does FAS maintain a log tracking significant OMMS-NG or P-OMMS down time? 5 12 . Are current OMMS DAPs installed, and does the FAS know under what conditions they are utilized? 5 13 . Is the Reports Release queue being managed and cleared of obsolete reports? (Any reports over 14 days) 5 14 . Are values in the Site Parameter set per TYCOM directives? 5 15 . Is the Maintenance Assignment dropdown list populated per TYCOM directives? 5 16 . Is the Work Candidate Status dropdown list populated per TYCOM directives? 5 17 . Are WCs per the Standard Work Center Codes identified at https://www.navsea.navy.mil/Home/SUBMEPP/Products/JFMM/TYCOM / 5

18 . Is there an effective process in place that deletes users as they transfer from the command? 5 19 . Does the Review and Approval queue have work candidates older than seven days below Ship Level Approval? 5 20 . Does the FAS have the current TYCOM directives and are they readily available to the ship? (i.e., Current CNAL User Guide, CNAP OMMS-NG User Guide, Ship’s Force Resource Manual for Aircraft Carrier Availability Planning, TSIMS/MODES User Guide, CNAF 3M Gazette Newsletter (4 Quarters)). 5

Total Points Available 100 Total Points Awarded Inspector Notes:

p. 341

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-B-19 APPENDIX B

Reporting and Automated Shore Interface (ASI) Processing Confidence Factor (RAF). RAF is the ability of ship’s maintenance and logistics personnel to make sure up-line reporting and ASI processing are done correctly and promptly, and system management of OMMS-NG is within CNAL/CNAP parameters. RAF is defined by the following formula:

Total Number of Points Awarded R A F = ÷ Total Possible Points

Determining RAF: RAF will be evaluated following the guidelines of appendix A (Engineering/Reactor Reporting ASI Processing Confidence Factor (RAF)). P-OMMS will be evaluated using a separate RAF sheet on those ships configured with P-OMMS. Reactor department will receive the P-OMMS RAF grade.

p. 342

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-B-20 APPENDIX B APPENDIX B SECTION IV-D ZONE INSPECTION ASSESSMENT

OVERALL PROGRAM EVALUATION: Each attribute valued at four points. GUIDELINE FOR PROGRAM EVALUATION: ABOVE STANDARDS: Program is working correctly with few minor deficiencies and is administered by personnel completely familiar with their responsibilities (scoring 90 – 100%). AT STANDARDS: Program has a few significant deficiencies but is meeting the basic goal of the program (scoring 85-89.99%). BELOW STANDARDS: Program has not been properly implemented; a program that has the appropriate directives published with shipboard infrastructure in place, but not correctly executed, or a program with numerous signifi cant deficiencies (scoring < 85%). NOTES: 1. The CNAF 3-M Team senior inspector can determine BELOW STANDARD based on a single major repair level-one safety discrepancy noted during assessment. 2. The conversion of delinquent zone inspection discrepancies to work candidates will not exceed 5% of the total open zone inspection discrepancies evaluated during the inspection period per 4790.1 guidelines. 3. CNAF 3-M Team will randomly select zone inspectors for observation during the zone inspection. Eighty percent (80%) of the selected inspectors and spaces should meet the criteria required to receive a satisfactory in line items 9, 13, 14, 15, 20 and 21.

p. 343

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-B-21 APPENDIX B Zone Inspection Program Check Sheet # ATTRIBUTE SAT UNSAT 1. Are all spaces of the ship in spected at least once a quarter? 2. Does the CO participate in zone inspections as an inspector? 3. Are the ZIDLs in TSIMS/MODES database correctly prioritized? 4. Are ship's officers and CPOs trained in the conduct of zone inspections? 5. Does the XO participate in zone inspections as an inspector? 6. Does the XO maintain an auditable record for the last 12 months indicating that all spaces have been inspected at least once a quarter? 7. Does the 3MO designate zones, zone boundaries, number of zones and the spaces assigned to each zone? 8. Does the 3MO furnish inspecting party with inspection binders containing blank ZIDLs appendix C section I, zone inspection material guide appendix C section II, and a copy of the last inspection ZIDLs?

9. Are all compartments, gear lockers, drawers, stowage lockers & other enclosures unlocked? 10. Do XO, DCA, safety officer, electrical officer (ELO) or designated representative (E-7 or above) provide specific direction on points of interest or other inspection criteria prior to commencement of zone inspection?

11. ZIDLs in MODES database have adequate information describing the deficiency or problem of the equipment (s). 12. Do DHs, DIVOs or LCPOs ensure all repair level one safety discrepancies are resolved immediately and reported to XO within 24hrs? 13. Do inspectors document all discrepancies on ZIDL? 14. Do inspectors show up on time with flashlight and conduct inspection properly? 15. Do inspectors understand inspection criteria? 16. Does the 3-M Office collect, review, and maintain completed ZIDLs and enter them into MODES module located in TSIMS program? 17. Does the 3-M Office and D3MAs correctly document discrepancies into MODES? 18. Are open ZIDLs in MODES older than 30 days for originating WC deficiencies or older than 7 days for discrepancies beyond the division's capabilities? 19. Does the 3-M Office and 3MAs take hours on closed ZIDLs in MODES? 20. Does each division have a ZIDL folder or binder containing ZIDLs from the last year’s inspections and blank ZIDL forms for each space assigned? 21. Does each division have a CSMP that reflects current condition and discrepancies for each space assigned? 22. Does the 3MO forward the MODES and the Zone Inspection Discrepancy Report to the XO, DHs, PAs DCA, ELO, Safety Officer, DEPT LCPOs, DIVOs and LCPOs for review?

23. Does the XO, DHs, DCA, ELO and Safety Officer review MODES and the Zone Inspection Discrepancy Report for action routed by the 3-M Officer?

24. When corrections are complete, does the department ensure the MODES database is routinely updated to reflect the status of corrective action via the 3-M Office?

25. Does the ship maintain a copy of the Ship's Force assessment for one year and the last three (3) CNAF assessments?

FINAL GRADE Printed Name: _______________________________ Signature: ____________________________________ Command: __________________________________________ Date:______________________

p. 344

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-B-22 APPENDIX B Zone Inspection Program Evaluation determines the ship’s ability to conduct thorough space inspections, and document and fix deficiencies. ZIPE is defined by the following formula:

Total Number of Satisfactory Questions X 4 Points ZIPE = ÷ Total Number of Points Available (100)

Determining ZIPE: ZIPE program is evaluated as per Zone Inspection Program Check Sheet. Final grade is applied across all departments.

p. 345

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-B-23 APPENDIX B APPENDIX B SECTION V OMMS-NG PRACTICAL (MCF) SHIP: DEPARTMENT: WORK CENTER: LEVEL of ACCESS:

If the results of line item 1 or 2 = NO, Automatic Failure ZERO points awarded. 1. 3-M PQS Qualified. YES NO 2. Can user log into OMMS-NG or P-OMMS application using own login? YES NO

Points Awarded 3. Display a list of configuration items (equipment). 10 4. Display a list of work candidates. 10 5. Demonstrate adding a work candidate. 10 6. Demonstrate changing or updating a work candidate. 10 7. Demonstrate closing a work candidate. 10 8. Review work candidate history. 10 9. Order and approve maintenance parts. 10 10. Generate and print CSMP reports.(MJB516 or MJB512) 10 11. Review and approval of work candidates - able to distinguish the following: a. Configuration item - is JCN written against correct configuration item? Does it match the write up? 2 b. Problem description and recommended solution - Remarks sufficient? 2 c. Maintenance level - Does it match what was requested by OWC in the write up? 2 d. Deferral reason code - Appropriate (justified in the write up)? 2 e. 1st and 2nd contacts - Correct? 2 f. EOC - Appropriate and accurate? 2 g. CSMP summary – Does the summary state a problem? 2 h. Deadline date - Invalid or missing for TA 2 and 3, invalid for TA 1 or 4 if assigned? 2 i. Safety Code - Appropriate (justified in the write up)? 2 j. Priority Code - Appropriate (justified in the write up)? 2 Totals 100 Percentage Ship’s Force Name and Rate: Inspector’s Name: ___________________________________________ Date:____________________

p. 346

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-B-24 APPENDIX B MDS Confidence Factor (MCF). The cornerstone of the program is the ability of ship’s maintenance personnel to initiate complete and accurate MDS documents. MCF will be determined based on a practical test of a user’s skill in basic OMMS-NG or P-OMMS system navigation. MCF is defined by the following formula:

Total Number of Satisfactory Practical Exams M C F = ÷ Total Number of Practical Exams

Determining MCF: An MDS practical will be conducted for each work center. The work center test sample will include maintenance personnel, RPPOs, WCSs, LCPOs, DIVOs, DHs, and MSC personnel. Those personnel tested who have access levels above WCS will have their grade applied to all WCs under their cognizance.

p. 347

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-B-25 APPENDIX B APPENDIX B SECTION VI 3-M INSPECTION COMMAND TOTAL SCORE 1. The FINAL GRADE consists of two parts. (PPR x .50) + (MPR x .50). A minimum grade point of 85 is required for a passing score. In addition, a CVN WILL FAIL if any of the following are true: a. Two or more “major departments” (C ombat, Air, Reactor, Engineering) fail. b. The overall RAR, SCAR or MPR score is under 85. c. The overall Damage Contro l (DCPO type checks in “40” Work Centers) SCAR is under 85. 2. PPR (PMS Performance Rate). PPR = (MAR x SCAR) divided by 100. This is the overall MAR (combination of PAR and SAR) multiplied by total SCAR (spot check validation) divided by 100 and expressed as a RATE. In other words, if a ship is properly scheduling only 90% of the checks assigned from NAVSEA, and then properly accomplishing those checks at a grade of 90%. Then PPR would be 90 x 90= 8100 divided by 100= 81 PMS Performance RATE. The PMS side counts as HALF of the overall grade. 3. MPR (MDS Performance Rate). The MDS portion gets an overall 50% weight of the overall 3-M Inspection grade. This comes from the weight fleet commanders (CNAL or CNAP) place on CSMP accuracy and validity. This leads to proper planning and budgeting for complex refueling overhauls, extensive yard periods, and getting CVNs out on time and at the lowest cost. The 5 sections detailed in section IV are weighted as: MPR = (MCF x .20) + (ZIDL x .25) + (CVF x .30) + (SRE x .20) + (RAF x .05). 4. OVERALL GRADE is computed as CTS Formula: CTS = Average of DTS DTS = Average of Work Center Score Work Center Score = (PPR X .50) + (MPR X .50) PPR = MAR X SCAR ÷ 100

p. 348

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-C-1 APPENDIX C APPENDIX C ZONE INSPECTION DEFICIENCY LIST, ZONE INSPECTION MATERIAL GUIDE AND FLOW CHARTS

p. 349

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-C-2 APPENDIX C APPENDIX C SECTION I ZONE INSPECTION DEFICIENCY LIST (ZIDL) FORM

LOCATION: Page: of

ZONE: DATE:

WORK CENTER INSPECTO R PRESENTER RECORDER

OVERALL GRADE: Outstanding Excellent Satisfactory Unsatisfactory

An UNSAT grade requires inspection with the DH and DEPT LCPO present. Reinspection will be conducted on a new ZIDL form.

Category Codes: S=Safety, D=Damage Control, M=Material, H=Habitability, P=Preservation, C=Cleanliness Priority Codes: 1=Repair Immediately/Critical, 2=Some Repair/Attention Required/Urgent, 3=Routine Repair Item Cat Pri Deficiency JCN or TRBL CALL # & DATE DIVO INIT

____________________________________ ________________________________ DEPT LCPO Signature and Date DEPT Head Signature and Date

p. 350

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-C-3 APPENDIX C

p. 351

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-C-4 APPENDIX C APPENDIX C SECTION II ZONE INSPECTION MATERIAL GUIDE This is provided as a general guideline for inspections and is not all-inclusive. It is not intended and cannot replace experience, expertise, and good common sense. Material Checklist

Grade 1. Bull's-Eye Visible and Correct SAT UNSAT N/A a. Compartment number matches CCOL. b. Forward frame number (1 st line) matches frame number (2nd line).(Some passageways may be an exception.) c. Accurate dimensions (12" high X 15" wide). d. Photo luminescent paint (with ex ception of spaces open to topside). e. Frame numbering accurate and visible at each access. 2. Egress Markings SAT UNSAT N/A a. Photo luminescent escape. b. No obstruction. 3. NTD Doors SAT UNSAT N/A a. Compartment information and number on both sides of door. b. Listed on CCOL. 4. DC Equipment SAT UNSAT N/A a. CCOL(s) are computer generated, current and inside a CCOL holder (single, duplicate, and partial). b. CCOL posted and visible at each entrance. c. Compartment number on Bull's-Eye and CCOL match. d. CCOL is stamped duplicate or partial (as applicable). e. Partial CCOL item numbers match CCOL. f. All DC fittings in space listed per NSTM 079 Vol II. g. Valve hand wheels color coded, proper ly labeled, DC classified with frame number and listed on CCOL per NSTM 505 and 079 Vol II.

p. 352

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-C-5 APPENDIX C h. Valves properly lubricated and remote operators connected and operable. i. Deck drains open and close properl y, T-wrench available as required, labeled and DC classified, posted on CCOL, all screws must be installed and properly maintained. 5. Lighting SAT UNSAT N/A a. Lighting fixtures are properly mounted, and all fasteners are installed. b. Lighting covers are not cracked, covered with paint and all fasteners installed. c. No frayed wiring. d. Darken ship switches work properly. e. No deteriorated gaskets. f. All red and white lights work. g. Check for light leaks throughout space (turn lights off to inspect). 6. Additional Items SAT UNSAT N/A a Lagging intact, painted. b. Air test fitting caps secured. c. Fire main jumper hoses hydrostatically tested per MRC. d. Sounding tube fittings, classification, and numbering. e. First aid, decontamination and traffic markings are clearly visible. f. Porthole, hatch, dogging wrench, T-wrenches, and ventilation weather closure open or closed, end wrenches on station (as applicable). g. Damage control shoring, present and in good condition. h. Medical stretchers properly stowed (if applicable). i. Posted safety precautions, warning signs, and operating instructions. j. Posted First Aid instructions (4 step). k. Safety nets installed, properly tagged, no tears or worn straps and all hooks or eyes in place. l. First aid boxes are properly marked, tamper-proof seal intact. m. Inspect for unauthorized flammable materials. n. Frame numbering at least once in a compartment < 24 ft in length and every 24 ft in compartments > 24 ft in length. o. Installed and portable eye-wash stations operational, PMS current, alarms operational.

p. 353

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-C-6 APPENDIX C p. Verify any Danger and Caution tags are filled out properly per TUMS and JFMM. 7. Battle Lanterns SAT UNSAT N/A a. Rubber boot free of cracks and tears. b. Operates, in good physical condition. c. Correctly positioned to illuminate vital gage boards and escape routes. d. Properly mounted (fixed units not able to be removed from bracket). e. Battery power sufficient, no leaks. 8. CO2 Bottle SAT UNSAT N/A a. Record tag attached and correctly filled out. b. Tamper seal intact and snug. c. Bracket secured to bulkhead. d. CO 2 decal in place. e. Horn and hose assembly free of paint, no deterioration. f. No electrical tape on metal fitting at valve. 9. PKP Bottle SAT UNSAT N/A a. Record tag per MRC. b. Tamper seal intact and snug. c. Hinged securing strap with lanyard and pin are attached to mount. d. Bracket secured to bulkhead. e. PKP decal in place. 10. Fire Station SAT UNSAT N/A a. Hose neatly stowed 6" off deck, on camel. b. No verdigris on interior or exterior of nozzles, strainers, hose couplings and Y- gates. c. Current hydrostatic date stenciled on hose per MRC. d Fire plug (FPL) bull's-eye correct, red and white characters only (8-1/2"H X 18"W) and lists FPL and all COVs for FPL. e Navy Vari-Nozzle on hose and in bracket. f Y-gate connection to hose is secured and connection without hose is open. g Necessary equipment to operate FPL must be on station per MRC.

p. 354

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-C-7 APPENDIX C 11. Bulkheads and Decks SAT UNSAT N/A a. General cleanliness and no rust. b. Paint condition (no runs, good condition). c. No holes or missing rivets. d. Angle irons clean. e. No unused brackets. f. Penetrations sealed properly (turn lights off to inspect). g. Proper insulation and lagging for hot or cold (as applicable). h. Tanks and voids properly DC cla ssified, marked, closed, and safety precautions posted (as applicable); listed on CCOL. i. Deck covering material intact and maintained. j. Pad-eyes weight test data plate installed and within periodicity. 12. Berthing SAT UNSAT N/A a All lockers and bunk drawers locked. b TV(s) operational. c Watch, Quarter and Station Bill posted. d Racks made. e Rack curtains installed, clean and in good condition. f Bedding and linen clean. g Rack lights in working order (no unauthorized modifications). h No personal gear adrift. i Ironing board and legal iron present. j Tables and chairs in good condition. k General cleanliness. l Space secured for sea. 13. Archways and Ladders SAT UNSAT N/A a. Three nonskid strips (no gaps) on the deck of both sides of archways and on the deck above and below each ladder. b. Hand-rails and chains in good condition. c. Photo luminescent paint along frame of ladder per NSTM. d. Ladder treads not worn.

p. 355

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-C-8 APPENDIX C e. Handrail and ladder pins intact. 14. Machinery Spaces SAT UNSAT N/A a. Valve hand wheels attached, labeled, painted appropriate color, and not leaking. b. Valves, piping vents properly marked. c. Flange shields properly installed. d. Noise hazard warning signs posted. e. Deck grating, hand-rails clean, in place and secured. f. Deck free of grease. g. No equipment lubricants leaking. h. Lagging intact and painted. i. Flexible hoses have correct hydrostatic test data tag, in periodicity, and correctly filled out. j. All panel indicator lights working. k. No excess HAZMAT. l. Fixed firefighting equipment properly maintained for type of space. m. Bilges dry. 15. Overheads, Piping and Ventilation SAT UNSAT N/A a. Pipes stenciled with functional name of system, have appropriate color and flow arrow every 15' but at least once in space per NSTM (arrows will be no less than 4" in length, pipes with outer diameter greater than 2" will be stenciled with 1" characters, pipes smaller will be stenciled but will not use 3/8" characters or smaller. Pipes too small will have label plates or tags indicating system). b. Cableways clean. c. All penetrations sealed. d. General cleanliness, no rust. e. Vent ducting properly lagged (col d or hot), properly stenciled with functional name of system and flow arrow every 15' but at least once in space per NSTM. f. Ventilation filters and screens cl ean and all fasteners installed. g. Pad-eyes and mono-rails weight test data plate installed and within periodicity. 16. Equipment and Gear SAT UNSAT N/A

p. 356

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-C-9 APPENDIX C a. No oily, combustible material or excess gear adrift. b. Flammable liquids in proper stowage, labeled “FLAMMABLE/COMBUSTIBLE LIQUIDS”, will have inventory posted, only one week’s worth, and cans properly sealed. c. Space secure for sea. d. Equipment foundations and supports properly preserved. e. Gage calibration within periodicity. f. Gage pointers properly set (red). g. LP air station oil lubricator filled. 17. Electrical Safety SAT UNSAT N/A a. Extension cords, appliance and tools safety checked. b. High voltage warnings posted (as applicable). c. Casualty power terminals pos ted and T-wrenches available. d. Emergency casualty power cables properly identified with number of cables, lengths and stowed. e. No frayed or exposed de ad ended electrical cables. f. Electrical outlets labeled and intact. g. Sound powered phone receptacles covere d, labeled, intact and wire lanyard installed to cover. h. Stuffing tube packed. i. One wire per stuffing tube, cables penetrate via stuffing tubes only. j. Power and lighting distribution panels labeled and intact. k. No unauthorized electrical or el ectronic equipment (refrigerators, coffee pots, fans, air conditioners, microwave, water cooler, etc. without proper authorization forms). m. Power panel megger holes plugged. n. Circuit breaker boxes have no voids. o. Vent controllers DC classified and listed on CCOL. p. Electrical panels, controllers , boxes cover bolts in place. 18. EEBDs SAT UNSAT N/A a. Sufficient number in space. 100% in work-spaces and berthing. 150% in main spaces.

b. Inspection port shows BLUE.

p. 357

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-C-10 APPENDIX C c. One per rack in berthing areas. 19. Office and Work Shops SAT UNSAT N/A a. Chairs in good condition, arms and backs intact. b. Cabinets open properly, door handles intact. c. Shelving installed prope rly, holding bar in place. d. Desk installed or mounted, drawers operate properly and in good condition. e. All lockers open and accessible. f. Space secured for sea with no horiz ontal or vertical movement. g. Rubber matting or diel ectric sheet associated electrical gear and or testing equipment. h. Electrical or electronic eq uipment safety checked. i. HAZMAT stowed in proper locker. 20. Heads SAT UNSAT N/A a. All plumbing operable and pipes have no cracks or leaks. b. No odors. c. General cleanliness. d. Toilets must be clean, free of buildup and toilet paper available. e. Shower curtains and stalls clean and free of mold. f. Hand soap dispenser available and filled. g. Electric hand dryer or paper towel dispenser filled and operational. 21. Access Closures SAT UNSAT N/A a. All dogs on center of strike plates on WTDs or QAWTDs when secured. b. All dogs present and able to be secured on WTHs. c. Hand wheels tight within ¼ turn of WTSs when secured. d. No paint on knife edges or gaskets, dogs, and striker plates. e. No loose dogs when WTH or WTD secured. f. No gap on gasket. g. No paint on moving parts. h. DC classification on both sides of door. i. Photo luminescent paint outlining door leading to egress.

p. 358

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-C-11 APPENDIX C j. Photo luminescent exit sign on bo ttom of door and within 5' of access. k. Label on both sides of hatch or scuttle. l. Door opens and shuts completely. m. Adequate non-skid strips (no gaps) on the deck on both sides of door. n. Listed on CCOL.

p. 359

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-C-12 APPENDIX C APPENDIX C SECTION III LIGHTING TROUBLE CALL FLOW CHART

p. 360

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-C-13 APPENDIX C

AIR CONDITIONING (A/C) NOT OPERATING TROUBLE CALL FLOW CHART

p. 361

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-C-14 APPENDIX C

FAN ROOM FLOODING TROUBLE CALL FLOW CHART

p. 362

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-C-15 APPENDIX C WATER CLOSET (TOILET) CLOG TROUBLE CALL FLOW CHART

p. 363

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-D-1 APPENDIX D APPENDIX D SKED 3.2 SETTINGS AND PREFERENCES

p. 364

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-D-2 APPENDIX D SKED 3.2 SYSTEM USER SETTINGS The following SKED system user settings are detailed in the table below. Commands will configure user roles as listed below.

Permission

Primary Tab ADMIN 3MC DH DIVO WCS LCPO D3MA CREW Create FBR FBR X X X X X X Delete FBR FBR X X X X Delete Feedbacks FBR X Export Approved Feedbacks FBR X Set Feedback Preferences FBR X Sign FBR FBR X X X X X Add Equipment to a MJC Task

General

X

X

X

X

X

X

Add or Modify User Accounts General ** X Create User Report General X X X X X X Create, Delete, Modify Local Report

General

X

X

X

Disable User Accounts General X Import and Export Equipment General X Load Navy PMS Compact Disc (CD) General X Modify the CoC General X X Print MIP and MRC Documents General X X X X X X X

p. 365

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-D-3 APPENDIX D SKED 3.2 SYSTEM USER SETTINGS

Permission

Primary Tab ADMIN 3MC DH DIVO WCS LCPO D3MA CREW Record Spot Check Results General X X X X X X Schedule Spot Checks General X X X Schedule Training Assignments General X X X X Set Global Preferences General X Set UIC Preferences General X Trigger MJC Work Candidate General X X X X X X Update Global Events General X Admin Tab Visible General X X X X X X Acknowledge Weekly Closeout Work Center X X X X X Add Work Center Journal Entry Work Center X X X X X X Approve MRC Lineout Customizations

Work Center

X

X

X

X

Assign Check and MRC Crew Assignments Work Center X X X X X X Create Work Center Work Center X Delete Work Center Work Center X Edit Check Note Work Center X X X X X X Enable and Disable IEM Work Center X X X X X X

p. 366

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-D-4 APPENDIX D SKED 3.2 SYSTEM USER SETTINGS

Permission

Primary Tab ADMIN 3MC DH DIVO WCS LCPO D3MA CREW Open 2K (Work Candidate) Work Center X X X X X X Perform MRC Lineout Customizations

Work Center

X

X

X

X

X

X

Perform Work Center Revisions Work Center X X PMS Alert Confirmation Work Center X X X X X Print PMS Deck Work Center X X X X X X Reschedule Checks Work Center X X X X X X Update Check Status Work Center X X X X X X X Update Local Events Work Center X X X X X X Update Situational Measurements Work Center X X X X X X Update Work Center Crew List Work Center X X X X X X Weekly Closeout Work Center X X X X X X

p. 367

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-D-5 APPENDIX D SKED 3.2 GLOBAL PREFERENCES SKED 3.2 Global Preferences will be set as referenced in the tables below:

PMS Art Path (as per system installation) OMMS .INI File Path (as per system installation) OMMS Mode OMMS Download Open work candidate? No Submit Completion work candidate? Yes Submit Open work candidate? Yes Download Stock Check Yes OMMS Download Equipment Yes OMMS PMS work candidate Discovery Code 9 Training Path Root (as per system installation) Distance Support Inbox Path (as per system installation) Distance Support Outbox Path Archive Path (as pe r system installation)

Allow CDM Import Document Path (as per system installation) FBR Path (as per system installation) Update Path (as per system installation)

p. 368

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-D-6 APPENDIX D SKED 3.2 UIC PREFERENCES SKED 3.2 UIC Preferences will be set as referenced in the table below:

Default Training Due Date in Days 60 Weekly Closeout Limit (Days) 1 FBR Approval Limit (Days) 4 Lineout Approval Limit (Days) 7 PMS Alert Acknowledge Limit (Days) 7 PAR Admin Pass or Fail Threshold 85 PAR Periodic Pass or Fail Threshold 85 PAR Situational Pass or Fail Threshold 85 Serial Number Index As per system installation.

p. 369

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-1-E-1 APPENDIX E APPENDIX E FORMAT FOR REPORTING 3-M INSPECTIONS

4790 Ser Date From: Accomplishing Activity To: Commanding Officer (Command Name and Hull Number (if applicable.) Subj: REPORT OF 3-M INSPECTION OF Ref: (a) NAVSEAINST 4790.8 (series); Ships’ Ma intenance and Material Management (3-M) Manual (b) COMUSFLTFORCOMINST 4790.3; Joint Fl eet Maintenance Manual, Volume VI, Chapter 19 Encl: (1) (as required) 1. Per references (a) and (b), a 3-M Inspection of (__________________________) was conducted during the period (Date) to (Date). 2. During this inspection, the following signi ficant deficiencies were discovered: a. (List) Specific department and WC deficiencies are provided in enclosure(s) (1) through ( ). 3. The following overall ship or departme nt numerical assessments are assigned: a. 3-M Total Score __________________ b. 3-M Inspection __________________

(Above, At or Below Standards)

Copy to: Type Commander (with enclosures)

p. 370

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-1 VOLUME VI CHAPTER 19-2 NAVY EXPEDITIONARY COMBAT COMMAND REFERENCES. (a) NAVSEAINST 4790.8 - Ships’ Maintena nce and Material Management (3-M) Manual (b) NAVEDTRA 43241 - Personnel Qualification Standard for Ship’s Maintenance and Material Management (3-M) System (c) NAVEDTRA 43523 - Personnel Qualificati on Standard for Quality Maintenance Program LISTING OF APPENDICES. A 3-M Inspection Criteria B Format for Reporting 3-M Inspections 19-2.1 ROLES AND RESPONSIBILITIES. a. Type Commander. Exercises primary re sponsibility for the effective operation and support of the Ships’ Maintenance and Material Management (3-M) System. Areas of responsibility include but are not limited to the following: (1) Ashore Maintenance Data System (MDS). (a) R-Supply, Organizational Maintena nce Management System – Next Generation (OMMS-NG). (b) Validation, Screening and Brokering (VSB). (2) Planned Maintenance System (P MS) Scheduling (SKED) software. (3) Current Ship’s Maintenance Project (CSMP). (4) The screening and processing of Feedback Reports (FBR). (5) Maintaining an inspection data file per 19-2.4.2.e of this chapter. (6) Providing program enhancement requirements to the respective Fleet Commander via N43. (7) Ensuring units are manned with Navy Enlisted Classification (NEC) qualified Type Commander (TYCOM) 3-M Coordinators (3MC) via N1. (8) Analyzing 3-M Inspection (3MI) an d Self-Assessment data, identifying common concerns, conducting root cause analysis, with the development, and implementation of solutions. (9) Ensuring TYCOM inspection team memb ers are qualified to inspect assigned areas. b. Immediate Superior In Command. The Im mediate Superior in Command (ISIC) is responsible for the routine monitoring and evaluation of the 3-M System for all

CHAPTER 19-2

p. 371

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-2 assigned activities. Areas of responsibility include but are not limited to the following: (1) Designating a 3-M Officer in writing. The 3-M Officer is responsible for the satisfactory administration of 3-M Programs, per reference (a) and this section, for subordinate commands or activities (2) Monitoring and evaluating 3-M Program for all assigned units. (3) Ensuring 3MIs are current. (4) Ensuring subordinate commands c onduct rigorous quarterly 3-M Self- Assessments and report results to the 3MC. (5) Monitoring the status of troubled systems and Top Management Attention items using the quarterly 3-M Self-Assessment. (6) Ensuring subordinate commands comply with standard Work Center (WC), division and department structure. (7) Tracking and monitoring 3-M ma jor milestones and training events, overseeing, or providing inspection teams and conducting 3-M Spot Checks during ISIC or staff visits. c. Inspection Teams. Areas of responsib ility include but are not limited to the following: (1) Scheduling and conducting 3MIs an d training events as directed. (2) Reporting of training status and cer tification recommendations to the TYCOM to include any perceived barriers to effective and timely completion of 3-M events. (3) Ensuring material failures are adequa tely examined to detect 3-M System inadequacies. d. Commanding Officer and Of ficer In Charge. The Commanding Officer (CO) or Officer in Charge is responsible for establishing an aggressive Self-Assessment Program that validates the administration and execution of maintenance and detects improperly conducted maintenance or falsely reported accomplishments. e. Executive Officer. The Executive Officer (XO) is the command’s 3-M System Manager responsible to the CO for the overall management of the 3-M Program. The XO will: (1) Chair quarterly 3-M System meetings with Department Heads (DH) and the 3MC. (2) Brief the CO on the status of 3-M. (3) Integrate 3-M System training into the command’s training and qualification program. (4) Ensure personnel receive adequate and effective 3-M System training. (5) Ensure the effectiveness of the command’s 3-M Self-Assessment Program.

p. 372

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-3 (6) Act as the final review officer for shifts of maintenance responsibility between departments. (7) Establish a command Zone Inspection Program. f. Command Master Chief. The Command Master Chief (CMC) will: (1) Attend the XO’s quarterly 3-M system meetings providing senior enlisted feedback. (2) Conduct PMS Spot Checks following the command’s policy to ensure required maintenance is being properly performed and documented. g. Command 3-M Coordinator. The 3MC will: (1) Serve as the key 3-M System assistant to the XO. (2) Maintain a file of 3-M System directives, newsletters, notes, and correspondence containing current 3-M Program information and ensure distribution to WC personnel. (3) Maintain copies of the current Force Revision (FR) NAVY PMS Digital Video Disk (DVD), List of Effective Pages (LOEP) for every WC, changes issued between FRs in their original format and classified Maintenance Requirement Cards (MRC). Digital copies are allowed unless there have been changes between FRs. (4) Advise, monitor, and assist Depart ment Heads (DHs), Division Officers (DIVO), Leading Chief Petty Officers (LCPO) and Work Center Supervisors (WCS) in matters concerning the 3-M System. (5) Monitor the Ship’s 3-M Personnel Qua lification Standard (PQS) Program and maintain an auditable record of personnel qualified in 3-M PQS. (6) Maintain a master accountability log of all PMS changes. (7) Develop and maintain a split Maintenance Index Page (MIP) Log. (8) Administer the configur ation management program. (9) Supervise the command’s 3-M Se lf-Assessment Program and provide a weekly status to the XO. (10) Develop and administer the PMS Spot Check Program. (11) Generate a weekly PMS spot check assignment matrix for officers, Chief Petty Officers (CPOs), and designated supervisory personnel. (12) Ensure corrective actions are take n on all unsatisfactory PMS Spot Checks and report same to the XO as part of weekly PMS reporting. (13) Ensure a complete back-up of the SKED system is made on removable media (i.e., DVD or Compact Disk (CD) following completion of the FR update and retain as part of the PMS Master File. (14) Ensure situational requirements ar e triggered in SKED and completed based on unit events.

p. 373

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-4 (15) Ensure that Global Stat es and Triggers are properly set at the command level. (16) Screen all FBRs, verify content, va lidity, serialize and forward within seven days of origination. (17) Maintain accountability of all submitted FBRs and actions taken until corrected or new PMS documentation is received. (18) Ensure the FBR originator and all ap plicable WCs are apprised of action taken and that changes or corrections are implemented when received. (19) Ensure 3-M documents such as Ship’s Maintenance Action Form OPNAV 4790/2K, Ship’s Configuration Change Forms OPNAV 4790/CK (CKs), etc. that require forwarding to a data processing activity are forwarded within seven days of origination or as operationally feasible. (20) Validate 3-M MDS data elements fo llowing the 3-M validation specifications. (21) Ensure 3-M documents returned fo r the correction of data are promptly revised and resubmitted. (22) Track the reporting of completed main tenance actions related to an alteration or because of a configuration change with timely processing of Automated Shore Interface (ASI) configuration and logistic data. (23) Report up-line CSMP maintenance transactions and command’s equipment file corrections at least twice a month. (24) Ensure current external bac kups of the command’s Configuration Management Database are created on removable media (i.e., DVD or CD). (25) Maintain any outstanding paper co pies of message work candidates and OPNAV 4790/2L, either paper or electronic. h. Maintenance Officer. The command Mainte nance Availability Coordinator will be responsible for the coordination of all Fleet Maintenance Activity (FMA) repairs and coordinate closely with the 3MC. The Maintenance Availability Coordinator will also provide a single working level point of contact and coordinate the command’s requirements with the requirements of the FMA. These duties include: (1) Technical review of work requests submitted for FMA accomplishment. (a) Ensure readability a nd technical correctness. (b) Prevent duplication of work reque sts for ship alterations, and other Master Job Catalog (MJC) originated deferrals. (c) Collect supplemental 4790/2L reque sts for routine work (i.e., lagging, painting, label plates, tiling, etc.) from all WCs and prepare an integrated priority list for each type of routine work to maximize the FMAs effectiveness. (2) Ensuring command preparations for an FMA availability are conducted per Volume II, Part I, Chapter 4 of this manual.

p. 374

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-5 (3) Meeting daily during an av ailability with the assigned Ship Superintendent to discuss the status of all active jobs. (4) Attending all FMA production, night work and management meetings. (5) Provide a daily FMA job status to ea ch DH, DIVO and Leading Petty Officer (LPO). (6) Establishment of a Planning Board for Maintenance (PB4M). i. Department Head. The DH is responsi ble to the XO for the operation and execution of the 3-M System within the department. Duties and responsibilities assigned to the DH are not to be delegated. The DH will: (1) Designate departmental 3- M personnel as applicable. (2) Ensure maintenance is prioritiz ed to facilitate accomplishment. (3) Review and approve all depart ment PMS schedules and revisions. (4) Review maintenance action annotations. (5) Acknowledge weekly alerts. (6) Implement a Self-Assessment Program within the department to validate properly accomplished and reported maintenance. (7) Take corrective action on all “Unsatis factory” PMS Spot Checks and report to the XO via 3MC as part of weekly PMS reporting. (8) Ensure all material deficiencies are documented and promptly reported. (9) Review and verify the content and va lidity of all FBRs, digitally sign FBRs within five days of origination. (10) Ensure the Configuration Mana gement Database accurately reflects equipment changes whether the action is performed by command personnel or outside activities. (11) Authorize placement of equipment in to an Inactive Equipment Maintenance (IEM) status, ensure PMS scheduling is annotated accordingly. (12) The review and approval of all depart ment work candidates within four days of creation; ensure completeness, accuracy, and the correct assignment of priority. (13) Review all work candidates in the departmental CSMP every 90 days. (14) Ensure that no classified data or Navy Nuclear Propulsion Information is reflected on 3-M documents designated for off hull distribution. (15) Conduct quarterly meetings with DI VOs, LCPOs and WCS and provide status of departmental 3-M System to the XO.

p. 375

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-6 j. Department Leading Chief Petty Officer. The department LCPO is responsible for the proper operation of the 3-M System within their department. The department LCPO will: (1) Provide 3-M System guidance and training to DIVOs and division LCPOs within their department. (2) Participate in quarterly Self-Assessments. (3) Review all quarterly Self-Assessments and promptly correct discrepancies found within the department. (4) Ensure the proper testing and inspec tion of work done by outside activities prior to job acceptance. k. Division Officer. The DIVO is respon sible to the DH for the execution of maintenance within the division. The DIVO will: (1) Ensure all PMS scheduling changes ha ve been properly annotated and applied prior to DH review and finalization. (2) Review the 13-Week Accountability Log at the beginning of the PMS week and sign at the end of the week if not using electronic accountability in SKED or when SKED is not available. (3) Review and verify the content and valid ity of PMS FBRs within three days of origination. (4) Ensure 3-M documents generated with in the division are complete, accurate and promptly submitted to the DH. (5) Conduct 3-M Self-Assessments as directed by the command’s policy. (6) Provide weekly updates to the DH con cerning the status of the 3-M System within the division. (7) Incorporate 3-M System training into the Divisional Training Plan. (8) Review divisional work candidates a nd the CSMP for validity and accuracy. (9) Conduct monthly briefings for the DH on the status of all work candidates. l. Division Leading Chief Petty Officer. The division LCPO is responsible for the proper operation of the 3-M System within their division. The division LCPO will: (1) Supervise WCSs in the execution of daily maintenance. (2) Ensure WCSs are properly trained, equipped and are knowledgeable of all WC divisional equipment maintenance requirements. (3) Ensure divisional personnel are pr operly trained and qualified to conduct maintenance. (4) Verify all divisional WC equipment is covered by PMS. (5) Ensure PMS is properly scheduled and conducted, including all underway and special evolution situational “R” checks.

p. 376

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-7 (6) Review WC PMS records (i.e., FRs, Advanced Change Notices (ACN) and PMS FBRs and Responses), approve all lineouts and additions on the LOEP, MIPs, and PMS schedules prior to DIVO and DH reviews. Ensure proper justification is noted on each lineout. (7) Review and approve non-applicable procedural steps lined-out on MRCs. (8) Review and sign the 13-Week Accountab ility Log at the end of the PMS week (if not using electronic accountability in SKED or when SKED is not available). Ensure checks added that week are hand-written into the blank accountability log. (9) Review the PMS Scheduling Forecasti ng Report to ensure that all Tools, Parts, Material and Test Equipment (TPMTE) are available to support upcoming maintenance actions. (10) Provide the DIVO a weekly status of the division’s Self-Assessment Program, CSMP and PMS. (11) Ensure the Configuration Manageme nt Database reflects current ship’s configuration. (12) Ensure FBRs are submitted reques ting LOEP changes to reflect system, equipment and component installs or removals. (13) Review and verify the content and va lidity of PMS FBRs within two days of origination. (14) Ensure the divisional CSMP accu rately reflects material conditions. (15) Review and approve work candidates, act as the second point of contact for work candidates and provide the DIVO a weekly brief on the status of all work candidates in the CSMP. (16) Ensure proper testi ng and inspection of work done by outside activities prior to job acceptance. (17) Coordinate repair activ ities within the division. (18) Review, approve, and close out weekly schedules. m. Work Center Supervisor. The WCS will be a senior petty officer assigned to the work center and qualified per reference (b). The WCS will: (1) Maintain a detailed working knowledge of all equipment deficiencies within the WC. (2) Ensure WC personnel have complete d 3-M PQS training commensurate with position held. (3) Ensure PMS covers all maintenance worthy equipment in the WC. (4) Maintain an accurate and current LOEP. (5) Ensure 3-M System WC files and pu blications are complete, current, and available to WC personnel.

p. 377

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-8 (6) Ensure WC initiated 3-M documentation is correct, legible, promptly prepared and submitted. (7) Maintain a 13-Week Accountability Log containing the current and previous 13-Week Log if not using electronic accountability in SKED or when SKED is not available. (8) Prepare weekly WC schedule, obtai n required approval, assign maintenance personnel, and update schedule to reflect status. (9) Ensure equipment changes, add ons and removals are reflected in the Configuration Management Database and, if not, report via a CK to the Configuration Data Manager (CDM). (10) Provide MRCs reflecting procedur al step lineouts and a listing of non- applicable R-Checks for review by the division LCPO or LPO. (11) Ensure FBRs are submitted whenever: (a) Maintenance requirements are not fully understood. (b) Errors are believed to exist. (c) Entries in the TPMTE block are wrong or inadequate. (d) Additional coverage is needed. (e) Performance of the maintenance requirement would cause a hazardous condition to exist. (12) Ensure prompt reporting of all material deficiencies and completed maintenance actions. (13) Ensure Periodic Maintenance Requirements scheduled for command accomplishment are completed and reported as required. (14) Ensure test and measurement equi pment or other portable support equipment is delivered for test or calibration as scheduled. (15) Ensure the DIVO and division LCPO or LPO are advised of all 3-M System activity within the WC. (16) Spot check completed equipment file validations; ensure accuracy of the information and PMS scheduling equipment associations. (17) Review the PMS Scheduling Forecasti ng Report to ensure that all TPMTE is available to support upcoming maintenance actions. (18) Ensure all WC weekly schedules are updated daily. n. Maintenance Personnel. Maintenance personnel will perform all PMS as assigned utilizing PMS documents in SKED and ensure Check Notes contain amplifying information and tagout identifiers as required. Maintenance personnel will: (1) Perform assigned maintenance. (2) Notify the WCS when:

p. 378

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-9 (a) An MRC is not fully understood, ap pears to be incorrect or cannot be accomplished as written. (b) There are issues with the TPMTE block of the MRC. (c) The technician has doubts concerning his or her ability to perform the maintenance. (d) Equipment deficiencies or casualties are discovered. (e) Factors exist which would make performance of the maintenance unwise or dangerous. (3) Initiate FBRs when discrepancies ar e discovered during the performance of an MRC. (4) Inform the WCS when planned main tenance requirements are complete. (5) Annotate PMS schedule to reflec t accomplishment of maintenance. (6) Sign 13-Week Accountability Log if not using electronic accountability in SKED or when SKED is not available. 19-2.2 QUALIFICATIONS. All personnel assigned to billets associated with the 3-M system must be 3-M PQS qualified for the assigned billet per reference (b). Evidence of qualification in support of 3-M requirements must be maintained by the command in an auditable fashion. In addition to 3-M PQS qualifications, all personnel assigned to accomplish 3-M related maintenance on systems listed in Volume V, Part 1,Chapter 2 paragraph 2.2.1 of this manual, must be qualified per reference (c). Table 19-2-1 reflects the PQS qualifications required to fill 3-M billets. Table 19-2-1 - Required PQS Qualifications 3-M Coordinator PQS-307 3-M Assistant PQS-306 Department Head PQS-306 Department LCPO PQS-305 Division Officer PQS-304 Division LCPO PQS-304 Work Center Supervisor PQS-303 Repair Parts Petty Officer PQS-302 or RPPO Continuous Training and Qualifications Software Maintenance Personnel PQS-301 19-2.3 PLANNED MAINTENANCE. 19-2.3.1 Minimum Standards. MRC accomplishment is critical for maintaining equipment in a ready state and achieving expected service life. The maintenance tasks directed by MRCs are the minimum standards for organizational (shipboard) preventative maintenance and therefore

p. 379

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-10 equipment degradation can be assumed if maintenance is deferred. The following provisions are provided to maximize on time performance of PMS and provide increased fleet latitude in maintaining equipment. a. MRCs are prepared as instructions to complete a maintenance task based upon the premise that the personnel assigned to perform the task have sufficient knowledge of the rate listed on the card and are qualified to perform maintenance as directed by the MRC. The MRC will be accomplished in sequential order, adhering to all Warnings, Cautions and Notes. Routine sub-steps (i.e., fastener removal, steps to don and remove Personnel Protective Equipment (PPE), turning on a vacuum) may or may not be included in the MRC and their absence should not prevent the maintainer from completing the maintenance task. b. Per Naval Sea System Command (NAVSEA), procedures are written at a level of detail based on the assumption maintenance personnel are trained, qualified, and supervised by experienced leadership to execute the maintenance consistently and expertly. They exist to provide a common standard, specify acceptance criteria, communicate warnings, and cautions specific to the maintenance and provide proven maintenance practices. They are not intended to: (1) Supplement or duplicate rules and pr ocedures that must be followed for hazards generally associated with the equipment, such as Hazardous Material Handling, Electrical Shock Risk Management, etc., but not specifically associated with a step of the procedure. (2) Identify every process and every wa rning associated with the maintenance environment of the component being maintained, such as aloft, in tanks, near an active flight deck, in a heat stress area, etc. (3) Specify every possible action of the maintainer. c. Leadership will uphold standards for comply ing with maintenance procedures. This standard does not mean the maintainer is expected to robotically follow the MRC word-by-word. Leadership, trainers, monitors, auditors, and inspectors should not expect it. The key word here is intent. The objective is to perform the intent of each step (not necessarily step-by-step performance). d. If a step is missing that is necessary to complete the task, and that step is not obvious to the Maintenance Person (MP), a FBR should be submitted. e. MRC completion status is dependent on the accomplishment of all procedural steps on all equipment listed on the MRC or its accompanying items listed on the Location Guide List (LGL) section of the MRC. f. The performance of additional rational ac tions during the accomplishment of an MRC is authorized. Examples of such actions include turning on and off items utilized during the performance of the MRC, such as vacuum cleaners, test equipment, etc., general housekeeping, cleaning up or containing spilled fluids or dirt. g. The substitution of any tools, materials or test equipment not held by the activity should be considered prior to deciding to defer the maintenance until the exact tools, materials or test equipment listed on the MRC are procured. This is especially critical

p. 380

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-11 for frequently required maintenance where several performance cycles can be missed while waiting for supply to provide the correct items. Substitution requirements are provided by reference (a) and other technical documents. 19-2.3.2 Functional Components. a. PMS Master File. The Master File, maintained by the units 3MC, contains information relative to PMS requirements that are specific to equipment for which the command is responsible. The Master File provides for duplicate issue of missing MIPs and MRCs, contains supplementary information provided by Naval Sea Logistics Center Detachments Norfolk or San Diego and serves as a repository for changes received between Navy FR distributions, which must be retained on file until the changes are reflected in a subsequent FR. Master File content is delineated in Appendix A, Section II, Command Level Effectiveness Review (CLER). b. Work Center PMS File. The WC File provides a ready reference of planned maintenance requirements and information to be retained in the working area for use by the WCS and maintenance personnel. The WC File contains only the documents and information applicable to a particular WC. The content of the WC File is delineated in Appendix A, Section I-B, Scheduling and Execution Effectiveness Review. c. Interim MRC Procedures. The comma nd may develop interim MRC procedures based on experience and applicable technical manuals in support of equipment or systems without PMS coverage until formal documentation is received. Before scheduling preliminary MIP requirements, the WCS and the DH must verify their applicability to installed equipment. d. Weekly Status Report. The weekly PMS M onitoring status reports will be retained (electronically if desired) by the 3MC for 12 months. These reports from the 3MC to the XO will contain, as a minimum, the information cited in paragraphs 19-2.3.2.d.(1) through (6) of this chapter. (1) Completed Spot Check and Monitored MRC results. (2) Completed WC audits and results. (3) The number of FBRs over seven days ol d that have not been reviewed by the Chain Of Command (CoC). (4) Abatement and corrective actions comp leted because of a monitoring program finding. (5) IEM Details Summary Report. (6) Overdue (Alerting) MRCs a nd plan of corrective action. e. Change Service Accountability Log. The Change Service Accountability Log (CSAL) (Figure 19-2-1) provides a definitive record of all changes to a command’s 3- M Program. Whenever a change to a command’s 3-M Program is directed (be it from an FR, FBR, ISIC direction, etc.), the change will be routed to the concerned WCS(s) via a memorandum. Whenever such a memorandum is issued, it must be recorded in

p. 381

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-12 the CSAL. Once the WCS reports the directed change has been completed, the 3MC will file the WCS’s response and annotate in the CSAL that the action is complete. (1) The CSAL is comprised of the actual l og sheet, a copy of all memos routed to the WCS and the memo from the WCS to the 3MC indicating completion. (2) The importance of the CSAL cannot be overstated. Basically, it provides for a day-to-day, year-to-year record of changes to a command’s planned maintenance program. It is also a turnover document at deployment sites, allowing a current command to quickly identify all changes from a previous command. Finally, it will be inspected during all command 3-M assessments and inspections, providing visibility as to how well a command manages 3-M from one inspection to another.

Figure 19-2-1 - Change Service Accountability Log

FR Change Number or Authority Date RCVD Cognizant Dept. or WC Date Cover Sheet Issued Date Cover Sheet Returned Date Master File Updated or Item Closed Summary of Change

p. 382

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-13 19-2.3.3 Related Maintenance. Related maintenance, so designated by the ISEA or Technical Warrant Holder, is determined from the MIP. The RELATED MAINT column of the MIP reflects related maintenance requirements. Related requirements are positioned on the MIP to line up directly across from the MRC to which they are related. Related maintenance requirements are also identified in the TPMTE section of the MRC under MISCELLANEOUS. a. Related Maintenance Categories. (1) Mandatory Related. Mandatory relate d maintenance requirement(s) are those maintenance actions that must be accomplished concurrently with another maintenance requirement. The mandatory relationship is indicated with the use of the # sign. If the mandatory related maintenance resides on the same MIP, it will be reflected in the RELATED MAINT column as “periodicity#” (i.e., M-3#). If the related maintenance resides on another MIP, it will be reflected as “MIP:periodicity#” (i.e., IC-013/033:M-4#). Mandatory related maintenance requirements are automatically scheduled by SKED. NOTE: MANDATORY RELATED REQUIREMENTS MUST BE LINKED IN SKED TO BE AUTOMATICALLY SCHEDULED. (2) Convenience Related. Convenience related maintenance requirements are those maintenance actions that can be accomplished concurrently with another maintenance requirement to save time (preliminary steps and tag-outs already accomplished) or for work force considerations. If the convenience related maintenance resides on the same MIP, it will be reflected in the RELATED MAINT column as “periodicity” (i.e., M-5). If the related maintenance resides on another MIP, it will be reflected as “MIP:periodicity” (i.e., EL- 010/001:M-4)). In both cases, the # symbol is omitted. The WCS manually schedules convenience related requirements. (3) Conditional Related. Conditional related maintenance requirements are those maintenance actions that are performed when specific conditions are present or specified parameters are not met on the referencing MRC. Conditional related maintenance will appear on the MIP in the same manner as convenience related maintenance. The WCS manually schedules conditional related requirements. (4) None. No related maintenance is reflected as “None” in the RELATED MAINT column. b. Work Center Supervisors Actions. WCSs are encouraged to review their schedules on a regular basis for opportunities to perform other PMS when an equipment or system has maintenance actions scheduled. Rescheduling of PMS to take advantage of other system maintenance, convenience related, is highly recommended. (1) If an MRC has related maintenance fr om another MIP, review the related MIP and MRC and determine if it requires assistance from another WC. (2) If the related MIP and MRC does not require assistance from another WC and is not on the lead WC LOEP, submit a FBR to have it added to the LOEP.

p. 383

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-14 (3) If the related MIP and MRC requires assistance or completion by another WC and is mandatory, convenience or conditional related then it should also be on the lead WC LOEP. If it is not on the lead WC LOEP, submit an FBR to have it added to the LOEP. If the related MRC requires technical assistance, a special NEC, or another rating, that is not part of the lead WC, then the person with the technical training, special NEC or required rating should be temporarily added to the lead WC “Crew List” and assigned the related maintenance in either an assist or performance role. All WCSs involved will collaboratively plan the required maintenance and may adjust schedules based upon individual workload. When the maintenance is completed, the lead WCS will mark the MRC as completed. NOTE: WHEN EQUIPMENT IF FULL Y OPERATIONAL AND WILL NOT BE UTILIZED FOR EXTENDED SHUTDOWN PERIOD. 19-2.3.4 Inactive Equipment Maintenance. a. Inactive Equipment. A piece of equipmen t or system intentionally placed in a hibernated state for a specific period with the intention of reactivating that equipment or system at the end of that period. (1) Status I. Equipment that will: (a) Remain onboard, (b) Is not scheduled for corrective maintenance or overhaul, or (c) Will be inactive during extended shutdown periods and maintenance availabilities as determined by the DH. (Example: Caterpillar 120M Road Grater.) (2) Status II. Equipment that is inactive and: (a) Subject to corrective maintenan ce, overhaul, or removal for safe storage, (b) Temporarily transferred to another activity for maintenance responsibility for extended shutdown periods as determined by the DH, (Example: Combatant Craft.) (c) When craft is going into an av ailability for engine overhaul. b. Implementation and Responsibility. Wh ile inactive, minimum maintenance is performed to ensure the success of the reactivation. The IEM section of the MIP will cover this maintenance. However, consideration should also be given to active PMS maintenance checks (i.e., M-1, Q-1, A-1) that can be manually added and performed during this period of inactivity. (1) To implement procedures for the accomplishment of PMS for equipment declared in an inactive status, current PMS schedules are modified to annotate the requirements listed in the IEM section of the MIP. For advance planning and scheduling of maintenance to take place, it is necessary to determine and identify the extent to which unit or Ship’s Force personnel will conduct PMS

p. 384

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-15 during an inactive period. MIPs in each WC will be reviewed to determine if equipment has IEM coverage (i.e., Lay-Up (LU), Periodic Maintenance (PM), Start-Up (SU) and Operational Test (OT)), if the coverage is adequate, and what procedures to follow if there is no IEM coverage on the MIP or provided coverage appears inadequate. The DH is responsible for determining equipment IEM status. When placing a system or equipment in IEM status, the DH will also determine the IEM start date to be reflected in SKED. The IEM end date will not be applied in SKED until the system or equipment is ready to be brought out of IEM status. All periodic PMS that would have been scheduled during the IEM period should be reviewed for applicability, with applicable maintenance accomplished prior to operating equipment. (2) IEM procedures are listed on MIPs and separated from operational PMS by a horizontal line. The IEM section is titled “Inactive Equipment Maintenance” and is prefaced by the following statement: “The following requirements will be scheduled when equipment is inactivated for periods of prolonged idleness.” When there are no IEM requirements the words “None required” will appear under the Inactive Equipment Maintenance Section of the MIP. When IEM procedures are inadequate, submit an FBR. The unit should consider all factors that affect equipment deterioration and take necessary precautionary measures. These factors include environmental conditions, equipment location, susceptibility to damage or other factors that cannot be anticipated when IEM procedures were originally developed by the cognizant ISEA or design activity. (3) The lack of IEM requirements on a MI P does not prohibit placing that system or equipment into an inactive state. Additionally, certain locations require precautions and maintenance not required force-wide. The unit should consider all factors that affect equipment deterioration and take necessary precautionary measures. The WCS or LCPO is responsible for identifying factors that are inadequate and may require additional preparation and maintenance of the inactive equipment while reporting same to the DH for approval. Factors may include environmental conditions, equipment location or susceptibility to damage. For those actions that are recurring in nature, the WCS should submit a FBR for possible MRC development. c. IEM Scheduling. SKED provides the capability to perform IEM scheduling. (1) Status I. The scheduling of main tenance for Status I inactive equipment utilizes conventional PMS scheduling techniques. LU checks will automatically be added to the schedule at the beginning of IEM by SKED. PM checks will be manually added to the schedule by the WCS for the period of IEM following the guidelines of the MIP. At the conclusion of IEM, SU checks and routine PMS will automatically be added to the schedule by SKED. SU checks must be accomplished the week IEM ends. All periodic checks added at the end of IEM, can be moved to the right, not to exceed the allowable date range. Since the MRC date range cannot be applied to the left into the IEM period, the MRC date range can only be moved to the right and

p. 385

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-16 therefore only the plus value of the specific range. For example, the date range for a monthly is 21-41 days. The requirement can only be moved (scheduled) ten days to the right and will not go into “alert” until after the 10th day. This allows the MP or WCS scheduling flexibility within the plus side of the date range of the MRC. (2) Status II. The scheduling of mainte nance for Status II inactive equipment utilizes conventional PMS scheduling techniques, however, not all scheduled IEM PMS may need to be accomplished by the unit or Ship’s Force. LU checks will automatically be added to the schedule at the beginning of IEM by SKED and may be marked “NA” if the LU check did not support the equipment being removed from the unit or “Accomplished by Higher Authority” symbol if completed by the intermediate or depot level maintenance activity. PM checks may be required to be scheduled during the IEM period. At the conclusion of IEM, SU checks and routine PMS will automatically be added to the schedule by SKED. SU checks must be accomplished the week IEM ends and may be marked with the “Accomplished by Higher Authority” symbol if they were completed by the intermediate or depot level maintenance activity. Routine PMS added at the end of IEM may also be marked with the “Accomplished by Higher Authority” symbol if they were completed by the intermediate or depot level maintenance activity. All periodic checks added at the end of IEM, can be moved to the right, not to exceed the allowable date range. Since the MRC date range cannot be applied to the left (into the IEM period), the MRC date range can only be moved to the right and therefore only the plus value of the specific range, i.e., the date range for a monthly is 21-41 days. The requirement can only be moved (scheduled) ten days to the right and will not go into “alert” until after the tenth day. This allows the MP or WCS scheduling flexibility within the plus side of the date range of the MRC. NOTE: WHERE THE GOAL OF 100 % ACCOMPLISHMENT CANNOT BE REACHED, THE UNIT’S COC MUST BE KEPT INFORMED OF THE CIRCUMSTANCES THAT PREVENT ACCOMPLISHMENT OF SCHEDULED MAINTENANCE. 19-2.3.5 Scheduling. PMS is a portion of the command’s 3-M Program that provides, in one authoritative system, the scheduling information and technical procedures governing planned maintenance. PMS provides a simple method for scheduling and documenting the execution of planned maintenance procedures. Fleet policy and scope are listed in Chapter 19 of this Volume with the scope identified in Chapter 19, paragraph 19.3 of this Volume. a. Situational maintenance scheduling will be managed utilizing the tools provided by the computer-based PMS scheduling software employed by the activity. All event driven situational requirements will be “triggered” when required and performed per reference (a). b. Check Notes are required in SKED under the following circumstances. (1) When PMS is marked as “lost”.

p. 386

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-17 (2) When PMS is marked as not-applicable. (3) When PMS is marked with the ‘¢ ’ symbol, “satisfied by Higher Level Maintenance.” (4) When PMS requires a tag-out, the tag- out program of record identifier will be entered. c. Alert Notes will be in the format of paragraph 19-2.3.8 of this chapter. 19-2.3.6 SKED. The use of SKED version 3.2 or subsequent versions for PMS Scheduling constitutes full compliance with all administrative provisions of the 3-M Manual. a. Guidance for use of SKED is provided vi a the SKED users guide with help menus, and wizards associated with SKED functionality. b. The Navy PMS DVD or CD-ROM is used to update the command or unit’s SKED PMS data. c. The SKED program uses days to schedule and keep track of calendar periodicities. MRCs are displayed as out of periodicity when they fall outside the established date ranges in the SKED program. These date ranges are as reflected in Table 19-2-2: Table 19-2-2 - SKED Periodicity – Date Ranges Periodicity Date Range Daily None 2D None 3D None Weekly None 2W 9 - 19 days 3W 14 - 28 days Monthly 21 - 41 days 2M 41 - 83 days Quarterly 61 - 121 days 4M 83 - 165 days Semi-Annually 121 - 243 days 8M 165 - 331 days 9M + or - 90 days from scheduled date Annual + or - 90 days from scheduled date Multi-month after annual + or - 90 days from scheduled date

p. 387

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-18 19-2.3.7 Accomplishing PMS. Maintenance personnel use MRCs to accomplish assigned planned maintenance as described in subparagraphs 19-2.3.7.a through 19-2.3.7.h of this chapter. a. From SKED “My Task” view , review the 13-week report. b. Determine maintenance task(s) assigned. c. Determine when the maintenance task(s) are due. d. Determine what tools, parts, material, te st equipment or supplies are needed. For MRCs that contain inspections and then maintenance actions based upon the inspection findings, the TPMTE needed to perform the follow-on maintenance caused by the inspection findings does not need to be obtained prior to performing the MRC but rather, may be obtained as needed. e. Perform the maintenance on schedule. f. Notify the WCS immediately whenever one or more of the following conditions exist: (1) Anything on an MRC is not fully understood, appears to be incorrect or cannot be accomplished as written. (2) TPMTE prescribed by the MRC is not av ailable, is not correct or questions about substitutions arise. (3) Any doubt exists about your capabilit y, training, or experience to properly perform the maintenance requirement as prescribed. (4) Factors exist which would make perf ormance of the maintenance requirement unwise or dangerous (i.e., disassembly of equipment needed for operations, radiation when prohibited, situations causing safety hazard to exist, etc.). (5) Equipment deficiencies or casualties are discovered. (6) Any provisions or requirements on the MRC cannot be accomplished as prescribed. See paragraph 19-2.4.1 of this chapter for clarification. g. If an MRC can be completed step by step as written, then the maintenance action can be signed off as completed. Report completed planned maintenance actions to the WCS, update the PMS schedule to reflect completed maintenance, annotate, and sign the 13-Week Report if used. If multiple maintenance personnel are assigned to a single maintenance action, the most senior person assigned must update the PMS Schedule, annotate, and sign the 13-Week Report or Check Note if using SKED 3.2 electronic accountability. h. Maintenance actions not fully completed will be reported to the WCS. If material deficiencies or casualties, which are unrelated to that MR, are discovered, the MR can be checked off provided the MR was fully completed, but the discrepancy must be reported via MDS. 19-2.3.8 Non-Accomplished PMS Categories. The WCS or LCPO will add a brief description for each Alert Note for non-accomplished categories using sub-paragraphs 19-2.3.8.a through 19-2.3.8.g of this chapter.

p. 388

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-19 a. System or Equipment Failure. System or Equipment is not operational or in a reduced operational status thus preventing maintenance from being accomplished. CSMP Job Sequence Number (JSN) required in additional text description. b. Inadequate Maintenance Procedures. MRC procedure or steps cannot be accomplished to a point where the maintenance can be considered accomplished. FBR number required in additional text description. c. Unit Operational Requirements. Operat ions prevent the maintenance from being accomplished. Requires additional text description. d. System or Equipment Operational Require ments. Required operation of system or equipment prevents maintenance from being accomplished. Requires additional text description e. Lack of Hazardous Material. Correct Hazardous Material (HAZMAT) not available at the time maintenance was to be performed. CSMP JSN required in additional text description. f. Missing or Incorrect TPMTE. Correct or calibrated TPMTE was not available at the time maintenance was to be performed. CSMP JSN required in additional text description. g. Other. Requires additi onal text description. 19-2.3.9 Accountability. The credibility of the Navy PMS program relies heavily on the individual accomplishing the maintenance. The required dedication and integrity of that individual cannot be overstressed. a. To maintain accountability, personnel ar e required to sign for the completion of assigned maintenance in an Accountability Log if used. The WCS is required to review and sign the Accountability Log weekly to verify the accuracy and completeness of entries. Accountability sheets will be maintained in the WC PMS File for a period of not less than 13 weeks. b. Electronic accountability will be utili zed by commands employing SKED 3.2. When an individual updates the disposition of a check, this is the same as signing and dating a check completion on a 13-Week Accountability Sheet. The disposition of a check will become permanent when the weekly closeout is performed. All PMS maintenance assigned to a MP is presented to them immediately upon SKED 3.2 log- on; and CoC review can be tracked on the Weekly Closeout Signature Sheet. Therefore, there is no need to print and sign the 13-Week Accountability Form. 19-2.3.10 Force Revision Implementation. In addition to the requirements of reference (a), the following steps ensure the most efficient and thorough implementation of an FR: a. The 3MC will: (1) Route the Service Brief to the CoC for review. (2) Enter the FR number from the Automa tic Library Issue Document in the PMS Supersedure and New Issue Accountability Log.

p. 389

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-20 (3) Update PMS and TFR data into SKED prior to routing the change documentation to WCs. (4) Route the FR to WCS for implementa tion. See Figures 19-2-2 and 19-2-3 of this chapter for an example of a routing memorandum and an FR implementation checklist, respectively. (5) Delete SKED FBRs after reflection within the FR. b. The WCS, upon receipt of the chan ge document from the 3MC, will: (1) Make the appropriate entry in the WC Record of Change Log. (2) Make appropriate LOEP, MIP, MRC, etc. changes to the WC PMS File. (3) Apply changes to the WC PMS sche dule utilizing SKED Revision Editor. (4) Route revision changes to division LCPO for review and concurrence. c. The division LCPO will: (1) Verify that all PMS changes have be en properly applied to the WC schedule utilizing SKED Revision Editor. (2) Review line outs on LOEPs, MIPs and MRCs. Initial all such line-outs to indicate concurrence. (3) Submit PMS schedule to the DIVO for review and concurrence. d. The DIVO will: (1) Verify that all PMS changes have be en properly applied to the WC schedule utilizing SKED Revision Editor. (2) Review and concur with the lined- out MIPs on the LOEP, MRCs on the MIPs. (3) Submit PMS schedule to DH for review and approval. e. The DH will: (1) Verify that all PMS changes have be en properly applied to the WC schedule utilizing SKED Revision Editor. (2) Review and approve with the lined-out MIPs on the LOEP, MRCs on the MIPs. (3) Review and approve WC PMS Schedules. f. The WCS makes final entrie s in the WC Record of Change Log, completes the PMS Change Documentation Routing Memorandum, and returns it to the 3MC. g. The 3MC updates the CSAL and notifies the XO that the FR has been installed after receiving all FR PMS Change Documentation Routing Memorandums from the WC.

p. 390

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-21 Figure 19-2-2 - Force Revision Routing Memorandum MEMORANDUM From: 3-M Coordinator To: __________ Work Center Supervisor Subj: FORCE REVISION PACKAGE X-XX Encl: (1) Force Revision Implementation Checklist (2) List of Effective Pages (LOEP) 1. Force Revision Serial: X-XX has arrived from NSLC. 2. The SKED Force Revision (FR) update is complete. Begin your WC FR implementation using enclosures (1) and (2); complete through your Department Head no later than (Day Month Year). 3. Corrections, including those to LOEP, MIP and MRC, should be made immediately. Make certain ACNs and FBR responses are reflected in the FR. If not, maintain the copies and changes to your MIP(s) and MRC(s) until reflected in a subsequent FR. 4. MRCs with procedural line-outs previously approved by the LCPO must again be reviewed by the LCPO to confirm they continue to meet the requirements of the JFMM volume VI, chapter 19. Specifically, in the procedure block, Work Center Supervisors may line-out the non- applicable line items (alternate procedures) that do not pertain to current equipment or configuration when the step includes the words “if applicable” or a note identifies steps to be omitted. These items must be reviewed and approved by the division LCPO. As these changes are WC and maintenance item specific, submission of an FBR is not required.

R/

MC

p. 391

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-22 Figure 19-2-3 - Force Revision Implementation Checklist MEMORANDUM From ____________________________ Work Center Supervisor To: 3-M Coordinator Subj: FORCE REVISION IMPLEMEN TATION CHECKLIST COMPLETION 1. The following actions have been accomplished in SKED to implement Force Revision X-XX. Task Description Initial Verified all equipment is listed under each MIP. Verified new or changed MRCs (green or yellow) are added to the correct Maintenance Item (equipment).

Verified all applicable MRCs for each piece of equipment are active. Verified all MRC’s have associated “Related Maintenance” attached. Verified that Safety of Ship is toggled to “YES” if applicable. Verified that all MIP lineout’s have a technical reason documented for deletion. (Select the “Pencil” Icon on top row)

Verify Maintenance Item Serials & Locations are correct. Upon completion of implementation Marked Complete for digital approval by: LCPO, Division Officer and Department Head. LCPO DIVO DH 2. After DH approval: LCPO run SKED report PMS Documents and Customized MRCs – Line-outs. Verify each procedural lineout meets JFMM volume VI chapter 19, paragraph 19.6.11 requirements.

WCS create an excel spread sheet from the Maintenance Outlook Report as a minimum electronic backup forecasting as many quarters in advance as available and store it on your hard drive (not a LAN drive) in the event of the LAN crashing.

WCS select “Work Center” from the upper menu and “Update Unassigned Slots.” Initially, any MRC without ownership will be assigned to the WCS. Reassignment by the WCS or LCPO will follow.

3. Printing requirements for MRCs are determined by individual command policy. Printed MRCs must come from “PMS Documents” (not PMS Viewer). 4. The only required documents in the WC PMS file are: a. Classified MRCs. b. MRCs required by the command. c. MRCs with pen & ink changes authorized by ACNs or answered FBRs.

p. 392

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-23 5. Approval Signatures: Position Signature LCPO DIVO DH 3MC

p. 393

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-24 19-2.3.11 Planned Maintenance System Feedback Reports. PMS FBRs are used to identify problems with PMS documentation or to request the addition or deletion of PMS coverage. Issues with the periodicity, rates, man-hours, TPMTE and procedure may all be reported via an FBR. An FBR is also used to request copies of classified MRCs, request the addition or deletion of a maintenance requirement to or from a MIP, splitting a MIP between WCs, shifting of maintenance responsibility or to request PMS coverage for newly installed systems or equipment. Paragraphs 19-2.3.11.a through 19-2.3.11.j of this chapter provide amplifying information dealing with the issues that may prompt the submission of an FBR. a. Periodicity. An FBR can be used to reque st the increase or decrease in the frequency of a maintenance action, (i.e., MRC). However, the originator needs to keep in mind that the unit has the prerogative to increase the frequency because of harsh weather, unusual operating conditions or corrective maintenance and associated testing requirements. b. Rates. The Rates block on the MRC repr esents the developer’s recommendation of the skill level (rate and rank) best suited to accomplish the maintenance action. The key word is recommendation. Qualified personnel other than the rate and ranking specified may be assigned. When a DCPO, Safety Petty Officer (SPO) or NEC is assigned, substitution of other personnel is not allowed other than those exceptions as noted in reference (a). An FBR requesting the rate on an MRC be changed from an ET2 to an FT2 will probably not pass TYCOM screening, yet a FBR requesting the addition or deletion of personnel will generally pass to the cognizant technical activity for review. c. Man-hours. The MRC reflects the average time per equipment, per person. It does not reflect or account for gathering and putting away tools, tag-outs or time removing and replacing interferences. From a maintainer’s perspective, this is not an accurate representation of the time required to accomplish the maintenance action. The Future of PMS initiative will attempt to do a better job of accounting for this additional time but until then, FBRs should be submitted only when the allotted time per equipment is significantly out of synch with the actual time required. For example, an MRC calls out 0.5 man-hours per equipment, but it takes 1.0 man-hours. d. Tools, Parts, Material and Test Equipm ent. TPMTE FBRs should be submitted when the procedure calls for an item not listed in the TPMTE block or when the TPMTE block lists an item not called out in the procedure. Updating the MRC to reflect common hand tools, administrative or office supplies and basic housekeeping items is addressed in paragraph 19-2.3.11.k.(1) of this chapter. e. Procedure. Procedures are written at a level of detail based on the assumption maintenance personnel are trained, qualified, and supervised by experienced leadership to execute the maintenance consistently and expertly. MRCs exist to provide standardized proven procedures, specify consistent acceptance criteria and to communicate warnings and cautions relative to the specific maintenance action. They are not intended to specify every possible action of the maintainer. There may be instances where an obvious typographical error exists on the MRC (example: Turn switch to ON; however, switch may already be ON and the intent of the step is to turn unit off, the card should read Turn switch to OFF). This type of error should not

p. 394

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-25 prevent the scheduling or performance of maintenance. However, in this situation, the accomplishment of the MRC is not possible until the WCS reviews the error and concurs that it is safe to proceed. A temporary notation including the reason for the correction must be made on the MRC, initialed by the WCS and a FBR submitted. Extreme caution will be taken when reviewing MRCs for this type of error. Errors must be obvious typographical errors and a PMS FBR must be submitted immediately upon discovered. Do not permanently alter the MRC until authorized by the applicable SYSCOM, ISEA or NSLC Detachment. If a step is missing that is necessary to complete the task, and that step is not obvious to the MP, submit a FBR to have it added. A FBR submitted to request procedural changes should include the originators contact information and supporting rationale or justification. If, however, a step is missing that is clearly obvious, such as a ladder that was used to install a fixture, but steps were not provided to put the ladder back in stowage, a FBR only serves to overload a process that should be focused on more technical issues. f. Duplicate MRCs. Unclassified MIPs a nd MRCs are now available from the DVD. Copies of classified MRCs still require a FBR request due to handling requirements. g. Addition or deletion of an MRC. During the life cycle of a system, equipment, or component it may become necessary to add a maintenance action to prevent an age- related functional failure or to delete a maintenance action due to inherent reliability not foreseen during maintenance development. A FBR submitted to request the addition or deletion of an MRC should include the originator’s contact information and supporting rationale or justification. h. Newly Installed or Removed Equipment. While a FBR request for PMS coverage will provide initial maintenance coverage or deletion of MIP(s) because of equipment removal, submission of a CK is still required to initiate the rest of the logistic support change process. This point cannot be overstressed; the submission of the FBR does not relieve the unit from initiating a CK. The CK initiates supply support, CDMD- OA changes, command selected record drawing updates and class maintenance plan updates. i. Splitting a MIP. There are instances in which a MIP includes MRCs for more than one WC to perform. When this occurs, a decision is required by the command as to whether the MIP will be split or will be scheduled singly by one WC. Only the XO can authorize the splitting of a MIP if an MRC requires another WC to perform the entire maintenance action. If the decision is made not to split the MIP, then the MRs will be accomplished through the coordination of WCSs. (1) If the MIP is split, the following procedures apply: (a) Submit to the XO a Non-Technical PMS FBR requesting approval to split the maintenance responsibility. (b) Upon receipt of the XO’s concurrence, the 3MC will make an annotation in the remarks block of the FBR stating, “XO concurs with splitting MIP maintenance responsibility”. (2) Upon receipt of the FBR approval:

p. 395

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-26 (a) Utilizing the SKED Revision Edito r, delete the MRC from the MIP and show the reason for deletion as the designation of the WC assuming responsibility (i.e., EE01). (b) If the WC assuming responsibil ity does not reflect the MIP and maintenance items, utilize the SKED Revision Editor to add them. Schedule only the MRC(s) that pertain to the WC. Reflect remaining as deleted with the reason for deletion the designation of the parent (lead) WC (i.e., EA01). (3) If the situation occurs where a WC removes a split MIP, the following procedures apply: (a) Submit an XO approved, non-technical PMS FBR reporting the decision to remove the split maintenance responsibility. Upon receipt of the XO’s concurrence, the 3MC will make an annotation in the remarks block of the FBR “XO concurs with removing split MIP maintenance responsibility. (b) Upon receipt of FBR approval, utilize the SKED Revision Editor, remove the MIP, MRC(s) and maintenance item(s) from the WC no longer involved. Ensure that the lead WC assumes full responsibility for the MIP and MRC(s) and annotates their schedules accordingly. j. Shift of Maintenance Responsibility. Individual units sometimes consider it necessary to shift maintenance responsibility from one WC to another, to combine two or more existing WCs or to split an existing WC. These requests for changes of PMS maintenance responsibility require XO concurrence and may require final approval by the applicable TYCOM. Due to the considerable administrative burden, requests for this type of change should not be submitted to accommodate a temporary situation such as short-term assignment of two WCs to one supervisor. (1) The following factors should be carefully considered before submitting such requests: (a) Composition of WCs by size and ratings. (b) Scope of maintena nce responsibilities. (c) WC workload. (d) Ease of administration of a WC as a cohesive maintenance group. (e) Importance of WC grouping to equipment maintenance responsibilities, PMS scheduling, MDS reporting and CSMP listings. (2) When changes in maintenance respon sibility are considered necessary, the following procedures apply: (a) Submit a PMS FBR (Non-technical) . Indicate from which WC(s) equipment is to be deleted and to which it is to be transferred. Upon receipt of the XO’s concurrence, the 3MC will make an annotation in

p. 396

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-27 the remarks block of the FBR “XO concurs with the shift of maintenance responsibility. (b) WC or equipment changes will also be reported in the OMMS/SNAP system via a CK through the CSMP up-line reporting process. (3) Upon receipt of the FBR approval, perform the following actions: (a) The PMS Master File is updated to reflect deletion of the MIP from one WC and addition to the WC receiving the responsibility. The originating FBR serial number is annotated on the affected line item on the LOEP for both WCs. The PMS Master File must contain a record of deleted equipment until the change is reflected in a future FR. (b) Utilizing the SKED Revision Editor, load the affected MIP(s) and MRC(s) to the WC receiving maintenance responsibility. Delete the MIP(s) and MRC(s) from WC shifting responsibility. (c) Utilizing SKED, perform a revisi on to move the equipment from the original WC’s current schedule to the WC receiving the maintenance responsibility. Data is exported from one and imported to the other maintaining equipment history. k. MRC Changes Not Requiring Feedback Reports. The only MRC modifications shipboard or unit personnel may make without submitting a PMS feedback report are as listed in sub-paragraphs 19-2.3.11.k.(1) and (2) of this chapter. (1) TPMTE block. (a) Common hand tools, administra tive or office supplies and basic housekeeping items may be substituted or added by the WCS. The WCS may add notes to the MRC to reflect these substitutions. In the case where specific common tools are called out by description, substitutions are not authorized. For example, substitutions such as using synthetic fiber brushes in place of animal hairbrushes or rags and paper towels in place of lint free cloths are not allowed. (b) Approved parts, materials and miscellaneous item substituted from the supply system, technical manual, or Military Specification, etc., which meet or exceed the requirements may be used. Ensure that substitutions satisfy both the basic maintenance and safety requirements of the MRC. If there is any doubt, a PMS FBR should be submitted specifying substitution desired and reason. (c) Test equipment or certified tools, which meet or exceed the Sub- Category (SCAT) code requirement, may be used. (d) When an MRC pertains to multiple configurations of equipment and the TPMTE block contains tools, parts, test equipment and materials for each unique configuration, the TPMTE block may be tailored for

p. 397

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-28 the unit’s specific configuration by lining out the items that do not pertain to equipment held. (e) Exception to TPMTE block change: If an item listed in the TPMTE block is not called for in the procedures block, submit an FBR explaining the circumstances. Conversely, if a tool, piece of test equipment, part or material is called for in the procedure block and is not listed in the TPMTE block an FBR should be submitted. (2) In the procedure block, WCSs may line-out the non-applicable line items, such as alternate procedures, that do not pertain to current equipment or configuration when the step includes the words “if applicable” or a note identifies steps to be omitted. These items must be reviewed and approved by the division LCPO. As these changes are WC and maintenance item specific, submission of a FBR is not required. If a step or steps in the procedure block have been lined-out and tools, parts, materials, or test equipment in the TPMTE block pertain only to that step or steps, then they will be lined-out as well with a reference to the step or steps lined-out and approved by the division LCPO. Warnings, cautions, and notes associated with the lined-out step or steps will also be lined-out. l. Types of Feedback Reports. There are two types of FBRs, Technical and Non- Technical. (1) Technical. These FBRs are used to report technical discrepancies inhibiting PMS performance. Technical feedbacks normally adjudicated by an ISEA responsible for the system or equipment covered by the PMS documentation require all the supporting information the originator can provide. The originator should identify the issue, providing as much supporting technical information (Allowance Parts List (APL), Reparable Identity Code, drawing or Hierarchical Structure Code) as available and a proposed response or solution if known. Most importantly, provide point of contact information (name and phone number) so that the ISEA can contact the originator should they have questions. Bottom line, the FBR must be accurate and complete to “stand alone”, that is, the FBR will be understood without additional explanation. The better the FBR describes the problem, the more likely the originator will receive a timely response. There are two sub-categories of technical FBRs: (a) Routine. An FBR will be consid ered routine when it relates to the technical requirements of PMS. It is used to report technical discrepancies or request clarification of procedures. (b) Urgent FBR. An FBR will be considered urgent when it relates to the technical requirements of PMS and involves safety of personnel, safety of ship or the potential for equipment damage. Urgent FBRs will be forwarded by naval message containing a PMS FBR serial number, to both NSLC Detachments Norfolk and San Diego, with info to the cognizant SYSCOM, TYCOM and the Naval Safety Center. The

p. 398

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-29 message must describe the unsafe procedure(s) or condition(s), must identify the MIP and MRC involved and reflect the serial number of the FBR generated in SKED or Planned Maintenance System - Management Information System (PMS-MIS). Once the message has been sent, include the date time group of the message in the FBR and submit. (2) Non-technical. These FBRs are intende d to support PMS requests that do not require technical review, including WC changes (shift of maintenance responsibility). Non-technical FBRs are submitted to request classified or other PMS documentation which cannot be obtained locally or to request clarification of issues not of a technical nature. m. Feedback Report Submission. All SKED users will submit FBRs via SKED using the Feedback Report Wizard. Non-SKED users may submit FBRs via the PMSMIS web site at https://pmsmis.navy.mil/ by selecting the Feedback Tab and Feedback Report Wizard from the drop-down tab. Non-SKED users accessing this web site for the first time will need to request an account. Click on File Manager and select New User Account Request. This displays options to select a form and readme file, which can be downloaded, filled out and sent via e-mail as directed in the readme file. An e-mail will be sent confirming your account and providing access to the main screen. The Anchor Desk web site can also be used to submit FBRs. n. Feedback Report Screening (Shipboard or Activity). (1) Initial screening is accomplished by th e originator or WCS who is responsible for ensuring all data is accurate and complete. (2) The division LCPO or DIVO accomp lishes the second level screening and verifies the content and validity of the FBR within three days of origination. (3) The DH, next to screen the FBR, is responsible for verifying the content and validity of the FBR and digitally signing FBRs within five days of origination. (4) The 3MC is responsible for sc reening, serializing, and forwarding FBRs within seven days of origination. The 3MC will also: (a) Maintain accountability for all PMS FBRs submitted and actions taken until updated PMS documentation is received. (b) Ensure that the originator and all applicable WCs are kept apprised of action taken and ensure the originating and other applicable WCSs implement the changes or corrections when received. o. Feedback Report Screening (External to Hu ll or Activity). FBRs are next processed by the TYCOM. The TYCOM will verify the content and validity of the FBR and

p. 399

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-30 either return the document to the originator or pass it on for further processing and resolution. p. Feedback Processing Activities. (1) The central control points for processing FBRs are the Planned Maintenance System Coordinating Activities (PMSCA). Depending on the type of FBR and level of technical authority necessary to answer the FBR, the PMSCA will either respond to the originator with a resolution or forward the FBR to the appropriate technical authority for action. (2) ISEAs are those activi ties designated by NAVSEA as the technical experts for specific systems or equipment. Naval Surface Warfare Center, Philadelphia Detachment is the ISEA for the majority of non-nuclear hull, mechanical and electrical equipment installed on most ships. ISEAs under the direction of the NAVSEA Technical Warrant Holder adjudicate the FBR request and forward the response to the PMSCAs. The PMSCA provides the final response to the originator and update the PMS database to reflect ISEA changes. PMS changes are issued with the next available FR. q. Feedback Processing. FBRs are processed per NAVSEA policy: (1) Urgent FBRs. (a) The PMSCAs will provide a message response to all urgent FBRs within one (1) working day of receipt. If the FBR is forwarded to a Design Activity or ISEA for resolution, then the Design Activity or ISEA will provide a message response informing the originator of specific actions or required changes because of the adjudication of the FBR within one working day of receipt. This message response must be addressed to the originator and distributed to all TYCOMs of units holding the affected documentation. TYCOMs will forward this message to all commands that could be affected by the PMS change. (b) The PMSCA will distribute revised PMS documentation to all affected users within 30 calendar days of receipt of the FBR, via special issue or ACN. (2) Routine FBRs. (a) The PMSCA will perform technical review, research, and provide a response to routine FBRs where resolution does not require technical authority action. (b) FBRs that the PMSCA cannot resolve will be sent to the cognizant Design Activity or ISEA. The cognizant Design Activity or ISEA will provide the response to the appropriate PMSCA describing the action taken. The PMSCA will provide the response to the originator by electronic means. (c) Distribution of the revised MRC to the originator and other affected users will be accomplished via ACN or the next available FR.

p. 400

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-31 (d) NAVSEA’s existing policy calls fo r technical review activities and ISEAs to provide FBR responses in less than 21 working days from time of receipt. In addition, NAVSEA has established a goal of providing answers to FBRs in one day. While some FBRs will require extensive research and days, weeks or in some cases months to resolve, the vast majority of FBRs can and should be answered much sooner. One day may be overly optimistic, but the intent is to put the emphasis back on the timely resolution of FBRs. (e) If no revision to PMS documenta tion is required, pertinent comments will be provided in the response to the PMSCA. When not concurring with the feedback report, the rationale for the non-concurrence must be provided to the PMSCA. NOTE: IT IS POSSIBLE AN FBR RESP ONSE MAY NOT MAKE A SPECIFIC FR BASED ON THE DATE THE RESPONSE WAS RECEIVED BY NSLC. PROCESSING TIME AND HANDLING MAY CAUSE THE REVISED DOCUMENTATION TO MISS AN FR CUTOFF DATE. HOWEVER, SINCE ALL FRS ARE NOW RECEIVED QUARTERLY, IF A REVISION MISSES THE CURRENT FR CUTOFF WINDOW, THE REVISED DOCUMENTATION WILL BE AVAILABLE WITHIN THE NEXT THREE (3) MONTHS. r. Feedback Response Implementation. Units will implement responses to FBRs based on the category and content as determined by the unit’s 3MC. (1) Urgent FBR. Within 24 hours of receipt of FBR response. (2) Urgent FBR with an ACN. With in 24 hours of receipt, the unit will implement an administrative change to incorporate the new PMS documentation. These revised documents will be utilized to conduct maintenance until the revised PMS document is incorporated into the next FR. (3) Routine FBR: (a) Technical. The response deals wi th content such as a revision to technical specifications, tolerances, test equipment, materials, acceptance criteria or the sequence of procedural steps. These changes need to be implemented within two weeks of receipt of the FBR response or prior to the next scheduled accomplishment date should that date fall within the two-week window. (b) Administrative. The response deals with issues that do not affect the technical content or procedural steps. Administrative changes might be added steps to provide a better degree of clarity, formatting revisions to tables or figures that do not change technical content, or updating of Notes, Warnings or Cautions that do not impact the performance of the MRC. These changes do not need to be implemented prior to receipt of the next FR. If the next FR does not reflect the revised documentation, implementation is required before the next scheduled accomplishment date of the MRC.

p. 401

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-32 (4) Routine FBR with an ACN: (a) Technical. These changes need to be implemented via an administrative change within two weeks of receipt of the FBR response or prior to the next scheduled accomplishment date should that date fall within the two-week window. These revised documents will be utilized to conduct maintenance until the revised PMS document is incorporated into the next FR. (b) Administrative. These changes do not need to be implemented prior to receipt of the next FR. If the next FR does not reflect the revised documentation, implementation is required via an administrative change before the next scheduled accomplishment date of the MRC. 19-2.3.12 Assessment Procedure MRCs. Assessment Procedure (AP) MRCs need not be scheduled within SKED, but they will be maintained “active” through the FR and TFR process. AP MRCs need only be printed on an “as needed” basis for use by assessment personnel or Ship’s Force. The record of completed AP MRCs by off-ship personnel is recorded on the work candidate and Ship’s Force participation is recorded in their completion remarks of that work candidate. There is no need for recording Ship’s Force participation in an assessment event on their PMS schedule within SKED. FBRs submitted requesting deletion of a MIP that only contains AP MRCs will be disapproved and returned to the originator. 19-2.4 MAINTENANCE AND MATERIAL MANAGEMENT AFLOAT AND ASHORE EVALUATION CRITERIA. 19-2.4.1 Self-Assessments. The ability of an activity to perform critical self-assessments is instrumental to the success of the command’s PMS program. The PMS Self-Assessment Program needs to address all aspects of 3-M. a. TYCOM Policy. 3-M Self-Assessments wi ll be conducted at least once during the command’s O-FRP, or once every 24 months where commands do not operate under an Optimized Fleet Response Plan (O-FRP). Additional 3-M Self-Assessments may be conducted at the CO’s discretion but are neither required nor reported to the TYCOM Maintenance Officer. 3-M Self-Assessment events are not limited to a set duration but will have a set completion date when originally directed by the CO. Commands must conduct a 3-M Self-Assessment within the first 90 days of deployment to a Remain in Place Table of Allowance site. b. Self-Assessment Elements. The major program elements of a Self-Assessment include an evaluation of the PMS Performance Rate (PPR) and CSMP Validity, monitoring MRC performance (monitored MRC), and conducting PMS Spot Checks, WC audits, an Administrative Performance Rate (APR) review and deficiency abatement. 3MCs will retain monitored PMS, Spot Checks and WC audits from the

p. 402

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-33 last completed quarter in either hard copy or digital format for review supporting the Self-Assessment. (1) Administrative Performance Rate. The APR consists of all administrative actions within a command. It is comprised of the average of all SEER scores + the CLER score divided by 2. APR = (SEER average + CLER) ÷ 2 (2) Monitored MRC. Supervisory pers onnel must periodically monitor the performance of PMS to provide feedback and training to maintenance personnel and to enforce command maintenance standards. Personnel charged with monitoring must be System Matter Experts (SME) for the system, equipment, or component for which the MRC applies. LCPOs, LPOs or personnel with similar system knowledge are appropriate. Monitored checks can be used for on-the-job training to teach the “right way” to conduct maintenance. These monitored MRCs will be documented as a monitored evolution and findings will be provided to the WC’s CoC for inclusion into training and deficiency abatement. The value of monitor maintenance cannot be overstated, and commands are encouraged to establish a robust monitored maintenance program. (3) PMS Spot Check. PMS Spot Checks are utilized to validate that previously scheduled and accomplished MRCs were performed and the degree to which they were performed. The checklist contained in Appendix A Section III of this chapter, is the tool supervisory personnel utilize to determine the accomplishment status of a completed MRC. Deficiencies noted and the final grade will be provided to the WC’s CoC for abatement. The WCS will record the Spot Check grade into SKED to generate the Spot Check Accomplishment Rating (SCAR) for the quarterly PMS Performance Report. Spot Checks will involve all elements of the CoC to include the CO, CMC, XO, 3MC, department CPOs, DHs, DIVOs, divisional CPOs, and first-class petty officers. By following the checklist, the inspector can determine if the sailor is competent, the maintenance was accomplished, required TPMTE was available and used, and safety precautions were followed. The focus should be less on administration and more on the condition of the gear. (a) Avoid Spot Checks of MRCs with insufficient complexity. Performing a Spot Check on a 3 or 5 step MRC does not provide the CoC an accurate picture of the health of the command’s maintenance program. Selected MRCs should be of sufficient content to provide the auditor with evidence of satisfactory performance (i.e., tag-outs, QA packages, parts required, off-hull reporting, test equipment, safety equipment, etc.). (b) Spot Checks evaluated as “below standards” will require immediate training and re-performance as determined by the XO. Any re- accomplishment of the MRC must be monitored by the LCPO to ensure noted deficiencies are not repeated.

p. 403

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-34 (c) The spot checker or monitor will ensure that the Spot Check or monitor data is immediately entered into SKED. When applicable, a brief synopsis of any deficiencies resulting from the Spot Check will be indicated within the Spot Check. (d) The minimum number of Spot Ch ecks are reflected in Tables 19-2-5 and 19-2-6 of this chapter. Table 19-2-5 - NECC Active Duty or Mobilized Commands Spot Checks Management Level Number of Checks Interval CO, XO, CMC or CSE 1 Weekly DH or Dept LCPO 1 per department Weekly DIVO or LCPO 1 per division Weekly 3MC 1 Weekly

Table 19-2-6 - NECC Non-Mobilized Reserve Units Spot Checks Management Level Number of Checks Interval CO, XO or CSO 1 Quarterly CMC or SEL 1 Quarterly DH 1 per department Quarterly DIVO or LCPO 1 per division Quarterly 3MC 1 Monthly (e) NECC Reserve Component 3MCs can request modification of the Spot Check matrix if it is believed that due to the size of the command and location of their WC, they are unable to accomplish that requirement. Requests must be submitted in writing to NECC N43 staff (via Echelon IV 3MC if applicable) and include their proposed Spot Check matrix for review. If approved, the command 3MC will maintain a copy of the request approval. (4) Work Center Audits. Each WC must receive an audit once per quarter by a supervisory individual, CPO or above. Deficiencies noted from this audit will be reported to the WC’s CoC for abatement. The 3MC will report recurring deficiencies to the XO for further investigation and corrective action. (5) Deficiency Abatement. The status of discovered deficiencies will be kept current within the monitoring program. Recurring deficiencies must be reported to the XO for further investigation and corrective action. Deficiencies that have been reported as corrected will be subject to follow up monitoring to ensure corrective action was effective and results of the follow

p. 404

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-35 up monitoring will be reported to the XO. The command’s 3-M Abatement Program will include the previous quarter’s audits, Spot Checks, monitored evolutions and CSMP validity audits noting trends and corrective actions. 19-2.4.2 Inspections. The goal of the 3MI is to evaluate the effectiveness of the unit’s 3-M Program. It is critical that the inspection be conducted in a similar fashion in every command and detachment across the force. Inspections will be completed once commenced; early below- standards indications will not be used to change an inspection into an assistance visit. a. Frequency of Inspections. The TYCOM or ISIC (command exercising administrative control) will conduct a complete inspection of each command under their cognizance as follows: (1) Every Fleet Response Training Plan or Optimize Report Plan (ORP) cycle. (2) When deemed necessary by the TYCOM, ISIC or the unit’s CO. (3) Not to exceed 36 months. (4) The ISIC will submit a 3MI periodicity extension request to the TYCOM if a 3MI will exceed the Fleet Response Training Plan or ORP cycle or 24 months has elapsed since the last inspection. The TYCOM, when replying to the request for extension, will include Commander, United States Fleet Forces Command N43 or Commander Pacific Fleet N43, as applicable, as information addressees. Only the TYCOM can authorize such an extension. b. Method for Assignment of Numerical Ev aluations. The minimum performance requirements are as identified below: (1) Formula Acronyms: (a) APR = Administrative Performance Review (b) CLER = Command Level Effectiveness Review (c) CTS = Command Total Score (d) CVF = CSMP Validity Factor (e) DTS = Department Total Score (f) MAR = Maintenance Accomplishment Rate (g) MDS = Maintenance Data System (h) MPR = MDS Performance Rate (i) PAR = Periodic Accomplishment Rate (j) PPR = PMS Performance Rate (k) SAR = Situational Accomplishment Rate (l) SEER = Scheduling and Execution Effectiveness Review (m) SCAR = Spot Check Accomplishment Rating (2) The CTS consists of three parts and weighted as follows:

p. 405

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-36 (a) APR = (SEER average + CLER) divided by 2 (b) Weighted PPR = (MAR x SCAR) divided by 100. (c) Weighted MPR = (Weighted CVF x RAF) divided by 100 (d) CTS = (APR x .2) + (PPR x .4) + (MPR x .4) (3) Criteria for grading MDS and CSMP: MPR = (CVF x RAF) divided by 100 (4) Ranking Standards. (a) Commands, departments, and WCs will be evaluated as “Above Standards” overall in 3-M if the unit’s total score is 90% or higher. (b) Commands, departments, and WCS will be evaluated as “At Standards” overall in 3-M if the unit’s total score is between 80% and 89.99%. (c) Commands, departments, and WC s will be evaluated as “Below Standards” overall in 3-M if the unit’s total score is less than 80%. (d) All calculations will be rounded to two decimal places. c. Inspection Procedures. Appendix A provi des a standard means for evaluating the 3- M Program. These procedures, centered on a set of core attributes applicable to all, are used to conduct 3-M Inspections. Inspection procedures are divided into five major areas: (1) Section I - Administrative Performa nce Review. The APR consists of all administrative actions within a command. It is comprised of the average of all SEER + CLER divided by 2. (2) Section II – Assessment of Command Level Effectiveness Review. The CLER is an evaluation of the XO’s management of the command’s maintenance as executed by the 3MC and the DHs. (3) Section III. PPR is calculated using a command’s MAR and SCAR. (4) Section IV - Maintenance Data System. (5) Section V - 3-M Inspec tion Command Total Score. d. Inspection Reporting. Significant defici encies and numerical assessments are reported to the assessed unit’s CO, ISIC and TYCOM using the format shown in appendix B of this chapter. Reporting may be accomplished on the entire unit or on a departmental basis. (1) Significant deficiencies require a report of corrective actions taken by the unit to be forwarded to the TYCOM via the ISIC within 30 days following the inspection. (2) Any command or department recei ving an overall evaluation of below standard in either CTS, MDS, and PPR must be re-evaluated within a

p. 406

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-37 reasonable period, not to exceed six months, to ensure below standard areas have been corrected. (3) Each TYCOM will report the findings of the previous year’s inspections to Commander, United States Fleet Forces Command or Commander Pacific Fleet N43, as applicable, at the end of the calendar year. e. Inspection Data Retention. NECC is to main tain an inspection data file for each unit. As each command is evaluated, the individual evaluation standards and calculated values identified will be recorded in the data file with a copy of the inspection report provided to the inspected command. Section I through Section V of Appendix A of this chapter provide specific criteria to be used in the assessment of each command. .

p. 407

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-A-1 APPENDIX A APPENDIX A SECTION I-A ADMINISTRATIVE PERFORMANCE REVIEW (APR)

The APR consists of all administrative actions within a command. It is comprised of the average of all SEER + CLER divided by 2. APR= (SEER average + CLER) divided by 2 1. Assessment of Scheduling Execution and Effectiveness Review (SEER) The SEER is an evaluation of PMS documentation at the WC level. The SEER focuses on PMS documentation within the WC PMS File, the scheduling of maintenance requirements in SKED and the documentation of accomplished PMS. Specific criteria for SEER evaluation is established by the TYCOM. Calculate each WC’s SEER as required by the SEER check sheet provided on the NECC Portal under the N43 tab. Calculate the command’s average SEER by calculating the sum of all WCs’ SEER scores and dividing by the number of WCs evaluated.

2. Assessment of Command Level Effectiveness Review (CLER) The CLER is an evaluation of the XO’s management of the command’s maintenance as executed by the 3MC and the DHs.

Specific criteria for CLER evaluation is established by the TYCOM and the command’s CLER is calculated by the CLER check sheet provided on the NECC Portal under the N43 tab.

p. 408

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-A-2 APPENDIX A APPENDIX A SECTION I-B SCHEDULING AND EXECUTION EFFECTIVENESS REVIEW (SEER)

Command Department Division Work Center Date General Attributes Value Points 1. Does the WC maintain: a. Current and applicable 3-M messages and notices? 2 b. Listing of personnel qualificat ions for personnel completing maintenance in the WC? (i.e., PQS, ASM, NEC, Training Completion)? 5 2. Is the WCS, and any assistant(s), designated in writing? 2 Maintenance Requirement Card (MRC) Deck 3. Does the LOEP and PMS Schedule reflect all PMS-worthy equipment? (Validate against authoritative database) 10 4. Do MRCs accurately re flect assigned MIPs? 10 5. Are LGL tables on MRC properly filled out? 2 6. Are inapplicable MRC lined out with the appropriate reference (FBR, Scheduling Aid, etc.). 3 7. Is mandatory related maintenance properly associated in accordance with the MIP? 10 8. Are all MRCs, if printed, the current version? 3 Chain of Command SKED Administration 9. Administrative functions: a. AAR (percentage from SKED divided by 10): 10 b. Are all PMS changes implemented and approved as required? 2 c. Are previous quarters archived as required? 2 d. Are check note entries accurate, valid, and complete? 5 Situational Requirements 10. Was situational PMS (pre & post op, metered, triggered and state events) accomplished when required? 10 11. Are meters updated to reflect reading when PMS was last accomplished? 5 PMS Execution and Accountability 12. Is maintenance assigned only to qualified maintenance personnel? 5 13. Are 13-Week Reports retained for the current week and 13 previous weeks? (13-Week Accountability Logs can be electronic or hard copy.) 2 14. Does the maintenance on the accoun tability sheets match maintenance listed in SKED? 2 15. Are Tag-Out serial numbers recorded as required? 2 Feedback Report Management

p. 409

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-A-3 APPENDIX A 16. Are all Feedback responses applicab le to the WC properly managed in the WC? 5 17. Are the "Response" blocks in SKED updated as appropriate? 3 Inactive Equipment Maintenance (IEM) 18. Is the start of IEM approved as required? 2 19. Are all IEM requirements properly scheduled? 5 20. Upon completion of IEM period, was all required IEM maintenance assigned (LU, SU, PM, OT) and mandatory related maintenance scheduled prior to use? 5

Totals (Attributes evaluated as “NA” are not calculated)

Total Points Available 112

Total Points Awarded _______ Above Standards At Standards Below Standards Above Standards (90% or greater) At Standards (80-89.99%) Below Standards (less than 80%) Inspector Name and Command (Print and Sign)

Partial credit, a lesser number of points awarded if only 80% of a given attribute accomplished. Total Value Partial Credit 2 0 3 1 5 3 10 7 No credit, no points awarded if less than 80% accomplished.

p. 410

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-A-4 APPENDIX A

Print & Sign Inspector Name/Command

Date

PAR SAR AAR Checks Comp. Spot Checks Req'd Qual'd Y/N

DH: DIVO:

OM

0

LCPO: WCS: ADJ MAR RPPO:

p. 411

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-A-5 APPENDIX A NECC SEER REMARKS

Provide amplifying information to describe the deficiencies driving point deductions. Significant deficiencies must be reported via the final inspection report. Attribute # Amplifying Information

Print Name: Signature: Command: Date:

p. 412

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-A-6 APPENDIX A SEER CHECKLIST ATTRIBUTE GRADING 1. Attribute 1: Does the WC PMS File contain: 2. Attribute 1a.: Current and applicable 3-M messages? Are the latest released 3-M messages applicable in the WC PMS File? Applicable 3-M messages are messages that affect the performance of maintenance. It may vary based on assigned TOA. ISIC should provide guidance and requirements to subordinate units as to which messages are applicable. 3. Attribute 1b.: Listing of personnel qualifications for personnel completing maintenance in the WC? (i.e., PQS, ASM, NEC, Training Completion)? a. This means, generally, that the WCS ma intains a list of personnel conducting PMA within the WC and their commensurate qualifications necessary to do so. This can either be an accurate ASM report, copies of PQS watch station cover sheets, training certificates, or other authoritative record of qualification. This list must be kept current by the WCS and should reflect “real-time” status.

b. Additional items to consider are specia l qualifications, such as NECC Armorer's Course, or NEC's, as required. 4. Attribute 2: Is the WCS, and assistant(s), designated in writing? (Self-explanatory) 5. Attribute 3 : Does the LOEP and PMS Schedule reflect all PMS-worthy equipment? Verify SKED and OMMS against current authoritative database (RCRP). 6. Attribute 4: Do MRCs accurately reflect assigned MIPs? a. Review SKED LOEP Manager, FBR Responses, and Local (ISIC) Guidance. b. Verify through an authoritative data base for onboard equipment (NSW Crane Inventory, EXMIS, CBSS, EKMS RCRP). c. Does LOEP FR number match the entr y on the WC change page and journal? d. Is the LOEP the most current one issued?

NOTE: ISIC GUIDANCE FOR WC STA NDARDIZATION BY TOA ASSIGNED SHOULD BE PROVIDED TO THEIR UNITS. IF NOT, THEN IT IS THE DISCRETION OF THE TYCOM 3MI TO DETERMINE IF MAINTENANCE GROUPS ARE 1. BUILT PROPERLY BASED ON TOA 2. CONTAIN ALL EQUIPMENT ASSIGNED TO THE WC. 7. Attribute 5: Are LGL tables on MRC properly filled out? Does the LGL contain equipment name, accurate equipment location, and equipment unique identifier (if required)? 8. Attribute 6: Does the 3MC maintain:

p. 413

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-A-7 APPENDIX A a. Current PMS DVD and Master LOEP? (Self-explanatory) b. Master LOEP is found on the PMS DVD a nd may be maintained hard-copy or electronically by the 3MC. (1) If changes (MIP additions or dele tions) for a WC LOEP are authorized by approved FBR, an up-to-date copy of the altered LOEP must be maintained by the 3MC. NOTE: THE CSAL IS COMPRISED OF THE ACTUAL LOG SHEET, A COPY OF ALL MEMOS ROUTED TO THE WCS AND THE MEMO FROM THE WCS TO THE 3MC INDICATING COMPLETION.

(2) Are all pen and ink changes on the LOEP, MIPs and MRCs (except where allowed by scheduling aid) annotated with the reference for the change (FBR serial number, ACN, etc.) and properly noted by the correct authority and initialed by LCPO? (3) Are all additions and deletions on LO EP, MIP and MRCs noted in SKED with the applicable authorization for the change? c. Current SKED database back-up files? 9. Attribute 7: Is mandatory related maintenance properly associated in accordance with the MIP? Calculate omitted checks, checks that should have been scheduled and completed but were not due to mandatory related maintenance not properly associated in SKED that should have been scheduled based on criteria set forth in the MRC of parent check. (Verify satisfactory condition of parent maintenance check requiring measurements or testing by way of documentation, i.e., AWR, logs) 10. Attribute 8: Are all MRCs, if printed, the current version? a. Verify that hard-copy MRCs are curren t and validated by the WCS as required. b. Verify that MRCs changes recorded to the Journal are reflected on the applicable MRC, when applicable. 11. Attribute 9: Administrative functions: a. AAR: (1) AAR (percentage from SKED divided by 10): (2) Awarded value will be the AAR fr om the SKED dashboard, sorted by WC, for the period covered by the inspection, divided by 10 and rounded to the nearest whole number. For example, if the AAR is a 76.54% then 8 points are awarded. (3) On the WC dashboard, double clic k the AAR, and it will generate a breakdown of all administrative actions within the WC. If AAR is not 100%, document items that negatively affected the percentage. b. Are all PMS changes implemented and approved as required?

p. 414

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-A-8 APPENDIX A (1) Ensure the FR was approved by th e DH using WC Journal entries. (2) If FR was not implemented on fi rst Monday of the quarter, did the XO authorize late implementation? (3) ACNs properly installed. (4) MIP and MRC lineouts or customi zation approved by LCPO or DIVO? c. Are previous quarters archived as required? (1) Should be completed as part of the FR process. (2) Can be reviewed via drop down menu in the WC view. d. Are check note entries accurate, valid, and complete? (1) Check notes are submitted for all maintenance not accomplished within periodicity. (2) Check notes should be detailed enough to explain why non-accomplishment. 12. Attribute 10: Was situational PMS (pre & post op, metered, triggered and state events) accomplished when required? a. If there are no situational or conditional checks in the last 13 weeks, marked NA. b. Is all required situati onal maintenance listed on the accountability logs, and in SKED? (1) Pre and post operational maintena nce required but not documented? (2) Meter based or “As Requi red” (i.e., M-2R or R-7D) maintenance required but not documented? c. Are all required LU, PM, SU, and OT on the Accountability Logs and in SKED as required? d. Are meters up to date for WC equipment? 13. Attribute 11: Are meters updated to reflect reading when PMS was last accomplished? Check "Meters" under the Situational Tab. Compare the values entered against equipment currently in use or listed on the 13-Week Report for situational maintenance ("as required" or R-Checks). 14. Attribute 12: Is maintenance assigned only to qualified maintenance personnel? a. Was maintenance assigned to person nel with 3-M 301 qualification or above? b. ASM is single authoritative qualification program for NECC 3-M PQS. If held at previous command FLTMPS printout will suffice if original PQS cover page is unavailable. c. For MRCs that indicate or require uni que qualifications or NECs, such as: SPO, DCPO, or a specific NEC(s), does the name listed on the 13-Week Accountability Log MP responsible block and signature block hold that qualification?

p. 415

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-A-9 APPENDIX A NOTE: SOME WEEKS (CURRENT, AN D POSSIBLY PREVIOUS) MAY STILL BE IN ROUTING THROUGH COC. 15. Attribute 13: Are 13-Week Accountability Logs retained for the current week and 13 previous weeks? (Self-explanatory) 13-Week Accountability Logs can be electronic or hard copy. NOTE: THE COLUMNS FOR ANY RE PORT GENERATED IN SKED CAN BE MANIPULATED (DRAGGED FROM LEFT TO RIGHT) TO HELP THE INSPECTOR LOCATE PERTINENT INFORMATION NEXT TO EACH OTHER FOR EASIER REVIEW. 16. Attribute 14: Does the maintenance on the accountability sheets match maintenance listed in SKED? a. Do the maintenance requirements from the completed and signed accountability sheets match the maintenance scheduled and marked completed within SKED? b. The number listed on the Forecasting Tab in the WC menu will display total number of completed checks, or a completed checks report can be generated in the Reports Tab under the Admin menu. 17. Attribute 15: Are Tag-Out serial numbers recorded as required? a. Does all maintenance with the tag-out icon and marked completed in SKED have the tag-out serial number annotated on the check note, or does all maintenance listed and marked completed on the WC’s 13-Week Accountability log annotate Tag-Out serial number or N/A? b. N/A is not required for maintenance not completed. c. Tag-Out serial numbers should be va lidated in the assigned Tag-Out binder. 18. Attribute 16: Are all FBR responses applicable to the WC properly managed in the WC? a. Has the WC received any PMS change notifications or memorandums, ACNs, or FBR responses? b. Have the required changes been installe d properly (i.e., revision made and approved, pen and ink changes made to MIPs or MRCs as required) and documented on the Journal or Change Page? c. Are authorized changes maintained un til corrected and installed by the NECC Force Revision Disc? 19. Attribute 17: Are the "Response" blocks in SKED updated as appropriate? The response block should be updated as part of the change memorandum workflow, if not, verify memorandums are being received from the 3MC to document changes. 20. Attribute 18: Is the start of IEM approved as required? Did the DH, or designated representative, approve equipment in IEM status? NOTE: IF THE EQUIPMENT IS IN IEM II PM MAINTENANCE IS NOT REQUIRED TO BE COMPLETED. VERIFY IEM CATEGORY WITH “IEM” TAB. 21. Attribute 19: Are all IEM requirements properly scheduled? a. Does the WC SKED contain proper schedul ing of all applicable IEM maintenance?

p. 416

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-A-10 APPENDIX A (1) The “Review” Tab contains a history of maintenance history. (2) Compare date equipment was placed in IEM to date of last completed IEM maintenance. If maintenance has not been completed IAW the MIP or MRC the grade for this attribute is a zero. b. If WC has a system or equipment in IE M Category II and is an IMA or depot level repair, are JSN(s), Work Documentation for Outside Activity or Repair Center annotated? c. If there is no equipment in IEM in the last 13 weeks, mark as NA. d. Do maintenance items in IEM status II have valid documentation in the IEM remarks? (i.e., JCN, SSIC, 1149)? e. Use OMMS-NG to validate the JCN or avai lability listed in the IEM remarks that correspond to the actual reason for IEM status II. f. Does the WC maintain a listing of all IEM (IEM log) equipment if not using SKED 3.2 in accordance with TYCOM or ISIC policy? 22 Attribute 20: Upon completion of IEM period, was all required IEM maintenance assigned (LU, SU, PM, OT) and mandatory related maintenance scheduled prior to use? a. Does the WC’s SKED properly annota te the completion of the IEM period? b. Did the WCS schedule all missed periodi c maintenance once out of IEM? All planned maintenance due during the IEM period must be scheduled at a reasonable time following IEM period, generally within the quarter depending on maintenance material availability, but ISIC policy may be more stringent. c. If there is no equipment in IEM in the last 13 weeks, mark as NA.

p. 417

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-A-11 APPENDIX A APPENDIX A SECTION II COMMAND LEVEL EFFECTIVENESS REVIEW (CLER) Command: Date: General Administration Value Points 1. Are the 3MC and 3-M Assistant Coordinator PQS Qualified, and designated in writing by the CO? 3 2. Does the 3MC maintain oversight of the unit’s 3-M qualification program as required? 5 3. Are the unit's 3-M qualifications commensurate to meet mission requirements? 10 4. Does the 3MC provide weekly status reports to the 3-M Manager? 5 5. Does the unit conduct a Planning Bo ard for Maintenance (PB4M)? 10 PMS Master File 6. Does the 3MC maintain: a. Current PMS DVD? 2 b. Master LOEP reflecting appr oved pen-and-ink changes? 3 c. Current SKED database back-up files? 5 PMS Changes 7. Does the 3MC: a. Maintain a standardized, sequent ial system for tracking FBRs? 5 b. Export and transmit FBRs as required? 5 c. Have an effective system for explaining, routing, and tracking PMS changes? 10 d. Does the CSAL or WC Journal(s) accurately reflect changes to the command's 3-M documentation? 5 Self-Assessment 8. Does the 3MC: a. Promulgate Spot Check requirements? 5 9. Did the unit conduct: a. Ensure Spot Checks are accomplished as required? (proportionally graded. i.e., if 9 of 10 completed = 10 x .9 10 b. Audits of all WCs? (proportionally graded. i.e., if 9 of 10 completed = 10 x .9) 10 c. Self-Assessment? 10

p. 418

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-A-12 APPENDIX A Totals (Attributes evaluated as” NA” are not calculated) Total Points Available: 95 Total Points Awarded: Above Standards At Standards Below Standards Inspector Name and Command (Print and Sign)

Attribute Scoring: Sat = 80 percent or better Attributes will be assessed as YES, NO, or NA except those specifically annotated as proportionally graded.

p. 419

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-A-13 APPENDIX A CLER CHECKLIST GRADING ATTRIBUTES

1. Attribute 1 : Are the 3MC and 3-M Assistant Coordinator PQS Qualified, and designated in writing by the CO? a. Is the 3MC NEC and PQS qualified, doe s the 3MC have a Letter of Designation signed by the CO? b. Is the 3MA PQS qualified to 3-M 305 at a minimum, and have a Letter of Designation signed by the CO? 2. Attribute 2 : Does the 3MC maintain a current ASM report of 3-M PQS? Does the 3MC maintain real-time oversite of 3-M qualifications for all personnel? This can be via direct access to ASM or some other means, but with the result being the 3MC tracks who aboard the command has what 3-M qualification(s) and who does not? 3. Attribute 3 : Are the unit's 3-M qualifications commensurate to meet mission requirements as required? Ensure that all personnel aboard greater than 90 days have obtained the 3-M watch station qualification MP (301) and that personnel filling a 3-M management role (i.e., RPPO to 3MC) and aboard greater than 90 days have obtained all requisite 3-M watch station qualifications for that position.” 4. Attribute 4 : Does the 3MC provide weekly status reports to the XO? a. Does the 3MC report the status of th e command’s 3-M Self-Assessment Program to the XO each week? Validate that the weekly reports report status of and changes to the Self-Assessment Program elements. These include spot checks (updated weekly), monitored MRCs (as they occur), WC audits (quarterly), bi-annual self-assessment (as it occurs), and deficiency abatement (status changes to POA&Ms as they occur). b. Is the XO report retained for at least one (1) year? (Can be electronic or hard-copy.) c. Ensure to check dates on W eekly XO Report for continuity. 5. Attribute 5 : Does the activity conduct a PB4M? 6. Attribute 6 : Does the 3MC maintain: a. Current PMS DVD and Master LOEP? (Self-explanatory) b. Master LOEP is found on the PMS DVD a nd may be maintained hard-copy or electronically by the 3MC. If changes (MIP additions or deletions) for a WC LOEP are authorized by approved FBR, an up-to-date copy of the altered LOEP must be maintained by the 3MC. NOTE: THE CSAL IS COMPRISED OF THE ACTUAL LOG SHEET, A COPY OF ALL MEMOS ROUTED TO THE WCS AND THE MEMO FROM THE WCS TO THE 3MC INDICATING COMPLETION. c. Does the CSAL or WC Journal accurate ly reflect changes to the command’s 3-M program? (1) CSAL should be in accordance with th e example provided in 19-2.3.2.e of this chapter.

p. 420

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-A-14 APPENDIX A (2) All PMS changes that would affect the command level should be annotated on the CSAL or WC Journal (i.e., AAMH, ACNs and DITs). d. Current SKED Database back-up files on external media? (1) External media includes but is not li mited to DVD-R(W), and external hard drives. (2) If the back-up file is located on the “H ”, “S” or “C” drive (local disc) of the 3MC’s machine, this attribute will be graded as a zero (0). 7. Attribute 7 : Does the 3MC: a. Maintain a standardized, sequential system for tracking FBRs? (1) If the command is not utilizing a split database configuration, the sequential serialization is completed automatically by SKED, but FBRs should be entered on CSAL. (2) If the command is utilizing a split database configuration, the sequential serialization needs to be done manually by opening the preferences of the FBR. (3) A log will be maintained by the 3-M staff to ensure no duplicate FBR serial numbers are exported. b. Export and transmit FBRs as required? (1) Check “FBR” tab in the WC SKED. All FBRs submitted are listed there, and information for status, date submitted, date exported is readily available. Receipt of exported report by PMSMIS (via RADWEB) must also be verified. This is accomplished by reviewing the serial numbers of unanswered FBRs in PMSMIS to ensure they were received. If the transmitted FBR doesn’t exist in PMSMIS 72 hours after transmittal, the 3MC likely did not upload it. (2) Double click to open details if fu rther information is required. c. Have an effective system for explai ning, routing, and tracking PMS changes? d. Does the CSAL or WC Journal(s) accur ately reflect changes to the command's 3-M documentation? (1) Check CSAL for received and completed PMS changes. (2) Check change memorandums verifying WC installation. (3) Ensure all received a nd applicable changes have a change memorandum completed from applicable WCs. (4) Verify using “FBR” tab in the WC view. 8. Attribute 8 : Does the 3MC: Promulgate Spot Check requirements? Ensure Spot Check matrix is inclusive of all levels of the 3-M CoC from the CO to the LCPO. 9. Attribute 9 : Did the unit conduct:

p. 421

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-A-15 APPENDIX A a. Does the command ensure Spot Checks are accomplished as required? (1) Compare spot check matrix to number of spot checks completed. Completed spot checks must be recorded into SKED. However, consideration must be made for SKED outages where paper copies may have been used, as well as the exporting of maintenance items when transferred or removed from custody. Maintenance items exported from SKED retain their spot check history. The WC leadership, 3MC or both should have record of maintenance item exported from SKED. (2) Proportionally graded. If 9 of 10 requir ed spot checks are completed, then the multiplier is .9. The attribute is worth 20 points, so the attribute will be graded as (20 x .9 = 18), and 18 points will be awarded. (3) If a non-accomplished or below stan dard Spot Check is reported, was appropriate follow-up action and abatement conducted to correct deficiency? b. Audits of all WCs? (proportionately gr aded. i.e., if 9 of 10 completed = 10 x .9) (1) Audits are required once quarterly to be conducted by a 3-M 304 qualified E-7 or above. (2) Are findings and discrepancie s reported to the WC’s CoC? (3) Audits are to be retained for one year (4 QTRS). c. Self-assessments? (1) Is the CO debriefed on results of th e self-assessment and intended corrective actions? (2) Is the report of self-assessment made via a memorandum from the 3-M Manager to the CO?

p. 422

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-A-16 APPENDIX A APPENDIX A SECTION III-A PMS PERFORMANCE RATE (PPR)

PPR (PMS Performance Rate) is calculated using a Command’s Maintenance Accomplishment Rate (MAR) and Spot Check Accomplishment Rate (SCAR). The MAR is a combination of the adjusted PAR and SAR, if applicable, multiplied by total SCAR divided by 100 and expressed as a RATE. For example, if a unit is properly scheduling and completing 90% of the checks assigned based on equipment configuration, and the average of Spot Checks conducted is 90%. Then PPR would be (90 x 90) ÷ 100 = 81% PMS Performance RATE. PPR = (MAR x SCAR) ÷ 100 Assessment of Maintenance Accomplishment Rate (MAR) The MAR is an evaluation of a command’s accomplishment of PMS maintenance requirements within periodicity and as required by situational requirements (R-Checks) and supporting Administrative Actions Required (AAR) within the previous 13 weeks prior to the inspection. Omitted maintenance is maintenance that was supposed to be scheduled and accomplished but was not, no matter the reason. Lost maintenance is scheduled maintenance that was not completed prior to the expiration of periodicity. Omitted maintenance and lost maintenance will be deducted from the WC’s MAR in the following manner: PAR = Completed divided by (Completed + Lost + Omitted). SAR = Completed divided by (Completed + Lost + Omitted). MAR = (PAR x .5) + (SAR x .5). Calculate the command’s average MAR by calculating the sum of all WCs’ MAR scores and dividing by the number of Work Centers evaluated. Null values - WCs that did not receive a Periodic Accomplishment Rate evaluation - will not be calculated into the CTS.

p. 423

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-A-17 APPENDIX A APPENDIX A SECTION III-B SPOT CHECK ACCOMPLISHMENT RATING (SCAR)

The SCAR is a measure of the inspector’s confidence that PMS maintenance requirements have been fully accomplished in accordance with PMS requirements. This is evaluated with one major consideration: PMS Spot Checks at the WC level by the inspector. Inspectors randomly select PMS maintenance requirements that have been recorded as accomplished at the organizational level within the previous 13 weeks until at least two percent of the total number of accomplished maintenance requirements have been selected with a minimum of one per WC. The total number of PMS Spot Checks per WC may be limited to 10 when the two percent results in more than 10 Spot Checks. In the event that no maintenance was completed in the past 13 weeks in a WC or if maintenance personnel whom have signed for completed maintenance in the past 13 weeks are not available to perform a Spot Check, the WC will receive a “Not Applicable” or “NA” evaluation and this will not be calculated toward the Command Total Score. Calculate each WC’s SCAR by dividing the total number of PMS Spot Checks assessed as fully accomplished by the total quantity of PMS Spot Checks conducted in that WC. Calculate the command’s average SCAR by calculating the sum of all WCs’ SCAR scores and dividing by the number of WCs evaluated. Null values (WCs that did not receive a SCAR evaluation) will not be calculated into the CTS. 1. Complete an MRC Evaluation SCAR Ch eck Sheet equivalent from SKED 3.2 or higher, for each MRC selected. Based on the results, evaluate the overall effectiveness of the accomplishment of each MR selected. Enter a numeric evaluation of each assessment attribute and provide amplifying information to describe the deficiencies driving point deductions. Significant deficiencies must be reported via the final inspection report. 2. Due to the nature of MRC completion, supporting programs such as Tag-Outs and HAZMAT are encountered. Care should be taken to avoid expanding the spot check to a review of the processes of those programs thereby preventing the assessor from determining the accomplishment status of the MRC under review. 3. The following is expanded guidance for co mpletion of the assessment attributes of the Spot Check sheet. Best practices or other policies not supported by source documentation must not be included in evaluating compliance: a. (1.a) Determine if the MP is qualified to perform the maintenance task. PQS 301 is required for all MRCs but attention should also be paid to other qualifications required such as SPO, DCPO or graduation from a required school such as NECC Armorer. b. (1.b) Determine if the correct TPM TE were used during the performance of the MRC. If the MP did not have the required TPMTE, it is unlikely that they would have been able to complete all the procedural steps of the MRC as

p. 424

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-A-18 APPENDIX A required. If an item of TPMTE was required to perform a conditional step and that step was not required to be accomplished, it is not considered deficient. If the required test equipment required calibration, ensure that the calibration is within date and the equipment is of sufficient scale to accomplish the MRC. c. (1.c) Determine if the MP maintained the correct equipment. d. (1.d) Examine the MRC to determine that any locally applied changes are authorized by procedural notes, external correspondence or allowed by reference (a). e. (1.e) Determine applicability of the MRC to the component that the MP signed for completion. NOTE: IF A PROCEDURAL STEP WAS NOT COMPLETED, THE MRC SHOULD NOT HAVE BEEN REPORTED AS COMPLETE AND THEREFORE THE ATTRIBUTE GRADE SHOULD BE ZERO AND ALL SUBSEQUENT ATTRIBUTES SHOULD ALSO BE ZERO, EFFECTIVELY “FAILING” THE SPOT CHECK. f. (2.a) From a variety of potential te chniques, determine if the MP performed all the required steps of the MRC. This may be accomplished via re- enactment, a discussion regarding the steps or re-performance. The inspector should come away with a clear impression that all the steps of the MRC were either fully accomplished or not. NOTE: IF A REQUIRED TAG-OUT WA S NOT CONDUCTED IN SUPPORT OF ACCOMPLISHING THE MRC, THE MRC SHOULD NOT HAVE BEEN CONDUCTED AND REPRESENTS A SERIOUS SAFETY VIOLATION AND THEREFORE THE ATTRIBUTE GRADE SHOULD BE ZERO AND ALL SUBSEQUENT ATTRIBUTES SHOULD ALSO BE ZERO, EFFECTIVELY “FAILING” THE SPOT CHECK. g. (2.b) If required by the MRC, veri fy that a tag-out was hung on the day the maintenance was performed. Ensure the isolation boundaries were appropriately identified and correctly positioned to ensure complete isolation of the maintained equipment. If no Tag-Out was required, write “NA” on the sheet. NOTE: FAILURE TO ADHERE TO A SA FETY PRECAUTION PROVIDED ON THE MRC CONSTITUTES A SERIOUS SAFETY VIOLATION AND THE FAILURE TO PERFORM THE MRC AS WRITTEN. THE ATTRIBUTE GRADE WILL BE ZERO AND ALL SUBSEQUENT ATTRIBUTES WILL ALSO BE ZERO, EFFECTIVELY “FAILING” THE SPOT CHECK. h. (2.c) Determine compliance with all sp ecific safety precautions listed on the MRC. If no safety requirements were invoked, write “NA” on the sheet. i. (3.a) By physical examination of the maintained equipment, determine if maintenance of the nature required by the MRC had been performed. Take note of fasteners that would have had to be disturbed, dirt in filters, fresh oil, etc., to make a judgment as to whether the maintenance has been performed.

p. 425

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-A-19 APPENDIX A If unable to make this determination with absolute certainty, write “NA” on the sheet. NOTE: DUE TO THE POTEN TIAL LIABILITY INCURRED BY IMPROPER USE AND DISPOSAL OF HAZMAT, SOME WCS HAVE ASSIGNED SPECIALLY TRAINED PERSONNEL TO PROVIDE HAZMAT AND DISPOSAL SERVICES FOR SURPLUS MATERIAL INSTEAD OF THE MP. THIS IS ACCEPTABLE PROVIDED THE INSPECTOR CAN DETERMINE FULL COMPLIANCE. j. (3.b) Determine through questioning and record verification that HAZMAT was properly used and disposed of as a means of determining whether the MRC was accomplished. Once the inspector has determined that the HAZMAT was used and disposed of correctly, this attribute is considered fulfilled. If no HAZMAT was required to be utilized, write “NA” on the sheet. k. (3.c) Determine if the MP could have performed the MRC from a standpoint of being trained and proficient in the tasks called out for by the procedure. l. (4.a) Determine if the MP filled out the 13-Week Accountability Log correctly or annotated proper disposition of maintenance in SKED for the accomplished MRC with the appropriate accomplishment date. If a tag-out isolation was used, ensure the tag serial number is recorded in the space allowed or as a check note in SKED. Ensure that the printed name and legal signature of the MP who performed the maintenance is recorded or, in case of group performed PMS, the MP in charge of the group. m. (4.b) From reviewing the discussions and findings during the spot check, determine if a FBR had been submitted if required. If no FBR was required, write “NA” on the sheet. n. (4.c) Determine if a material defici ency was noted during the PMS; if so, examine the CSMP to ensure the deficiency was documented. If no material deficiency was noted, write “NA” on the sheet. If material discrepancies are properly documented in the CSMP attribute graded as a two. Material discrepancies which are not documented in the CSMP will receive an automatic grade of zero. 4. When a Spot Check is determined to be below standards, comments must be made in the “additional remarks” section of the sheet. Detailed descriptions will facilitate root cause analysis, the formulation of an effective corrective action plan and assist to clearly identify factors contributing to deficiencies that led to the conclusion that the MRC was not conducted as written or not conducted at all.

p. 426

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-A-20 APPENDIX A SPOT CHECK ACCOMPLISHMENT RATING (SCAR) CHECK SHEET Planned Maintenance System (PMS) 3-M Spot Check Form SHIP DEPARTMENT EQUIPMENT WORK CENTER DATE PERFORMED MIP EVALUATED MRC EVALUATED

Assigned To: Assigned Crew:

NOTES: “*” If attributes 1.a or 2 are evaluated as unsatisfactory, all subsequent attributes will be graded as "0".

Inspection Attribute Value Grade Notes Contact the MP assigned responsibility for the accomplishment of the MRC, have the individual deliver MRC (and EGL if applicable), and determine the following by questions, personal observation, or both. 1. a.* Is the MP qualified (PQS) to perform the MR? 2 b. Did the MP present the correct tools, Personal Protective Equipment (PPE), parts (NSN), material (Military Specification and calibrated test equipment? 3

c. Did the MP properly identify the equipment (location, equipment validation)? 4

d. Are there unauthorized changes or corrections to the MRC? 3 e. Is the MRC correct for the equipment maintained? 3 Demonstrated all steps of MR including all Notes, Warnings and Cautions according to the MRC. 2. a.* Followed all steps of the MRC. 5 b.* Correctly performed equipment Tag- Out. 5 c.* Followed all safety precautions. 5 Does the equipment condition reflect accomplishment of the MRC? 3. a. Is it apparent that maintenance was performed recently? 10 b. Correctly demonstrat ed use and disposal of Hazardous Material. 3 c. Was the MRC within the capability of the assigned individual? 5 PMS Reporting 4. a. MP reported status of MR to the WCS if Completed or Not Fully Accomplished and made appropriate updates. 2

b. WC generated FBR for any problem with MRC. 2 c. Material deficiencies detected by the PMS action were recorded in MDS. 2

Attributes Evaluated as “NA” are not Calculated Total Points Available: Total Points Awarded: Spot Check (SCAR) (Grade = Points Awarded ÷ Points Available): SCAR =

p. 427

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-A-21 APPENDIX A Above Standards (90% or greater) At Standards (85-89.99%) Below Standards (less than 85%) Above Standards At Standards Below Standards Below Standard grade requires immediate accomplishment (if 3-M Manager determines re- performance is required) monitored by a Chief Petty Officer Additional Remarks: Printed Name:_______________________________Signature:_____________________________________ Command:_____________________________________________Date:_______________________________

p. 428

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-A-22 APPENDIX A APPENDIX A SECTION IV-A CSMP VALIDITY FACTOR (CVF) CHECKLIST UNIT DEPARTMENT DIVISION WORK CENTER DATE

CSMP VALIDITY (RAW DATA) ASSESSMENT ATTRIBUTE VALUE 1. Number of TA-1 (Depot) Automa ted Work Requests (AWR). 2. Number of TA-2 (Intermediate Maintenance Activity) AWR. 3. Number of TA-3 (SYSCOM/OT A/Contractor Rep) AWR. 4. Number of TA-4 (Ship's Force) AWR. 5. Total Number of Work Candidates (WC) Sum of 1 – 4. 6. Number of TA-2 AW R over 180 days old. 7. Number of TA-4 AWR over 180 days old not forwarded to ISIC as required. 8. Aged AWR Work Candidates (WCO) Sum 6 and 7. 9. Material Correction Rate: WCO/3 (Aged TA-4). (#7/3)/#4 10. CSMP Validity review results from CVF Sheet. Enter score from CVF Worksheet. 11. Number of Ship's Force (TA-4) AWR over 7 days old that require parts and the parts are not submitted to RSUPPLY. 12. Open Ship’s Force WC over 30 days old, not up-lined to the Master CSMP. 13. Total Work Candidate Deficiencies (WCD) Sum. (#11 - #12)/#4 14. Work Candidate Multiple Average #9, #10 and #13 15. Number of material deficiencies noted on materiel condition inspections and spot checks not documented in CSMP. 16. Deductions #15/#5 17. CSMP Validity Average #14 and #16 Weighted Work Center Totals CSMP Validity Above Standards At Standards Below Standards

Above Standards (90% or greater), At Standards (80-89%), Below Standards (less than 80%)

p. 429

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-A-23 APPENDIX A Remarks:

p. 430

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-A-24 APPENDIX A

CSMP VALIDITY FACTOR (CVF) GRADING ATTRIBUTES NOTE: SEVERAL ATTRIBUTES CONT AINED ON THE CSMP VALIDITY CHECKLIST ARE NOT INCORPORATED INTO THE GRADE AND ARE DESIGNED TO CAPTURE CSMP DATA FOR FURTHER ANALYSIS. 1. Attribute 1 : Number of Type Availability (T/A) 1 Work Candidates. Defined as Depot level work candidates. 2. Attribute 2 : Number of Type Availability (T/A) 2 Work Candidates. Defined as Intermediate Maintenance Activity (IMA) level work candidates. 3. Attribute 3 : Number of Type Availability (T/A) 3 Work Candidates. Defined as Technical Support request work candidates in the CSMP. 4. Attribute 4 : Number of Type Availability (T/A) 4 Work Candidates. Defined as Ships Force level work candidates. 5. Attribute 5 : Total Work Candidates (sum of attributes 1 thru 4). Defined as All work candidates in the CSMP. 6. Attribute 6 : Number of TA-2 Work Candidates over 180 Days old. 7. Attribute 7 : Number of TA-4 Work Candidates over 180 Days old. 8. Attribute 8 : Aged Work Candidates (WCO) sum of 6 and 7. 9. Attribute 9 : Material Correction Rate WCO/3 (Aged TA-4) (#7/3)/#4. Defined as total TA2 and TA4 work candidates in the CSMP over 180 days old, divided by 3. That total is divided by Attribute 4: Number of TA-4 Work Candidates. This numerically defines if command is managing CSMP and maintenance. 10. Attribute 10: CSMP Validity review results from CVF Sheet Enter score from CVF Worksheet. CVF Work Candidate Worksheet is used for this score. 11. Attribute 11: Ship’s Force WC over seven days old that require parts and the parts are not ordered. RPPO log (submitted by the command prior to assessment) along with actual R- supply verification will be utilized to determine this attribute. 12. Attribute 12: Total Work Candidate Deficiencies (WDC) Sum (#11/#4). Place the result from Attribute 11: Ship’s Force WC over seven days old that require parts and the parts are not ordered divided by Attribute 4: Number of TA-4 Work Candidates. 13. Attribute 13: Work Candidate Multiple Average, #10 minus (#9 + #12) = CSMP Validity

p. 431

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-A-25 APPENDIX A

CSMP VALIDITY FACTOR (CVF) WORK CANDIDATE WORKSHEET COMMAND:________________________________________________ DATE:________________ DEPARTMENT:___________________DIVISION:_______________WORK CENTER:________ JCN EQUIP Material not Ordered > 7 days 1 2 3 4 5 6 7 8 9 CVF Y N N/A Y N N/A Y N N/A Y N N/A Y N N/A Y N N/A Y N N/A Y N N/A Y N N/A CVF Average of all cells A V G A V G A V G A V G A V G A V G A V G A V G A V G A V G AVG

Number of Jobs Reviewed: CSMP entry was reviewed with the following results: Minus PTs 1. The work candidate written against the correct configuration item? #1 QTY 15 2. Problem description was adequate. #2 QTY 10 3. Recommended solution was adequate. #3 QTY 15 4. Deferral reason was incorrect. #4 QTY 10 5. 1st and 2nd contact not assigned. (Cannot be the same person) #5 QTY 10 6. Write-up does not reflect maintenance level assigned. (Originating WC, Intermediate Maintenance Activity, Depot Level Maintenance) #6 QTY 10 7. Incorrect CSMP summary. (Does not state the problem) #7 QTY 10 8. Priority code incorrect. #8 QTY 5 9. Does the Work Candidate Equipment Status Code match problem description? (Operational or Non-Operational) #9 QTY 15 10. Does the work candidate reflect the current and correct status of the material deficiency? #10 QTY Yes or No

Enter only numeric portion of JSN after ensuring that Department and WC header is filled in. NOTE: IF ITEM #10 IS “NO”, THE WORK CANDIDATE WILL BE ZERO. Assessment of CSMP Validity Factor (CVF). The CVF is an evaluation of a WC’s ability to accurately record deferred and corrective maintenance actions in the MDS. This is evaluated at the command level utilizing both the CVF Work Candidate (2K) check sheet. Inspectors will evaluate between 25 and 100 percent of deferred maintenance actions, per WC recorded on the CSMP. The results of the work candidate evaluation are then transferred to the CVF Score Sheet for

p. 432

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-A-26 APPENDIX A incorporation with other attributes evaluated. Calculate each WC’s CVF as required by the CVF check sheet provided on NECC Portal under the N43 tab. Calculate the command’s average CVF by calculating the sum of all WCs’ CVF scores and dividing by the number of WCs evaluated. Null values (WCs that did not receive a CVF evaluation) will not be calculated into the CTS.

p. 433

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-A-27 APPENDIX A APPENDIX A SECTION IV-B REPORTING AND ASI PROCESSING CONFIDENCE FACTOR (RAF) REVIEW UNIT:

MDS Administration Points Available Points Awarded 1. Does the 3MC have a mechanism to track and remove users from MDS as they depart the command? 2 Configuration Management 2. Does the 3MC maintain a master file to track Configuration Item record validations? 3 3. Have all Parent-Level configuration items validated within prescribed timelines? 10 4. Is monthly follow-up action initiated with the CDM for CKs awaiting response in excess of 60 days? 5 5. Is the Review and Approval queue free of configuration transactions older than 7 days? 10 Work Candidate Management 6. Is each Department conducting monthly CSMP review? 10 7. Are there any approved Work Candidates with a Priority Designator of 1-3, without a CASREP as required? 5 8. Are Work Candidates, older than 180 days, forwarded to ISIC for assistance, if required? 3 9. Is the Review and Approval queue free of Work Candidates with no approval, over 7 days? 10 OMMS-NG System Maintenance 10. Are completed reports regularly deleted? 2 11. Is the Import Correction queue empty? 2 12. Has "Inactivate" been run in the past 15 days? 2 13. Has "Archive" been run in the past 15 days? 2 ASI Processing & Upline Reporting 14. Does the 3MC maintain an up-to-date ASI or Upline log? 5 15. Is the OMMS-NG Batch Job Queue routinely purged of completed processes? 5 16. Are .uru, .pts, and error report files kept for one year? 3 17. Are ASI_CDM error reports forwarded to the CDM following completion of each ASI? 3

p. 434

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-A-28 APPENDIX A Attributes Evaluated as “NA” are not Calculated Total Points Available: 82 Total Points Awarded: RAF % = TP Awarded divided by TP Available RAF** 120 Inspector’s Name and Rate:_______________________________Date:_________________ Inspector Notes: ** SAT = 80% or better All attributes are assessed with a YES, NO or NA status. No partial points will be awarded.

p. 435

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-A-29 APPENDIX A APPENDIX A SECTION IV-C MAINTENANCE DATA SYSTEM PERFORMANCE RATE (MPR)

MDS Performance Rate (MPR) is an evaluation of the Current Ship’s Maintenance Project Validity Factor (CVF) and Reporting and Automated Shore Interface (ASI) Processing Confidence Factor (RAF) calculated by multiplying the CVF and RAF score divided by 100 and expressed as a RATE. For example, if a unit has a CVF of 90% and a RAF of 90%, then the MPR would be (90 x 90) ÷ 100 = 81% MPR. MPR = (CVF x RAF) ÷ 100 The MPR has an overall 40% weight of the overall 3M Inspection grade. This comes from the weight commanders place on CSMP accuracy and validity. This leads to proper maintenance action planning at the lowest cost, drives manning, and budget requirements. Specific criteria for MPR evaluation is established by the TYCOM and the approved MPR check sheet is provided on the NECC Portal under the N43 tab. Assessment of Current Ship’s Maintenance Project Validity Factor (CVF). The CVF is an evaluation of a WC’s ability to accurately record deferred and corrective maintenance actions in MDS. This is evaluated at the command level utilizing both the CVF Work Candidate (2K) check sheet. Inspectors will evaluate between 25 and 100 percent of deferred maintenance actions, per WC recorded on the CSMP. The results of the work candidate evaluation are then transferred to the CVF Score Sheet for incorporation with other attributes evaluated. Calculate each WC’s CVF as required by the CVF check sheet provided on NECC Portal under the N43 tab. Calculate the command’s average CVF by calculating the sum of all WCs CVF scores and dividing by the number of WCs evaluated. Null values - WCs that did not receive a CVF evaluation - will not be calculated into the CTS. Reporting and ASI Processing Confidence Factor (RAF). The RAF is an evaluation of a command’s ability to accurately report MDS records and ASI processing. Specific criteria for RAF is established by the TYCOM and the command’s RAF is calculated by the RAF check sheet provided on the NECC Portal under the N43 tab.

p. 436

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-A-30 APPENDIX A APPENDIX A SECTION V COMMAND TOTAL SCORE

1. The CTS consists of three (3) parts and weighted as follows: APR = (SEER average + CLER) divided by 2 Weighted PPR = (MAR x SCAR) divided by 100. Weighted MPR = (Weighted CVF x RAF) divided by 100 CTS = (APR x .2) + (PPR x .4) + (MPR x .4) 2. A minimum grade point of 80 is required for a satisfactory score. The final grade is awarded based on final scores as established utilizing grading check sheets.

p. 437

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-A-31 APPENDIX A 3-M ASSESSMENT TOTALS WORK SHEET

p. 438

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-2-B-1 APPENDIX B APPENDIX B FORMAT FOR REPORTING 3-M INSPECTIONS

4790 Ser Date From: Accomplishing Activity To: Commanding Officer (Command Name and Hull Number (if applicable.) Subj: REPORT OF 3-M INSPECTION OF Ref: (a) NAVSEAINST 4790.8 (series); Ships’ Maintenance and Material Management (3- M) Manual (b) COMUSFLTFORCOMINST 4790.3; Join t Fleet Maintenance Manual, Volume VI, Chapter 19 Encl: (1) (as required) 1. Per references (a) and (b), a 3-M Inspection of (__________________________) was conducted during the period (Date) to (Date). 2. During this inspection, the following signi ficant deficiencies were discovered: a. (List) Specific department and WC deficiencies are provided in enclosure(s) (1) through ( ). 3. The following overall ship or departme nt numerical assessments are assigned: a. 3-M Total Score __________________ b. 3-M Inspection __________________ (Above, At or Below Standards)

Copy to: Immediate Superior In Command (with enclosures) Type Commander (with enclosures)

p. 439

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-1 VOLUME VI CHAPTER 19-3 NAVAL INFORMATION FORCES REFERENCES. (a) NAVSEAINST 4790.8 - Ships’ Maintena nce and Material Management (3-M) Manual (b) NAVEDTRA 43241 - Personnel Qualificati on Standard for Ship’s Maintenance and Material Management (3-M) System (c) NAVSUP P-485 – Naval Supply Procedures (d) COMNAVIDFOR M-2066.1 – Base Communications Operations (e) COMNAVIFORINST 11311.1 – Test and Ma intenance Requirements for Generators, UPS, and Chillers Ashore (f) CNICINST 11000.3 – Z one Inspection, Building Manager and Building Energy Monitor Programs (g) SECNAV M-5239.2 – Cyber Information Technology and Cybersecurity Workforce Management and Qualification Manual (h) OPNAVINST 5100.23 - Navy Safety and Occupational Health Program (i) CNICINST 5100.2 – Tagout and Lockout Energized Work Program (j) UFC 3-560-01 – Operation and Maintenance: Electrical Safety LIST OF APPENDICES. A Inspection Criteria B Division Inactive Equipment Maintenance Plan C Format for Reporting 3-M Inspections 19-3.1 ROLES AND RESPONSIBILITIES. a. Type Commander. The Type Co mmander (TYCOM) exercises primary responsibility for the effective operation and support of the 3-M System. Areas of responsibility include but are not limited to the following: (1) Ashore Maintenance Data System (MDS). (a) Automated Work Notification (AWN). (b ) Maintenance Figure of Merit family of systems. (2) Planned Maintenance System (PMS) Scheduling (SKED) software. (3) Configuration Data Managers Database - Open Architecture (CDMD-OA) and Model Based Product Support (MBPS). (4) Scheduling and conducting 3-M Inspections (3MI), Training Assist Visits (TAV), and Evaluation Visits to be conducted by both TYCOM and Immediate Superior In Commands (ISIC). (5) Master Job Catalog. (6) The screening and processing of PMS feedback reports (FBR).

CHAPTER 19-3

p. 440

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-2 (7) Maintaining inspection data files. (8) Providing program enhancement requirements to the respective Fleet Commander via N43. (9) Ensuring units are manned with Navy Enlisted Classification (NEC) qualified 3-M Coordinators (3MC). (10) Analyzing 3-M and self-assessment data, identifying common concerns, conducting problem root cause analysis with the development and implementation of solutions. (11) Ensuring TYCOM inspection team me mbers are qualified to inspect assigned areas. b. Immediate Superior In Command. The ISIC is responsible for the routine monitoring and evaluation of the 3-M System for all assigned activities. Areas of responsibility include but are not limited to the following: (1) Designating a 3-M Officer (3MO) in writing. The 3MO is responsible for the satisfactory administration of 3-M programs, per reference (a) and this subchapter, for subordinate commands or activities. The 3MO will maintain staff PMS and Personnel Qualification Standards (PQS) records. (2) Monitoring and evaluating 3- M program for all assigned units. Responsible for all TAVs as assigned by the TYCOM. (3) Ensuring 3MI are current. (4) Ensuring subordinate commands c onduct rigorous quarterly 3-M Self- Assessments and report results to the TYCOM 3MC. (5) Monitoring the status of troubled systems and Top Management Attention items using the quarterly 3-M Self-Assessment. (6) Ensuring subordinate commands comply with standard Work Center (WC), division and department structure. (7) Tracking and monitoring 3-M ma jor milestones and training events, overseeing, and providing inspection teams and conducting 3-M Spot Checks during ISIC or staff visits. (8) Forward all ISIC conducted 3MIs and TAVs to the TYCOM, and 30-day updates from post 3MI and TAV Plan of Action and Milestones (POA&M). c. Inspection Teams. Areas of responsib ility include but are not limited to the following: (1) Scheduling and conducting 3MIs an d training events as directed. (2) Reporting of training status and cer tification recommendations to the TYCOM to include any perceived barriers to effective and timely completion of 3-M events. (3) Ensuring material failures are adequa tely examined to detect 3-M system inadequacies.

p. 441

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-3 d. Commanding Officer or Officer In Charge. The Commanding Officer (CO) or Officer In Charge (OIC) or site Technical Director is responsible for establishing an aggressive Self-Assessment Program that validates the administration and execution of maintenance and detects improperly conducted maintenance or falsely reported accomplishments. e. Executive Officer. The Executive Offi cer (XO) is the command’s 3-M System Manager responsible to the CO or OIC for the overall management of the 3-M Program. For sites with no on-site executive officer, the OIC or technical director will ensure locally the below functions are conducted, and briefed to the ISIC Executive Officer. The XO will: (1) Chair quarterly 3-M System meetings with Department Heads (DH) and the 3MC. (2) Brief the CO on the status of 3-M. (3) Integrate 3-M System training into the command’s training and qualification program. (4) Ensure personnel receive adequate and effective 3-M System training. (5) Ensure the effectiveness of the command’s 3-M Self-Assessment Program. (6) Act as the final review officer for shifts of maintenance responsibility between departments. (7) Establish a command Zone Inspection Program. f. Command Master Chief. The Command Master Chief will: (1) Attend the XO’s scheduled 3-M System meetings providing senior enlisted feedback. (2) Conduct PMS Spot Checks following the command’s policy to ensure required maintenance is being properly performed and documented. g. Command 3-M Coordinator. The 3MC will: (1) Serve as the key 3-M System assistant to the XO. (2) Maintain a file of 3-M System directives, newsletters, notes, and correspondence containing current 3-M program information and ensure distribution to WC personnel. (3) Maintain copies of the current Force Revision (FR) NAVY PMS Digital Video Disk (DVD), List of Effective Pages (LOEP) for every WC, changes issued between FRs in their original format and classified Maintenance Requirement Cards (MRCs). Digital copies are allowed unless there have been changes between FRs. (4) Advise, monitor, and assist DHs, di vision officers (DIVOs), leading chief petty officers (LCPOs) and work center supervisors (WCS) in matters concerning the 3-M System.

p. 442

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-4 (5) Monitor the 3-M PQS Program and main tain an auditable record of personnel qualified in 3-M PQS. (6) Maintain a master accountability log of all PMS changes. (7) Develop and maintain a Split Ma intenance Index Page (MIP) Log. (8) Administer the configur ation management program. (9) Supervise the command’s 3-M Se lf-Assessment Program and provide a weekly status to the XO. (10) Develop and administer the PMS Spot Check Program. (11) Generate a weekly PMS Spot Check assignment matrix for officers, Chief Petty Officers (CPO) and designated supervisory personnel. (12) Ensure corrective actions are take n on all unsatisfactory PMS Spot Checks and report same to the XO as part of weekly PMS reporting. (13) Ensure a complete back up of the SKED system is made on removable media (e.g., DVD or Compact Disk (CD)) following completion of the FR update and retain as part of the PMS Master File. (14) Ensure situational requirements ar e triggered in SKED and completed based on unit events. (15) Ensure that Triggers are pr operly set at the command level. (16) Screen all FBRs, verify content, va lidity, serialize and forward within seven days of origination. (17) Maintain accountability of all submitted FBRs and actions taken until corrected or new PMS documentation is received. (18) Ensure the FBR originator and all ap plicable WCs are apprised of action taken and that changes or corrections are implemented when received. (19) Ensure 3-M documents such as Maintenance Action Form OPNAV 4790/2K (2-Kilo), Configuration Change Forms OPNAV 4790/CK, etc. that require forwarding to a data processing activity are forwarded within seven days of origination or as operationally feasible. (20) Validate 3-M MDS data elements fo llowing the 3-M validation specifications. (21) Ensure 3-M documents returned fo r the correction of data are promptly revised and resubmitted. (22) Track the reporting of completed main tenance actions related to an alteration or because of a configuration change with timely processing of Automated Shore Interface configuration and logistic data (as applicable). (23) Report up-line CSMP maintenance tr ansactions and command equipment file corrections at least once a week. (24) Ensure current external bac kups of the command’s Configuration Management Database are created on removable media (e.g., DVD or CD).

p. 443

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-5 (25) Maintain any outstanding paper co pies of message work candidates and 2- Kilos (paper or electronic). (26) Maintain a record of account cr eation documents as per volume II part 2 chapter 1 of this manual. (27) Ensure the sites in which responsib le are conducting equipment validations in such a manner that one hundred percent of configuration items are validated in a 36-month period. (28) Review all shore inst allation packages for Configuration, PMS, or Locally Generated Maintenance requirements in the shore installation program SPIDER. h. Department Head. The DH is responsibl e to the XO for the operation and execution of the 3-M System within the department. Duties and responsibilities assigned to the DH are not to be delegated. The DH will: (1) Designate departmental 3- M personnel as applicable. (2) Ensure maintenance is prioritiz ed to facilitate accomplishment. (3) Review and approve all depart ment PMS schedules and revisions. (4) Review maintenance action annotations. (5) Acknowledge weekly alerts if no DIVO is assigned to the WC. (6) Implement a Self-Assessment Program within the department to validate properly accomplished and reported maintenance. (7) Take corrective action on all “Unsatis factory” PMS Spot Checks and report to the XO via 3MC as part of weekly PMS reporting. (8) Ensure all material deficiencies are documented and promptly reported. (9) Review and verify the content and va lidity of all FBRs, digitally sign FBRs within five days of origination. (10) Ensure the Configuration Mana gement Database accurately reflects equipment changes whether the action is performed by command personnel or outside activities. (11) Authorize placement of equipment in to an Inactive Equipment Maintenance (IEM) status, ensure PMS scheduling is annotated accordingly. (12) Review and approve department work candidates within four days of creation; ensure completeness, accuracy, and the correct assignment of priority. (13) Review all work candidates in the departmental CSMP every 90 days. (14) Ensure that no classi fied data is reflected on 3-M documents designated for off hull distribution. (15) Conduct quarterly meetings with DIVOs, LCPOs and WCSs and provide status of departmental 3-M System to the XO.

p. 444

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-6 i. Department Leading Chief Petty Officer. The department LCPO is responsible for the proper operation of the 3-M System within their department. The department LCPO will: (1) Provide 3-M System guidance and training to DIVOs and division LCPOs within their Department. (2) Participate in quarterly Self-Assessments. (3) Ensure the proper testing and inspec tion of work done by outside activities prior to job acceptance. j. Division Officer. The DIVO is resp onsible to the DH for the execution of maintenance within the division. The DIVO will: (1) Ensure all PMS scheduling changes ha ve been properly annotated and applied prior to DH review and finalization. (2) Review the 13-Week Accountability Log at the beginning of the PMS week and sign at the end of the week (if not using electronic accountability in SKED or when SKED is not available). (3) Review and verify the content and valid ity of PMS FBRs within three days of origination. (4) Ensure 3-M documents generated with in the division are complete, accurate and promptly submitted to the DH. (5) Conduct 3-M Self-Assessments as directed by the command’s policy. (6) Provide weekly updates to the DH con cerning the status of the 3-M System within the division. (7) Incorporate 3-M System training into the Divisional Training Plan. (8) Review divisional work candidates a nd the CSMP for validity and accuracy. (9) Conduct monthly briefings for the DH on the status of all work candidates. (10) Acknowledge PMS Alerts. (11) Conduct weekly close-outs when the LCPO is not available. (12) When no LCPO is designated perfor m the functions of the LCPO, as well. k. Division Leading Chief Petty Officer. Th e division LCPO is responsible for the proper operation of the 3-M System within their division. The division LCPO will: (1) Supervise WCSs in the execution of daily maintenance. (2) Ensure WCSs are properly trained, equipped and are knowledgeable of all WC divisional equipment maintenance requirements. (3) Ensure divisional personnel are pr operly trained and qualified to conduct maintenance. (4) Verify all divisional WC equipment is covered by PMS.

p. 445

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-7 (5) Ensure PMS is properly scheduled and conducted, including all underway and special evolution situational “R” checks. (6) Review WC PMS records (e.g., FRs, Advanced Change Notices (ACN) and PMS FBRs and Responses), approve all lineouts and additions on the LOEP, MIP, and PMS schedules prior to DIVO and DH reviews. Ensure proper justification is noted on each lineout. (7) Review and approve non-applicable procedural steps lined-out on MRCs. (8) Review and sign the 13-Week Accountab ility Log at the end of the PMS week and ensure checks added that week are hand-written into the blank accountability log. (If not using electronic accountability in SKED or when SKED is not available. (9) Review the PMS Scheduling Forecasti ng Report to ensure that all Tools, Parts, Material and Test Equipment (TPMTE) are available to support upcoming maintenance actions. (10) Provide the DIVO a weekly status of the division’s Self-Assessment Program, CSMP and PMS. (11) Ensure the Configuration Mana gement Database reflects current configuration. (12) Ensure FBRs are submitted reques ting LOEP changes to reflect system, equipment and component installs or removals. (13) Review and verify the content and va lidity of PMS FBRs within two days of origination. (14) Ensure the divisional CSMP accu rately reflects material conditions. (15) Review and approve work candidates, act as the second point of contact for work candidates and provide the DIVO a weekly brief on the status of all work candidates in the CSMP. (16) Ensure proper testi ng and inspection of work done by outside activities prior to job acceptance. (17) Coordinate repair activ ities within the division. (18) Review all quarterly Self-Assessmen ts and promptly correct discrepancies found within the division. (19) Review, approve, and close out weekly schedules. This closeout of the previous week’s schedules must occur on the first day of the following week. (20) Review Check Notes for required and updated information. (21) Write PMS Alert details to include why planning allowed loss of periodicity and the plan to complete PMS. (22) When no DIVO is designated perfor m the functions of the DIVO as well.

p. 446

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-8 l. Work Center Supervisor. The WCS should be a senior petty officer assigned to the WC and qualified per reference (b) or civilian equivalent. The WCS will: (1) Maintain a detailed working knowledge of all equipment deficiencies within the WC. Record all equipment deficiencies within their WC, utilizing AWN to ensure all required 3-M System documents are submitted to the division LCPO. (2) Ensure WC personnel have complete d 3-M PQS training commensurate with position held. (3) Ensure PMS covers all maintenance worthy equipment in the WC. (4) Maintain an accurate and current LOEP. (5) Ensure 3-M System WC files and pu blications are complete, current, and available to WC personnel. (6) Ensure WC initiated 3-M documentation is correct, legible, promptly prepared and submitted. (7) Maintain a 13-Week Accountability Log containing the current and previous 13-Week Log (if not using electronic accountability in SKED or when SKED is not available). (8) Prepare weekly WC schedule, obtai n required approval, assign maintenance personnel, and update schedule to reflect status. (9) Ensure equipment changes, adds and removals are reflected in the Configuration Management Database and, if not, report via 4790/CK to the Configuration Data Manager (CDM). (10) Ensure FBRs are submitted whenever: (a) Maintenance requirements are not fully understood. (b) Errors are believed to exist. (c) Entries in the TPMTE block are wrong or inadequate. (d) Additional coverage is needed. (e) Performance of the maintenance requirement would cause a hazardous condition to exist. (11) Ensure prompt reporting of all material deficiencies and completed maintenance actions. (12) Ensure Periodic Maintenance Requirements scheduled for command accomplishment are completed and reported as required. (13) Ensure test and measurement equi pment or other portable support equipment is delivered for test or calibration as scheduled. (14) Ensure the DIVO and division LCPO or LPO are advised of all 3-M System activity within the WC.

p. 447

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-9 (15) Spot check completed equipment file validations; ensure accuracy of the information and PMS scheduling equipment associations. (16) Review the PMS Scheduling Forecasti ng Report to ensure that all TPMTE is available to support upcoming maintenance actions. (17) Ensure all WC weekly schedules are updated daily. (18) Use the Edit Equipment Details f unction of SKED to the maximum extent possible to associate maintenance items to the CDMD-OA database embedded in SKED 3.2 for configuration Items. The association should be made to the highest level or piece of the applicable equipment being maintained. m. Repair Parts Petty Offi cer. RPPO personnel are responsible to support the supply acquisition process for the shore site. Due to Naval information Forces’ (NAVIFOR) unique nature and not having a RSUPPLY back-end to AWN. RPPO will: (1) Order all NSN based parts per reference (c) . (2) Ensure all funding expenditure s are captured as outlined in section 19-3.4.2 of this chapter. (3) Maintain a RPPO log, to ensure accu rate transactions with Supply Staff. n. Maintenance Personnel. Maintenance personnel will perform all PMS as assigned utilizing PMS documents in SKED and ensure Check Notes contain amplifying information and tagout identifiers as required. Maintenance personnel will: (1) Perform assigned maintenance. (2) Notify the WCS when: (a) An MRC is not fully understood, ap pears to be incorrect or cannot be accomplished as written. (b) There are issues with the TPMTE block of the MRC. (c) The technician has doubts concerning his or her ability to perform the maintenance. (d) Equipment deficiencies or casualties are discovered. (e) Factors exist which would make performance of the maintenance unwise or dangerous. (3) Initiate FBRs when discrepancies ar e discovered during the performance of an MRC. (4) Inform the WCS when planned main tenance requirements are complete. (5) Annotate PMS schedule to reflec t accomplishment of maintenance. (6) Sign 13-Week Accountability Log (if not using electronic accountability in SKED or when SKED is not available). (7) Open a Work Notification in AWN when any discrepancy is annotated. o. Other Roles and Responsibilities

p. 448

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-10 (1) Memorandum of Agreements (MOA) must be in place, per reference (f), when two sites are operating outside of the single site structure or tenant commands of one another to clearly define the responsibilities of both sites (2) Entities not covered by traditional 3M roles and responsibilities but are either required or contracted to conduct maintenance, whether hardware or software, must have those roles clearly defined by either a contract or MOA per reference (i). The site must still utilize the Navy’s 3M system to track the completion of this maintenance. If the utilized entity is outside of the site, the site will utilize a cent sign as dictated in this instruction to accomplish the maintenance actions. (3) Commands that may not have the PMS portion of 3-M, are still required to utilize MDS for mission readiness when the unavailability of the services effects mission capability, configuration management, facility issues, funding expenditures of Operation and Maintenance dollars, and man-hour expenditures for equipment driven and equipment supporting tasks. (4) Base Communications Operations (BCO ) as defined in reference (d) have configurations such as but not limited to Universal Power Supplies (UPS), Generators, and Definity Servers that are to be maintained in accordance with this manual. All BCO deficiencies and updated configurations are to be documented and maintained in accordance with section 19-3.4.2 and volume VI, chapter 19-7 of this manual. (5) NAVIFOR has a large amount of small boats, all small boats maintenance will follow in addition to this chapter, JFMM VOL VI, chapter 11. (6) For equipment supporting and installed on Military Sealift Command ships by NAVIFOR activities, will use JFMM VOL VI in the performance of their maintenance and deficiency reporting. 19-3.2 QUALIFICATIONS. All personnel assigned to billets associated with the 3-M system must be 3-M PQS qualified for the assigned billet per reference (b). a. All military, civilian, or contract, who are on-site contractors providing maintenance coverage, assigned or contracted to billets associated with performing 3-M must complete required 3-M PQS, which coincides with their position or billet. All military, Department of Defense civilian, and contractors are required to re-qualify when directed by a PQS revision, or if the member’s qualification date has exceeded 5 years. For Local National (LN) personnel, where the LN cannot be qualified a Military or Government employee must perform a quality review of the work, and sign-off the maintenance as the government official. b. 3MCs are responsible for maintaining an effective 3-M training program designed to equip personnel with the knowledge and skills required for their designated position incorporated into the long term and short-term training plans, to include but not limited to requirements outlined in reference (a). c. Evidence of qualification in support of 3-M requirements must be maintained by the command in an auditable record. Fleet Training Management and Planning System

p. 449

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-11 (FLTMPS) reporting is the required method to reflect qualifications and NEC requirements. d. Cyber security work force qualification and certifications for system administrator maintenance must be maintained as applicable to the user or system administration role of the performance of maintenance, further delineated below and in reference (g) (1) Minimum qualification NAVEDTRA 43469, Personnel Qualification Standard for Cybersecurity, is required at all levels of cybersecurity workforce and directs the training necessary prior to qualifying as a technician or manager as per reference (g). (2) For Host Based Security System (H BSS), all personnel with privileged access must be trained with “F” school or Network Security Vulnerability Technician (NSVT) NEC, with certification on file as per reference (g). (3) For cyber security operating syst em certifications, and requirements for system utilization required baselines are outlined in reference (g). e. Evidence of qualification in support of 3- M requirements must be maintained by the command in an auditable fashion. In addition to 3-M PQS qualifications, all personnel assigned to accomplish 3-M related maintenance on systems listed in Volume V, Part 1, Chapter 2 paragraph 2.2.1 of this manual, must be qualified per reference (c). Table 19-3-1 reflects the PQS qualifications required to fill 3-M billets. Table 19-3-1 - Required PQS Qualifications 3-M Coordinator PQS-307 3-M Assistant PQS-306 Department Head PQS-306 Department LCPO PQS-305 Division Officer PQS-304 Division LCPO PQS-304 Work Center Supervisor PQS-303 Repair Parts Petty Officer PQS-302 Maintenance Personnel PQS-301 f. Personnel checking into the command w ith a 3-M qualification obtained from a previous command may be required to re-qualify. They will re-qualify directly to the highest level previously obtained and they do not have to re-qualify at lower levels.

p. 450

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-12 g. Completion of SKED training videos provided on the FR disk equivalent to 3-M PQS qualification is required. h. Commands will utilize a written test, a nd the appendix a Sked Proficiency, and MDS proficiency sheets to ensure as the baseline for oral board signatures for every qualification and re-qualification. i. Training resources include but not limited to the following: (1) NAVIFOR 3-M Milsuite course at https://www.milsuite.mil/university/navifor3-m (2) 3-M University (3) SKED training modules in the SKED 3.2 program (4) Training Assist Visits from the ISIC or TYCOM, this is not a requirement prior to an inspection. 19-3.3 PLANNED MAINTENANCE. 19-3.3.1 PMS Functional Operation: a. PMS execution is conducted in accordance reference (a), and no other Preventive Maintenance system supersedes the 3-M system, other than those dictated in chapter 19 of this instruction. PMS execution begins Ashore with the Fleet Readiness Certification Board (FRCB) process, and the preventive maintenance can be found in the logistics section for User Logistic Support Summary (ULSS) packages. This will list out the required MIPS or point to the technical manuals to be utilized for locally generated maintenance procedures for PMS. b. Change Service Accountability Log (CSAL) provides a definitive record to all work center changes and is kept in the master PMS File by the 3MC. For sites where the 3MC is not co-located, the site must also maintain a CSAL. The CSAL includes all changes no matter how minor including MRC changes in the command or sites 3M Program. An example of items in the CSAL include, but not limited to FR, ACN, FBR, locally generated maintenance changes, or Document Information Transmittal (DIT). (1) The CSAL is comprised of the actual l og sheet, a copy of all memos routed to the WCS and the memo from the WCS to the 3MC indicating completion. (2) The importance of the CSAL cannot be overstated. In essence, it provides for a day-to-day, year-to-year record of changes to a command’s planned maintenance program. It is also a turnover document at deployment sites, allowing a current command to quickly identify all changes from a previous command. Finally, it will be inspected during all command 3-M assessments and inspections, providing visibility as to how well a command manages 3-M from one inspection to another.

p. 451

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-13 Figure 19-3-1 Change Service Accountability Log FR Change Number or Authority Date RCVD Cognizant Dept. or WC Date Cover Sheet Issued Date Cover Sheet Returned Date Master File Updated or Item Closed Summary of Change

c. Planning Board for Maintenance (PB4M). E ach unit will have a formally structured PB4M which will meet monthly at minimum. For Echelon 5 and below ISIC representation should be present for the PB4M. This forum provides a review of current/future planned installs and updates, organizational maintenance, CSMP quality and accuracy, future maintenance, and fiscal concerns. Attendees must include XO, 3MC, all DH’s, and additional personnel as desired. d. A SKED forecasting report will be used to ensure all future requirements such as tools, parts, and test equipment are available for maintenance checks. Any items with NSN must be ordered from the primary means of Military Standard Requisitioning and Issue Procedures (MILSTRIP) ONETOUCH. e. Standard entries will be utilized for all SKED 3.2 check notes reports or alert details. (1) SKED 3.2 Check note report entries must begin with rescheduled, out of periodicity, non-accomplished, lost or n/a (2) Detailed remarks explaining why check note was not completed to include date, Job sequence number, and/or supply requisition numbers. (3) For units using SKED Electronic f. Cent (¢) sign Check note entries will begin with “PERFORMED BY” and followed by the detailed information of the individual completing the maintenance, job sequence number (JSN), Work order, or applicable documentation used to complete the maintenance. Due to the unique nature of NAVIFOR units, this mark is utilized for outside activities performing maintenance such as engine repair shops, NAVFAC, not to be utilized with internal contractors that are conducting the maintenance as part of the command. In cases where the completing activity is not available to sign the accountability log, the DH will sign into SKED 3.2 to document the completion of the MRs by outside activities after reviewing the Check Note ensuring the LCPO has

p. 452

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-14 annotated satisfactory completion of the maintenance action (For example: “PERFORMED BY –Captain’s Marina and Boat Shop, Contractor John Smith, JSN BCIC-0124 Work Order #2018-031). g. The substitution of any tools, materials or test equipment not held by the activity should be considered prior to deciding to defer the maintenance until the exact tools, materials or test equipment listed on the MRC are procured. This is especially critical for frequently required maintenance where several performance cycles can be missed while waiting for supply to provide the correct items. Substitution requirements are provided by reference (a) and other technical documents. h. The minimum requirement for the testing and maintenance of facility mission support equipment that is government owned and maintained by NAVIFOR components, is listed in reference (e). Examples of facility mission support equipment include but are not limited to: Uninterruptable Powers Supply (UPS) systems, generators, and Heating, Ventilation, and Cooling (HVAC) systems. i. Locally generated maintenance must be in place if no maintenance procedures exist for the mission support equipment. Following the TFBR process for Equipment not covered by PMS section dictated in reference a. This process details the designations for Maintenance requirement substantiated, and No Maintenance required. Maintenance requirement substantiated can be further defined below for PMS and MDS clarification. (1) Government owned equipment that is maintained by military, civilian, or contractor will fall into both PMS and MDS programs (2) Contractor owned equipment as per the contract that is maintained by contractors that affects readiness or degradation of mission will fall into the MDS program only. (3) Contractor owned equipment as per the contract that is maintained by contractors that does not affect readiness or degradation of mission will not fall into either the PMS or MDS programs. j. All maintenance and testing procedures must be scheduled, and accomplished in SKED, whether conducted by outside contractor or local command representative. k. COMSEC maintenance, ashore COMSEC sites will utilize PMS SKED program in order to maintain and record COMSEC equipment maintenance. When transferring the COMSEC from the ashore site to another, the site will utilize the import/export feature to ensure the maintenance history of the equipment is going to where the Controlled Cryptographic Item is being transferred to. 2-Kilos will be submitted for the accomplishment of those items. l. Where a difference between requirements or procedures of PMS and other technical documentations exist, PMS requirements will take precedence. m. For equipment not currently supported by Naval Sea Systems Command (NAVSEA), command subject matter experts will develop local PMS procedures. Commands are required to search the FR Reference disk, and PMSMIS prior to locally generating maintenance procedures. These procedures can be pointer cards that point to

p. 453

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-15 procedures already created, and meet the intent, and training required to maintain the system whether hardware or software. 19-3.3.2 Functional Components. a. PMS Master File. The Master File, maintained by the units 3MC, contains information relative to PMS requirements that are specific to equipment for which the command is responsible. The Master File provides for duplicate issue of missing MIPs and MRCs, contains supplementary information provided by Naval Sea Logistics Center (NSLC) Detachments Norfolk or San Diego and serves as a repository for changes received between FR distributions, which must be retained on file until the changes are reflected in a subsequent FR. Master File content is delineated in Appendix A Section I-B the Command Level Effectiveness Review (CLER) of this subchapter. b. Work Center PMS File. The WC File provides a ready reference of planned maintenance requirements and information to be retained in the working area for use by the WCS and maintenance personnel. The WC File contains only the documents and information applicable to a specific WC. The content of the WC File is delineated in Appendix A Section I-A the Scheduling and Execution Effectiveness Review (SEER) of this subchapter. c. PMS Administrative Requirements. In lie u of a WC or a Master File the following should be retained: (1) Work Center: Current locally generated LOEP and MRCs. (2) 3-M Coordinator (a) SKED 3.2 Help file (b) Split MIP Tracking Log (updated to current FR). (c) Applicable 3-M Instructions (Activity, ISIC or TYCOM). (d) Current 3-M messages and guidance. (f) Master classified MRCs (g) Current SKED Database back- up files on DVD or CD-ROM and an Excel spread sheet from the SKED report Checks and Maintenance Outlook Report of all WCs, for the current and next future quarter. (3) 3-M Program short and long range training plan approved by the XO. (4) The following post-quarter SKED reports will be generated by the 3MC and forwarded to the ISIC by the 3rd Monday of the quarter (as conditions permit). These reports will be analyzed and electronically routed through the applicable DH to the XO. These reports will be retained as Objective Quality Evidence, by the 3MC for four quarters. (a) PMS Analysis Spreadsheet and the virtual snap shot .pdf file. (b) Calibration METBENCH Calibration Management System (MCMS Report).

p. 454

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-16 (c) Spot Checks – Passed & Failed Reports . d. Interim MRC Procedures. The activity ma y develop interim MRC procedures based on experience and applicable technical manuals in support of equipment or systems without PMS coverage until formal documentation is received. Before scheduling preliminary MIP requirements, the WCS and the DH must verify their applicability to installed equipment. e. Weekly Status Report. The weekly PMS monitoring status reports will be retained (electronically if desired) by the 3MC for six months. These reports from the 3MC to the XO will contain, as a minimum, the information cited in paragraphs 19-3.4.2.e.(1) through (6) of this chapter: (1) Completed Spot-Check and Monitored MRC results. (2) Completed WC audits and results. (3) The number of FBRs over seven days ol d that have not been reviewed by the Chain of Command (CoC). (4) Abatement and corrective actions comp leted because of a monitoring program finding. (5) IEM Details Summary Report. (6) Overdue or alerting MRCs a nd plan of corrective action. (7) For commands that have been moved over to the virtual snap shot tool, this will become the weekly status report with attached sections for line item 2, 3, 4, and 5.

19-3.3.3 Related Maintenance. Related maintenance, so designated by the In-Service Engineering Activity (ISEA) or Technical Warrant Holder, is determined from the MIP. The RELATED MAINT column of the MIP reflects related maintenance requirements. Related requirements are positioned on the MIP to line up directly across from the MRC to which they are related. Related maintenance requirements are also identified in the TPMTE section of the MRC under MISCELLANEOUS. a. Related Maintenance Categories. (1) Mandatory Related. Mandatory relate d maintenance requirements are those maintenance actions that must be accomplished concurrently with another maintenance requirement. The mandatory relationship is indicated with the use of the # sign. If the mandatory related maintenance resides on the same MIP, it will be reflected in the RELATED MAINT column as “periodicity#” (e.g., M-3#). If the related maintenance resides on another MIP, it will be reflected as “MIP:Periodicity#” (e.g., IC-013/033:M-4#). Mandatory related maintenance requirements are automatically scheduled by SKED. NOTE: MANDATORY RELATED REQUIREMEN TS MUST BE LINKED IN SKED TO BE AUTOMATICALLY SCHEDULED.

p. 455

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-17 (2) Convenience Related. Convenience related maintenance requirements are those maintenance actions that can be accomplished concurrently with another maintenance requirement to save time (preliminary steps and tag-outs already accomplished) or for work force considerations. If the convenience related maintenance resides on the same MIP, it will be reflected in the RELATED MAINT column as “periodicity” (e.g., M-5). If the related maintenance resides on another MIP, it will be reflected as “MIP:Periodicity” (e.g., EL- 010/001:M-4)). In both cases, the # symbol is omitted. The WCS manually schedules convenience related requirements. (3) Conditional Related. Conditional related maintenance requirements are those maintenance actions that are performed when specific conditions are present or specified parameters are not met on the referencing MRC. Conditional related maintenance will appear on the MIP in the same manner as convenience related maintenance. The WCS manually schedules conditional related requirements. (4) None. No related maintenance is reflected as “None” in the “RELATED MAINT” column. b. Work Center Supervisor Actions. WCSs ar e encouraged to review their schedules on a regular basis for opportunities to perform other PMS when an equipment or system has maintenance actions scheduled. Rescheduling of PMS to take advantage of other system maintenance (convenience related) is highly recommended. (1) If an MRC has related maintenance fr om another MIP, review the related MIP and MRC and determine if it requires assistance from another WC. (2) If the related MIP and MRC does not require assistance from another WC and is not on the lead WC LOEP, submit an FBR to have it added to the LOEP. (3) If the related MIP and MRC requires assistance or completion by another WC and is mandatory, convenience or conditional related then it should also be on the lead WC LOEP. If it is not on the lead WC LOEP, submit an FBR to have it added to the LOEP. If the related MRC requires technical assistance, a special NEC, or another rating, that is not part of the lead WC, then the person with the technical training, special NEC or required rating should be temporarily added to the lead WC “Crew List” and assigned the related maintenance in either an assist or performance role. All WCSs involved will collaboratively plan the required maintenance and may adjust schedules based upon individual workload. When the maintenance is completed, the lead WCS will mark the MRC as completed. 19-3.3.4 Inactive Equipment Maintenance. a. Inactive Equipment. A piece of equipm ent or system intentionally placed in a hibernated state for a specific period with the intention of reactivating that equipment or system at the end of that period. (1) Status I. Equipment that will: (a) Remain onboard,

p. 456

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-18 (b) Is not scheduled for corrective maintenance or overhaul, or (c) Will be inactive during extended shutdown periods and maintenance availabilities as determined by the DH. Example: Submarine CO2 Removal Plant in wet or dry lay-up. NOTE: PERFORM A “WET LAY-UP” (CO 2 REMOVAL PLANT FILLED WITH DISTILLED OR DEMINERALIZED WATER) PRIOR TO ENTERING PORT WHEN THE SHIP IS EXPECTED TO BE IN PORT FOR 7 TO 45 DAYS OR A “DRY LAY-UP” (CO 2 REMOVAL PLANT LEFT EMPTY AFTER FLUSHING AND DRAINING), PRIOR TO ENTERING PORT WHEN THE SHIP IS EXPECTED TO BE IN PORT FOR GREATER THAN 45 DAYS, OR PRIOR TO ENTERING PORT WHEN MAINTENANCE REQUIRING THE REMOVAL OF ALL CO2 REMOVAL PLANT FLUID IS EXPECTED. (2) Status II. Equipment that is inactive and: (a) Subject to corrective maintenan ce, overhaul, or removal for safe storage, or (b) Temporarily transferred to another activity for maintenance responsibility for extended shutdown periods as determined by the DH. (Example: Submarine Refrigeration Compressor removed for Depot level overhaul.) (c) When system(s) components are scheduled for replacement. b. Implementation and Responsibility. Wh ile inactive, minimum maintenance is performed to ensure the success of the reactivation. The IEM section of the MIP will cover this maintenance. However, consideration should also be given to active PMS maintenance checks that can be manually added and performed during this period of inactivity. (1) The activity will develop an IEM plan for all inactive equipment. The plan will include reason for inactivation, and duration. DH approval of this plan will be documented in the SKED IEM remarks. Use Appendix B of this chapter. (2) To implement procedures for the accomplishment of PMS for equipment declared in an inactive status, current PMS schedules are modified to annotate the requirements listed in the IEM section of the MIP. For advance planning and scheduling of maintenance to take place, it is necessary to determine and identify the extent to which unit personnel will conduct PMS during an inactive period. MIPs in each WC will be reviewed to determine if equipment has IEM coverage (e.g., Lay-up (LU), Periodic Maintenance (PM), Start-up (SU) and Operational Test (OT)), if the coverage is adequate, and what procedures to follow if there is no IEM coverage on the MIP in question or provided coverage appears inadequate. The Department Head is responsible for determining equipment IEM status. When placing a system or equipment in IEM status, the DH will also determine the IEM start date to be reflected in SKED. The IEM end date will not be applied in SKED until the system or

p. 457

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-19 equipment is ready to be brought out of IEM status. All periodic PMS scheduled at the end of IEM should be reviewed for applicability, with applicable maintenance accomplished prior to operating equipment. (3) IEM procedures are listed on MIPs and separated from operational PMS by a horizontal line. The IEM section is titled “Inactive Equipment Maintenance” and is prefaced by the following statement: “The following requirements will be scheduled when equipment is inactivated for periods of prolonged idleness.” When there are no IEM requirements the words “None required” will appear under the IEM section of the MIP. When IEM procedures are inadequate, submit an FBR. The unit should consider all factors that affect equipment deterioration and take necessary precautionary measures. These factors include environmental conditions, equipment location, susceptibility to damage or other factors that cannot be anticipated when IEM procedures were originally developed by the cognizant ISEA or design activity. (4) The lack of IEM requirements on a MI P does not prohibit placing that system or equipment into an inactive state. Additionally, certain locations require precautions and maintenance not required force-wide. The unit should consider all factors that affect equipment deterioration and take necessary precautionary measures. The WCS or LCPO is responsible for identifying factors that are inadequate and may require additional preparation and maintenance of the inactive equipment while reporting same to the DH for approval. Factors may include environmental conditions, equipment location or susceptibility to damage. For those actions that are recurring in nature, the WCS should submit an FBR for possible MRC development. c. IEM Scheduling. SKED provides th e capability to perform IEM scheduling. (1) Status I. The scheduling of main tenance for Status I inactive equipment utilizes conventional PMS scheduling techniques. LU checks will automatically be added to the schedule at the beginning of IEM by SKED. PM checks will be manually added to the schedule by the WCS for the period of IEM following the guidelines of the MIP. At the conclusion of IEM, SU checks and routine PMS will automatically be added to the schedule by SKED. SU checks must be accomplished the week IEM ends. All periodic checks added at the end of IEM, can be moved to the right, not to exceed the allowable date range. Since the MRC date range cannot be applied to the left (into the IEM period), the MRC date range can only be moved to the right and therefore only the plus value of the specific range, i.e., the date range for a monthly is 21-41 days. The requirement can only be moved (scheduled) ten days to the right and will not go into “alert” until after the 10th day. This allows the Maintenance Person (MP) or WCS scheduling flexibility within the plus side of the date range of the MRC. (2) Status II. The scheduling of main tenance for Status II inactive equipment utilizes conventional PMS scheduling techniques, however, not all scheduled IEM PMS may need to be accomplished by activity personnel. LU checks will automatically be added to the schedule at the beginning of IEM by SKED

p. 458

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-20 and may be marked “N/A” if the LU check did not support the equipment being removed from the activity or “Accomplished by Higher Authority” symbol if completed by the intermediate or depot level maintenance activity. PM checks may be required to be schedule during the IEM period. At the conclusion of IEM, SU checks and routine PMS will automatically be added to the schedule by SKED. SU checks must be accomplished the week IEM ends and may be marked with the “Accomplished by Higher Authority” symbol if they were completed by the intermediate or depot level maintenance activity. Routine PMS added at the end of IEM may also be marked with the “Accomplished by Higher Authority” symbol if they were completed by the intermediate or depot level maintenance activity. All periodic checks added at the end of IEM, can be moved to the right, not to exceed the allowable date range. Since the MRC date range cannot be applied to the left (into the IEM period), the MRC date range can only be moved to the right and therefore only the plus value of the specific range, i.e., the date range for a monthly is 21-41 days. The requirement can only be moved (scheduled) ten days to the right and will not go into “alert” until after the tenth day. This allows the MP or WCS scheduling flexibility within the plus side of the date range of the MRC. 19-3.3.5 Scheduling. PMS is a portion of the command’s 3-M program that provides, in one authoritative system, the scheduling information and technical procedures governing planned maintenance. PMS provides a simple method for scheduling and documenting the execution of planned maintenance procedures. Fleet policy and scope are listed in chapter 19 of this volume. NOTE: WHERE THE GOAL OF 100 % ACCOMPLISHMENT CANNOT BE REACHED, THE UNIT’S CoC MUST BE KEPT INFORMED OF THE CIRCUMSTANCES THAT PREVENT ACCOMPLISHMENT OF SCHEDULED MAINTENANCE. a. Situational maintenance scheduling will be managed utilizing the tools provided by the computer based PMS scheduling software employed by the activity. All event driven situational requirements will be “triggered” when required and performed per reference (a). b. The MP will be assigned prior to comme ncing the week and must complete the maintenance as directed. If a different person is required, the WCS will reassign the PMS accordingly. c. Check Notes are required in SKED under the following circumstances. (1) When PMS is marked as “lost”. (2) When PMS is marked as not-applicable. (3) When PMS is marked with the ‘¢ ’ symbol, “satisfied by Higher Level Maintenance.” (4) When PMS requires a tag-out, the tag-out program of record identifier will be entered. d. Alert Notes will be in the format of paragraph 19-3.4.8 of this chapter.

p. 459

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-21 e. After the FR is approved, the 3MC will conduct quarter archival to maintain one completed quarter, one current quarter, and at least four future quarters. This permits the ability to review past records and forecasting of upcoming maintenance actions. 19-3.3.6 SKED. The use of SKED version 3.2 or subsequent versions for PMS scheduling constitutes full compliance with all administrative provisions of the 3-M Manual. a. Guidance for use of SKED is provided vi a the SKED users guide with help menus, and wizards associated with SKED functionality. b. The Navy PMS DVD or CD-ROM is used to update the command or unit’s SKED PMS data c. The SKED program uses days to schedule and keep track of calendar periodicities. MRCs are displayed as out of periodicity when they fall outside the established date ranges in the SKED program. These date ranges are as reflected in Table 19-3-2: Table 19-3-2 - SKED Periodicity – Date Ranges Periodicity Date Range Daily None 2D None 3D None Weekly None 2W 9 - 19 days 3W 14 - 28 days Monthly 21 - 41 days 2M 41 - 83 days Quarterly 61 - 121 days 4M 83 - 165 days Semi-Annually 121 - 243 days 8M 165 - 331 days 9M + or - 90 days from scheduled date Annual + or - 90 days from scheduled date

p. 460

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-22 Table 19-3-2 - SKED Periodicity – Date Ranges Periodicity Date Range Multi-month after annual + or - 90 days from scheduled date 19-3.3.7 SKED Server Failure. In the event of a SKED server failure, operation of PMS performance and tracking is as follows: a. Retrieve Maintenance Outl ook Report that was created following approval of current FR. b. The WCS or LCPO will maintain the a ssignment of PMS with the Maintenance Outlook Report until server is restored. c. Print assigned MRCs from the PMS viewer program that is located on the FR DVD. d. Document and retain accomplished main tenance on printed blank 13 Week Reports that are in the documents folder on the FR DVD. e. When the server is restored, update SKED based on accomplished maintenance documented on 13-Week Reports. 19-3.3.8 Accomplishing PMS. Maintenance personnel use MRCs to accomplish assigned planned maintenance as described in subparagraphs 19-3.3.8.a through 19-3.3.8.h of this chapter. a. From SKED “My Task” view , review the 13-Week Report. b. Determine maintenance tasks assigned. c. Determine when the maintenance task is due. d. Determine what tools, parts, material, te st equipment or supplies are needed. For MRCs that contain inspections and then maintenance actions based upon the inspection findings, the TPMTE needed to perform the follow-on maintenance caused by the inspection findings does not need to be obtained prior to performing the MRC but rather, may be obtained as needed. e. Perform the maintenance on schedule. f. Notify the WCS immediately whenever one or more of the following conditions exist: (1) Anything on an MRC is not fully understood, appears to be incorrect or cannot be accomplished as written. (2) TPMTE prescribed by the MRC is not av ailable, is not correct or questions about substitutions arise. (3) Any doubt exists about your capabilit y, training, or experience to properly perform the maintenance requirement as prescribed. (4) Factors exist which would make perf ormance of the maintenance requirement unwise or dangerous (e.g. disassembly of equipment needed for operations, radiation when prohibited, situations causing safety hazard to exist, etc.).

p. 461

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-23 (5) Equipment deficiencies or casualties are discovered. (6) Any provisions or requirements on the MRC cannot be accomplished as prescribed. See paragraph 19-3.4.1 of this chapter for clarification. g. If an MRC can be completed step by step as written, then the maintenance action can be signed off as completed. Report completed planned maintenance actions to the WCS, update the PMS schedule to reflect the completed maintenance, and annotate and sign the 13-Week Report if used. If multiple maintenance personnel are assigned to a single maintenance action, the most senior person assigned must update the PMS schedule, annotate, and sign the 13-Week Report or Check Note if using SKED 3.2 electronic accountability. h. If inspection criteria or a threshold insp ected by the MRC does not meet the intended criteria, then those maintenance actions cannot be signed off as completed until the discrepancies are corrected. The only allowable maintenance actions that can be signed off as complete are those discrepancies where the PMS documents (MRC or MIP) have an actual statement that directs a CSMP, MCAP, or EDL entry to be made if there are discrepancies. The statement to inform the WCS of discrepancies, by itself, is not sufficient to sign the maintenance action as complete when discrepancies exist. Maintenance actions not fully completed will be reported to the WCS. However, if material deficiencies or casualties, which are unrelated to that MR, are discovered, the MR can be checked off, provided the MR was fully completed, but the discrepancy must be reported via the MDS. 19-3.3.9 Non-Accomplished Categories. The WCS or LCPO will add a brief description for each check note or alert for non-accomplished categories using paragraphs 19-3.3.9.a through 19-3.3.9.g of this chapter. a. System or Equipment Failure. System or equipment is not operational or in a reduced operational status thus preventing maintenance from being accomplished. CSMP JSN required in additional text description. b. Inadequate Maintenance Procedures. MRC procedure or steps cannot be accomplished to a point where the maintenance can be considered accomplished. FBR number required in additional text description. c. Ship and Unit Operational Requirements. Operations prevent the maintenance from being accomplished. Requires additional text description, with a JSN for the ships force backlog, and deferral. d. System or Equipment Operational Requirements. Required operation of system or equipment prevents maintenance from being accomplished. Requires additional text description. e. Lack of Hazardous Material. Correct Hazardous Material (HAZMAT) not available at the time maintenance was to be performed. CSMP JSN required in additional text description.

p. 462

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-24 f. Missing or Incorrect TPMTE. Correct or calibrated TPMTE was not available at the time maintenance was to be performed. CSMP JSN required in additional text description. g. Other. Requires additional text description. 19-3.3.10 Accountability. The credibility of the Navy PMS program relies heavily on the individual accomplishing the maintenance. The required dedication and integrity of that individual cannot be overstressed. a. To maintain accountability, personnel ar e required to sign for the completion of assigned maintenance in an Accountability Log, if used. The WCS is required to review and sign the Accountability Log weekly to verify the accuracy and completeness of entries. Accountability sheets will be maintained in the WC PMS File for a period of not less than 13 weeks. b. For commands utilizing electronic accountability by activities employing SKED 3.2, the following will be used. (1) When an individual updates the dispositi on of a check, this is the same as signing and dating a check completion on a 13-Week Accountability Sheet. The disposition of a check will become permanent when the weekly closeout is performed. (2) All PMS maintenance assigned to a maintenance person is presented to them immediately upon SKED 3.2 log-on. (3) CoC review can be tracked on the Weekly Closeout Signature Sheet. There is no need to print and sign the 13-Week Accountability Form. 19-3.3.11 Force Revision Implementation. In addition to the requirements of reference (a), the following steps ensure the most efficient and thorough implementation of an FR: a. MRC deletions on MIPs must be mark ed to indicate the reason for deletion: (1) Scheduling Aids (SA). Indicate ap plicable scheduling aid “(e.g., SA-.”). (2) Split MIP. Indicate responsible WC (e.g., “EA01”) if the MRC is applicable to the activity, the responsible WC designation must be used versus a scheduling aid. (3) “Other” includes approved responses to FBRs, ACNs (e.g., “NSWC ltr Ser 4790.005.”), Message Date Time Group (e.g., “NUWC R124535Z AUG 05.”), and dual periodicity. Indicate guiding notation for deletion: “SA-1” or “Note 1”, configuration change number. b. The FR should be completed on or before the first Monday of the new calendar quarter. When operational schedules do not provide adequate time to implement the revision prior to the start of the quarter, the XO may direct an alternate implementation date. This deferred FR will be reported to the ISIC unless deployed. If two or more FRs were not available while the unit was deployed, only the most recent FR will be installed and implemented.

p. 463

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-25 c. It is advisable to complete the FR process through DH approval before conducting quarterly audits by a chief or more senior. d. The 3MC will: (1) Route the Service Brief to the CoC for review. (2) Enter the FR number from the ALID in the PMS Supersedure and Accountability Log. (3) Update PMS data into SKED prior to routing the change documentation to WCs. (4) Route the FR to WCS for implementa tion. See Figures 19-3-2 and 19-3-3 of this chapter for an example of a routing memorandum and an FR implementation checklist respectively. (5) Delete SKED FBRs after reflection within the FR. e. The WCS, upon receipt of the change document from the 3MC, will: (1) Make the appropriate entry in the WC Record of Change Log (2) Make appropriate LOEP, MIP, MRC, etc. changes to the WC PMS File. (3) Apply changes to the WC PMS sche dule utilizing SKED Revision Editor. (4) Route revision changes to division LCPO for review and concurrence.

p. 464

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-26 Figure 19-3-2 - Force Revision Routing Memorandum MEMORANDUM From: 3-M Coordinator To: __________ Work Center Supervisor Subj: FORCE REVISION PACKAGE X-XX Encl: (1) Force Revision Implementation Checklist (2) List of Effective Pages (LOEP) 1. Force Revision Serial: X-XX has arrived from NSLC 2. The SKED Force Revision (FR) update is complete. Begin your WC FR implementation using enclosures (1) and (2); complete through your Department Head no later than (Day Month Year). 3. Corrections, including those to LOEP, MIP and MRC, should be made immediately. Make certain ACNs and FBR responses are reflected in the FR. If not, maintain the copies and changes to your MIP(s) and MRC(s) until reflected in a subsequent FR. 4. MRCs with procedural line-outs previously approved by the LCPO must again be reviewed by the LCPO to confirm they continue to meet the requirements of the JFMM volume VI, chapter 19. Specifically, in the procedure block, Work Center Supervisors may line-out the non- applicable line items (alternate procedures) that do not pertain to current equipment or configuration when the step includes the words “if applicable” or a note identifies steps to be omitted. These items must be reviewed and approved by the division LCPO. As these changes are WC and maintenance item specific, submission of an FBR is not required.

R/

3MC

p. 465

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-27 Figure 19-3-3 - Force Revision Implementation Checklist MEMORANDUM From __________ Work Center Supervisor To: 3-M Coordinator Subj: FORCE REVISION IMPLEMEN TATION CHECKLIST COMPLETION 1. The following actions have been accomplished in SKED to implement Force Revision X-XX. Task Description Initial Verified all equipment is listed under each MIP. Verified new or changed MRCs (green or yellow) are added to the correct Maintenance Item (equipment).

Verified all applicable MRCs for each piece of equipment are active. Verified all MRC’s have associated “Related Maintenance” attached. Verified that Safety of Ship is toggled to “YES” if applicable. Verified that all MIP lineout’s have a technical reason documented for deletion. (Select the “Pencil” Icon on top row)

Verify Maintenance Item Serials & Locations are correct. Upon completion of implementation Marked Complete for digital approval by: LCPO, Division Officer and Department Head. LCPO DIVO DH 2. After DH approval: LCPO run SKED report PMS Documents and Customized MRCs – Line- outs. Verify each procedural lineout meets JFMM volume VI chapter 19, paragraph 19.6.11 requirements.

WCS create an excel spread sheet from the Maintenance Outlook Report as a minimum electronic backup forecasting as many quarters in advance as available and store it on your hard drive (not a LAN drive) in the event of the LAN crashing.

WCS select “Work Center” from the upper menu and “Update Unassigned Slots.” Initially, any MRC without ownership will be assigned to the WCS. Reassignment by the WCS or LCPO will follow.

p. 466

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-28 3. Printing requirements for MRCs are determined by individual command policy. Printed MRCs must come from “PMS Documents” (not PMS Viewer). 4. The only required documents in the WC PMS file are: a. Classified MRCs. b. MRCs required by the command. c. MRCs with pen & ink changes authorized by ACNs or answered FBRs. 5. Approval Signatures: Position Signature LCPO DIVO DH 3MC

f. The division LCPO will: (1) Verify that all PMS changes have be en properly applied to the WC schedule utilizing SKED Revision Editor. (2) Review line outs on LOEPs, MIPs and MRCs. Initial all such line-outs to indicate concurrence. (3) Submit PMS schedule to DIVO for review and concurrence. g. The DIVO will: (1) Verify that all PMS changes have be en properly applied to the WC schedule utilizing SKED Revision Editor. (2) Review line outs on LOEPs, MIPs and MRCs. Initial all such line-outs to indicate concurrence. (3) Submit PMS schedule to DH for review and approval. h. The DH will: (1) Verify that all PMS changes have be en properly applied to the WC schedule utilizing SKED Revision Editor. (2) Review and approve lined out MIPs on the LOEP, and MRCs on the MIPs. (3) Review and approve WC PMS Schedules.

p. 467

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-29 i. The WCS makes final entries in the WC Record of Change Log, completes the PMS Change Documentation Routing Memorandum, and returns it to the 3MC. j. The 3MC updates the CSAL and notifies the XO that the FR has been installed after receiving all FR PMS Change Documentation Routing Memorandums from the WCs. 19-3.3.12 Planned Maintenance System Feedback Reports. PMS FBRs are used to identify problems with PMS documentation or to request the addition or deletion of PMS coverage. Issues with the periodicity, rates, man-hours, TPMTE and procedure may all be reported via an FBR. An FBR is also used to request copies of classified MRCs, request the addition or deletion of an MRC (maintenance requirement) to or from a MIP, splitting a MIP between WCs, shifting of maintenance responsibility or to request PMS coverage for newly installed systems or equipment. Paragraphs 19-3.3.12.a. through 19-3.3.12.j of this chapter provide amplifying information dealing with the issues that may prompt the submission of an FBR. a. Periodicity. An FBR can be used to reque st the increase or decrease in the frequency of a maintenance action, i.e., an MRC. However, the originator needs to keep in mind that the ship or unit has the prerogative to increase the frequency because of harsh weather, unusual operating conditions or corrective maintenance and associated testing requirements. A 726 Class submarine submitted an FBR requesting the frequency of cleaning a specific electronics cabinet filter be increased from quarterly to monthly. Research revealed this MRC was applicable to all 726 Class units and no other ship had submitted a similar request. In fact, two other units had requested the frequency be decreased to semi-annual. It was determined that the submitting unit was in an extended upkeep period and increased foot traffic by shipyard personnel near the electronic cabinet was the most likely cause of the filter becoming clogged. The ship was authorized to increase the frequency to support the extended upkeep period and the periodicity of the MRC was not changed. b. Rates. The Rates block on the MRC repr esents the developer’s recommendation of the skill level (rate and rank) best suited to accomplish the maintenance action. The key word is recommendation. Qualified personnel other than the rate and ranking specified may be assigned. When an NEC is assigned or Damage Control Petty Officer (DCPO) or Safety Petty Officer (SPO), substitution of other personnel is not allowed other than those exceptions as noted in reference (a). An FBR requesting the rate on an MRC be changed from an ET2 to an FT2 will probably not pass TYCOM screening, yet an FBR requesting the addition or deletion of personnel will generally pass to the cognizant technical activity for review. c. Man-hours. The MRC reflects the average time per equipment, per person. It does not reflect or account for gathering and putting away tools, tag-outs or time removing and replacing interferences. From a maintainer’s perspective, this is not an accurate representation of the time required to accomplish the maintenance action. The Future of PMS initiative will attempt to do a better job of accounting for this additional time but until then, FBRs should be submitted only when the allotted time per equipment

p. 468

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-30 is significantly out of synch with the actual time required. For example, an MRC calls out 0.5 man-hours per equipment, but it takes 1.0 man-hours. d. Tools, Parts, Material and Test Equipm ent. TPMTE FBRs should be submitted when the procedure calls for an item not listed in the TPMTE block or when the TPMTE block lists an item not called out in the procedure. Updating the MRC to reflect common hand tools, administrative or office supplies and basic housekeeping items is addressed in paragraph 19-3.3.12.k.(1) of this chapter. e. Procedure. Procedures are written at a level of detail based on the assumption maintenance personnel are trained, qualified, and supervised by experienced leadership to execute the maintenance consistently and expertly. MRCs exist to provide standardized proven procedures, specify consistent acceptance criteria and to communicate warnings and cautions relative to the specific maintenance action. They are not intended to specify every possible action of the maintainer. There may be instances where an obvious typographical error exists on the MRC (example: Turn switch to ON; however, switch may already be ON and the intent of the step is to turn unit off, the card should read Turn switch to OFF). This type of error should not prevent the scheduling or performance of maintenance. However, in this situation, the accomplishment of the MRC is not possible until the WCS reviews the error and concurs that it is safe to proceed. A temporary notation including the reason for the correction must be made on the MRC, initialed by the WCS and an FBR submitted. Extreme caution will be taken when reviewing MRCs for this type of error. Errors must be obvious typographical errors and a PMS FBR must be submitted immediately upon discovered. Do not permanently alter the MRC until authorized by the applicable SYSCOM, ISEA or NSLC Detachment. If a step is missing that is necessary to complete the task, and that step is not obvious to the maintenance person, submit an FBR to have it added. An FBR submitted to request procedural changes should include the originators contact information and supporting rationale or justification. If, however, a step is missing that is clearly obvious (a ladder was used to install a fixture, but steps were not provided to put the ladder back in stowage) an FBR only serves to overload a process that should be focused on more technical issues. f. Duplicate MRCs. Unclassified MIPs a nd MRCs are now available from the DVD. Copies of classified MRCs still require an FBR request due to handling requirements. g. Addition or Deletion of an MRC. During the life cycle of a system, equipment, or component it may become necessary to add a maintenance action to prevent an age related functional failure or to delete a maintenance action due to inherent reliability not foreseen during maintenance development. An FBR submitted to request the addition or deletion of an MRC should include the originator’s contact information and supporting rationale or justification. h. Newly Installed or Removed Equipment. While an FBR request for PMS coverage will provide initial maintenance coverage or deletion of MIP(s) because of equipment removal, submission of an OPNAV 4790/CK or Not In Model for AWN, is still required to initiate the rest of the logistic support change process. This point cannot be overstressed; the submission of the FBR does not relieve the ship or unit from

p. 469

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-31 initiating a CK. The CK initiates supply support, CDMD-OA/MBPS changes, selected record drawing updates and class maintenance plan updates. i. Splitting a MIP. There are instances in which a MIP includes MRCs for more than one WC to perform. When this occurs, a decision is required by the command as to whether the MIP will be split or will be scheduled singly by one WC. Only the XO can authorize the splitting of a MIP if an MRC requires another WC to perform the entire maintenance action. If the decision is made not to split the MIP, then the MRs will be accomplished through the coordination of WCSs. (1) If the MIP is split, the following procedures apply: (a) Submit to the XO a non-technical PMS FBR requesting approval to split the maintenance responsibility. (b) Upon receipt of the XO’s concurrence, the 3MC will make an annotation in the remarks block of the FBR stating, “XO concurs with splitting MIP maintenance responsibility”. (2) Upon receipt of the FBR approval: (a) Utilizing the SKED Revision Edito r, delete the MRC from the MIP and show the reason for deletion as the designation of the WC assuming responsibility (e.g., EE01). (b) If the WC assuming responsibil ity does not reflect the MIP and maintenance items, utilize the SKED Revision Editor to add them. Schedule only the MRC(s) that pertain to the WC. Reflect remaining as deleted with the reason for deletion the designation of the parent or lead WC (e.g., EA01). (3) If the situation occurs where a WC removes a split MIP, the following procedures apply: (a) Submit an XO approved, non-technical PMS FBR reporting the decision to remove the split maintenance responsibility. Upon receipt of the XO’s concurrence, the 3MC will make an annotation in the remarks block of the FBR “XO concurs with removing split MIP maintenance responsibility”. (b) Upon receipt of FBR approval, utilize the SKED Revision Editor, remove the MIP, MRC(s) and maintenance item(s) from the WC no longer involved. Ensure that the lead WC assumes full responsibility for the MIP and MRC(s) and annotates their schedules accordingly. j. Shift of Maintenance Responsibility. Indi vidual ships or units sometimes consider it necessary to shift maintenance responsibility from one WC to another, to combine two or more existing WCs or to split an existing WC. These requests for changes of PMS maintenance responsibility require XO concurrence and may require final approval by the applicable TYCOM. Due to the considerable administrative burden,

p. 470

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-32 requests for this type of change should not be submitted to accommodate a temporary situation such as short-term assignment of two WCs to one supervisor. (1) The following factors should be carefully considered before submitting such requests: (a) Composition of WCs by size and ratings. (b) Scope of maintena nce responsibilities. (c) WC workload. (d) Ease of administration of a WC as a cohesive maintenance group. (e) Importance of WC grouping to equipment maintenance responsibilities, PMS scheduling, MDS reporting and CSMP listings. (2) When changes in maintenance respon sibility are considered necessary, the following procedures apply: (a) Submit a Non-technical PMS FBR. Indicate from which WC(s) equipment is to be deleted and to which it is to be transferred. Upon receipt of the XO’s concurrence, the 3MC will make an annotation in the remarks block of the FBR “XO concurs with the shift of maintenance responsibility (b) WC or equipment changes will also be reported in the OMMS or SNAP system via a 4790-CK through the CSMP up-line reporting process. (3) Upon receipt of the FBR approval, perform the following actions: (a) The PMS Master File is updated to reflect deletion of the MIP from one WC and addition to the WC receiving the responsibility. The originating FBR serial number is annotated on the affected line item on the LOEP for both WCs. The PMS Master File must contain a record of deleted equipment until the change is reflected in a future FR. (b) Utilizing the SKED Revision Editor, load the affected MIP(s) and MRC(s) to the WC receiving maintenance responsibility. Delete the MIP(s) and MRC(s) from WC shifting responsibility. (c) Utilizing SKED, perform a revisi on to move the equipment from the original WC’s current schedule to the WC receiving the maintenance responsibility. Data is exported from one and imported to the other maintaining equipment history. k. MRC Changes Not Requiring Feedback Reports. The only MRC modifications shipboard or unit personnel may make without submitting a PMS feedback report are as listed in paragraphs 19-3.3.12.k.(1) and (2) of this chapter. (1) TPMTE Block

p. 471

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-33 (a) Common hand tools, administra tive or office supplies and basic housekeeping items may be substituted or added by the WCS. The WCS may add notes to the MRC to reflect these substitutions. In the case where specific common tools are called out by description, substitutions are not authorized. For example, substitutions such as using synthetic fiber brushes in place of animal hairbrushes or rags and paper towels in place of lint free cloths are not allowed. (b) Approved parts, materials and miscellaneous item substituted from the supply system, technical manual, or Military Specification (MIL- SPEC), etc., which meet or exceed the requirements may be used. Ensure that substitutions satisfy both the basic maintenance and safety requirements of the MRC. If there is any doubt, a PMS FBR should be submitted specifying substitution desired and reason. (c) Test equipment or certified tools, which meet or exceed the Sub- Category (SCAT) code requirement, may be used. (d) When an MRC pertains to multiple configurations of equipment and the TPMTE block contains tools, parts, test equipment and materials for each unique configuration, the TPMTE block may be tailored for the unit’s specific configuration by lining out the items that do not pertain to equipment held. (e) Exception to TPMTE block change: If an item listed in the TPMTE block is not called for in the procedures block, submit an FBR explaining the circumstances. Conversely, if a tool, piece of test equipment, part or material is called for in the procedure block and is not listed in the TPMTE block an FBR should be submitted. (2) In the procedure block, WCSs may line-out the non-applicable line items (alternate procedures) that do not pertain to current equipment or configuration when the step includes the words “if applicable” or a note identifies steps to be omitted. These items must be reviewed and approved by the division LCPO. As these changes are WC and maintenance item specific, submission of an FBR is not required. If a step or steps in the procedure block have been lined out and tools, parts, materials, and test equipment in the TPMTE block pertain only to that step or steps, then they will be lined out as well with a reference to the step or steps lined out and approved by the division LCPO. Warnings, Cautions and Notes associated with the lined-out step or steps will also be lined out. l. Types of Feedback Reports. There are two types of FBRs, Technical and Non- Technical. (1) Technical. These FBRs are used to report technical discrepancies inhibiting PMS performance. Technical feedbacks normally adjudicated by an ISEA responsible for the system or equipment covered by the PMS documentation require all the supporting information the originator can provide. The originator should identify the issue, providing as much supporting technical

p. 472

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-34 information (Allowance Parts List, Reparable Identity Code, drawing or Hierarchical Structure Code) as available and a proposed response or solution if known. Most importantly, provide point of contact information (name and phone number) so that the ISEA can contact the originator should they have questions. Bottom line, the FBR must be accurate and complete to “stand alone”, that is, the FBR will be understood without additional explanation. The better the FBR describes the problem, the more likely the originator will receive a timely response. There are two sub-categories of technical FBRs: (a) Routine. An FBR will be consid ered routine when it relates to the technical requirements of PMS. It is used to report technical discrepancies or request clarification of procedures. (b) Urgent. An FBR will be considered urgent when it relates to the technical requirements of PMS and involves safety of personnel, safety of ship or the potential for equipment damage. Urgent FBRs will be forwarded by naval message containing a PMS Feedback Serial Number, to both NSLC Detachments Norfolk and San Diego, with info to the cognizant SYSCOM, TYCOM and the Naval Safety Center. The message must describe the unsafe procedure(s) or condition(s), must identify the MIP and MRC involved and reflect the serial number of the FBR generated in SKED or Planned Maintenance System – Management Information System. Once the message has been sent, include the date time group of the message in the FBR and submit. (2) Non-technical. These FBRs are intende d to support PMS requests that do not require technical review, including WC changes (shift of maintenance responsibility). Non-technical FBRs are submitted to request classified or other PMS documentation which cannot be obtained locally or to request clarification of issues not of a technical nature. m. Feedback Report Submission. All SKED users will submit FBRs via SKED using the Feedback Report Wizard. Non-SKED users may submit FBRs via the Planned Maintenance System – Management Information System web site at https://algol.pmsmis.navy.mil/PMSMIS by selecting the Feedback Tab and Feedback Report Wizard from the drop-down tab. Non-SKED users accessing this web site for the first time will need to request an account. Click on File Manager and select New User Account Request. This displays options to select a form and readme file, which can be downloaded, filled out and sent via e-mail as directed in the readme file. An e-mail will be sent confirming your account and providing access to the main screen. n. Feedback Report Screening. (1) Initial screening is accomplished by th e originator or WCS who is responsible for ensuring all data is accurate and complete. (2) The division LCPO or DIVO accomp lishes the second level screening and verifies the content and validity of the FBR within three days of origination. (3) The DH, next to screen the FBR, is responsible for verifying the content and validity of the FBR and digitally signing FBRs within five days of origination.

p. 473

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-35 (4) The 3MC is responsible for screen ing, serializing, and forwarding FBRs within seven days of origination. The 3MC will also: (a) Maintain accountability for all PM S FBRs submitted and actions taken until updated PMS documentation is received. (b) Ensure that the originator and all applicable WCs are kept apprised of action taken and ensure the originating and other applicable WCSs implement the changes or corrections when received. o. Feedback Report Screening (External to Hu ll or Activity). FBRs are next processed by the TYCOM. The TYCOM will verify the content and validity of the FBR and either return the document to the originator or pass it on for further processing and resolution. p. Feedback Processing Activities. (1) The central control points for processing FBRs are the Planned Maintenance System Coordinating Activities (PMSCA). Depending on the type of FBR and level of technical authority necessary to answer the FBR, the PMSCAs will either respond to the originator with a resolution or forward the FBR to the appropriate technical authority for action. (2) ISEAs are those activi ties designated by NAVSEA as the technical experts for specific systems or equipment. Naval Surface Warfare Center, Philadelphia Detachment (NAVSURFWARCEN-PD) is the ISEA for the majority of non- nuclear hull, mechanical and electrical equipment installed on most ships. ISEAs under the direction of the NAVSEA Technical Warrant Holder adjudicate the FBR request and forward the response to the PMSCAs. The PMSCAs provide the final response to the originator and update the PMS database to reflect ISEA changes. PMS changes are issued with the next available FR. q. Feedback Processing. FBRs are processed per NAVSEA policy: (1) Urgent FBRs. (a) The PMSCA will provide a message response to all urgent FBRs within one working day of receipt. If the FBR is forwarded to a Design Activity or ISEA for resolution, then the Design Activity or ISEA will provide a message response informing the originator of specific actions or required changes as a result of the adjudication of the FBR within one working day of receipt. This message response must be addressed to the originator and distributed to all TYCOMs of units holding the affected documentation. TYCOMs will forward this message to all commands that could be affected by the PMS change. (b) The PMSCA will distribute revised PMS documentation to all affected users within 30 calendar days of receipt of the FBR, via special issue or ACN. (2) Routine FBRs.

p. 474

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-36 (a) The PMSCA will perform technical review, research, and provide a response to routine FBRs where resolution does not require technical authority action. (b) FBRs that the PMSCA cannot resolve will be sent to the cognizant Design Activity or ISEA. The cognizant Design Activity or ISEA will provide the response to the appropriate PMSCA describing the action taken. The PMSCAs will provide the response to the originator by electronic means. (c) Distribution of the revised MRC to the originator and other affected users will be accomplished via ACN or the next available FR. (d) NAVSEA’s existing policy calls fo r technical review activities and ISEAs to provide FBR responses in less than 21 working days from time of receipt. In addition, NAVSEA has established a goal of providing answers to FBRs in one day. While some FBRs will require extensive research and days, weeks or in some cases months to resolve, the vast majority of FBRs can and should be answered much sooner. One day may be overly optimistic, but the intent is to put the emphasis back on the timely resolution of FBRs. (e) If no revision to PMS documenta tion is required, pertinent comments will be provided in the response to the PMSCA. When not concurring with the feedback report, the rationale for the non-concurrence must be provided to the PMSCA. NOTE: IT IS POSSIBLE AN FBR RESPON SE MAY NOT MAKE A SPECIFIC FR BASED ON THE DATE THE RESPONSE WAS RECEIVED BY NAVSEALOGCEN. PROCESSING TIME AND HANDLING MAY CAUSE THE REVISED DOCUMENTATION TO MISS AN FR CUTOFF DATE. HOWEVER, SINCE ALL FRS ARE NOW RECEIVED QUARTERLY, IF A REVISION MISSES THE CURRENT FR CUTOFF WINDOW, THE REVISED DOCUMENTATION WILL BE AVAILABLE WITHIN THE NEXT THREE MONTHS. r. Feedback Response Implementation. Units will implement responses to FBRs based on the category and content as determined by the unit’s 3MC. (1) Urgent FBR – within 24 hours of receipt of FBR response. (2) Urgent FBR with an ACN – within 24 hours of receipt, the ship or unit will implement an administrative change to incorporate the new PMS documentation. These revised documents will be utilized to conduct maintenance until the revised PMS document is incorporated into the next FR. (3) Routine FBR: (a) Technical. The response deals wi th content such as a revision to technical specifications, tolerances, test equipment, materials, acceptance criteria or the sequence of procedural steps. These changes need to be implemented within two weeks of receipt of the FBR

p. 475

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-37 response or prior to the next scheduled accomplishment date should that date fall within the two-week window. (b) Administrative. The response deals with issues that do not affect the technical content or procedural steps. Administrative changes might be added steps to provide a better degree of clarity, formatting revisions to tables or figures that do not change technical content, or updating of Notes, Warnings or Cautions that do not impact the performance of the MRC. These changes do not need to be implemented prior to receipt of the next FR. If the next FR does not reflect the revised documentation, implementation is required before the next scheduled accomplishment date of the MRC. (4) Routine FBR with an ACN: (a) Technical. These changes need to be implemented via an administrative change within two weeks of receipt of the FBR response or prior to the next scheduled accomplishment date should that date fall within the two-week window. These revised documents will be utilized to conduct maintenance until the revised PMS document is incorporated into the next FR. (b) Administrative. These changes do not need to be implemented prior to receipt of the next FR. If the next FR does not reflect the revised documentation, implementation is required via an administrative change before the next scheduled accomplishment date of the MRC. 19-3.3.13 Assessment Procedures MRCs. Assessment Procedure (AP) MRCs need not be scheduled within SKED, but they will be maintained “active” through the FR process. AP MRCs need only be printed on an “as needed” basis for use by assessment personnel or Ship’s Force. The record of completed AP MRCs by off-ship personnel is recorded on the work candidate and Ship’s Force participation is recorded in their completion remarks of that work candidate. There is no need for recording Ship’s Force participation in an assessment event on their PMS schedule within SKED. FBRs submitted requesting deletion of a MIP that only contains AP MRCs will be disapproved and returned to the originator. 19-3.4 MAINTENANCE AND MATERIAL MANAGEMENT ASHORE EVALUATION CRITERIA. 19-3.4.1 Self-Assessments. The ability of an activity to perform critical self-assessments is instrumental to the success of the command’s PMS program. The PMS Self-Assessment Program needs to address all aspects of 3-M. a. TYCOM Policy. Each co mmand and subordinate command(s) must conduct a rigorous quarterly 3-M Self-Assessment. The 3-M checklists contained in appendix A will be utilized and retained for 12 months. In addition, the Maintenance Accomplishment Rate (MAR) and Spot Check Accomplishment Rating (SCAR) percentages will be reported to Commander, Naval information Forces (CNIF) no later than the 25th day of January, April, July, and October. The CO will receive a

p. 476

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-38 formal briefing of the findings of the Self-Assessment and intended corrective actions. b. Self-Assessment Elements. The major program elements of a Self-Assessment include an evaluation of the PMS Performance Rate (PPR) and CSMP Validity, monitoring MRC performance (monitored MRC), and conducting PMS Spot-Checks, WC audits, and deficiency abatement. 3MCs will retain monitored PMS results, Spot Checks and WC audits from the last completed quarter in either hard copy or digital format for review supporting the self-assessment. (1) PMS Performance Rate. The PPR is made up of the MAR multiplied by the SCAR divided by 100. PPR = MAR X SCAR ÷ 100 (2) CSMP Validity. The CSMP Validity f actor is evaluated utilizing the check sheets provided via section IV (MDS) of the TYCOM’s 3-M Inspection Criteria, appendix A. (3) Monitored MRC. Supervisory pers onnel must periodically monitor the performance of PMS to provide feedback and training to maintenance personnel and to enforce command maintenance standards. Personnel charged with monitoring must be system matter experts for the system, equipment, or component for which the MRC applies. LCPOs, LPOs or personnel with similar system knowledge are appropriate. Monitored checks can be used like on the job training to teach the “right way” to conduct maintenance. These monitored MRCs will be documented as a monitored evolution and findings will be provided to the WC’s CoC for inclusion into training and deficiency abatement. The value of monitor maintenance cannot be overstated. (4) PMS Spot Check. PMS Spot Checks are utilized to validate that previously scheduled and accomplished MRCs were performed and the degree to which they were performed. The checklist contained in Appendix A section II of this chapter, is the tool supervisory personnel utilize to determine the accomplishment status of a completed MRC. Deficiencies noted and the final grade will be provided to the WC’s CoC for abatement. The WCS will record the Spot Check grade into SKED to generate the SCAR for the quarterly PMS Performance Report. Spot Checks will involve all elements of the CoC to include the CO, Command Master Chief, XO, 3MC, department CPOs, DHs, DIVOs, divisional CPOs, and first class petty officers. By following the checklist, the inspector can determine if the sailor is competent, the maintenance was accomplished, required TPMTE was available and used, and safety precautions were followed. The focus should be less on administration and more on the condition of the gear. (a) Avoid Spot-Checks of MRCs with insufficient complexity. Performing a Spot-Check on a 3 or 5 step MRC does not provide the CoC an accurate picture of the health of the command’s maintenance program. Selected MRCs should be of sufficient content to provide the auditor with evidence of satisfactory performance (e.g., tag-outs,

p. 477

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-39 QA packages, parts required, off-hull reporting, test equipment, safety equipment, etc.). (b) Command 3MCs can request modifica tion of the Spot Check matrix if it is believed that due to the size of the command and location of their WCs, they are unable to accomplish that requirement. Requests must be submitted in writing to CNIF 3-M staff (via Echelon IV 3MC if applicable) and include their proposed Spot Check matrix for review. If approved by CNIF, the command 3MC will retain a copy of the request approval. (c) Spot-Checks evaluated as “below standards” will require immediate training and re-performance as determined by the XO. Any re- accomplishment of the MRC must be monitored by the LCPO to ensure noted deficiencies are not repeated. (d) Table 19-3-3 represents the minimum number of Spot Checks and Monitored Checks for CNIF activities. (e) Utilize the Spot Check Randomizer located in the Weekly Virtual Snap-Shot Report. Use is mandated unless Sailor or equipment is unavailable in which 3MC will select another Spot Check to be conducted. (f) Spot Check Randomizer. The Spot Check Randomizer is the last section of the Virtual Snap-Shot Report. It produces a list of random spot checks based upon criteria such as periodicity, troubled systems, and when the check was accomplished. The program will reduce the number of times the same maintenance check is selected. The list of spot checks is for the next week. The program will choose a single check for each work center but will not assign a spot checker. 3MC will still create a list of spot checkers and assign the work center they are to inspect. The spot checker will then conduct a spot check on the maintenance action selected by the program. The 3MC will ensure that spot checkers are inspecting checks selected by the program. (5) Work Center Audits. Each WC must receive an audit once per quarter by a supervisory individual, (CPO) or above. Deficiencies noted from this audit will be reported to the WC’s CoC for abatement. The 3MC will report recurring deficiencies to the XO for further investigation and corrective action. (6) Deficiency Abatement. The status of discovered deficiencies will be kept current within the monitoring program. Recurring deficiencies must be reported to the XO for further investigation and corrective action. Deficiencies that have been reported as corrected will be subject to follow up monitoring to ensure corrective action was effective and results of the follow up monitoring will be reported to the XO. The unit’s 3-M Abatement

p. 478

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-40 Program will include the previous quarter’s audits, Spot-Checks, monitored evolutions and CSMP validity audits noting trends and corrective actions. (7) The Virtual Snap-Shot Report is a n Excel workbook that creates a 20-page graphical representation for the health of the MAR and Spot Check program pillars of performance. The report uses a drill down method to identify strengths and weaknesses with the two pillars. (a) This report is to be conducted at a minimum monthly by all commands, and should be utilized weekly. (b) Required documents are the PMS analysis Spreadsheet and Spot Check – All reports. (8) The Virtual Snap-shot re port Cover Sheet breakdown (a) Cover sheet, automatically fills in the ship’s name and date. The user will enter the below information for the command’s 3-M program. (b) FR#. Enter the current Force Revision the SKED implemented at the commands. (Ex. 4-21, 1-22, 2-22) (c) 3-M Cert Date. Enter the date for your last 3-M Certification event. If the certification even is not known, contact your TYCOM 3-M team to provide. (d) CSMP Reconciliation. Enter the date of the last CSMP reconciliation was conducted, ex: during a PB4M. (e) Attachments. There are two mandatory attachments that must be submitted with the Virtual Snap-Shot Report. The IEM Details Report, (f) Acknowledgement blocks: The use of these blocks are voluntary. It contains a place for the CO/XO/OIC/TD to initial stating they have received the document. (9) PMS Performance Rate (PPR). The PPR page provides an overview of both the command’s MAR and Spot Check Average to create a PPR for the command and each of the departments within. (10) Maintenance Accomplishment Summ ary. The Maintenance Accomplishment Summary provides a three-page executive level evaluation of the MAR for the command. The major sections of the report as follows: (a) Maintenance Accomplishment by Week Graph. A graphical representation of the MAR for the last 13 weeks. The graph provides a trend analysis for the command’s maintenance accomplishment. The Fleet Requirement of 80% is identified by a red dotted line on the graph. (b) Each department at the command has the maintenance accomplishment number identified. This is listed as #COMPL, #ALERTS, #LOST, #NA, TOTAL # CHKS, PAR %, SAR %, WEIGHT %, MAR%.

p. 479

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-41 (c) Work Centers for the Last Quarter. This section is identical to the department section except data is for a specific Work Center over the last 13 weeks. (d) Alerts Report. A two-page section that graphically displays the command’s alerts over the last 13 weeks. It is important to understand that a check will not start alerting until the check is beyond its maximum scheduling range. For example, an A-1 check will not alert as soon as the check is due. The check can still be moved out six months. After 18 months the check will start alerting. This section contains the Alerts by Week, Number of Alerts per Work Center, Top 50 longest alerts by # of weeks alerted, W/C, MIP, Periodicity, Equipment name. (e) Lost Checks report. A two-page section that graphically displays the command’s lost checks over the last 13 weeks. This is listed by Lost Checks per Week, Lost Checks per Work Center, Top 50 Equipment with the most lost checks by W/C, # of times lost, and Equipment. (f) NA Checks Report. A two-page section that graphically displays the command’s Not Applicable checks over the last 13 weeks. Although NA checks are not counted against the command’s MAR, the command should be aware of the checks marked NA as it could indicate maintenance that should have been accomplished and was not. (g) Top 50 Equipment items with the most NA checks. This is a list of the top 50 NA checks based upon the equipment and work center. (11) Spot Check Analysis Report. A summary of the Spot Check Program health via actionable metrics. (a) Number of Spot Checks per Week. A graph that displays the number of Spot Checks conducted at the command over the last 13 weeks (b) Department Spot Check Program Health. A list of each department and their respective Spot Check Metrics by # of Spot Checks, # Fail, Pass %, Weight %, and AVG Score %. (c) Work Center Spot Check Pogrom Health. A list of each Work Center and their Respective Spot Check metrics by Work Center, #Spot Checks, #Fail, Pass %, Weight %, and AVG Score %. (d) Top 10 Spot Checks Conducted. A list of the maintenance checks that were spot checked the most in the last 13 weeks. The “# of SCs” block indicates the number of times a spot check was completed. Line items highlighted in green indicate a troubled system check as specified by TYCOM. These are checks mostly identified as leading to 3MI discrepancies. (e) Toughest Spot Checkers. This list contains the names of the 10 personnel that have failed the most spot checks. The list will only contain the names of Spot Checkers that have conducted more than the

p. 480

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-42 average number of spot checks for the command and have failed at least one spot check. (f) The 100% Club. A list of Spot Checkers that have conducted the over the average number of spot checks and have found zero discrepancies. While grading one or more spot checks at 100% may be legitimate, this list may indicate personnel that need to have a more critical eye during spot checks. (g) Partial Spot Checkers. A list of personnel that have conducted one or more spot checks with a partial grade. CNIF does not authorize partial grading during spot checks. Each attribute on the Spot Check form is an all or nothing score. For Example, an attribute worth 10 points will either be 10, 0, or NA as applicable. A grade of 1 through 9 will not be used for any reason for this attribute. (12) Spot Check Completion Report. A li st of the command spot checkers and the number of spot checks the personnel conducted for each week for the last 13 weeks. Because this list is derived directly from SKED data, the personnel paygrade is unavailable. Due to this limitation, the list is sorted based upon the number of historical checks conducted in the last 13 weeks. (13) Spot Check Randomizer. A list of ra ndomly selected checks to be spot checked for each work center that has conducted maintenance in the last 13 weeks. Checks are randomly selected based upon periodicity, troubled system status, when the check was accomplished, and how many times the spot check was previously conducted. All units are directed to utilize the Spot Check Randomizer to the maximum extent possible. If a maintenance person or equipment is unavailable and the randomly selected check cannot be performed, the spot checker will select another check within that work center with a moderate level of difficulty. c. Zone Inspection. The XO will establish a zone inspection program (1) Zone inspections will be all areas utilized by the command, and if there are any tenant commands, they must conduct zone inspections on their cognizant spaces. Examples include but not limited to, working areas, electronic spaces, server communication rooms, UPS rooms, or generator areas. (2) The XO will designate command personnel to perform the zone inspections on every space outlined above at minimum quarterly periodicity. (3) All discrepancies annotated during the zone inspection will be recorded as part of the CSMP by the owning work center in AWN, utilizing the Zone Inspection Deficiency List (ZIDL) status code for the AWN 2-Kilo. d. 3MC will ensure a quarterly Virtual Snap-shot report is forwarded to the ISIC with POAM for discrepancies identified. (1) Virtual Snap Shot template reports can be found on the CNIF 3-M Forcewide Teams Page, or ISIC.

p. 481

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-43 Table 19-3-3 - CNIF Spot Checks Management Level Periodicity of Number of Spot Checks Periodicity of Monitored Maintenance CO or OIC One per Month N/A XO or AOIC or Technical Director Two Per Month Monthly DH Two Per Month Monthly DIVO Two Per Month Monthly 3MC One a week Weekly LCPO Two Per Month Monthly LPO N/A Two Per Month WCS N/A Two Per Month 19-3.4.2 Maintenance Data System . This section is to provide greater clarity for the Maintenance Data System and does not supersede but provides more detail in MDS processes ashore. h. All commands under NAVIFOR administrative control will utilize AWN as their MDS program. All sites are required to use MDS for documenting man hour expenditures pertaining to network administration, cyber hygiene, locally generated maintenance, corrective maintenance, and all monetary expenditures whether contractual, tools, parts or otherwise. The use of the MDS is baselined and dictated from volume VI chapters 5 and 19-7 and volume II part II chapter 1 of this manual. b. Weekly bulk jobs are au thorized to account for man hour expenditures mentioned above utilizing the tasks completed against the configuration or if no configuration the “Support Services” category. Care should be taken to ensure appropriate work center association and info provided meets grading criteria per appendix a. These type of jobs must have enough detail, the purpose is to right size, to ensure the right amount of Sailors, Civilians, and Contractors are on site. This type of job is not for recording watchstanding hours, only the equipment driven and equipment supporting tasks that may have occurred during that time frame. c. In order to ensure proper readiness reporti ng for the E-Pillar all sites are required to have their configuration whether Program of Record or not to be put into CDMD- OA/MBPS that refreshes AWN for equipment validations. This can be done either through the shore side installation process FRCB through work files for Program Executive Office (PEO) or Program Manager, Warfare (PMW) installation entities, or

p. 482

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-44 using Not In Models (NIM) inside of AWN for 3rd party and other than command funded installations done by the command. d. Equipment validations must be conducted on a weekly basis by each work center to ensure proper logistics support, and accurate configuration management. The goal is to validate all equipment in a five-year period in AWN. The 3MC will maintain a master listing of all configuration items, assign all validations, and track validation completion. The person conducting the equipment validation will sign and date the validation sheet obtained from AWN upon completion. All validation information, including completion date, will be entered into AWN. All validations will be provided to the 3MC who will verify changes. The 3MC will also maintain validations on file for a minimum of 13 weeks. e. Sailors, civilians, and contractors will only be granted access up to their 3-M qualification level, and designation letter. For example, a WCS does not warrant 3MC access even though they may be 3MC qualified, and a DIVO that is not qualified DIVO, even if designated, must not have DIVO access in AWN unless qualified or interim qualified. f. AWN Management is imperative and for each 2Kilo the following is done. (1) Proper configuration is identified whether hardware or software. (2) Correct codes are used for Cause Codes, discovery codes, deferral codes, and type availability. (3) The CoC reviews each 2Kilo and approves at the appropriate level. (4) Proper supply documents are generated to ensure correct part tracking, and expenditure is in the 2K. This means for the majority of NAVIFOR units a manual entry from ONETOUCH as the primary MILSTRIP process, secondarily through open purchase requests. g. Examples of equipment driven and equipment supporting tasks that require the use of a 2K. (1) Fleet Technical Support per Vol VI Chapter 2 of this manual, intermediate, and Depot level work requests for both hardware and software requires the initial Job Control Number (JCN) before the use of NAVY 311/NESD. This same concept will utilize for NAVFAC’s MAXIMO program, and any other PARM ticketed system will utilize this concept in ensuring 2K are entered into the command CSMP. (2) Installations of new equipment whether PEO, Other than Command Funded, or 3 rd/site installed equipment. (3) Accounting for locally generated maintenance man-hours expenditures. h. CNIF Ashore funding expenditure process due to the lack of a supply back-end and to connect maintenance data to the configuration, and command the following processes must be used.

p. 483

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-45 (1) OPNAV as the resource sponsor and liaison for funding for Operation and Maintenance dollars requires an accounting method inside of AWN. (2) All AWN CSMP entries will include the cost of the maintenance action which is to be entered in the AWN comment section under ships force. (3) The requirement to document cost in the Supply comment section applies to all corrective maintenance and logistics actions (including one-touch or any other program being utilized for navy standard stock repair parts, command contracts for systems maintenance, casualty report (CASREP) support, open purchase for non-standard stock parts and maintenance services). (4) Maintenance Contracts (FOR NAVWAR, NIWC, CIV or GOV contractor support) and open purchase documentation must incorporate the AWN assigned JCN. (5) Recording cost data in AWN and applying the JCN to financial documentation will support NAVIFOR budget discussions with OPNAV. Failure to document all maintenance actions and associated costs in AWN will limit NAVIFOR ability to support command unfunded requirements submissions and seek additional funding from OPNAV resource sponsors. (6) All commands without an AWN account will use their parent commands AWN account to submit CSMP entries. For commands without an AWN account and no parent command AWN account, contact NAVIFOR points of contact for additional guidance. (7) Financial documentation includes documents used for open purchase items and contracting maintenance actions or contracting support services. E.G. Infrastructure upkeep, system administration. If you are purchasing services for maintenance, it requires a CSMP entry. General office supply purchases, servmart, and command operating expenditures such labor and utilities (salary, electric, vehicles, water, sewer, etc.) are exempt from AWN CSMP entries. (8) Open AWN CSMP entries for maintenance contracts entering Statement of Work (SOW) and Period of Performance (POP) in the narrative, adding the cost to the AWN comments section under ships force. After entry is made and approved by 3MC, after contract is awarded and funds executed, the job can be closed. Subsequent contract renewals, option year extensions, or if a current fiscal year contract (shorter than full fiscal year POP) is extended, will require new AWN CSMP entries with costs applied to AWN comment section under Supply comments. (9) The goal is to capture maintenance actions and associated costs to support budget submissions and verifications with OPNAV N2N6. Your documented maintenance data is the authoritative record to eliminate budget shortfalls and restore funding to modernize based on traceable and supportable documentation pulled from the authoritative source.

p. 484

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-46 i. CNIF MDS Supply Process. All NAVIFOR units will utilize the ref n that is for both shipboard and ashore for ordering processes, and Material Obligation Verification processes. (1) For non-RSUPPLY connected AWN, NSN ordering process will be, to enter a 2Kilo into AWN. (2) NSN will be verified via ONETOUCH. (3) Site will check the MILSTRIP requisition tracking spreadsheet, which is created and maintained by the site, for which document number to use next. W requisitions tracking spreadsheets for CASREPs. (4) Site will input the NSN into ONETOUCH, verify it is correct. Once verified to be correct they will generate the MILSTRIP for the requisition along with the supporting 1348. (5) Site will send an email attaching the 1348 to the email and will input the full MILSTRIP Requisition into the body of the email as well. The E-mail will go to the COMPCONTROLLER for funding verification and MILSTRIP recording. (6) Once MILSTRIP is verified to be correct and funding has been approved, site will open ONETOUCH, navigate to the Requisition Functions menu, select MILSTRIP upload, paste the MILSTRIP into the File Contents box and hit the submit button. (7) COMPCONTROLLER will record the MILSTRIP into Command Financial Management System and Standard Accounting, Budgeting, and Reporting System. (8) Site will continue to follow any carcass turn-in and documentation record procedures. (9) Update the AWN JCN with funding expenditure in supply comments, and requisition into the recommended solution block. (10) If the site cannot find the required item via NSN, then an Open Purchase Request (OPR) be utilized. All OPRs will be verified with a JCN prior to ordering and funding expenditures outlined in Supply Comments. (11) If items need to be added to the APL/AEL. The site will utilize the COSAL FBR process per reference (c). j. To ensure proper job Verification, Sc reening, and Brokeraging NAVIFOR follows JFMM VOL II Part II Chapter 1. k. Configuration management is a key co mponent of all maintenance, material management, and readiness reporting across the Navy. Configuration management is dictated from volume VI chapter 19-7 of this manual and its associated references. 19-3.4.3 Programmatics: a. Calibration and Test Equipment. All Test, Measurement, and Diagnostic Equipment (TDME) that is within the NAVIFOR force must utilize volume VI chapter 9 of this

p. 485

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-47 manual, and utilize MCMS to track all government owned calibration equipment for calibration readiness and reporting. For any test equipment item that requires calibration, a job in AWN must be entered to account for the item’s degradation. b. 2-M Processes will be utilized from chapter 8 of this volume, all CCA/ECMs will be screened that are owned by the platform, and a subsequent 2-K will be processed for the screening and repairing against the configuration. c. A lock out and tag out program shall be used if an energy-isolating device is capable of being locked out. Shore activities will pattern their lock out tag out program after Occupational Safety and Health Administration (OSHA) regulations as delineated in reference (h), utilizing NAVSEA Form 9210/9, Tag Out Record Sheet (TORS). Lock out tag out procedures are necessary to prevent the unexpected startup of machinery or equipment, or the release of stored or residual energy that could cause material damage, serious injury, or death. Lock out tag out is achieved through the installation of locking devices and tags to isolate energy sources so maintenance can be accomplished safely. Per references (h), (i), and (j), lock out procedures will be used for all corrective and preventive maintenance requiring electrical or mechanical isolation, including maintenance performed by repair activities or contractors. When energy isolating devices are not lockable, technicians will follow tag out procedures outlined in references (i) and (j). Kirkey lock-out/tag-out Systems will follow NAVIFOR Safety Professional guidance. 19-3.4.4 Inspections and Training Assist Visits. The goal of the 3MI is to evaluate the effectiveness of the unit’s 3-M program. It is critical that the inspection be conducted in a similar fashion in every command and detachment across the force. Inspections will be completed once commenced; early below-standards indications will not be used to change an inspection into an assistance visit. Current instructions are available on the COMNAVIFOR portal page at https://usff.navy.deps.mil/sites/NAVIFOR/N4/N42/Pages/N421.aspx, and the NAVIFOR 3-M Teams Page. 3-M is the foundation of a well-executed, effective maintenance program. Therefore, configuration, PMS, and MDS must be vigorously prosecuted and thoroughly monitored. The standards of PMS performance must remain high. a. Frequency of Inspections and TAVs. The TYCOM or ISIC will conduct a complete inspection of each command under their cognizance as follows: (1) When deemed necessary and scheduling allows outside of the normal inspection window by the TYCOM, ISIC or the unit’s CO. (2) Not to exceed 36 months. The governing factor is that every unit will be inspected every 24 months, and a maximum of 36 months (3) The ISIC will submit a 3MI periodicity extension request to the TYCOM if a 3MI will exceed 24 to 36 months has elapsed since the last inspection. The TYCOM, when replying to the request for extension, will include Commander, United States Fleet Forces Command N43 or Commander, Pacific Fleet N43 (as applicable) as information addressees. Only the TYCOM can authorize such an extension. (4) TAVs will be conducted by the ISICs as dictated from the TYCOM, or the by the TYCOM if the ISIC is the TYCOM. TAVs are an opportunity to train

p. 486

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-48 personnel in specific areas of 3-M. The purpose of the assist visit is to identify areas where improvements may be made, this is not a direct translation of a 3MI. Prior to the arrival of the 3-M Team, the ship will respond appropriately to identify areas that need attention and ascertain the type of assistance desired. This is not required to conduct an inspection (5) An evaluation visit may be determined or required when a command has during a previous assessment was deemed as having no configuration whether hardware or software. This visit will occur once every 36 months to determine that the command has not gained any configurations during that timeframe, whether program of record or not. Once determined the TYCOM will include Commander, United States Fleet Forces Command N43 or Commander, Pacific Fleet N43 (as applicable) as concurrences. b. Inspection Team Composition. (1) Team Leader. The inspection team leader will be the TYCOM 3-M Representative who will concur with the assignment of inspection team members. The team leader will ensure inspection attributes are evaluated in a manner consistent with current guidance and directives provided by COMNAVIFOR and provide guidance to the inspection team members to ensure a common process. (2) Team Members. Team members will c onsist of Commander, Naval Forces or ISIC staff personnel or both who are adequately trained in the area to which they are assigned to assess. They will report findings to the team leader. c. Method for Assignment of Numerical Evaluations. The minimum performance requirements are as identified below: (1) Formula Acronyms: (a) CLER = Command Level Effectiveness Review (b) CTS = Command Total Score (c) CVF = CSMP Validity Factor (d) DTS = Department Total Score (e) MAR = Maintenance Accomplishment Rate (f) MDS = Maintenance Data System (g) MPR = MDS Performance Rate (h) PAR = Periodic Accomplishment Rate (i) PPR = PMS Performance Rate (j) SAR = Situational Accomplishment Rate (k) SEER = Scheduling and Execution Effectiveness Review (l) SCAR = Spot Check Accomplishment Rating

p. 487

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-49 (2) CTS must 80 percent or higher , 50 percent of the score is the PMS effectives, and 50% is the MDS effectiveness. Any CTS score evaluated below 80 percent will be re-evaluate. CNIF CTS = ((SCAR X .15) + (MAR X .10) + (SEER X .15) + (CLER X .10) + (SPF X .5)) + ((CVF X .40) + (MPF .5)) * For commands without a billeted or collateral duty 3MC: CTS = ((SCAR X .20) + (MAR X .10) + (SEER X .20) + (SPF X .5)) + ((CVF X .40) + (MPF .5)) (3) MAR = PAR (.5) + SAR (.5) MA R = PAR (If Work Center holds no situational maintenance) PAR = Completed / (Complet ed + Lost + Alerts + Omitted) SAR = Completed / (Completed + Lost + Omitted ) (4) Each Department is required to m eet the DTS minimum of 80 percent. DTS = Work Center Score X Weighted Factor Work Center Score= (PPR X .50) + (CVF/MDS X .50) PPR = 50% of the Work Center Score CVF/MDS = 50% of the Work Center Score PPR = MAR X SCAR ÷ 100 (5) Ranking Standards. (a) Commands, departments, and WCs will be evaluated as “Above Standards” overall in 3-M if the unit’s total score is 90% or higher. (b) Commands, departments, and WCs will be evaluated as “At Standards” overall in 3-M if the unit’s total score is between 80% and 89.99%. (c) Commands, departments, and WC s will be evaluated as “Below Standards” overall in 3-M if the unit’s total score is less than 80%. (d) All calculations will be rounded to two decimal places. d. Inspection Procedures. Appendix A provide s a standard means for evaluating the 3- M program. These procedures, centered on a set of core attributes applicable to all, are used to conduct 3-M Inspections. Inspection procedures are divided into six major areas, and three programmatic scores for CNIF: (1) Section I - Work Center a nd Command Effectiveness Reviews (a) Scheduling and Execution Effectiveness Review. (b) Command Level Effectiveness Review. (2) Section II - Spot Check Accomplishment Rating. (3) Section III - Maintenance Accomplishment Rate.

p. 488

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-50 (4) Section IV - Maintenance Data System. (5) Section V - Proficiency (6) Section VI - 3-M Inspec tion Command Total Score. (7) Section VII – Test Equipment (8) Section VIII – 2-M (9) Section IX - Lock-out/Tag-out e. Inspection Reporting. Significant defici encies and numerical assessments are reported to the assessed unit’s CO, ISIC and TYCOM using the format shown in appendix C. Reporting may be accomplished on the entire unit or on a departmental basis. (1) Significant deficiencies require a report of corrective actions taken by the unit to be forwarded to the TYCOM via the ISIC within 30 days following the inspection. (2) Any command or department recei ving an overall evaluation of below standard in either PPR or CVF and MDS must be re-evaluated. (3) Each TYCOM will report the findings of the previous year’s inspections to Commander, United States Fleet Forces Command or Commander, Pacific Fleet N43, as applicable, at the end of the calendar year. f. Inspection Data Retention. CNIF will mainta in an inspection data file for each unit. As each command is evaluated, the individual evaluation standards and calculated values identified will be recorded in the data file with a copy of the inspection report provided to the inspected command. Sections I through VI of Appendix A provides specific criteria to be used in the assessment of each command. Section VII is evaluated based on test equipment readiness from chapter 9 of this manual. Section VIII is evaluated based on chapter 8 of this manual. Section IX is evaluated based on reference (h).

p. 489

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-1 APPENDIX A APPENDIX A INSPECTION CRITERIA

p. 490

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-2 APPENDIX A APPENDIX A SECTION I-A SCHEDULING AND EXECUTION EFFECTIVENESS REVIEW (SEER) Complete the SEER checklist below for each WC. Enter a numeric evaluation of each inspection attribute and provide amplifying information to describe the deficiencies driving point deductions on the “Remarks” page provided. Significant deficiencies must be reported via the final inspection report. Command Department Division Work Center Date General Attributes Value Points 1. Does the WC PMS file contain: a.* The current Service Brief? 1

b.* Current and applicable 3-M messages, notices, and supplementary information are available? 2 2. Do MIPs and MRCs accurately reflect equipment configuration; are non-applicable MRCs correctly lined out and are applicable MRCs active? 10 3. * Does the WC retain an auditable record of 3-M personnel qualification standards and designation letters? 5 Maintenance Requirement Card (MRC) Deck 4. Is the WC deck of MRCs, including classified MRC locator cards, complete and current? (Per TYCOM direction) 2 5. Are locally generated MRCs complete and current? 3 6. Are blanks requiring installation data (including MRC location block) filled in prior to use? Specific location must reflect BLDG # with Room #. 3 Chain of Command SKED Administration 7. Are all administrative changes a pproved at the appropriate level? a. Is the FR approved by DH? (Verify using Journal tab.) 2 b. Are weekly closeouts are performed by close of business on the first workday of the week by the LCPO? 2 c. Are lineouts and MRC customization approved by the LCPO? 2 d. Are check notes reviewed, and alerts approved by the DH? 2

p. 491

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-3 APPENDIX A Location Guide Lists (LGL) 8. a. Do LGLs contain required information (e.g., equipment name, equipment location, equipment serial number or unique identifier)? 3

b. Are maintenance items in SKED associated to the existing equipment configuration? 3 Situational Requirements 9. * Are all situational (states, triggered or metered) events being scheduled and executed in SKED? 8 PMS Execution and Accountability 10. Are check note entries accurate, valid, and complete? 3 11. * Was maintenance assigned only to qualified maintenance personnel for MRCs requiring unique qualifications, NECs, or billet? 4 12. Is a check note made for maintenance actions not completed or rescheduled during the week and retained in SKED? 2 13. Is a unique tag out serial number or “tag out not required” entered as a “check note” for maintenance actions requiring a lock out or tag out and marked as complete? 2 14. Have the minimum number of spot checks and monitored checks been accomplished? 3

FBR File 15. Are FBRs tracked in SKED, “Action Taken” block updated by WCS? 3 Inactive Equipment Maintenance (IEM) 16. * Is the start of an inactive period correctly annotated and approved by DH? 2 17. Are all IEM requirements properly scheduled? 5 18. Is the completion of the inactive period correctly annotated? 2 Totals (Attributes evaluated as NA are not calculated) Total Points Available:__________ Total Points Awarded:_______ SAT **SAT is 80% or better UNSAT (Score = Points Awarded Divided by Points Available)

* Electronic Versions Acceptable Attribute Scoring: > 85% = Satisfactory = Full Credit < 85% = Unsatisfactory = No Credit

p. 492

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-4 APPENDIX A Example - Attribute 17 – If 85% or better of IEM requirements were properly scheduled, points awarded would be five. If less than 85% of IEM requirements were properly scheduled, points awarded would be zero.

p. 493

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-5 APPENDIX A APPENDIX A SECTION I-A2 SEER REMARKS Provide amplifying information to describe the deficiencies driving point deductions. Significant deficiencies must be reported via the final inspection report. Attribute # Amplifying Information

Print Inspector’s Name: ________________________ Signature: ________________________ Command: _____________________________________ Date: __________________

p. 494

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-6 APPENDIX A APPENDIX A SECTION I-A3 SKED 3.2 SEER CHECKLIST GRADING ATTRIBUTES

* Indicates electronic versions acceptable.

1. Attribute 1 : Does the WC PMS file contain: 2. Attribute 1a. (*) : (1). Current Service Brief? (2). Is the latest FR PMS Service Brief available? 3. Attribute 1b. (*): (1). Current and applicable 3-M messages, notices, and supplementary information? (2). Are applicable messages and bulletins th at provide additional guidance, information or areas of focus that pertain to MIPs or MRCs available? (3). Have the 3-M team at the activity, read and initialed the 3-M messages, notices, and supplementary information? Digital copy may be retained after initialed up to DH. 4. Attribute 2: Do MIPs and MRCs accurately reflect equipment configuration; are non- applicable MRCs correctly lined out and are applicable MRCs active? (May be MIP standardization violations) a. Does WC meet TYCOM MIP standardiza tion requirements? Are any MRCs listed on MIP lined out that are applicable to installed equipment configuration and within the cognizance of the WC to perform maintenance? (Split MIP log will be verified against the LOEP and MIP.) b. Are applicable MRCs active on all applicable maintenance items? c. Are non-applicable MRCs lined out? MRCs that are not applicable to the WC’s installed equipment configuration. d. Are line out justifications on MIPs accurate? e. Has activities configuration been ve rified against available maintenance requirements? Does the shore Installation Process packages dictate that locally generated maintenance be required or identified maintenance requirements in technical manuals provided? 5. Attribute 3 (*): a. Does the WC retain an auditable r ecord of personnel PQS qualifications and designation letters? b. Does the WC have record of:

p. 495

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-7 APPENDIX A (1) Department. 3MA and WCS designati on letters for 3-M (301) Maintenance Person PQS, 3-M (303) WCS PQS, and 3-M (304) Division Officer PQS? (2) FLTMPS report, if available, must be used. If FLTMPS is not available, PQS watch station cover sheets signed by the XO must be used. 6. Attribute 4 : Is the WC deck of MRCs, including classified MRC locator cards, complete and current? (Per TYCOM direction) a. Does WC MRC deck contain all MRCs that are not lined out on MIP? As a minimum, the deck will contain all quarterly checks and below, all R-checks, and all MRCs with fill in the blanks or pen and ink changes. Any MRC completed within the previous 13 weeks must be retained in the WC MRC deck. Verify SYSCOM MRC control number against MIPs per the 3-M Manual or TYCOM guidance? b. Does MRC location block contain one of th e following entries, as appropriate? (1) BLDG # with room #; (2) “See LGL,” (3) “See METBENCH Calibration Management System (MCMS)” (4) “See Account Inventory Summary (AIS),” (5) “LGL attached.” c. Is the MRC SYSCOM correct and ma tches the SYSCOM number on the MIP? 7. Attribute 5: Are locally generated MRCs complete and current? a. Does the command perform local maintenance? b. Has the local maintenance been recently updated? c. Is there a locally generated LOEP with MIPs associated to these MRCs? d. Do antenna’s that do not have maintenan ce been verified again the Ashore Red HF, Ashore Green VHF/UHF/HF, and Ashore Yellow LF/VLF books? e. Shore stations that do not have a lo cally generated MRC documentation mark as “N/A”. 8. Attribute 6: a. Are blanks requiring installation data (inc luding MRC location block) filled in prior to use? Specific location must reflect BLDG # with Room #. b. Are all WC MRCs with blank fields or tables within the MRC procedure block requiring data completed? 9. Attribute 7: Are all administrative changes approved at the appropriate level? 10. Attribute 7a: FR approved by DH. (Verify using Journal tab.) Has the final approval of revisions (FR, ACNs, FBR, Document Information Transmittals (DIT), and administrative changes) been completed by DH? 11. Attribute 7b:

p. 496

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-8 APPENDIX A a. Are weekly closeouts performed by close of business on the first workday of the week by the LCPO? b. Is the weekly closeout completed on the first workday of the week? c. Is the weekly closeout completed by LCPO? 12. Attribute 7c: All lineouts and MRC customization approved by the LCPO. Are all lineouts approved and initialed by LCPO? 13. Attribute 7d: a. Are check notes reviewed, and alerts approved by the DH? b. Are check notes and alert details approved by DH? 14. Attribute 8a (*): a. Do LGLs contain required informati on (e.g., equipment name, equipment location, equipment serial number or unique identifier)? b. WCs with LGLs: Does the LGL have e quipment nomenclature, serial number or unique identifier, and location (BLDG # and Room #) block completed for each line item? c. If equipment manufacture serial numbe r is available, it must be used. 15. Attribute 8b: a. Are maintenance items in SKED associ ated to existing equipment configuration? b. Are maintenance items in SKED correctly associated with equipment configuration? 16. Attribute 9 (*): a. Are all situational (states, triggers, mete red) events being scheduled and executed in SKED? b. Are all local triggers and states executed as required? c. Are all required R-Checks listed on the acc ountability logs and scheduled in SKED? d. Are metered readings entered and tracked in SKED (if applicable)? 17. Attribute 10: a. Are check note entries acc urate, valid, and complete? b. For all entries on the WC schedule that are not marked complete, is there a corresponding check note entry? c. Does the check note entry begin with either: rescheduled, out of periodicity, non- accomplished, not applicable (NA) for situational checks and with the date the check went out of periodicity, the reason why the MR was not accomplished, or the reason check was not applicable? d. Cent (¢) sign entries will begin with “P erformed by” and followed by the detailed information of the outside activity completing the maintenance, JSN, work order or applicable documentation used to complete the maintenance. Proof of the completion

p. 497

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-9 APPENDIX A will be maintained in the WC PMS file until the next accomplishment of the maintenance action. DH will sign for accountability of all maintenance actions completed by outside activities. 18. Attribute 11: a. Was maintenance assigned only to qualified maintenance personnel for MRCs requiring unique qualifications, NECs, or billet? For example, a system administrator requires NAVEDTRA 43469 for privileged access into the system. b. For MRCs that indicate or require unique qualifications such as: SPO, DCPO, gage calibration or NECs, does the assigned individual(s) hold that qualification or billet? Utilize school completion certificates, position descriptions or FLTMPS for verification. 19. Attribute 12: a. Is a check note made for maintenance actions not completed or rescheduled during the week and retained in SKED? b. Do all check note entries match all entries in SKED? c. Do check notes that require a JCN or Requisition number accurately placed into SKED? 20. Attribute 13: a. Is a unique tag out serial number or “tag out not required” entered as a “check note” for maintenance actions requiring a lock out or tag out and marked as complete? b. No entry is required for maintenance not completed. 21. Attribute 14: a. Have the minimum number of spot check s and monitored checks been accomplished? b. Are all required spot checks co mpleted per this instruction? 22. Attribute 15: a. Are FBRs being tracked in SKED, “Action Taken” block updated by WCS? b. Does the WC retain copies of FBR res ponses requiring changes to PMS documents until reflected in the FR? c. Are FBRs being tracked in SKED? d. Are FBR responses entered in SKED when received and action taken updated within seven days? e. If no outstanding FBRs, mark as NA. 23. Attribute 16 (*): a. Is the start of an inactive period correctly annotated and approved by DH? b. Does WC IEM tab annotate the proper IEM status?

p. 498

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-10 APPENDIX A c. If WC has systems or equipment in IEM status II, is a JSN, work documentation, DH authorization and outside activity or repair WC annotated? d. Did the WC obtain DH written authorizati on prior to placing equipment in IEM? e. Does the equipment in IEM for being sunset or retired in place, have an appropriate Divestment or sunset message? e. If there is no equipment in IEM in the last 13 weeks, mark as NA. 24. Attribute 17: a. Are all IEM requirements properly scheduled? b. Does the WC annotate the proper scheduling of all applicable IEM maintenance (e.g., LU and PM)? c. If there is no equipment in IEM in the last 13 weeks, mark as NA. 25. Attribute 18: a. Is the completion of the in active period correctly annotated? b. Does the WC schedule annotate the pr oper scheduling when removing equipment from IEM (e.g., SU and OT)? c. If there was no equipment removed from IEM in the last 13 weeks, mark as NA.

p. 499

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-11 APPENDIX A APPENDIX A SECTION I-B1 COMMAND LEVEL EFFECTIVENESS REVIEW (CLER) Using the attributes and grading criteria described below, conduct the CLER. Provide amplifying information for deficiencies causing point reduction on the remarks page. Command: Date: General Attributes Value Points 1. Does the 3MC maintain: a. A Change Accountability Log (including FBR Accountability Log in SKED)? 2 b. * A log tracking the assignment of MRCs from split MIPs to ensure all applicable MRCs are assigned (if applicable)? 3 c. A LOEP containing locally generated MIPs and a record of the associated MRC files? 2 d. * A current PMS DVD or downloaded file? 3 2. Does the command have a reliable system for backing up MDS and PMS data? 5 3. * Does the 3MC have an effective system in place to track, route and explain externally provided PMS changes? 3 4. Is there an effective system in use (Spot Check Program) whereby supervisory personnel periodically and routinely monitor PMS performance? 10 5. Have all FBRs entered in SKED been properly reviewed by the CoC and submitted off station within seven days? 3 6. Have CSMP reconciliations been conducted per JFMM and TYCOM instructions? 5 7. * Does the activity conduct internal audits (Quarterly Self- Assessments) of all WCs and retain for one year copies of deficiencies, corrections, and abatements? Are copies of assessments forwarded to the ISIC and TYCOM on a quarterly basis? 15

p. 500

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-12 APPENDIX A 8. * Does the 3MC provide weekly status reports to the 3-M Manager per specific TYCOM directives? 3 9. * Does the 3MC have an approve d master copy of 3-M PQS? 3 10. * Does the 3MC maintain an auditable record of PMS PQS for the command (e.g., copy of service record entries, signed copy of PQS cover letter, officer verified divisional training record or FLTMPS report)? 3 11. Does the 3MC maintain the status of command FBRs, responses and follow up actions taken in SKED? 3 12. Does the activity conduct 3-M pr ogram training per directives? 10 13. Does the 3MC have an active AWN account with proper permissions? 2 14. Does the activity conduct equi pment validations via AWN? 3 15. Are changes annotated on validation and entered in AWN? 3 16. Does the 3MC retain 13 w eeks’ worth of validations? 2 17. Does the 3MC retain one years’ worth of quarterly reports? 2 18. Are the quarterly reports si gned and dated by the CoC? 2 19. Are the Check Note Reports included? 1 Totals (Attributes evaluated as NA are not calculated) Total Points Available: (88) Total Points Awarded:_________ (Score = Points Awarded Divided by Points Available) SAT UNSAT Inspector Name and Command (Print and Sign) * Electronic Version Acceptable Sat = 80 percent or better Attribute Scoring: 80% or above = Satisfactory = Full Credit Less than 80% = Unsatisfactory = No Credit

p. 501

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-13 APPENDIX A APPENDIX A SECTION I-B2 CLER REMARKS Provide amplifying information describing the deficiencies and associated point deductions. Significant deficiencies will be reported via the final inspection report. Attribute # Amplifying Information

Print Name: _____________________________Signature: _______________________________ Command: _______________________________________ Date: ________________________

p. 502

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-14 APPENDIX A APPENDIX A SECTION I-B3 CLER CHECKLIST GRADING ATTRIBUTES

* Indicates electronic versions acceptable. 1. Attribute 1: Does the 3MC maintain: 2. Attribute 1a. Does the 3MC maintain: (1) A Change Accountability Log (inclu ding FBR Accountability Log in SKED)? (2) Is the Accountability Log and FBR record in SKED updated? 3. Attribute 1b. Does the 3MC maintain: (1) A log tracking the assignment of MRCs from split MIPs to ensure all applicable MRCs are assigned (if applicable)? (2) Is a log available and ap proved by the XO to track the assignment of MRC(s) from split MIPs? 4. Attribute 1c. Does the 3MC maintain: a. A LOEP containing locally generated MIPs and a record of the associated MRC files? b. Does the 3MC maintain a LOEP that contains locally generated MIPs? c. Does the 3MC maintain a master file with the locally generated MRC documentation? d. Shore stations that do not have a locally generated LOEP or associated locally generated MRC documentation mark as “NA”. 5. Attribute 1d (*). Does the 3MC maintain: a. A current PMS DVD or downloaded file? b. The latest PMS FR loaded and finalized on the first Monday of the quarter or on the later date as authorized by TYCOM? c. The latest version of SKED implemented? 6. Attribute 2 (*): a. Does the command have a reliable system for backing up MDS and PMS data? b. Are back-ups and daily systems checks conducted? c. Are external back-ups available? d Are multiple data points saved on NM CI or ONE-NET servers as required? 7. Attribute 3 (*): a. Does the 3MC have an effective system in place to track, route and explain externally provided PMS changes? b. Does the 3MC route, maintain and tr ack externally provided PMS changes?

p. 503

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-15 APPENDIX A 8. Attribute 4: a. Is there an effective system in us e (Spot Check Program) whereby supervisory personnel periodically and routinely monitor PMS performance? b. Does the 3MC maintain a Spot Check Matrix for the current week and the past 13 weeks? 9. Attribute 5: a. Have all FBRs entered in SKED been properly reviewed by the CoC and submitted off hull within seven days? b. Are all FBRs entered in SKED? c. Are all FBRs reviewed and processed off station (Planned Maintenance System – Management Information System) within seven days? 10. Attribute 6: a. Have CSMP reconciliations been co nducted per JFMM and TYCOM instructions? b. Does the command or activity routinely submit CSMP reports to the ISIC and TYCOM per TYCOM direction? c. Does the command conduct CSMP Reconciliations during PB4M? 11. Attribute 7 (*): a. Does the activity conduct internal audits (Quarterly Self-Assessments) of all WCs and retain for a one (1) year the copies of deficiencies, corrections, and abatement? Are copies of assessments forwarded to the ISIC and TYCOM on a quarterly basis? b. Does the unit conduct quarterl y internal audits or self-assessments of all WC PMS? c. Are quarterly self-assessme nts retained for one year? d. Are complete quarterly self-assessment deficiencies and POAM submitted to ISIC and TYCOM? 12. Attribute 8 (*): a. Does the 3MC provide weekly status reports to the 3-M Manager per specific TYCOM directive? b. Does 3MC provide weekly status reports to the 3-M Manager as per this instruction? c. Does 3MC retain the last 13 weeks of weekly reports plus the current week? d. Does 3MC retain the cover pages of one y ears’ worth of weekly reports signed by the CoC? 13. Attribute 9: a. Does the 3MC have an approved master copy of 3-M PQS specifically tailored for the command? b. Does 3MC have a master copy of 3-M PQS specifically tailored for the command that is approved by the CO?

p. 504

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-16 APPENDIX A c. Is the command using the latest version of 3-M PQS? 14. Attribute 10 (*): a. Does the 3MC maintain an auditable record of PMS PQS for the command (e.g., copy of service record entries, signed copy of PQS cover letter, officer verified divisional training record, or FLTMPS report)? b. Does the 3MC will maintain a list of all assigned 3-M positions and PQS qualifications? c. Are all personnel qualified fo r their assigned 3-M positions? 15. Attribute 11: a. Does the 3MC maintain the status of command FBRs, responses and follow up actions taken in SKED? b. Are the FBR response actions noted in SKED Feedback Report Manager? c. Are command generated FBRs, respons es and action taken tracked in SKED. d. Is the latest PMS 22 availabl e? (Reports issued monthly.) 16. Attribute 12: a. Does the activity conduct 3-M program training per directives? b. Is 3-M training included in PB4T (Planning Board for Training). c. Is 3-M training scheduled and published in the POW or POD? d. Does the 3MC retain copies of 3-M traini ng muster sheets for a minimum of one (1) year? 17. Attribute 13: a. Does the 3MC have an active AWN account with proper permissions? b. Can the 3MC demonstrate creating a new AWN account? 18. Attribute 14: Does the activity conduct equipment validations via AWN? 19. Attribute 15: a. Are changes annotated on validation and entered in AWN? b. Does the 3MC ensure that pen and ink ch anges annotated on the validation aid are entered in AWN? 20. Attribute 16: a. Does the 3MC retain 13 weeks’ worth of validations? b. Does 3MC ensure all required validations are completed? 21. Attribute 17: Does the 3MC retain one years’ worth of quarterly reports? 22. Attribute 18: Are the quarterly reports signed and dated by the CoC? 23. Attribute 19: Are the Check Note Reports included?

p. 505

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-17 APPENDIX A APPENDIX A SECTION II-A SPOT CHECK ACCOMPLISHMENT RATING (SCAR) Using the basic definitions and guidelines described, determine the PMS Spot Check Accomplishment Rating (SCAR) for each WC. Enter the values determined on the Spot Check Monitor Form, section II-A of this appendix. The number of Spot Checks has been established: Periodic= 2% Situational= 0.5% For all completed maintenance (including daily, weekly, and bi-weekly) from the last 13 weeks. Every WC will receive at least one periodic and one situational documented spot check. The maximum spot checks accomplished during the inspection will be five per WC. 1. Complete an MRC Evaluation, SCAR Check Sheet , Section II-A of this appendix, for each MRC selected. Based on the results, evaluate the overall effectiveness of the accomplishment of each MR selected. Enter a numeric evaluation of each assessment attribute and provide amplifying information describing the deficiencies and associated point deductions. Significant deficiencies will be reported via the final inspection report. 2. The SCAR Check Sheet reflects a series of questions to be asked to determine the accomplishment status of an MRC previously reported as accomplished. Although, the sheet may be used as a reference for conducting a real time monitored MRC evaluation, for the purposes of conducting a 3MI, all spot checks will be conducted on accomplished (historic) MRCs. 3. Due to the nature of MRC completion, supporting programs such as Tag-Outs and HAZMAT are encountered. Care should be taken to avoid expanding the spot check to a review of the processes of those programs thereby preventing the assessor from determining the accomplishment status of the MRC under review. 4. The following is expanded guidance for completion of the SCAR check sheet. Items identified in ( ) are the SCAR check sheet inspection attributes. Best practices or other policies not supported by source documentation will not be included in evaluating compliance: a. (1.a.) Determine if the MP is qualified to perform the maintenance task. PQS 301 is required for all MRCs but attention should also be paid to other qualifications required such as Quality Maintenance (see Volume 5, Part I, Chapter 3, paragraph 3.4 of this manual) or graduation from a required school such as gage calibration technician. b. (1.b.) Determine if the correct TPMTE were used during the performance of the MRC. If the MP did not have the required TPMTE, it is unlikely that he or she would have been able to complete all the procedural steps of the MRC as required. If an item of TPMTE was required to perform a conditional step and that step was not required to be accomplished, it is not considered deficient. If the required test equipment required calibration, ensure that the calibration is within date and the equipment is of sufficient scale to accomplish the MRC. c. (1.c.) Determine if the MP maintained the correct equipment.

p. 506

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-18 APPENDIX A d. (1.d.) Examine the MRC to determine that any locally applied changes are authorized by procedural notes, external correspondence, or allowed by reference (a). e. (1.e.) Determine applicability of the MRC to the component that the MP signed for completion on the 13-Week Accountability Log. NOTE: IF A PROCEDURAL STEP WAS NOT COMPLETED, THE MRC SHOULD NOT HAVE BEEN REPORTED AS COMPLETE AND THEREFORE THE ATTRIBUTE GRADE SHOULD BE ZERO AND ALL SUBSEQUENT ATTRIBUTES SHOULD ALSO BE ZERO, EFFECTIVELY “FAILING” THE SPOT CHECK. f. (2.a.) From a variety of potential techniques, determine if the MP performed all the required steps of the MRC. This may be accomplished via re-enactment, a discussion regarding the steps or re-performance. The inspector should come away with a clear impression that all the steps of the MRC were either fully accomplished or not. NOTE: IF A REQUIRED TAG-OUT WA S NOT CONDUCTED IN SUPPORT OF ACCOMPLISHING THE MRC, THE MRC SHOULD NOT HAVE BEEN CONDUCTED AND REPRESENTS A SERIOUS SAFETY VIOLATION. THEREFORE, THE ATTRIBUTE GRADE SHOULD BE ZERO AND ALL SUBSEQUENT ATTRIBUTES SHOULD ALSO BE ZERO, EFFECTIVELY “FAILING” THE SPOT CHECK. g. (2.b.) If required by the MRC, veri fy that a Tag-Out was hung before the maintenance was performed. Ensure the isolation boundaries were appropriately identified and correctly positioned to ensure complete isolation of the maintained equipment. If no tag-out was required, write NA on the sheet. NOTE: FAILURE TO ADHERE TO A SA FETY PRECAUTION PROVIDED ON THE MRC CONSTITUTES A SERIOUS SAFETY VIOLATION AND THE FAILURE TO PERFORM THE MRC AS WRITTEN. THE ATTRIBUTE GRADE WILL BE ZERO AND ALL SUBSEQUENT ATTRIBUTES WILL ALSO BE ZERO, EFFECTIVELY “FAILING” THE SPOT CHECK. h. (2.c.) Determine compliance with all speci fic safety precautions listed on the MRC. If no safety requirements were invoked, write NA on the sheet. i. (3.a.) By physical examination of the maintained equipment, determine if maintenance of the nature required by the MRC had been performed. Take note of fasteners that would have had to be disturbed, dirt in filters, fresh oil, etc. to make a judgment as to whether the maintenance has been performed. NOTE: DUE TO THE POTEN TIAL LIABILITY INCURRED BY IMPROPER USE AND DISPOSAL OF HAZMAT, SOME WCS HAVE ASSIGNED SPECIALLY TRAINED PERSONNEL TO PROVIDE HAZMAT AND DISPOSAL SERVICES FOR SURPLUS MATERIAL INSTEAD OF THE MP. THIS IS ACCEPTABLE PROVIDED THE INSPECTOR CAN DETERMINE FULL COMPLIANCE. j. (3.b.) Determine through questioning and record verification that HAZMAT was properly used and disposed of as a means of determining whether the MRC was

p. 507

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-19 APPENDIX A accomplished. Once the inspector has determined that the HAZMAT was used and disposed of correctly, this attribute is considered fulfilled. If no HAZMAT was required to be utilized, write NA on the sheet. k. (3.c.) Determine if the MP could have performed the MRC from a standpoint of being trained and proficient in the tasks called out for by the procedure. l. (4.a.) Determine if the MP filled out the 13-Week Accountability Log or annotated proper disposition of maintenance in SKED correctly for the accomplished MRC with the appropriate accomplishment date. Ensure that if a tag-out isolation was used; the tag serial number is recorded in the space allowed or as a check note in SKED. Ensure that the printed name and legal signature of the MP who performed the maintenance is recorded or, in case of group performed PMS, the MP in charge of the group. m. (4.b.) From reviewing the discussions and findings during the spot check, determine if an FBR had been submitted if required. If no FBR was required, write NA on the sheet. n. (4.c.) Determine if a mate rial deficiency was noted during the PMS; if so, examine the CSMP to ensure the deficiency was documented. If no material deficiency was noted, write NA on the sheet. If material discrepancies are properly documented in the CSMP attribute graded as a two. Material discrepancies which are not documented in the CSMP will be entered with an automatic grade of zero. 5. When a Spot Check is determined to be belo w standards, the command undergoing inspection is likely to have numerous questions. To facilitate root cause analysis and the formulation of an effective corrective action plan, care should be taken to clearly identify factors contributing to deficiencies that led to the conclusion that the MRC was not conducted as written or not conducted at all.

p. 508

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-20 APPENDIX A APPENDIX A SECTION II-B SCAR CHECK SHEET Planned Maintenance System (PMS) 3-M Spot Check Form COMMAND DEPARTMENT EQUIPMENT WORK CENTER DATE PERFORMED MIP EVALU ATED MRC EVALUA TED

Maintenance Person: Spot Check Date: NOTES: 1. If an attribute marked with an “*” is evaluated as unsatisfactory, all subsequent attributes will be graded as "0". 2. Attribute marked with a pound sign “#”. Due to the potential liability incurred by improper use and disposal of HAZMAT, some WCs have assigned specially trained personnel to provide HAZMAT and disposal services for surplus material instead of the MP. This is acceptable provided the inspector can determine full compliance. Inspection Attribute Value Grade Notes Contact the MP assigned responsibility for the accomplishment of the MRC, have the individual deliver MRC, and determine the following by questions, personal observation, or both. 1. a.* Is the MP qualified (PQS) to perform the MR? 2 b. Did the MP present the correct tools, Personal Protective Equipment, parts (NSN), material (Military Specification (MIL-SPEC)) and calibrated test equipment? 3

c. Did the MP properly identify the equipment (location, equipment validation)? 4

d. Are there unauthorized changes or corrections to the MRC? 3

p. 509

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-21 APPENDIX A e. Is the MRC correct for the equipment maintained? 3 Demonstrated all steps of MR including all Notes, Warnings and Cautions according to the MRC. 2. a.* Followed all steps of the MRC. 5 b.* Correctly performed equipment Tag-Out. 5 c.* Followed all safety precautions. 5 Does the equipment condition reflect accomplishment of the MRC? 3. a. Is it apparent that maintenance was performed recently? 10 b.# Correctly demonstrated use and disposal of Hazardous Material. 3 c. Was the MRC within the capability of the assigned individual? 5 PMS Reporting 4. a. MP reported status of MR to the WCS if Completed or Not Fully Accomplished and made appropriate updates in SKED. 2

b. WC generated FBR for any problem with MRC. 2 c. Material deficiencies detected by the PMS action were recorded in MDS. 2

Attributes Evaluated as NA are not Calculated Total Points Available:_____________ Total Points Awarded:____________ Spot Check (SCAR) (Grade = Points Awarded ÷ Points Available): SCAR = Above Standards (90% or greater) At Standards (80-89.99%) Below Standards (less than 80%) Above Standards At Standards Below Standards

p. 510

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-22 APPENDIX A Below Standard grade requires immediate accomplishment (if XO determines re-performance is required) monitored by a Chief Petty Officer Additional Remarks: Printed Name:______________________________________________________ Signature:__________________________________________________________ Command:___________________________________________ Date:__________________

p. 511

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-23 APPENDIX A APPENDIX A SECTION III MAINTENANCE ACCOMPLISHMENT RATE (MAR)

1. The Maintenance Performance formula has been redefined to more effectively capture maintenance that was not scheduled. 2. The PAR and SAR reports are automatically generated by SKED. 3. The MAR grade will be determined utilizing the formula reflected and a date range consisting of the previous 13 weeks of maintenance. MAR = PAR (.5) + SAR (.5) MAR = PAR (If WC holds no situational maintenance) PAR = Comp ÷ (Comp + Lost + Alerts + Omitted) SAR = Comp ÷ (Comp + Lost + Omitted) 4. Omitted is defined as any maintenance action that should have been performed on any and every maintenance item and no matter the reason did not get scheduled. For example: a. Situational or state maintenance that did not get scheduled when the situation dictated. b. Improperly lined out periodic checks. c. Non-accomplished IEM checks. d. Non-accomplished maintenance added via ACN, FBR, Preliminary PMS, etc.

p. 512

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-24 APPENDIX A APPENDIX A SECTION IV-A CURRENT MAINTENANCE PROJECT VALIDITY FACTOR (CVF) CHECKLIST COMMAND DEPARTMENT DIVISION WC DATE General: Assessment Attributes Value

CSMP Validity Raw Data 1. Number of TA-1 Work Candidates. 2. Number of TA-2 Work Candidates. 3. Number of TA-3 Work Candidates. 4. Number of TA-4 Work Candidates. 5. Total Work Candidates Sum of 1, 2, 3, 4. 6. Number of TA-2 Work Candidates ove r 180 days old (not reported to the ISIC).

7. Number of TA-4 Work Candidates ove r 180 days old (not reported to the ISIC).

8. Aged Work Candidates (WCO) Sum of 6 and 7. 9. Material Correction Rate: WCO/3 (Aged TA-4) (#7÷3)÷#4 (percentage). 10. CSMP Validity review results from CVF Sheet. (Enter score from CVF Worksheet). 11. Ship's Force Work Candidates over seve n days old that require parts and the parts are not yet ordered.

p. 513

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-25 APPENDIX A 12. Open Ship's Force Work Candidates over 30 days old, not in the 2-K status. 13. Total Work Candidate Deficiencies (WCD) Sum (#11+#12)÷#4 (percentage).

14. Work Candidate Multiple #10 minus (#9 + #13). 15. Material deficiencies noted by MRC spot checks , or space walk-thru’s that were not documented in the CSMP.

16. Deductions #15 ÷ #5 (percentage). 17. CSMP Validity Score #14 and #16. CSMP Validity Above Standards At Standards Below Standards Above Standards (90% or greater), At Standards (80-89%), Below Standards (less than 80%)

p. 514

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-26 APPENDIX A APPENDIX A SECTION IV-B CVF WORK CANDIDATE WORKSHEET CSMP VALIDITY FACTOR (CVF) WORK CANDIDATE WORKSHEET COMMAND:______________________________________________________DATE:_______ _______________ DEPARTMENT:________________________DIVISION:_________________WORK CENTER:____________ JCN EQUIPMENT 1 2 3 4 5 6 7 8 9 10 CVF

CVF Average of all cells A V G A V G A V G A V G A V G A V G A V G A V G A V G A V G AVG

CSMP entry was reviewed with the following results: Score 1. Problem description adequate. 10 2. Recommended solution adequate. 10 3. Write-up reflects maintenance level assigned. 10 4. First (1st) and second (2nd) contact person assigned. 10 5. Correct CSMP summary. 10

p. 515

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-27 APPENDIX A 6. Correct type of availability (maintenance assignment) 1, 2, 3 or 4 work candidates. 10 7. Priority code correct. 10 8. Write-up matches the configuration item and is written on the correct configuration item. 20 9. Was the correct special purpose or safety block selected with the correct values assigned? If selected, was the required Block 35 remarks present? 10 10. Does the work candidate reflect the current and correct status of the material deficiency? (physical verification, space walk-throughs, spot checks)

Yes or No

For attributes not required due to class or type differences, “N/A” attribute and recalculate total value of each field. NOTE: IF ITEM #10 IS “NO”, THE WORK CANDIDATE WILL BE ZERO. NOTE: ENTER ONLY NUMERIC PORTIO N OF JSN AFTER ENSURING THAT DEPARTMENT AND WC HEADER ARE FILLED IN.

p. 516

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-28 APPENDIX A APPENDIX A SECTION V-A1 SKED 3.2 PROFICIENCY FACTOR (SPF) WORKSHEET COMMAND DEPARTMENT DIVISION WC DATE Individual Evaluated: 3M Billet Assigned: Proficiency Required Proficie ncy Attribute Yes or No WORK CENTER ACTIONS MP WC S LCP O DIV O D H 3M C Y/N Y/N Y/N Y/N Y/N Y/N 1 X X X X X X Able to log on. 2 X X X X X X Able to open a WC. 3 X X X X X X Able to view the Schedule, Review, Forecast, Situational, IEM, Journal and PMS Document displays.

4 X X X X X X Able to annotate disposition of maintenance.

5 X X X X X X Able to view previous 13-weeks. 6 X X X X X X Able to view Check Details. 7 X X X X X Able to schedule Spot Checks and update Spot Check results.

8 X X X X X X Able to enter and view Check Note remarks.

SCHEDULE ACTIONS 9 X X X X X Able to add, delete or modify MIPs/MRCs in Revision Mode.

10 X X X Able to perform MRC lineout. 11 X X X X X Able to modify MRC line out justification.

12 X X X Able to approve MRC lineout. 13 X X X Able to perform weekly closeout. 14 X X X X Able to acknowledge PMS Alerts. 15 X X X X Able to reschedule checks.

p. 517

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-29 APPENDIX A 16 X X X X Able to assign maintenance responsibilities.

17 X X X Able to modify equipment associations.

18 X Able to archive 13-weeks. EVENT LIST ACTIONS 19 X X X Able to create an Event List. 20 X X X Able to add checks to an Event List. 21 X X X X Able to trigger a Local Event. 22 X Able to trigger a Global Event. FEEDBACK REPORT ACTIONS 23 X X Able to generate an FBR. 24 X X X X Able to review and approve an FBR. REVISION ACTIONS 25 X X X Able to start a revision. 26 X X X Able to approve a revision. 27 X X Able to finalize a revision. REPORTS 28 X X X X X Able to generate and view PMS reports.

ADMINISTRATIVE ACTIONS 29 X Able to add users. 30 X X X X Able to edit users. 31 X X X Able to disable users. 32 X X X X Able to view and modify the CoC. TOTALS 8 19 26 23 18 32 Divide total Yes by Proficiency required totals for the billet held by the individual. Total Yes SKED PROFICIENCY FACTOR SAT = 85% or better MP SPF (%):

p. 518

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-30 APPENDIX A WCS LCPO DIVO DH 3MC

COMMENTS

p. 519

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-31 APPENDIX A APPENDIX A SECTION V-A2 SPF DESCRIPTION AND GRADING ATTRIBUTES 1. Ability to log on. a. Click on SKED 3.2 desktop icon. b. Enter username and password. c. Click “ Enter”. 2. Ability to open a Work Center. a. On the view tab bar, click “ WORKCENTER”. A box should open. b. Click to highlight the WC to be opened. c. Click “ Open” or double click the highlighted WC to open it. 3. Ability to view the Schedule, Review, Fo recast, Situational, IEM, Journal and PMS Document display. a. From the WC toolbar, click “ Schedule”. b. From the WC toolbar, click “ Review”. c. From the WC toolbar, click “ Forecast”. d. From the WC toolbar, click “ Situational”. e. From the WC toolbar, click “ IEM”. f. From the WC toolbar, click “ Journal”. g. From the WC toolbar, click “ PMS Documents”. 4. Ability to annotate disposition of maintenance. (Mark a check as complete etc.) a. From an open WC, in the grid, click to highlight the desired check. b. Right click the selected item and select the “Complete (Green X) Check” icon from the menu. c. The icon (Green X) will be displayed in the grid. d. To unmark the check, right click the sa me item and click the (Green X) again. NOTE: WHEN THE PIN ACCOUNTABIL ITY FEATURE IS ENABLED THE CREW MEMBER THAT WAS ASSIGNED THE MAINTENANCE MUST BE PRESENT TO INPUT PIN WHEN WCS MARKS THE CHECK COMPLETE. 5. Ability to view previous 13-Weeks. a. From an open WC, in Schedule display vi ew, on the secondary tool bar, click on the “Quarterly” icon drop down arrow. b. Click one of the available quarter s in the past to be reviewed.

p. 520

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-32 APPENDIX A c. Once done reviewing, click on the “ Quarterly” icon drop down arrow and select the current quarter. 6. Ability to view Check Details. a. From an open WC, in Schedule display view , highlight a check in the grid and right click it. b. From the menu, select “ View Details”. c. From the “ Check Details” window, select the desired tab, such as General, SPMIG, MIP Document and MRC Document. d. Close when done. 7. Ability to schedule Spot Checks and update Spot Check results. a. Ability to update Spot Check results: (1) From an open WC, in Schedule display view, highlight a check that has been scheduled for a spot check. A circle with a yellow  (check mark), is the spot check icon. (2) Double click it. NOTE: A SPOT CHECK MUST HAVE BEEN ALREADY ASSIGNED ON THE SCHEDULE. (3) The check details box opens, sele ct the “Spot Checks”, click on the “Edit Spot Check” icon and a spot check window displays. (4) Fill in the scores of the spot check. The task will be in your task list. (5) Double click the task to edit the spot check results. b. Ability to Schedule Spot Check. (1) On the view bar tab, click “ SPOT CHECK”. (2) On the secondary tool bar select “ Schedule Spot Check”. (3) The Spot Check scheduling wizard will appear . Click “Next”. (4) Select “ Spot Check”. (5) Select the person that will be conducting the spot check, then click “Next”. (6) Select the date the spot check will be conducted and the WC the spot check will be conducted in. (7) Select the check, click “ Next”. (8) Review the information and click “ Finish”. 8. Ability to view and enter Check Note remarks . a. From an open WC, in Schedule display vi ew, click to highlight the desired check. b. Right click the highlighted check. c. Select the “ Check Note” icon from the menu.

p. 521

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-33 APPENDIX A d. Enter your remarks (Lost, Not Applicable, Reschedule etc.). e. Click “ OK”. 9. Ability to add, delete or modify MIPs and MRCs in Revision Mode . NOTE: THE WC MUST BE PUT IN RE VISION MODE, DONE BY THE LCPO (STEP #25 LCPO OR 3MC ONLY). PROCEDURES 12 THROUGH 16 ARE PERFORMED FROM THE REVISION EDITOR. a. Ability to add a New MIP . (1) On the Revision Editor toolbar, click “ New MIP” icon. (2) The Add MIP dialog box opens. (3) Select the MIP to be added to your WC. NOTE: IF YOUR MIP IS NOT LISTED , ENTER THE MIP NUMBER IN THE BLANK PROVIDED IN THE LOWER PORTION OF THE SCREEN. THIS WILL ONLY BE AN ADMINISTRATIVE CHANGE UNTIL THE NEW MIP IS ADDED TO THE FR DVD. CLICK “OK”. THE NEW MIP WILL BE GREEN. b. Ability to make a maintenance it em active or inactive (Delete). (1) Follow the MIP outline to the desire d maintenance item and highlight it. (2) On the toolbar, click the “ Make Active or Inactive” icon. The maintenance item icon in the outline will become blue for active and gray for inactive. Clicking the button will toggle back and forth. NOTE: MAKING A MAINTENANCE ITEM ACTIVE OR INACTIVE WILL AUTOMATICALLY MAKE ALL MRCS FOR THAT MAINTENANCE ITEM ACTIVE OR INACTIVE TO MATCH THE MAINTENANCE ITEM. c. Ability to add MRCs (Same as add cross MIP related MRCs) . Follow the MIP outline to the desired maintenance item and highlight the item. (1) On the toolbar, click the “ New MRC” icon. The add MRC wizard opens. (2) Click “ Next”. (3) Click the check box next to Check to se lect an MRC from the reference data. A check appears and the MIP Outline on the screen becomes active. (4) Follow the MIP Outline to the MRC to be added. Highlight the MRC and click “Next”. (5) Review the MRC details and make needed adjustments. Click “Next”. (6) Click “ Finish” and the MRC is added to the WC’s MIP Outline. NOTE: STEPS 4 AND 5 MAY BE SKIPPED BUT THE INDIVIDUAL BEING EVALUATED NEEDS TO MANUALLY ENTER ALL DETAILS OF THE MRC IN STEP 6.

p. 522

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-34 APPENDIX A d. Ability to modify the details of a maintenance item or MRCs. (1) Follow the MIP outline to the desired maintenance item or MRC and highlight the item. (2) Modify or add data in the white gr ids only on the right pane of the window. The maintenance item or MRC icon on the MIP outline and the grid that has changed becomes yellow. NOTE: “BOLD” TEXT INDICATES A STATUS CHANGE FOR THAT MRC. THE MRC SYSCOM CONTROL NUMBERS (MRC CODE) MAY NOT BE EDITED. IF A REVISED DOCUMENT IS RECEIVED BECAUSE OF AN FBR OR DIT REPLY, THE “ADD MRC” FUNCTIONALITY IS USED TO ADD THE DOCUMENT. 10. Ability to perform MRC lineout. NOTE: DHS MUST APPROVE LINEOUTS BEFORE THEY ARE PRINTED. a. From an open WC, click “ PMS Documents”. b. Expand the appropriate MIP folder and follow the path to the MRC. c. On the secondary toolbar, click “ Customize MRC”. The Customize MRC Document dialog box opens. d. Scroll through the MRC and double click and hi ghlight the procedure lines that are to be omitted. e. To remove a lineout, double cl ick the procedure line again. f. Type the notes to appear on the MRC in the Tools, Parts and Materials Custom Note field. Click “OK”. g. Your custom note is now part of the M RC and all the icons in the organizational outline become red. (Not yet approved.) 11. Ability to modify MRC line out justification. a. From an open WC, click the “ PMS Documents” button on the top of the screen. b. Expand the MIP for the MRC that needs changes. c. Expand the tree for that MIP to get to the list of MRC(s) under that MIP. d. Highlight the MRC th at needs modification. e. Click on the “ Pencil” icon on the top left-hand corner of the screen (this the “customize MRC” icon). f. A “Customize MRC Document” box will co me up containing the MRC selected. (1) Scroll through the MRC and click on the procedural step(s) that need(s) to be lined out. The affected procedural step will have a red line going through it. The red line indicates that the lineout has been performed but not yet approved. Lineouts approved by LCPO or higher turn the lineout from red to blue.

p. 523

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-35 APPENDIX A (2) In the Tools, Parts, and Materials Custom Note on the bottom, refer to the specific procedural step lined out and provide detailed justification for lineout (e.g., Step 1.a.(2)(a) – Step omitted per FBR 2025-18). (3) To reverse a lineout marked in red, click on the procedural step again. As long as the lineout is not yet approved, this will clear the lineout. 12. Ability to approve MRC lineout. a. “MY TASKS” displays MRCs that have custom review and omit line outs which require lineout for a WC in your role in the CoC. Since multiple users may belong to the same role in the CoC, only one of the user’s needs to approve the lineout to remove it from everyone’s list. Lineouts appear in red, indicating they are not yet approved. When approving or disapproving lineouts, the requirement is to approve All or None of the lineouts. Partial lineouts are not allowed. b. Expand the Lineout approval list. c. Highlight the desired row. d. Double click the row. The Approve Custom izations details screen displays for the selected item. e. On the “View Details” toolbar, click “ Approve and Close or Reject and Close”. The task is removed from your “My Task” list. 13. Ability to perform weekly closeout. a. From an open WC, on the “Tool bar”, click to open the WC menu. b. Scroll down to “Weekly Closeout” and clic k it. A window opens, if there are no issues in the WC to resolve, the “Close Out” icon at the top of the window will be active. c. Select it and the week will be closed out. d. If there are issues, they must be reso lved prior to the week being closed out. 14. Ability to acknowledge PMS Alerts. a. “MY TASKS” displays PMS Alerts for MRCs that are out of periodicity. When PMS cannot be accomplished before going out of periodicity, the WCS must provide a reason, which should be specific and include well-defined details. The CoC, from the LCPO to the 3MC sees the alerts displayed in their “MY TASKS” list. Only one user needs to acknowledge the alert to remove it from everyone’s list. b. On the secondary toolbar at th e top of the screen click on “Tasks”. c. Expand the PMS Alert list. d. Highlight the desired row, double clic k it, or on the tool bar select “VIEW DETAILS” icon. e. Click “ OK”.

p. 524

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-36 APPENDIX A NOTE: IF “CANCEL” IS SELEC TED, THE PMS ALERT IS NOT ACKNOWLEDGED AND THEREFORE NOT REMOVED FROM THE TASK LIST. 15. Ability to Reschedule Checks. Checks that are manually added or reschedule checks when the periodicity is weekly or greater. a. From an open WC in the grid, right click a check. A menu will open. b. Scroll down to the “ Reschedule” calendar icon and click it. c. A calendar opens with the origin ally scheduled date highlighted. d. Click the date the check is to be rescheduled. ( Only the white dates are available for the check to be rescheduled to.) e. Click “ Next”. Click “Finish”. NOTE: PER COMNAVIFOR 4790.1, A CHEC K NOTE MUST BE ENTERED FOR RESCHEDULED, OUT OF PERIODICITY, NON-ACCOMPLISHED CHECKS. 16. Ability to assign maintenance responsibilities. a. From an open WC, in Schedule display view. b. In the grid, click to highlight the desired check. c. On the “Toolbar”, click “ Assign Crew Member” icon, or right click the desired check and select “Assign Crew” from the menu. d. Under the column heading for Crew Member, click the drop-down arrow to view available crew members. e. Click the crewmember’s name. f. Click the small box to apply changes. A checkmark will appear in this box. g. Click “ OK”. 17. Ability to modify equipment associations. a. From an open WC, on the toolba r, click to open the WC menu. b. Select “ Edit Equipment Details”. c. Follow the MIP outline to the desired maintenance item and highlight the item. d. Click the ellipses button in the SHIP RI N or CDM RIN row, which is found in the white grids. A dialog box will open. Use the drop-down menus to locate criteria or enter search text. Click “GO”. Highlight the row of data needed. Click “OK”. e. Alternately, from the Revision Editor: f. Follow the MIP outline to the desired maintenance item and highlight the item. g. Click the ellipse button in the SHIP RI N or CDM RIN row, which is found in the white grids.

p. 525

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-37 APPENDIX A h. A dialog box will open. Use the drop-down me nus to locate criteria or enter search text. Click “GO”. Highlight the row of data needed. Click “OK”. 18. Ability to archive 13-weeks. NOTE: THIS IS PERFORMED ONLY BY THE 3MC. ALL WCS MUST BE UP TO DATE WITH THE LAST WEEK OF THE CURRENT QUARTER CLOSED OUT FOR THE QUARTER BEING ARCHIVED. WHEN THE 3MC ARCHIVES A QUARTER, A NEW QUARTER WILL BE CREATED. a. On the view tab bar, click “ ADMIN”. b. From the “Admin” drop down on the top of screen, click “Archive Quarter”. c. If any WC has not closed out a week in the quarter being archived, a message will appear, and the archive process will not be allowed to continue until close issues are resolved. 19. Ability to create an Event List. a. Local Event List. (1) Click on “Reports tab”. (2) Double click "Local Events" from the left-side menu. (3) Click “Next”. (4) Select your WC from the drop-down menu. Click “Next”. (5) Select your date ranges when prompted. Click “Next”. (6) Click "Finish" to run your report. b. Situational “ Event List”. (1) Click on “ Reports tab”. (2) Double click " Situational Events" from the left-side menu. Click “Next”. (3) Select your WC from the drop-down menu. Click “Next”. (4) Select your situational even t from the drop-down menu. Click “Next”. (5) Click " Finish" to run your report. 20. Ability to add checks to an Event List. a. Click “ Add Trigger” on the toolbar. A dialog box opens. b. Select a trigger from the menu. Use the scroll bar to view all selections. c. Click the date the trigger is to occur. The trigger icon now displays on the EVENTS calendar. 21. Ability to trigger a Local Event. a. From the Situational view, on the secondary toolbar, click “Events”. b. In the left pane, open the desired MIP outline.

p. 526

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-38 APPENDIX A c. Click to highlight the maintenance item. d. Click the “ADD TRIGGER” icon to launch the Add Trigger Wizard. e. From the list, highlight a trigger. Then select the date for the trigger to occur. f. Click “ OK”. 22. Ability to trigger a Global Event. NOTE: THIS IS PERFORME D ONLY BY THE 3MC. 23. Ability to generate an FBR. NOTE: THERE ARE SEVERA L WAYS TO CREATE AN FBR IN SKED 3.2. THE FOLLOWING IS JUST ONE WAY OF DOING IT. a. From an open WC, highlight a check from the grid. b. On the WC toolbar menu, scroll down to “ Submit Feedback Report” and click it. c. Select “ Technical MIP Changes or Technical MRC Changes”. d. The Feedback Report Wizard opens. e. Several choices will be available for your selection. Choose one. Click “Next”. f. Enter any additional comments. Click “ Next”. g. Your information will be displayed. If ch anges are required, click the back button, or click “Finish”. 24. Ability to review and approve an FBR. a. “My Tasks” displays FBRs aw aiting your review and approval. b. Expand the FBR list. c. Highlight the desired row. d. Double-click the row. The FBR Details block opens. e. The ability to view, approve, modify, ma ke urgent or reject the FBR is here. f. The LCPO, DIVO, and DH must review and sign the FBR before it goes to the 3MC. NOTE: THE 3MC CAN BYPA SS THE CoC IF REQUIRED TO GET THE FBR TRANSMITTED ASAP. 25. Ability to start a revision. NOTE: THE LCPO WILL PUT THE WC IN REVISION MODE FOR THE WCS. a. Open the WC, on the “Toolbar”. Click to open the “Work Center” menu. b. Scroll down to “ Start Revision” and click it. The Start Revision wizard opens. c. Click “ Next”. The Start Revision dialog box opens. d. Select the Revision Type. e. Enter a valid Revision Name. Click “ Next”.

p. 527

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-39 APPENDIX A f. Provide a revision reason. A reason for starting a revision for anything other than an FR is required. Click “OK”, then click “Finish”. g. The Revision editor will load. The evaluated individual should now be in Revision Editor Mode. 26. Ability to approve a revision. a. “MY TASKS” displays re visions ready for approval. b. Expand the revision approval list . Highlight the desired row. c. Double click the row. The Revision Edito r opens. Expand the path to the revision. d. On the toolbar, click “ Approve” (Star icon) e. The Revision Editor screen closes and is removed from your task list. 27. Ability to finalize a revision. a. Same as paragraph 26, except that if perf ormed by the DH or 3MC once they click on “Approve” (Star icon), the revision is finalized. b. Revisions should be approved (signed) by the LCPO and DIVO before being approved by the DH. When the DH goes in to approve the revision, they will see a window indicating whether the revision was approved by the LCPO and DIVO. The DH can choose to approve the revision regardless. 28. Ability to generate and view PMS Reports. a. Open the “REPORTS” tab at the bot tom right of the SKED 3.2 program. b. A window opens with two panes. The left-hand pane has all the reports available to view. The right-hand pane is blank. This is where your data will be displayed. c. Double click the report of your choice and follow the report wizard to display your requested data. 29. Able to add users. a. Select the Admin tab (Last tab on the lower right). b. Select User Manageme nt from the top menu. c. Click “ Add User” icon. The Edit User Details, New User dialog box opens. d. Enter pertinent information for the new user. e. Click the General, Feedback Reports, and Work Center tabs to check allowed permissions. 30. Ability to edit users. a. Select the Admin tab (Last tab on the lower right). b. Select User Manageme nt from the top menu. c. Highlight a crewmember from th e display grid, and double click it. d. The User Details box opens.

p. 528

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-40 APPENDIX A e. Update User information in the appropriate fields. f. Click “ OK” to save changes. 31. Ability to disable users. a. Select the Admin tab (Last tab on the lower right). b. Select User Manageme nt from the top menu. c. Highlight a crewmember from th e display grid, and double click it. d. The User Details box opens. e. Click the Status Field arrow. Select disabled. f. Click “ OK” to save changes. 32. Ability to view or modify the CoC. a. Select the Admin tab (Last tab on the lower right). b. Select chain of comm and from the top menu. c. A screen displays for the activity and lists the username, role, rate, last name, first name, and signature. d. Click the plus sign at the far left to view by department, division, and WC. e. Select the “ Edit Chain of Command” icon (top left corner, under File menu). An Edit CoC display box opens. Edit accordingly (add or delete) DH, DIVO, LCPO, or WCS.

p. 529

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-41 APPENDIX A APPENDIX A SECTION V-B MAINTENANCE DATA SYSTEM PROFICIENCY FACTOR (MPF) WORKSHEET

COMMAND DEPARTMENT DIVISION WORK CENTER DATE Individual Evaluated: 3-M Billet Assigned: Proficiency Required Proficie ncy Attribute Yes or No MP RPP O WC S LCPO DIV O DH 1 X X X X X X 3-M PQS Qualification completed. 2 X X X X X X Able to Log-on. CSMP ACTIONS 3 X X X X X X Display Work Candidate or Maintenance Action.

4 X X X X X Add Work Candidate or Maintenance Action.

5 X X X X X Change Work Candidate or Maintenance Action.

6 X X X X X Close Work Candidate or Maintenance Action.

CONFIGURATION MAINTENANCE ACTIONS 7 X X X X X X Display Equipment File or Configuration Item.

8 X X X Report Installation of Equipment. 9 X X X Report Modification of Equipment File (to include Validation and WC Change)

1 0 X X X Report Removal of Equipment.

p. 530

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-42 APPENDIX A SUPPLY REQUISITIONING 1 1 X X X X Order Maintenance Parts from Allowance Parts List (ONETOUCH)

1 2 X X X X Order Maintenance Parts not Listed (COSAL FBR)

1 3 X X X X Order Non-Maintenance Related Items (Open Purchase)

1 4 X X X X Review Parts Ordered Status (RSUPPLY, ONETOUCH)

1 5 X X X Execute Parts Approval. PRINT REPORTS 1 6 X X X Validation Aid Report. 1 7 X X X X X CSMP Reports with Parts Status. REVIEW AND APPROVAL 1 8 X X X X Review Work Candidate (Add, Mod, Complete).

1 9 X X X X Review Configuration Item (Add, Mod, Delete).

2 0 X X X X Review Work Related to Configuration Item.

TOTALS 7 12 19 20 20 9 Divide Total Yes by Proficiency Required totals for the billet held by the individual. Total Yes

MPF (%)

p. 531

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-43 APPENDIX A Comments:

SAT = 80% or better

p. 532

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-A-44 APPENDIX A APPENDIX A SECTION VI 3-M INSPECTION COMMAND TOTAL SCORE (CTS)

1. CNIF CTS = ((SCAR X .15) + (MAR X .10) + (SEER X .15) + (CLER X .10) + (SPF X .5)) + ((CVF X .40) + (MPF .5)) * For commands without a billeted or collateral duty 3MC: 2. CNIF CTS = ((SCAR X .20) + (MAR X .10) + (SEER X .20) + (SPF X .5)) + ((CVF X .40) + (MPF .5)) A minimum grade point of 80 is required for a passing score.

p. 533

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-B-1 APPENDIX B APPENDIX B DIVISION INACTIVE EQUIPMENT MAINTENANCE (IEM) PLAN

From: Division Leading Chief Petty Officer, To: Department Head,

Subj: Division Inactive Equipmen t Maintenance (IEM) Plan

Ref: (a) COMUSFLTFORCOMINST 4790.3

Encl: (1) Inactive Equipment Maintenance Plan Matrix

1. Per reference (a), the following systems or equipment will be placed in an IEM status in SKED while the command conducts.

2. Enclosure (1) lists all Systems and Equipment that this division will place in IEM for the upcoming maintenance period. This list was checked for accuracy and linked to the appropriate system or equipment restoration and key event. The IEM Plan is considered a living document; reviews will occur when key events timelines change.

3. A current copy of this plan will be provided to the command 3MC and be made available to the LMA, CTE, and Project Superintendent.

//SIGNATURE// I.M. CHIEF

5. I concur with placing the Systems or Equipment identified in Encl (1) in an IEM Status.

// SIGNATURE// Department Head

p. 534

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-B-2 APPENDIX B

Enclosure (1)

System or Equipment MIP CAT 1 / 2 LU PM SU/OT Due MRs Restoration Key Event Estimated Restoration Date #1 Burner 5151/902 1 LU- 3 LU- 4 PM- 1 PM- 2 SU-2 SU-3 OT-1 A-8 43 Ventilation Restore 12/25/16

p. 535

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 NOV 2023 VI-19-3-C-1 APPENDIX C APPENDIX C FORMAT FOR REPORTING 3-M INSPECTIONS

4790 Ser Date From: Accomplishing Activity To: Commanding Officer (Command Name) Subj: REPORT OF 3-M INSPECTION OF Ref: (a) NAVSEAINST 4790.8; Ships’ Mainte nance and Material Management (3-M) Manual (b) COMUSFLTFORCOMINST 4790.3; Jo int Fleet Maintenance Manual, Volume VI, Chapter 19 Encl: (1) (as required) 1. Per references (a) and (b), a 3-M Inspection of (__________________________) was conducted during the period (Date) to (Date). 2. During this inspection, the following signi ficant deficiencies were discovered: a. (List) by enclosure Specific department and WC deficiencies are provided in enclosure(s) (1) through ( ). 3. The following overall activity or departme nt numerical assessments are assigned: a. 3-M Total Score __________________ b. 3-M Inspection __________________ (Above, At or Below Standards)

Copy to: Immediate Superior In Command (with enclosures) Type Commander (with enclosures)

p. 536

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-1 VOLUME VI CHAPTER 19-4 NAVAL INSTALLATIONS COMMAND REFERENCES. (a) OPNAVINST 4790.4 - Ships Maintenance a nd Material Management System Policy (b) NAVSEAINST 4790.8 - Ships’ Maintena nce and Material Management (3-M) Manual (c) NAVEDTRA 43241 - Personnel Qualification Standard for Ship’s Maintenance and Material Management (3-M) System LIST OF APPENDICES. A Inspection Criteria B Division Inactive Equipment Maintenance (IEM) Plan C Format for Reporting 3-M Inspections 19-4.1 ROLES and RESPONSIBILITIES. a. Type Commander. The Type Co mmander (TYCOM) exercises primary responsibility for the effective operation and support of the Maintenance and Material Management (3-M) System. Areas of responsibility include but are not limited to the following: (1) Ashore Maintenance Data System (MDS). (a) Maintenance Figure of Merit family of systems. (b) Maintenance Data Analysis Tool. (2) Planned Maintenance System (P MS) Scheduling (SKED) software. (3) Configuration Data Managers Databa se - Open Architecture (CDMD-OA). (4) Current Shore Maintenance Project (CSMP). (5) The screening and processi ng of feedback reports (FBR). (6) Maintaining an inspection data file per paragraph 19-4.4.2.f of this chapter. (7) Ensuring units are manned with Navy Enlisted Classification (NEC) qualified 3-M Coordinator (3MC) (as required). (8) Analyzing 3-M inspection and self -assessment data, identifying common concerns, conducting problem root cause analysis with the development and implementation of solutions. (9) Ensuring TYCOM inspection team memb ers are qualified to inspect assigned areas.

CHAPTER 19-4

p. 537

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-2 b. TYCOM 3-M Team. The 3-M team consists of representatives from Port Operations (N31), Air Operations (N32), and Force Protection (N34). This team is responsible for: (1) Assisting and advising Commander Naval Installations Command (CNIC) commands in administration of the 3-M System. (2) Conducting reviews of PMS f eedback reports and responses. (3) Conducting 3-M System trai ning, assists and inspections. (4) Monitoring overall implementation a nd effectiveness of the 3-M System. (5) Review of self-assessment results to identify trends and provide prompt support to stations as required. (6) Maintaining liaison with Commander, U.S. Fleet Forces Command, Naval Sea Logistics Centers (NSLC) and other commands on 3-M matters. c. Immediate Superior In Command an d Regional Commander. The Immediate Superior In Command (ISIC) and Regional Commander are responsible for the routine monitoring and evaluation of the 3-M System for all assigned activities. Areas of responsibility include but are not limited to the following: (1) Monitoring and evaluating 3-M Program for all assigned units in accordance with reference (a) and (b). (2) Ensuring 3-M Inspections (3MI) are current. (3) Ensuring subordinate commands c onduct rigorous quarterly 3-M Self- Assessments and report results to the TYCOM 3-M team. (4) Monitoring the status of troubled systems using the quarterly 3-M Self- Assessment. (5) Ensuring subordinate commands comply with standard Work Center (WC), division and department structure. (6) Tracking and monitoring 3-M majo r milestones, training events, and conducting 3-M Spot Checks during ISIC or staff visits. d. Commanding Officer or Of ficer In Charge. The Commanding Officer (CO) or Officer In Charge is responsible for establishing an aggressive Self-Assessment Program that validates the administration and execution of maintenance and detects improperly conducted maintenance or falsely reported accomplishments. The designate the 3MC in writing as the primary duty of an officer, Chief Petty Officer (CPO) or Petty Officer First Class (who has been assigned a secondary Navy Enlisted Classification (NEC) of 9517). As an exception to this policy, commands not having

p. 538

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-3 an allowance for a 3MC will assign these duties in writing as the most significant collateral duty of an appropriately qualified officer, CPO or Petty Officer First Class. e. Executive Officer. The Executive Officer (XO) is the command’s 3-M System Manager responsible to the CO for the overall management of the 3-M Program. The XO will: (1) Chair quarterly 3-M System meetings with Department Heads (DH) and the 3MC. (2) Brief the CO on the status of 3-M. (3) Ensure personnel receive adequate and effective 3-M System training. (4) Ensure the effectiveness of the command’s 3-M Self-Assessment Program. f. Command Master Chief. The Command Master Chief (CMC) will: (1) Attend the XO’s quarterly 3-M System meetings providing senior enlisted feedback. (2) Conduct PMS Spot Checks following the command’s policy to ensure required maintenance is being properly performed and documented. g. Command 3-M Coordinator. The 3MC will: (1) Serve as the key 3-M System assistant to the XO. (2) Maintain a file of 3-M System directives, newsletters, notes, and correspondence containing current 3-M Program information and ensure distribution to WC personnel. (3) Maintain copies of the current Force Revision (FR) NAVY PMS Digital Video Disk (DVD), List of Effective Pages (LOEP) for every WC, changes issued between FRs in their original format and classified Maintenance Requirement Cards (MRCs). Digital copies are allowed unless there have been changes between FRs. (4) Advise, monitor, and assist DHs, Di vision Officers (DIVOs), Leading Chief Petty Officers (LCPOs) and Work Center Supervisors (WCS) in matters concerning the 3-M System. (5) Monitor the 3-M Personnel Qualif ication Standard (PQS) Program and maintain an auditable record of personnel qualified in 3-M PQS. (6) Maintain a master accountability log of all PMS changes. (7) Develop and maintain a Split Ma intenance Index Page (MIP) Log. (8) Administer the configur ation management program. (9) Supervise the command’s 3-M Se lf-Assessment Program and provide a weekly status to the XO. (10) Develop and administer the PMS Spot Check Program.

p. 539

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-4 (11) Generate a weekly PMS Spot Check assignment matrix for officers, CPOs, and designated supervisory personnel. (12) Ensure corrective actions are take n on all unsatisfactory PMS Spot Checks and report same to the XO as part of weekly PMS reporting. (13) Ensure a complete back up of the SKED system is made on removable media (e.g., DVD or CD-ROM) following completion of the FR update and retain as part of the PMS Master File. (14) Ensure two complete backups of the SKED database are produced weekly and saved in two separate locations (e.g., local hard drive, share drive). (15) Ensure situational requirements ar e triggered in SKED and completed based on unit events. (16) Ensure that Triggers are pr operly set at the command level. (17) Screen all FBRs, verify content, va lidity, serialize and forward within seven days of origination. (18) Maintain accountability of all submitted FBRs and actions taken until corrected or new PMS documentation is received. (19) Ensure the FBR originator and all ap plicable WCs are apprised of action taken and that changes or corrections are implemented when received. (20) Ensure 3-M documents such as Maintenance Action Form OPNAV 4790/2K, Configuration Change Forms OPNAV 4790/CK, etc. that require forwarding to a data processing activity are forwarded within seven days of origination or as operationally feasible. (21) Ensure 3-M documents returned fo r the correction of data are promptly revised and resubmitted. h. Department Head. The DH is responsibl e to the XO for the operation and execution of the 3-M System within the department. Delegating review and approval authority will not relieve the DH of his or her duties and responsibilities in maintaining an effective 3-M Program. The DH will: (1) Ensure departmental 3-M assistant, DIVOs, LCPOs and WCSs are qualified in accordance with reference (c) and designated in writing as applicable. (2) Ensure maintenance is prioritiz ed to facilitate accomplishment. (3) Review and approve all depart ment PMS schedules and revisions. (4) Review maintenance action annotations. (5) Implement a Self-Assessment Program within the department to validate properly accomplished and reported maintenance. (6) Take corrective action on all “Unsatis factory” PMS Spot Checks and report to the XO via 3MC as part of weekly PMS reporting. (7) Ensure all material deficiencies are documented and promptly reported.

p. 540

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-5 (8) Review and verify the content and va lidity of all FBRs, digitally sign FBRs within five days of origination. (9) Ensure the Configuration Manage ment Database accurately reflects equipment changes whether the action is performed by command personnel or outside activities. (10) Authorize placement of equipment in to an Inactive Equipment Maintenance (IEM) status, ensure PMS scheduling is annotated accordingly. (11) Review and approve department work candidates within four days of creation; ensure completeness, accuracy, and the correct assignment of priority. (12) Review all work candidates in the departmental CSMP every 90 days. (13) Ensure that no classified da ta is reflected on 3-M documents. (14) Conduct quarterly meetings with DIVOs, LCPOs and WCSs and provide status of departmental 3-M System to the XO. i. Department Leading Chief Petty Officer or Departmental 3M Assistant. The department LCPO is responsible for the proper operation of the 3-M System within their department. The department LCPO will: (1) Provide 3-M System guidance and training to DIVOs and division LCPOs within their department. (2) Participate in quarterly Self-Assessments. (3) Ensure the proper testing and inspec tion of work done by outside activities prior to job acceptance. j. Division Officer. The DIVO is resp onsible to the DH for the execution of maintenance within the division. The DIVO will: (1) Ensure all PMS scheduling changes ha ve been properly annotated and applied prior to DH review and finalization. (2) Review the 13-Week Accountability Log at the beginning of the PMS week and sign at the end of the week if not using electronic accountability in SKED or when SKED is not available. (3) Review and verify the content and valid ity of PMS FBRs within three days of origination. (4) Ensure 3-M documents generated with in the division are complete, accurate and promptly submitted to the DH. (5) Conduct 3-M Self-Assessments as directed by the command’s policy. (6) Provide weekly updates to the DH con cerning the status of the 3-M System within the division. (7) Incorporate 3-M System training into the Divisional Training Plan. (8) Ensure divisional personnel are pr operly trained and qualified to conduct maintenance.

p. 541

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-6 (9) Review divisional work candidates a nd the CSMP for validity and accuracy. (10) Conduct monthly briefings for the DH on the status of all work candidates. (11) Acknowledge PMS Alerts. k. Division Leading Chief Petty Officer. Th e division LCPO is responsible for the proper operation of the 3-M System within their division. The division LCPO will: (1) Supervise WCSs in the execution of daily maintenance. (2) Ensure WCSs are properly trained, equipped and are knowledgeable of all WC divisional equipment maintenance requirements. (3) Verify all divisional WC equipment is covered by PMS. (4) Ensure PMS is properly scheduled and conducted, including all special evolution situational “R” checks. (5) Review WC PMS records (e.g., FRs, Advanced Change Notices (ACN) and PMS FBRs and Responses), approve all lineouts and additions on the LOEP, MIP, and PMS schedules prior to DIVO and DH reviews. Ensure proper justification is noted on each lineout. (6) Review and approve non-applicable procedural steps lined-out on MRCs. (7) Review and sign the 13-Week Accountab ility Log at the end of the PMS week and ensure checks added that week are hand-written into the blank accountability log (if not using electronic accountability in SKED or when SKED is not available). (8) Review the PMS Scheduling Forecasti ng Report to ensure that all Tools, Parts, Material and Test Equipment (TPMTE) are available to support upcoming maintenance actions. (9) Provide the DIVO a weekly status of the division’s Self-Assessment Program, CSMP and PMS. (10) Ensure the Configuration Mana gement Database reflects current configuration. (11) Ensure FBRs are submitted reques ting LOEP changes to reflect system, equipment and component installs or removals. (12) Review and verify the content and va lidity of PMS FBRs within two days of origination. (13) Ensure the divisional CSMP accu rately reflects material conditions. (14) Review and approve work candidates, act as the second point of contact for work candidates and provide the DIVO a weekly brief on the status of all work candidates in the CSMP. (15) Ensure proper testi ng and inspection of work done by outside activities prior to job acceptance. (16) Coordinate repair activ ities within the division.

p. 542

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-7 (17) Review all quarterly Self-Assessmen ts and promptly correct discrepancies found within the division. (18) Review, approve, and close out weekly schedules. This closeout of the previous week’s schedules must occur on the first day of the following week (i.e., Monday). (19) Review Check Notes for required and updated information. (20) Write PMS Alert details to include why planning allowed loss of periodicity and the plan to complete PMS. l. Work Center Supervisor. The WCS will be a Senior Petty Officer assigned to the WC and qualified per reference (c) or civilian equivalent. The WCS will: (1) Maintain a detailed working knowledge of all equipment deficiencies within the WC. Record all equipment deficiencies within their WC, utilizing AWN or authorized equivalent to ensure all required 3-M System documents are submitted to the division LCPO. (2) Ensure WC personnel have complete d 3-M PQS training commensurate with position held. (3) Ensure PMS covers all maintenance worthy equipment in the WC. (4) Maintain an accurate and current LOEP. (5) Ensure 3-M System WC files and pu blications are complete, current, and available to WC personnel. (6) Ensure WC initiated 3-M documentation is correct, legible, promptly prepared and submitted. (7) Maintain a 13-Week Accountability Log containing the current and previous 13-Week Log if not using electronic accountability in SKED or when SKED is not available. (8) Prepare weekly WC schedule, obtai n required approval, assign maintenance personnel, and update schedule to reflect status. (9) Ensure equipment changes, adds and removals are reflected in the Configuration Management Database and, if not, report via 4790/CK to the Configuration Data Manager (CDM). (10) Ensure FBRs are submitted whenever: (a) Maintenance requirements are not fully understood. (b) Errors are believed to exist. (c) Entries in the TPMTE block are wrong or inadequate. (d) Additional coverage is needed. (e) Performance of the maintenance requirement would cause a hazardous condition to exist.

p. 543

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-8 (11) Ensure prompt reporting of all material deficiencies and completed maintenance actions. (12) Ensure test and measurement equi pment or other portable support equipment is delivered for test or calibration as scheduled. (13) Ensure the DIVO and division LCPO or LPO are advised of all 3-M System activity within the WC. (14) Spot check completed equipment file validations. Ensure accuracy of the information and PMS scheduling equipment associations. (15) Review the PMS Scheduling Forecasti ng Report to ensure that all TPMTE is available to support upcoming maintenance actions. (16) Ensure all WC weekly schedules are updated daily. (17) Use the Edit Equipment Details f unction of SKED to the maximum extent possible to associate maintenance items to the CDMD-OA database embedded in SKED 3.2 for configuration items. The association should be made to the highest level (piece) of the applicable equipment being maintained (i.e., #1 Torpedo Tube vice the Slide Valve). m. Maintenance Personnel. Maintenance personnel will perform all PMS as assigned utilizing PMS documents in SKED and ensure Check Notes contain amplifying information and tag-out identifiers as required. Maintenance personnel will: (1) Perform assigned maintenance. (2) Notify the WCS when: (a) An MRC is not fully understood, ap pears to be incorrect or cannot be accomplished as written. (b) There are issues with the TPMTE block of the MRC. (c) The technician has doubts concerning his or her ability to perform the maintenance. (d) Equipment deficiencies or casualties are discovered. (e) Factors exist which would make performance of the maintenance unwise or dangerous. (3) Initiate FBRs when discrepancies ar e discovered during the performance of an MRC. (4) Inform the WCS when planned main tenance requirements are complete. (5) Annotate PMS schedule to reflec t accomplishment of maintenance. (6) Sign 13-Week Accountability Log (if not using electronic accountability in SKED or when SKED is not available).

p. 544

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-9 19-4.2 QUALIFICATIONS. All personnel assigned to billets associated with the 3-M System must be 3-M PQS qualified for the assigned billet per reference (c) and Table 19-4-1. a. Evidence of qualification in support of 3- M requirements must be maintained by the command in an auditable fashion. b. Personnel checking into the command w ith a 3-M qualification obtained from a previous command may be required to re-qualify. They may re-qualify directly to the highest level previously obtained and they do not have to re-qualify at lower levels. Table 19-4-1 - Required PQS Qualifications 3-M Coordinator PQS-307 Departmental 3-M Assistant PQS-305 Department Head PQS-306 Department LCPO PQS-305 Division Officer PQS-304 Division LCPO PQS-304 Work Center Supervisor PQS-303 Repair Parts Petty Officer PQS-302 or RPPO Continuing Training and Qualifications Software Maintenance Personnel PQS-301 19-4.3 PLANNED MAINTENANCE 19-4.3.1 Minimum Standards. MRC accomplishment is critical for maintaining equipment in a ready state and achieving expected service life. The maintenance tasks directed by MRCs are the minimum standards for organizational (activity) planned maintenance and therefore equipment degradation can be assumed if maintenance is deferred. The following provisions are provided to maximize on time performance of PMS and provide increased fleet latitude in maintaining equipment. a. MRCs are prepared as instructions to complete a maintenance task based upon the premise that the personnel assigned to perform the task have sufficient knowledge of the rate listed on the card and are qualified to perform maintenance as directed by the MRC. The MRC will be accomplished in sequential order, adhering to all Warnings, Cautions and Notes. Routine sub-steps (e.g., fastener removal, steps to don and remove personnel protective equipment, turning on a vacuum) may or may not be included in the MRC and their absence should not prevent the maintainer from completing the maintenance task. b. Per Naval Sea Systems Command (NAVSEA), procedures are written at a level of detail based on the assumption maintenance personnel are trained, qualified, and supervised by experienced leadership to execute the maintenance consistently and expertly. They exist to provide a common standard, specify acceptance criteria,

p. 545

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-10 communicate warnings, and cautions specific to the maintenance and provide proven maintenance practices. They are not intended to: (1) Supplement or duplicate rules and pr ocedures that must be followed for hazards generally associated with the equipment (Hazardous Material Handling, Electrical Shock Risk Management, etc.) but not specifically associated with a step of the procedure. (2) Identify every process and every wa rning associated with the maintenance environment of the component being maintained (aloft, in tanks, near an active flight deck, in a heat stress area, etc.) (3) Specify every possible action of the maintainer. c. Leadership will uphold standards for comply ing with maintenance procedures. This standard does not mean the maintainer is expected to robotically follow the MRC word-by-word. Leadership, trainers, monitors, auditors, and inspectors should not expect it. The key word here is intent. The objective is to perform the intent of each step (not necessarily step-by-step performance). d. If a step is missing that is necessary to complete the task, and that step is not obvious to the Maintenance Person (MP), an FBR should be submitted. e. MRC completion status is dependent on the accomplishment of all procedural steps on all the equipment listed on the MRC or its accompanying Equipment Guide List or items listed on the Location Guide List (LGL) section of the MRC. f. The performance of additional rational ac tions during the accomplishment of an MRC is authorized. Examples of such actions include turning on and off items utilized during the performance of the MRC (vacuum cleaners, test equipment, etc.) and general housekeeping (cleaning up or containing spilled fluids or dirt). g. The substitution of any tools, materials or test equipment not held by the activity should be considered prior to deciding to defer the maintenance until the exact tools, materials or test equipment listed on the MRC are procured. This is especially critical for frequently required maintenance where several performance cycles can be missed while waiting for supply to provide the correct items. Substitution requirements are provided by reference (b) and other technical documents. 19-4.3.2 Functional Components. a. PMS Master File. The Master File, maintained by the units 3MC, contains information relative to PMS requirements that are specific to equipment for which the command is responsible. The Master File provides for duplicate issue of missing MIPs and MRCs, contains supplementary information provided by NSLC Detachments Norfolk or San Diego and serves as a repository for changes received between FR distributions, which must be retained on file until the changes are reflected in a subsequent FR. Master File content is delineated in appendix A, section I-B the Command Level Effectiveness Review (CLER). b. Work Center PMS File. The WC File provides a ready reference of planned maintenance requirements and information to be retained in the working area for use

p. 546

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-11 by the WCS and maintenance personnel. The WC File contains only the documents and information applicable to a specific WC. The content of the WC File is delineated in appendix A section I-A, Scheduling and Execution Effectiveness Review (SEER). c. PMS Administrative Requirements. In lie u of a WC or a Master File the following should be retained: (1) Work Center (a) Current locally generated LOEP and MRCs. (b) Current Tailored Force Revision reports. (2) 3-M Coordinator (a) SKED 3.2 Help file. (b) Split MIP Tracking Log (updated to current FR). (c) Applicable 3-M instructions (Activity, ISIC, or TYCOM). (d) Current 3-M messages and guidance. (e) Current 3MC Tailored Force Revision (TFR) Reports. (f) Master classified MRCs. (g) Current SKED Database back- up files on DVD or CD-ROM and an Excel spread sheet from the SKED report Checks and Maintenance Outlook Report of all WCs, for the current and next future quarter. (3) 3-M Program short and long range training plan approved by the XO. (4) The following post-quarter SKED reports will be generated by the 3MC and forwarded to the ISIC by the third Monday of the quarter as conditions permit. These reports will be analyzed and electronically routed through the applicable DH to the XO. These reports will be retained as objective quality evidence, by the 3MC for four quarters. (a) PMS Analysis Spreadsheet. (b) Spot Checks – Passed & Failed Reports. d. Interim MRC Procedures. The activity ma y develop interim MRC procedures based on experience and applicable technical manuals in support of equipment or systems without PMS coverage until formal documentation is received. Before scheduling preliminary MIP requirements, the WCS and the DH must verify their applicability to installed equipment. e. Weekly Status Report. The weekly PMS monitoring status reports will be retained, electronically if desired, by the 3MC for six months. These reports from the 3MC to the XO will contain, as a minimum: (1) Completed Spot-Check a nd Monitored MRC results. (2) Completed WC audits and results.

p. 547

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-12 (3) The number of FBRs over seven days ol d that have not been reviewed by the Chain of Command (CoC). (4) Abatement and corrective actions comp leted because of a monitoring program finding. (5) IEM Details Summary Report. (6) Overdue (Alerting) MRCs a nd plan of corrective action. f. Change Service Accountability Log. The Change Service Accountability Log (CSAL) (Figure 19-4-1) provides a definitive record of all changes to a command’s 3- M Program. Whenever a change to a command’s 3-M Program is directed, be it from an FR, FBR, ISIC direction, etc., the change will be routed to the concerned WCS(s) via a memorandum. Whenever such a memorandum is issued, it must be recorded in the CSAL. Once the WCS reports the directed change has been completed, the 3MC will file the WCS’s response and annotate the CSAL that the action is complete. (1) The CSAL is comprised of the actual l og sheet, a copy of all memos routed to the WCS and the memo from the WCS to the 3MC indicating completion. (2) The importance of the CSAL cannot be overstated. In essence, it provides for a day-to-day, year-to-year record of changes to a command’s planned maintenance program. It is also a turnover document at deployment sites, allowing a current command to quickly identify all changes from a previous command. Finally, it will be inspected during all command 3-M assessments and inspections, providing visibility as to how well a command manages 3-M from one inspection to another.

p. 548

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-13

Figure 19-4-1 - Change Service Accountability Log FR Change Number or Authority Date RCVD Cognizant Dept. or WC Date Cover Sheet Issued Date Cover Sheet Returned Date Master File Updated or Item Closed Summary of Change

p. 549

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-14 19-4.3.3 Related Maintenance. Related maintenance, so designated by the ISEA or Technical Warrant Holder, is determined from the MIP. The “RELATED MAINT” column of the MIP reflects related maintenance requirements. Related requirements are positioned on the MIP to line up directly across from the MRC to which they are related. Related maintenance requirements are also identified in the TPMTE section of the MRC under “MISCELLANEOUS”. NOTE: MANDATORY RELATED REQUIREMENTS MUST BE LINKED IN SKED TO BE AUTOMATICALLY SCHEDULED. a. Related Maintenance Categories. (1) Mandatory Related. Mandatory relate d maintenance requirements are those maintenance actions that must be accomplished concurrently with another maintenance requirement. The mandatory relationship is indicated with the use of the # sign. If the mandatory related maintenance resides on the same MIP, it will be reflected in the “RELATED MAINT” column as “periodicity#” (e.g., M-3#). If the related maintenance resides on another MIP, it will be reflected as “MIP:Periodicity#” (e.g., IC-013/033:M-4#). Mandatory related maintenance requirements are automatically scheduled by SKED. (2) Convenience Related. Convenience related maintenance requirements are those maintenance actions that can be accomplished concurrently with another maintenance requirement to save time, such as preliminary steps and tag-outs already accomplished, or for work force considerations. If the convenience related maintenance resides on the same MIP, it will be reflected in the “RELATED MAINT” column as “periodicity” (e.g., M-5). If the related maintenance resides on another MIP, it will be reflected as “MIP:Periodicity” (e.g., EL-010/001:M-4)). In both cases, the # symbol is omitted. The WCS manually schedules convenience related requirements. (3) Conditional Related. Conditional related maintenance requirements are those maintenance actions that are performed when specific conditions are present or specified parameters are not met on the referencing MRC. Conditional related maintenance will appear on the MIP in the same manner as convenience related maintenance. The WCS manually schedules conditional related requirements. (4) None. No related maintenance is reflected as “None” in the “RELATED MAINT” column. b. Work Center Supervisor Actions. WCSs ar e encouraged to review their schedules on a regular basis for opportunities to perform other PMS when an equipment or system has maintenance actions scheduled. Rescheduling of PMS to take advantage of other system maintenance (convenience related) is highly recommended. (1) If an MRC has related maintenance from another MIP, review the related MIP and MRC and determine if it requires assistance from another WC.

p. 550

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-15 (2) If the related MIP and MRC does not require assistance from another WC and is not on the lead WC LOEP, submit an FBR to have it added to the LOEP. (3) If the related MIP and MRC requi res assistance or completion by another WC and is mandatory, convenience or conditional related then it should also be on the lead WC LOEP. If it is not on the lead WC LOEP, submit an FBR to have it added to the LOEP. If the related MRC requires technical assistance, a special NEC, or another rating, that is not part of the lead WC, then the person with the technical training, special NEC or required rating should be temporarily added to the lead WC “Crew List” and assigned the related maintenance in either an assist or performance role. All WCSs involved will collaboratively plan the required maintenance and may adjust schedules based upon individual workload. When the maintenance is completed, the lead WCS will mark the MRC as completed. 19-4.3.4 Inactive Equipment Maintenance. a. Inactive Equipment. A piece of equipm ent or system intentionally placed in a hibernated state for a specific period with the intention of reactivating that equipment or system at the end of that period. (1) Status I. Equipment that will: (a) Remain onboard. (b) Is not scheduled for corrective maintenance or overhaul. or (c) Will be inactive during extended shutdown periods and maintenance availabilities as determined by the DH. (2) Status II. Equipment that is inactive and: (a) Subject to corrective maintenan ce, overhaul, or removal for safe storage. or (b) Temporarily transferred to another activity for maintenance responsibility for extended shutdown periods as determined by the DH. (c) When system(s) components are scheduled for replacement. b. Implementation and Responsibility. Wh ile inactive, minimum maintenance is performed to ensure the success of the reactivation. The IEM section of the MIP will cover this maintenance. However, consideration should also be given to active PMS maintenance checks (e.g., M-1, Q-1, A-1) that can be manually added and performed during this period of inactivity. (1) The activity will develop an IEM plan for all inactive equipment. The plan will include reason for inactivation, and duration. DH approval of this plan will be documented in the “SKED IEM” remarks. Use Appendix (B)

p. 551

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-16 (2) To implement procedures for the accomplishment of PMS for equipment declared in an inactive status, current PMS schedules are modified to annotate the requirements listed in the IEM section of the MIP. For advance planning and scheduling of maintenance to take place, it is necessary to determine and identify the extent to which unit personnel will conduct PMS during an inactive period. MIPs in each WC will be reviewed to determine if equipment has IEM coverage (e.g., Lay-up (LU), Periodic Maintenance (PM), Start-up (SU) and Operational Test (OT)), if the coverage is adequate, and what procedures to follow if there is no IEM coverage on the MIP in question or provided coverage appears inadequate. The Department Head is responsible for determining equipment IEM status. When placing a system or equipment in IEM status, the DH will also determine the IEM start date to be reflected in SKED. The IEM end date will not be applied in SKED until the system or equipment is ready to be brought out of IEM status. All periodic PMS scheduled at the end of IEM should be reviewed for applicability, with applicable maintenance accomplished prior to operating equipment. (3) IEM procedures are listed on MIPs and separated from operational PMS by a horizontal line. The IEM section is titled “Inactive Equipment Maintenance” and is prefaced by the following statement: “The following requirements will be scheduled when equipment is inactivated for periods of prolonged idleness.” When there are no IEM requirements the words “None required” will appear under the IEM section of the MIP. When IEM procedures are inadequate, submit an FBR. The unit should consider all factors that affect equipment deterioration and take necessary precautionary measures. These factors include environmental conditions, equipment location, susceptibility to damage or other factors that cannot be anticipated when IEM procedures were originally developed by the cognizant ISEA or design activity. (4) The lack of IEM requirements on a MI P does not prohibit placing that system or equipment into an inactive state. Additionally, certain locations require precautions and maintenance not required force-wide. The unit should consider all factors that affect equipment deterioration and take necessary precautionary measures. The WCS or LCPO is responsible for identifying factors that are inadequate and may require additional preparation and maintenance of the inactive equipment while reporting same to the DH for approval. Factors may include environmental conditions, equipment location or susceptibility to damage. For those actions that are recurring in nature, the WCS should submit an FBR for possible MRC development. c. IEM Scheduling. SKED provides the capability to perform IEM scheduling. (1) Status I. The scheduling of main tenance for Status I inactive equipment utilizes conventional PMS scheduling techniques. LU checks will automatically be added to the schedule at the beginning of IEM by SKED. PM checks will be manually added to the schedule by the WCS for the period of IEM following the guidelines of the MIP. At the conclusion of IEM, SU checks and routine PMS will automatically be added to the schedule by

p. 552

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-17 SKED. SU checks must be accomplished the week IEM ends. All periodic checks added at the end of IEM, can be moved to the right, not to exceed the allowable date range. Since the MRC date range cannot be applied to the left (into the IEM period), the MRC date range can only be moved to the right and therefore only the plus value of the specific range, i.e., the date range for a monthly is 21-41 days. The requirement can only be moved (scheduled) ten days to the right and will not go into “alert” until after the tenth day. This allows the MP or WCS scheduling flexibility within the plus side of the date range of the MRC. (2) Status II. The scheduling of mainte nance for Status II inactive equipment utilizes conventional PMS scheduling techniques, however, not all scheduled IEM PMS may need to be accomplished by activity personnel. LU checks will automatically be added to the schedule at the beginning of IEM by SKED and may be marked “NA” if the LU check did not support the equipment being removed from the activity or “Accomplished by Higher Authority” symbol if completed by the intermediate or depot level maintenance activity. PM checks may be required to be schedule during the IEM period. At the conclusion of IEM, SU checks and routine PMS will automatically be added to the schedule by SKED. SU checks must be accomplished the week IEM ends and may be marked with the “Accomplished by Higher Authority” symbol if they were completed by the intermediate or depot level maintenance activity. Routine PMS added at the end of IEM may also be marked with the “Accomplished by Higher Authority” symbol if they were completed by the intermediate or depot level maintenance activity. All periodic checks added at the end of IEM, can be moved to the right, not to exceed the allowable date range. Since the MRC date range cannot be applied to the left (into the IEM period), the MRC date range can only be moved to the right and therefore only the plus value of the specific range, i.e., the date range for a monthly is 21-41 days. The requirement can only be moved (scheduled) ten days to the right and will not go into “alert” until after the tenth day. This allows the MP or WCS scheduling flexibility within the plus side of the date range of the MRC. NOTE: WHERE THE GOAL OF 100 % ACCOMPLISHMENT CANNOT BE REACHED, THE UNIT’S CoC MUST BE KEPT INFORMED OF THE CIRCUMSTANCES THAT PREVENT ACCOMPLISHMENT OF SCHEDULED MAINTENANCE. 19-4.3.5 Scheduling. PMS is a portion of the command’s 3-M Program that provides, in one authoritative system, the scheduling information and technical procedures governing planned maintenance. PMS provides a simple method for scheduling and documenting the execution of planned maintenance procedures. Fleet policy and scope are listed in Chapter 19 of this volume. a. Situational maintenance scheduling will be managed utilizing the tools provided by the computer based PMS scheduling software employed by the activity. All event driven situational requirements will be “triggered” when required and performed per reference (a).

p. 553

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-18 b. The MP will be assigned prior to comme ncing the week and must complete the maintenance as directed. If a different person is required, the WCS will reassign the PMS accordingly. c. Check Notes are required in SKED under the following circumstances. (1) When PMS is marked as “lost”. (2) When PMS is marked as not-applicable. (3) When PMS is marked with the ‘¢ ’ symbol, “satisfied by Higher Level Maintenance.” (4) When PMS requires a tag-out, the tag-out program of record identifier will be entered. d. After the FR is approved, the 3MC will conduct quarter archival to maintain one completed quarter, one current quarter, and at least four future quarters. This permits the ability to review past records and forecasting of upcoming maintenance actions. 19-4.3.6 SKED. The use of SKED version 3.2 or subsequent versions for PMS scheduling constitutes full compliance with all administrative provisions of the 3-M Manual. a. Guidance for use of SKED is provided vi a the SKED users guide with help menus, and wizards associated with SKED functionality. b. The Navy PMS DVD or CD-ROM is used to update the command or unit’s SKED PMS data c. The SKED program uses days to schedule and keep track of calendar periodicities. MRCs are displayed as out of periodicity when they fall outside the established date ranges in the SKED program. These date ranges are as reflected in Table 19-4-2.

Table 19-4-2 - SKED Periodicity – Date Ranges Periodicity Date Range Daily None 2D None 3D None Weekly None 2W 9 - 19 days 3W 14 - 28 days Monthly 21 - 41 days 2M 41 - 83 days Quarterly 61 - 121 days 4M 83 - 165 days

p. 554

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-19 Table 19-4-2 - SKED Periodicity – Date Ranges Periodicity Date Range Semi-Annually 121 - 243 days 8M 165 - 331 days 9M + or - 90 days from scheduled date Annual + or - 90 days from scheduled date Multi-month after annual + or - 90 days from scheduled date 19-4.3.7 SKED Server Failure. In the event of a SKED server failure, operation of PMS performance and tracking is as follows: a. Retrieve Maintenance Outl ook Report that was created following approval of current FR. b. The WCS or LCPO will maintain the a ssignment of PMS with the Maintenance Outlook Report until server is restored. c. Print assigned MRCs from the PMS viewer program that is located on the FR DVD. d. Document and retain accomplished main tenance on printed blank 13-Week Reports that are in the documents folder on the FR DVD. e. When the server is restored, update SKED based on accomplished maintenance documented on 13-Week Reports. 19-4.3.8 Accomplishing PMS. Maintenance personnel use MRCs to accomplish assigned planned maintenance as described in sub-paragraphs 19-4.3.8.a. through 19-4.3.8.h of this chapter. a. From SKED “My Task” view , review the 13-Week Report. b. Determine maintenance task(s) assigned. c. Determine when the maintenance task(s) are due. d. Determine what tools, parts, material, te st equipment or supplies are needed. For MRCs that contain inspections and then maintenance actions based upon the inspection findings, the TPMTE needed to perform the follow-on maintenance caused by the inspection findings does not need to be obtained prior to performing the MRC but rather, may be obtained as needed. e. Perform the maintenance on schedule. f. Notify the WCS immediately whenever one or more of the following conditions exist: (1) Anything on an MRC is not fully understood, appears to be incorrect or cannot be accomplished as written. (2) TPMTE prescribed by the MRC is not av ailable, is not correct or questions about substitutions arise.

p. 555

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-20 (3) Any doubt exists about your capabilit y, training, or experience to properly perform the maintenance requirement as prescribed. (4) Factors exist which would make perf ormance of the maintenance requirement unwise or dangerous (e.g., disassembly of equipment needed for operations, radiation when prohibited, situations causing safety hazard to exist, etc.). (5) Equipment deficiencies or casualties are discovered. (6) Any provisions or requirements on the MRC cannot be accomplished as prescribed. g. If an MRC can be completed step-by-step as written, then the maintenance action can be signed off as completed. Report completed planned maintenance actions to the WCS, update the PMS schedule to reflect the completed maintenance, annotate and sign the 13-Week Report. If multiple maintenance personnel are assigned to a single maintenance action, the most senior person assigned must update the PMS schedule, annotate, and sign the 13-Week Report or Check Note if using SKED 3.2 electronic accountability. h. If inspection criteria or a threshold insp ected by the MRC does not meet the intended criteria, then those maintenance actions cannot be signed off as completed until the discrepancies are corrected. Maintenance actions not fully completed will be reported to the WCS. However, if material deficiencies or casualties, which are unrelated to that MR, are discovered, the MR can be checked off (provided the MR was fully completed) but the discrepancy must be reported via the MDS. The only exceptions are: (1) Systems designed with redundancy capability (e.g., AN/GPN-30, AN/URN 32, AN/FPN63, etc.) if one channel or stack meets the MRC criteria then maintenance action can be signed off as complete. However, the discrepancy must be recorded via MDS (Maintenance Data Analysis Tool for Air Operations). (2) Maintenance actions that can be signed off as complete are those discrepancies where the PMS documents (MRC or MIP) have an actual statement that directs a CSMP entry(s) to be made if there are discrepancies. The statement to inform the WCS of discrepancies, by itself, is not sufficient to sign the maintenance action as complete when discrepancies exist. 19-4.3.9 Non-Accomplished Categories. The WCS or LCPO will add a brief description for each check note or alert for non-accomplished categories using subparagraphs 19-4.3.9.a through 19-4.3.9.g of this chapter. a. System or Equipment Failure. System or equipment is not operational or in a reduced operational status thus preventing maintenance from being accomplished. CSMP Job Sequence Number (JSN) required in additional text description. b. Inadequate Maintenance Procedures. MRC procedure or steps cannot be accomplished to a point where the maintenance can be considered accomplished. FBR number required in additional text description.

p. 556

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-21 c. Unit Operational Requirements. Operat ions prevent the maintenance from being accomplished. Requires additional text description. d. System or Equipment Operational Require ments. Required operation of system or equipment prevents maintenance from being accomplished. Requires additional text description. e. Lack of Hazardous Material. Correct Hazardous Material (HAZMAT) not available at the time maintenance was to be performed. CSMP JSN required in additional text description. f. Missing or Incorrect TPMTE. Correct or calibrated TPMTE was not available at the time maintenance was to be performed. CSMP JSN required in additional text description. g. Other. Requires additi onal text description. 19-4.3.10 Accountability. The credibility of the Navy PMS program relies heavily on the individual accomplishing the maintenance. The required dedication and integrity of that individual cannot be overstressed. a. To maintain accountability, personnel ar e required to sign for the completion of assigned maintenance on the 13-Week Accountability Sheet. The WCS is required to review and sign the Accountability Sheet weekly to verify the accuracy and completeness of entries. Accountability sheets will be maintained in the WC PMS Manual for the current and previous quarter. b. Electronic Accountability may be utili zed by commands employing SKED 3.2. When an individual updates the disposition of a check, this is the same as signing and dating a check completion on a 13-Week Accountability Sheet. The disposition of a check will become permanent when the weekly closeout is performed. All PMS maintenance assigned to a MP is presented to them immediately upon SKED 3.2 log- on; and CoC review can be tracked on the Weekly Closeout Signature Sheet. However, commands must still print, sign, and retain 13-Week Accountability Sheets as prescribed in para 19-4.3.10.a. of this chapter to retain accomplishment record in the event of a database loss. 19-4.3.11 Force Revision Implementation. In addition to the requirements of reference (a), the following steps ensure the most efficient and thorough implementation of an FR: a. MRC deletions on MIPs will be marked to indicate the reason for deletion: (1) Scheduling Aids (SA). Indicate ap plicable scheduling aid “(e.g., SA-.”). (2) Split MIP. Indicate responsible WC (e.g., “EA01”) if the MRC is applicable to the activity, the responsible WC designation will be used versus a scheduling aid. (3) “Other” includes approved responses to FBRs, ACNs (e.g., “NSWC ltr Ser 4790.005.”), Message Date Time Group (e.g., “NUWC R124535Z AUG 05.”), dual periodicity. Indicate guiding notation for deletion: “SA-1” or “Note 1”, configuration change number.

p. 557

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-22 b. The FR will be completed on or before th e first Monday of the new calendar quarter. When operational schedules do not provide adequate time to implement the revision prior to the start of the quarter, the XO may direct an alternate implementation date. This deferred FR will be reported to the ISIC. c. It is advisable to complete the FR process through DH approval before conducting quarterly audits by a chief or more senior. d. The 3MC will: (1) Route the Service Brief to the CoC for review. (2) Enter the FR number from the ALID in the PMS Supersedure and Accountability Log. (3) Update PMS and TFR data into SKED prior to routing the change documentation to WCs. (4) Route the FR to WCS for implemen tation. See Figure 19-4-2 and Figure 19- 4-3 of this chapter for an example of a routing memorandum and an FR implementation checklist, respectively) (5) Delete SKED FBRs after reflection within the FR. e. The WCS, upon receipt of the ch ange document from the 3MC, will: (1) Make the appropriate entry in the WC Record of Change Log (2) Make appropriate LOEP, MIP, MRC, etc. changes to the WC PMS File. (3) Apply changes to the WC PMS sche dule utilizing SKED Revision Editor. (4) Route revision changes to division LCPO for review and concurrence. f. The division LCPO will: (1) Verify that all PMS changes have be en properly applied to the WC schedule utilizing SKED Revision Editor. (2) Review line outs on LOEPs, MIPs and MRCs. Initial all such line-outs to indicate concurrence. (3) Submit PMS schedule to DIVO for review and concurrence. g. The DIVO will: (1) Verify that all PMS changes have be en properly applied to the WC schedule utilizing SKED Revision Editor. (2) Review line outs on LOEPs, MIPs and MRCs. Initial all such line-outs to indicate concurrence. (3) Submit PMS schedule to DH for review and approval. h. The DH will: (1) Verify that all PMS changes have be en properly applied to the WC schedule utilizing SKED Revision Editor.

p. 558

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-23 (2) Review and approve lined-out MIPs on the LOEP, and MRCs on the MIPs. (3) Review and approve WC PMS Schedules. i. The WCS makes final entries in the WC Record of Change Log, completes the PMS Change Documentation Routing Memorandum, and returns it to the 3MC. j. The 3MC updates the CSAL and notifies the XO that the FR has been installed after receiving all FR PMS Change Documentation Routing Memorandums from the WCs.

Figure 19-4-2 - Force Revision Routing Memorandum MEMORANDUM From: 3-M Coordinator To: __________ Work Center Supervisor Subj: FORCE REVISION PACKAGE X-XX Encl: (1) Force Revision Implementation Checklist (2) List of Effective Pages 1. Force Revision Serial: X-XX has arrived from NSLC 2. The SKED Force Revision (FR) update is complete. Begin your WC FR implementation using Enclosures (1) and (2). Complete through your Department Head no later than Day/Month/Year. 3. Corrections, including those to LOEP, MIP and MRC, should be made immediately. Make certain ACNs and FBR responses are reflected in the FR. If not, maintain the copies and changes to your MIP(s) and MRC(s) until reflected in a subsequent FR. 4. MRCs with procedural line-outs previously approved by the LCPO must again be reviewed by the LCPO to confirm they continue to meet the requirements of COMUSFLTFORCOMINST 4790.3, Volume VI, Chapter 19. Specifically, in the procedure block, Work Center Supervisors may line-out the non-applicable line items (alternate procedures) that do not pertain to current equipment or configuration when the step includes the words “if applicable” or a note identifies steps to be omitted. These items must be reviewed and approved by the division LCPO. As these changes are WC and maintenance item specific, submission of an FBR is not required.

R/ 3MC

p. 559

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-24 Figure 19-4-3 - Force Revision Implementation Checklist MEMORANDUM From __________ Work Center Supervisor To: 3-M Coordinator Subj: FORCE REVISION IMPLEMEN TATION CHECKLIST COMPLETION 1. The following actions have been accomplished in SKED to implement Force Revision X-XX. Task Description Initial Verified all equipment is listed under each MIP. Verified new or changed MRCs (green or yellow) are added to the correct Maintenance Item (equipment).

Verified all applicable MRCs for each piece of equipment are active. Verified all MRC’s have associated “Related Maintenance” attached. Verified that all MIP lineout’s have a technical reason documented for deletion. (Select the “Pencil” Icon on top row)

Verify Maintenance Item Serials & Locations are correct. Upon completion of implementation Marked Complete for digital approval by: LCPO, Division Officer and Department Head. LCPO DIVO DH 2. After DH approval: LCPO run SKED report PMS Documents and Customized MRCs – Line-outs. Verify each procedural lineout meets JFMM volume VI chapter 19-4.3.12. requirements.

WCS create an excel spread sheet from the Maintenance Outlook Report as a minimum electronic backup forecasting as many quarters in advance as available and store it on your hard drive (not a LAN drive) in the event of the LAN crashing.

WCS select “Work Center” from the upper menu and “Update Unassigned Slots.” Initially, any MRC without ownership will be assigned to the WCS. Reassignment by the WCS or LCPO will follow.

3. Printing requirements for MRCs are determined by individual command policy. Printed MRCs must come from “PMS Documents” (not PMS Viewer). 4. Approval Signatures: POSITION SIGNATURE LCPO DIVO DH 3MC

p. 560

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-25 19-4.3.12 Planned Maintenance System Feedback Reports. PMS FBRs are used to identify problems with PMS documentation or to request the addition or deletion of PMS coverage. Issues with the periodicity, rates, man-hours, TPMTE and procedure may all be reported via an FBR. An FBR is also used to request copies of classified MRCs, request the addition or deletion of an MRC (maintenance requirement) to or from a MIP, splitting a MIP between WCs, shifting of maintenance responsibility or to request PMS coverage for newly installed systems or equipment. Paragraphs 19-4.3.12.a. through 19-4.3.12.j of this chapter. provide amplifying information dealing with the issues that may prompt the submission of an FBR. a. Periodicity. An FBR can be used to reque st the increase or decrease in the frequency of a maintenance action, i.e., an MRC. However, the originator needs to keep in mind that the ship or unit has the prerogative to increase the frequency because of harsh weather, unusual operating conditions or corrective maintenance and associated testing requirements. A 726 Class submarine submitted an FBR requesting the frequency of cleaning a specific electronics cabinet filter be increased from quarterly to monthly. Research revealed this MRC was applicable to all 726 Class units and no other ship had submitted a similar request. In fact, two other units had requested the frequency be decreased to semi-annual. It was determined that the submitting unit was in an extended upkeep period and increased foot traffic by shipyard personnel near the electronic cabinet was the most likely cause of the filter becoming clogged. The ship was authorized to increase the frequency to support the extended upkeep period and the periodicity of the MRC was not changed. b. Rates. The Rates block on the MRC repr esents the developer’s recommendation of the skill level (rate and rank) best suited to accomplish the maintenance action. The key word is recommendation. Qualified personnel other than the rate and ranking specified may be assigned. When an NEC is assigned or Damage Control Petty Officer or Safety Petty Officer, substitution of other personnel is not allowed other than those exceptions as noted in reference (a). An FBR requesting the rate on an MRC be changed from an ET2 to an FT2 will probably not pass TYCOM screening, yet an FBR requesting the addition or deletion of personnel will generally pass to the cognizant technical activity for review. c. Man-hours. The MRC reflects the average time per equipment, per person. It does not reflect or account for gathering and putting away tools, tag-outs or time removing and replacing interferences. From a maintainer’s perspective, this is not an accurate representation of the time required to accomplish the maintenance action. The Future of PMS initiative will attempt to do a better job of accounting for this additional time but until then, FBRs should be submitted only when the allotted time per equipment is significantly out of synch with the actual time required. For example, an MRC calls out 0.5 man-hours per equipment, but it takes 1.0 man-hours. d. Tools, Parts, Material and Test Equipm ent. TPMTE FBRs should be submitted when the procedure calls for an item not listed in the TPMTE block or when the TPMTE block lists an item not called out in the procedure. Updating the MRC to reflect

p. 561

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-26 common hand tools, administrative or office supplies and basic housekeeping items is addressed in paragraph 19-4.3.12.k.(1) of this chapter. e. Procedure. Procedures are written at a level of detail based on the assumption maintenance personnel are trained, qualified, and supervised by experienced leadership to execute the maintenance consistently and expertly. MRCs exist to provide standardized proven procedures, specify consistent acceptance criteria and to communicate warnings and cautions relative to the specific maintenance action. They are not intended to specify every possible action of the maintainer. There may be instances where an obvious typographical error exists on the MRC (example: Turn switch to ON; however, switch may already be ON and the intent of the step is to turn unit off, the card should read Turn switch to OFF). This type of error should not prevent the scheduling or performance of maintenance. However, in this situation, the accomplishment of the MRC is not possible until the WCS reviews the error and concurs that it is safe to proceed. A temporary notation including the reason for the correction must be made on the MRC, initialed by the WCS and an FBR submitted. Extreme caution will be taken when reviewing MRCs for this type of error. Errors must be obvious typographical errors and a PMS FBR must be submitted immediately upon discovered. Do not permanently alter the MRC until authorized by the applicable Systems Command (SYSCOM), ISEA or NSLC Detachment. If a step is missing that is necessary to complete the task, and that step is not obvious to the maintenance person, submit an FBR to have it added. An FBR submitted to request procedural changes should include the originators contact information and supporting rationale or justification. If, however, a step is missing that is clearly obvious, such as a ladder was used to install a fixture, but steps were not provided to put the ladder back in stowage, an FBR only serves to overload a process that should be focused on more technical issues. f. Duplicate MRCs. Unclassified MIPs a nd MRCs are now available from the DVD. Copies of classified MRCs still require an FBR request due to handling requirements. g. Addition or Deletion of an MRC. During the life cycle of a system, equipment, or component it may become necessary to add a maintenance action to prevent an age related functional failure or to delete a maintenance action due to inherent reliability not foreseen during maintenance development. An FBR submitted to request the addition or deletion of an MRC should include the originator’s contact information and supporting rationale or justification. h. Newly Installed or Removed Equipment. While an FBR request for PMS coverage will provide initial maintenance coverage or deletion of MIP(s) because of equipment removal, submission of an OPNAV 4790/CK is still required to initiate the rest of the logistic support change process. This point cannot be overstressed; the submission of the FBR does not relieve the ship or unit from initiating an OPNAV 4790/CK. The OPNAV 4790/CK initiates supply support, CDMD-OA changes, selected record drawing updates and class maintenance plan updates. i. Splitting a MIP. There are instances in which a MIP includes MRCs for more than one WC to perform. When this occurs, a decision is required by the command as to whether the MIP will be split or will be scheduled singly by one WC. Only the XO

p. 562

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-27 can authorize the splitting of a MIP if an MRC requires another WC to perform the entire maintenance action. If the decision is made not to split the MIP, then the MRs will be accomplished through the coordination of WCSs. (1) If the MIP is split, the following procedures apply: (a) Submit to the XO a non-technical PMS FBR requesting approval to split the maintenance responsibility. (b) Upon receipt of the XO’s concurrence, the 3MC will make an annotation in the remarks block of the FBR stating, “XO concurs with splitting MIP maintenance responsibility”. (2) Upon receipt of the FBR approval: (a) Utilizing the SKED Revision Edito r, delete the MRC from the MIP and show the reason for deletion as the designation of the WC assuming responsibility (e.g., EE01). (b) If the WC assuming responsibil ity does not reflect the MIP and maintenance items, utilize the SKED Revision Editor to add them. Schedule only the MRC(s) that pertain to the WC. Reflect remaining as deleted with the reason for deletion the designation of the parent (lead) WC (e.g., EA01). (3) If the situation occurs where a WC removes a split MIP, the following procedures apply: (a) Submit an XO approved, non-technical PMS FBR reporting the decision to remove the split maintenance responsibility. Upon receipt of the XO’s concurrence, the 3MC will make an annotation in the remarks block of the FBR “XO concurs with removing split MIP maintenance responsibility”. (b) Upon receipt of FBR approval, utilize the SKED Revision Editor, remove the MIP, MRC(s) and maintenance item(s) from the WC no longer involved. Ensure that the lead WC assumes full responsibility for the MIP and MRC(s) and annotates their schedules accordingly. j. Shift of Maintenance Responsibility. Individual units sometimes consider it necessary to shift maintenance responsibility from one WC to another, to combine two or more existing WCs or to split an existing WC. These requests for changes of PMS maintenance responsibility require XO concurrence and may require final approval by the applicable TYCOM. Due to the considerable administrative burden, requests for this type of change should not be submitted to accommodate a temporary situation such as short-term assignment of two WCs to one supervisor. (1) The following factors should be carefully considered before submitting such requests: (a) Composition of WCs by size and ratings. (b) Scope of maintena nce responsibilities.

p. 563

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-28 (c) WC workload. (d) Ease of administration of a WC as a cohesive maintenance group. (e) Importance of WC grouping to equipment maintenance responsibilities, PMS scheduling, MDS reporting and CSMP listings. (2) When changes in maintenance respon sibility are considered necessary, the following procedures apply: (a) Submit a PMS FBR (Non-technical) . Indicate from which WC(s) equipment is to be deleted and to which it is to be transferred. Upon receipt of the XO’s concurrence, the 3MC will make an annotation in the remarks block of the FBR “XO concurs with the shift of maintenance responsibility (b) WC or equipment changes will also be reported in the OMMS or SNAP system via a configuration change request OPNAV 4790/CK through the CSMP up-line reporting process. (3) Upon receipt of the FBR approval, perform the following actions: (a) The PMS Master File is updated to reflect deletion of the MIP from one WC and addition to the WC receiving the responsibility. The originating FBR serial number is annotated on the affected line item on the LOEP for both WCs. The PMS Master File must contain a record of deleted equipment until the change is reflected in a future FR. (b) Utilizing the SKED Revision Editor, load the affected MIP(s) and MRC(s) to the WC receiving maintenance responsibility. Delete the MIP(s) and MRC(s) from WC shifting responsibility. (c) Utilizing SKED, perform a revisi on to move the equipment from the original WC’s current schedule to the WC receiving the maintenance responsibility. Data is exported from one and imported to the other maintaining equipment history. k. MRC Changes Not Requiring Feedback Reports. The only MRC modifications shipboard or unit personnel may make without submitting a PMS feedback report are as listed in subparagraphs 19-4.3.12.k.(1) and (2) of this chapter. (1) TPMTE Block (a) Common hand tools, administra tive or office supplies and basic housekeeping items may be substituted or added by the WCS. The WCS may add notes to the MRC to reflect these substitutions. In the case where specific common tools are called out by description, substitutions are not authorized. For example, substitutions such as using synthetic fiber brushes in place of animal hairbrushes or rags and paper towels in place of lint free cloths are not allowed.

p. 564

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-29 (b) Approved parts, materials and miscellaneous item substituted from the supply system, technical manual, or Military Specification, etc., which meet or exceed the requirements may be used. Ensure that substitutions satisfy both the basic maintenance and safety requirements of the MRC. If there is any doubt, a PMS FBR should be submitted specifying substitution desired and reason. (c) Test equipment or certified tools, which meet or exceed the Sub- Category code requirement, may be used. (d) When an MRC pertains to multiple configurations of equipment and the TPMTE block contains tools, parts, test equipment and materials for each unique configuration, the TPMTE block may be tailored for the unit’s specific configuration by lining out the items that do not pertain to equipment held. (e) Exception to TPMTE block change: If an item listed in the TPMTE block is not called for in the procedures block, submit an FBR explaining the circumstances. Conversely, if a tool, piece of test equipment, part or material is called for in the procedure block and is not listed in the TPMTE block an FBR should be submitted. (2) In the procedure block, WCSs may line-ou t the non-applicable line items (alternate procedures) that do not pertain to current equipment or configuration when the step includes the words “if applicable” or a note identifies steps to be omitted. These items must be reviewed and approved by the division LCPO. As these changes are WC and maintenance item specific, submission of an FBR is not required. If a step or steps in the procedure block have been lined-out and tools, parts, materials, and test equipment in the TPMTE block pertain only to that step or steps, then they will be lined-out as well with a reference to the step or steps lined-out and approved by the division LCPO. Warnings, Cautions and Notes associated with the lined-out step or steps will also be lined-out. l. Types of Feedback Reports. There are two types of FBRs, Technical and Non- Technical. (1) Technical. These FBRs are used to report technical discrepancies inhibiting PMS performance. Technical feedbacks normally adjudicated by an ISEA responsible for the system or equipment covered by the PMS documentation require all the supporting information the originator can provide. The originator should identify the issue, providing as much supporting technical information (Allowance Parts List, Reparable Identity Code, drawing or Hierarchical Structure Code) as available and a proposed response or solution if known. Most importantly, provide point of contact information (name and phone number) so that the ISEA can contact the originator should they have questions. Bottom line, the FBR must be accurate and complete to “stand alone”, that is, the FBR will be understood without additional explanation. The better the FBR describes the problem, the more likely the originator will receive a timely response. There are two sub-categories of technical FBRs:

p. 565

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-30 (a) Routine. An FBR will be consid ered routine when it relates to the technical requirements of PMS. It is used to report technical discrepancies or request clarification of procedures. (b) Urgent. An FBR will be considered urgent when it relates to the technical requirements of PMS and involves safety of personnel, safety of ship or the potential for equipment damage. Urgent FBRs will be forwarded by naval message containing a PMS Feedback Serial Number, to both NSLC Detachments Norfolk and San Diego, with info to the cognizant SYSCOM, TYCOM and the Naval Safety Center. The message must describe the unsafe procedure(s) or condition(s), must identify the MIP and MRC involved and reflect the serial number of the FBR generated in SKED or Planned Maintenance System – Management Information System (PMS-MIS). Once the message has been sent, include the date time group of the message in the FBR and submit. (2) Non-technical. These FBRs are intende d to support PMS requests that do not require technical review, including WC changes, such as shift of maintenance responsibility. Non-technical FBRs are submitted to request classified or other PMS documentation which cannot be obtained locally or to request clarification of issues not of a technical nature. m. Feedback Report Submission. SKED user s will generate FBRs via SKED using the Feedback Report Wizard. Command 3MCs will then export FBR text file for submission to NLSC for uploading to the Planned Maintenance System Management Information System (PMSMIS). Following adjudication NLSC will send FBR response to command 3MC for uploading into SKED for implementation as required. Non-SKED user can also generate FBRs in PMSMIS at https://pmsmis.navy.mil/Default.aspx by selecting the “Feedback” tab and “Feedback Report Wizard” from the drop-down tab. Non-SKED users accessing this web site for the first time will need to request an account. Click on “File Manager” and select “New User Account Request”. This displays options to select a form and readme file, which can be downloaded, filled out and sent via e-mail as directed in the readme file. An e-mail will be sent confirming your account and providing access to the main screen. n. Feedback Report Screening. (1) Initial screening is accomplished by th e originator or WCS who is responsible for ensuring all data is accurate and complete. (2) The division LCPO or DIVO accomp lishes the second level screening and verifies the content and validity of the FBR within three days of origination. (3) The DH, next to screen the FBR, is responsible for verifying the content and validity of the FBR and digitally signing FBRs within five days of origination. (4) The 3MC is responsible for screen ing, serializing, and forwarding FBRs within seven days of origination. The 3MC will also:

p. 566

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-31 (a) Maintain accountability for all PM S FBRs submitted and actions taken until updated PMS documentation is received. (b) Ensure that the originator and all applicable WCs are kept apprised of action taken and ensure the originating and other applicable WCSs implement the changes or corrections when received. o. Feedback Report Screening (External to Ac tivity). FBRs are next processed by the TYCOM. The TYCOM will verify the content and validity of the FBR and either return the document to the originator or pass it on for further processing and resolution. p. Feedback Processing Activities. (1) The central control points for processing FBRs are the Planned Maintenance System Coordinating Activities (PMSCA). Depending on the type of FBR and level of technical authority necessary to answer the FBR, the PMSCAs will either respond to the originator with a resolution or forward the FBR to the appropriate technical authority for action. (2) ISEAs are those activi ties designated by NAVSEA as the technical experts for specific systems or equipment. Naval Surface Warfare Center, Philadelphia Detachment is the ISEA for the majority of non-nuclear hull, mechanical and electrical equipment installed on most ships. ISEAs under the direction of the NAVSEA Technical Warrant Holder adjudicate the FBR request and forward the response to the PMSCAs. The PMSCAs provide the final response to the originator and update the PMS database to reflect ISEA changes. PMS changes are issued with the next available FR. NOTE: IT IS POSSIBLE AN FBR RESPON SE MAY NOT MAKE A SPECIFIC FR BASED ON THE DATE THE RESPONSE WAS RECEIVED BY NAVSEALOGCEN. PROCESSING TIME AND HANDLING MAY CAUSE THE REVISED DOCUMENTATION TO MISS AN FR CUTOFF DATE. HOWEVER, SINCE ALL FRS ARE NOW RECEIVED QUARTERLY, IF A REVISION MISSES THE CURRENT FR CUTOFF WINDOW, THE REVISED DOCUMENTATION WILL BE AVAILABLE WITHIN THE NEXT THREE (3) MONTHS. q. Feedback Processing. FBRs are processed per NAVSEA policy: (1) Urgent FBRs. (a) The PMSCA will provide a message response to all urgent FBRs within one working day of receipt. If the FBR is forwarded to a Design Activity or ISEA for resolution, then the Design Activity or ISEA will provide a message response informing the originator of specific actions or required changes as a result of the adjudication of the FBR within one working day of receipt. This message response must be addressed to the originator and distributed to all TYCOMs of units holding the affected documentation. TYCOMs will forward this message to all commands that could be affected by the PMS change.

p. 567

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-32 (b) The PMSCA will distribute revised PMS documentation to all affected users within 30 calendar days of receipt of the FBR, via special issue or ACN. (2) Routine FBRs. (a) The PMSCA will perform technical review, research, and provide a response to routine FBRs where resolution does not require technical authority action. (b) FBRs that the PMSCA cannot resolve will be sent to the cognizant Design Activity or ISEA. The cognizant Design Activity or ISEA will provide the response to the appropriate PMSCA describing the action taken. The PMSCAs will provide the response to the originator by electronic means. (c) Distribution of the revised MRC to the originator and other affected users will be accomplished via ACN or the next available FR. (d) NAVSEA’s existing policy calls fo r technical review activities and ISEAs to provide FBR responses in less than 21 working days from time of receipt. In addition, NAVSEA has established a goal of providing answers to FBRs in one day. While some FBRs will require extensive research and days, weeks or in some cases months to resolve, the vast majority of FBRs can and should be answered much sooner. One day may be overly optimistic, but the intent is to put the emphasis back on the timely resolution of FBRs. (e) If no revision to PMS documenta tion is required, pertinent comments will be provided in the response to the PMSCA. When not concurring with the feedback report, the rationale for the non-concurrence must be provided to the PMSCA. r. Feedback Response Implementation. Units will implement responses to FBRs based on the category and content as determined by the unit’s 3MC. (1) Urgent FBR. Within 24 hours of receipt of FBR response. (2) Urgent FBR with an ACN. Within 24 hours of receipt, the ship or unit will implement an administrative change to incorporate the new PMS documentation. These revised documents will be utilized to conduct maintenance until the revised PMS document is incorporated into the next FR. (3) Routine FBR: (a) Technical. The response deals wi th content such as a revision to technical specifications, tolerances, test equipment, materials, acceptance criteria or the sequence of procedural steps. These changes need to be implemented within two weeks of receipt of the FBR response or prior to the next scheduled accomplishment date should that date fall within the two-week window.

p. 568

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-33 (b) Administrative. The response deals with issues that do not affect the technical content or procedural steps. Administrative changes might be added steps to provide a better degree of clarity, formatting revisions to tables or figures that do not change technical content, or updating of “Notes, Warnings or Cautions” that do not impact the performance of the MRC. These changes do not need to be implemented prior to receipt of the next FR. If the next FR does not reflect the revised documentation, implementation is required before the next scheduled accomplishment date of the MRC. (4) Routine FBR with an ACN: (a) Technical. These changes need to be implemented via an administrative change within two weeks of receipt of the FBR response or prior to the next scheduled accomplishment date should that date fall within the two-week window. These revised documents will be utilized to conduct maintenance until the revised PMS document is incorporated into the next FR. (b) Administrative. These changes do not need to be implemented prior to receipt of the next FR. If the next FR does not reflect the revised documentation, implementation is required via an administrative change before the next scheduled accomplishment date of the MRC. 19-4.3.13 Assessment Procedure MRCs. Assessment Procedure (AP) MRCs need not be scheduled within SKED, but they will be maintained “active” through the FR and TFR process. AP MRCs need only be printed on an “as needed” basis. The completion of AP MRCs is recorded on the work candidate. There is no need for recording unit participation in an assessment event on their PMS schedule within SKED. FBRs submitted requesting deletion of a MIP that only contains AP MRCs will be disapproved and returned to the originator. 19-4.4 MAINTENANCE AND MATERIAL MANAGEMENT EVALUATION CRITERIA. 19-4.4.1 Self-Assessments. The ability of an activity to perform critical self-assessments is instrumental to the success of the command’s PMS program. The PMS Self-Assessment Program needs to address all aspects of 3-M. a. TYCOM Policy. Each co mmand and subordinate command(s) must conduct a rigorous quarterly 3-M Self-Assessment. The 3-M checklists contained in appendix A will be utilized and retained for 12 months. The CO will receive a formal briefing of the findings of the Self-Assessment and intended corrective actions. b. Self-Assessment Elements. The major program elements of a Self-Assessment include an evaluation of the PMS Performance Rate (PPR) and CSMP Validity, monitoring MRC performance (monitored MRC), and conducting PMS Spot-Checks, WC audits, and deficiency abatement. 3MCs will retain monitored PMS results, Spot

p. 569

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-34 Checks and WC audits from the last completed quarter in either hard copy or digital format for review supporting the self-assessment. (1) PMS Performance Rate. The PPR is made up of the Maintenance Accomplishment Rate (MAR) multiplied by the Spot Check Accomplish Rate (SCAR) divided by 100. PPR = MAR X SCAR ÷ 100 (2) CSMP Validity. The CSMP Validity f actor is evaluated utilizing the check sheets provided via Section IV (MDS) of the TYCOM’s 3-M Inspection Criteria, Appendix (A). (3) Monitored MRC. Supervisory pers onnel must periodically monitor the performance of PMS to provide feedback and training to maintenance personnel and to enforce command maintenance standards. Personnel charged with monitoring must be system matter experts (SME) for the system, equipment, or component for which the MRC applies. LCPOs, LPOs or personnel with similar system knowledge are appropriate. Monitored checks can be used like on the job training to teach the “right way” to conduct maintenance. These monitored MRCs will be documented as a monitored evolution and findings will be provided to the WC’s CoC for inclusion into training and deficiency abatement. The value of monitor maintenance cannot be overstated, and commands are encouraged to establish a robust monitored maintenance program. (4) PMS Spot Check. PMS Spot Checks are utilized to validate that previously scheduled and accomplished MRCs were performed and the degree to which they were performed. The checklist contained in appendix A Section II, is the tool supervisory personnel utilize to determine the accomplishment status of a completed MRC. Deficiencies noted and the final grade will be provided to the WC’s CoC for abatement. The WCS will record the Spot Check grade into SKED to generate the SCAR for the quarterly PMS Performance Report. Spot Checks will involve all elements of the CoC to include the CO, CMC, XO, 3MC, department CPOs, DHs, DIVOs, divisional CPOs, and first class petty officers. By following the checklist, the inspector can determine if the sailor is competent, the maintenance was accomplished, required TPMTE was available and used, and safety precautions were followed. The focus should be less on administration and more on the condition of the gear. (a) Avoid Spot-Checks of MRCs with insufficient complexity. Performing a Spot-Check on a 3 or 5 step MRC does not provide the CoC an accurate picture of the health of the command’s maintenance program. Selected MRCs should be of sufficient content to provide the auditor with evidence of satisfactory performance (e.g., tag-outs, QA packages, parts required, off-hull reporting, test equipment, safety equipment, etc.). (b) Command 3MCs can request modifica tion of the Spot Check matrix if it is believed that due to the size of the command and location of their

p. 570

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-35 WCs, they are unable to accomplish that requirement. Requests must be submitted in writing to CNIC 3-M team (via Regional Commander as applicable) and include their proposed Spot Check matrix for review. If approved by CNIC, the command 3MC will retain a copy of the request approval. (c) Spot-Checks evaluated as “below standards” will require immediate training and re-performance as determined by the XO. Any re- accomplishment of the MRC must be monitored by the LCPO to ensure noted deficiencies are not repeated. (d) Table 19-4-3 represents the mi nimum number of Spot Checks for CNIC activities. (5) Work Center Audits. Each WC must receive an audit once per quarter by a supervisory individual, CPO or above. Deficiencies noted from this audit will be reported to the WC’s CoC for abatement. The 3MC will report recurring deficiencies to the XO for further investigation and corrective action. (6) Deficiency Abatement. The status of discovered deficiencies will be kept current within the monitoring program. Recurring deficiencies must be reported to the XO for further investigation and corrective action. Deficiencies that have been reported as corrected will be subject to follow up monitoring to ensure corrective action was effective and results of the follow up monitoring will be reported to the XO. The unit’s 3-M Abatement Program will include the previous quarter’s audits, Spot-Checks, monitored evolutions and CSMP validity audits noting trends and corrective actions. .Table 19‐4‐3 ‐ CNIC Spot Checks Management Level Number of Checks Interval CO or Officer in Charge 1 Quarterly XO or AOIC 2 Quarterly CMC 1 Quarterly DH 2 Monthly DIVO 2 Monthly 3MC 1 Weekly LCPO 2 Monthly 19-4.4.2 Inspections. The goal of the 3MI is to evaluate the effectiveness of the unit’s 3-M Program. It is critical that the inspection be conducted in a similar fashion in every command and detachment across the force. CNIC does not have a dedicated 3M inspection team or 3MO to conduct independent 3MIs. Inspections will be completed concurrently with other TYCOM or ISIC inspections or visits by N31, N32, and N34 representatives. Inspections will be conducted

p. 571

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-36 at the department level with results provided to CNIC N32 Ground Electronics Officer for consolidation and retention. a. Frequency of Inspections. The TYCOM or ISIC (command exercising administrative control) will conduct a complete inspection of each command under their cognizance as follows: (1) When deemed necessary by the TYCOM, ISIC or the unit’s CO. (2) Every 24 months in conjunction with other TYCOM inspections and not to exceed 36 months. b. Inspection Team Composition. The team will be comprised of members from the respective TYCOM N-code that is conducting the primary inspection. c. Method for Assignment of Numerical Evaluations. The minimum performance requirements are as identified below: (1) Formula Acronyms: (a) CLER = Command Level Effectiveness Review (b) CTS = Command Total Score (c) CVF = CSMP Validity Factor (d) DTS = Department Total Score (e) MAR = Maintenance Accomplishment Rate (f) MDS = Maintenance Data System (g) MPR = MDS Performance Rate (h) PAR = Periodic Accomplishment Rate (i) PPR = PMS Performance Rate (j) SAR = Situational Accomplishment Rate (k) SEER = Scheduling and Execution Effectiveness Review (l) SCAR = Spot Check Accomplishment Rating (2) CTS must 80 percent or higher. Any CTS score evaluated below 80 percent will be re-evaluated on a case by case basis. CNIC CTS = Sum of all Departments ÷ Total number of Departments (Example 1: CTS = N31 DTS + N32 DTS + N34 DTS ÷ 3) (3) Each Department is required to m eet the DTS minimum of 80 percent. (a) DTS = Sum of all Work Center Scores ÷ Total number of Work Centers (b) Work Center Score= (PPR x .5) + (CVF/MDS x .3) + (SEER x .2) (c) PPR = 50% of the Work Center Score (d) CVF/MDS = 30% of th e Work Center Score

p. 572

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-37 (e) SEER = 20% of the Work Center Score (f) PPR = MAR x SCAR ÷ 100 (g) MAR = (PAR x .5) + (SAR x .5) (h) MAR = PAR (If WC holds no situational maintenance) (i) SCAR = Sum of Spot Check Scor es ÷ Total number of spot checks (4) Ranking Standards. (a) Commands, departments, and WCs will be evaluated as “Above Standards” overall in 3-M if the unit’s total score is 90% or higher. (b) Commands, departments, and WCs will be evaluated as “At Standards” overall in 3-M if the unit’s total score is between 80% and 89.99%. (c) Commands, departments, and WC s will be evaluated as “Below Standards” overall in 3-M if the unit’s total score is less than 80%. (d) All calculations will be rounded to two decimal places. d. Inspection Procedures. Appendix A provide s a standard means for evaluating the 3- M Program. These procedures, centered on a set of core attributes applicable to all, are used to conduct 3-M Inspections. Inspection procedures are divided into six major areas: (1) Section I - Work Center a nd Command Effectiveness Reviews (a) Scheduling and Execution Effectiveness Review. (b) Command Level Effectiveness Review. (2) Section II – Spot Check Acco mplishment Rating (Spot Checks). (3) Section III - Assessment of Ma intenance Accomplishment Rate. (4) Section IV - Maintenance Data System. (5) Section V – Proficiency (6) Section VI - 3-M Inspec tion Command Total Score. e. Inspection Reporting. Significant defici encies and numerical assessments are reported to the assessed unit’s CO, ISIC and TYCOM using the format shown in Appendix C. Reporting may be accomplished on the entire unit or on a departmental basis. (1) Significant deficiencies require a report of corrective actions taken by the unit to be forwarded to the TYCOM via the ISIC within 30 days following the inspection. (2) Any command or department recei ving an overall evaluation of below standard in either PPR or CVF and MDS must be re-evaluated within a reasonable period, not to exceed six months, to ensure below standard areas have been corrected.

p. 573

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-38 f. Inspection Data Retention. CNIC will mainta in an inspection data file for each unit. As each command is evaluated, the individual evaluation standards and calculated values identified will be recorded in the data file with a copy of the inspection report provided to the inspected command. Section I through Section VI of Appendix A of this chapter provides specific criteria to be used in the assessment of each command.

p. 574

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-A-1 APPENDIX A APPENDIX A INSPECTION CRITERIA

p. 575

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-A-2 APPENDIX A APPENDIX A SECTION I-A1 SCHEDULING AND EXECUTION EFFECTIVENESS REVIEW (SEER) Complete the SEER checklist below for each WC. Enter a numeric evaluation of each inspection attribute and provide amplifying information to describe the deficiencies driving point deductions on the “Remarks” page provided. Significant deficiencies will be reported via the final inspection report.

Command Department Division Work Center Date General Attributes Value Points 1. Does the WC PMS file contain: a.* The current Service Brief? 1 b.* Current and applicable 3-M messages, notices, and supplementary information? 2 2. Do MIPs and MRCs accurately reflect equipment configuration; are non-applicable MRCs correctly lined-out and are applicable MRCs active? 10 3. * Does the WC retain an auditable record of 3-M personnel qualification standards and designation letters? 5 Maintenance Requirement Card (MRC) Deck 4. Is the WC deck of MRCs, includ ing classified MRC locator cards, complete and current? (Per TYCOM direction) 2 5. Are locally generated MRCs complete and current? 3 6. Are blanks requiring installation data (including MRC location block) filled in prior to use? Specific location must reflect BLDG # with Room #. 3 Chain of Command SKED Administration 7. Are all administrative changes a pproved at the appropriate level? a. Is the FR approved by DH? (Verify using Journal tab.) 2 b. Are weekly closeouts are perfor med by close of business on the first workday of the week by the LCPO? 2 c. Are lineouts and MRC customization approved by the LCPO? 2 d. Are check notes reviewed, and alerts approved by the DH? 2 Location Guide Lists

p. 576

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-A-3 APPENDIX A 8. a. Do LGLs contain required information (e.g., equipment name, equipment location, equipment serial number or unique identifier)? 3 b. Are maintenance items in SKED associated to the existing equipment configuration? 3 Situational Requirements 9. * Are all situational (states, triggered or metered) events being scheduled and executed in SKED? 8 PMS Execution and Accountability 10. Are check note entries accurate, valid, and complete? 3 11. * Was maintenance assigned only to qualified maintenance personnel for MRCs requiring unique qualifications, NECs, or billet? 4 12. Are current quarter and previous quarter 13-week reports maintained? 3 13. Is a check note made for maintenance actions not completed or rescheduled during the week and retained in SKED? 2 14. Is a unique tag-out serial number or “tag-out not required” entered as a “check note” for maintenance actions requiring a lock out or tag-out and marked as complete? 2 15. Have the minimum number of spot checks and monitored checks been accomplished? 3 FBR File 16. Are FBRs tracked in SKED, “Ac tion Taken” block updated by WCS? 3 Inactive Equipment Maintenance 17. * Is the start of an inactive pe riod correctly annotated and approved by DH? 2 18. Are all Inactive Equipment Maintenance requirements properly scheduled? 5 19. Is the completion of the inac tive period correctly annotated? 2 Totals (Attributes evaluated as NA are not calculated) Total Points Available:__________ Total Points Awarded:_______ SAT **SAT is 80% or better UNSAT (Score = Points Awarded Divided by Points Available)

* Electronic Versions Acceptable Attribute Scoring: > 85% = Satisfactory = Full Credit < 85% = Unsatisfactory = No Credit

p. 577

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-A-4 APPENDIX A Example - Attribute 18 – If 85% or better of IEM requirements were properly scheduled, points awarded would be five (5). If less than 85% of IEM requirements were properly scheduled, points awarded would be zero (0).

p. 578

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-A-5 APPENDIX A APPENDIX A SECTION I-A2 SEER REMARKS Provide amplifying information to describe the deficiencies driving point deductions. Significant deficiencies must be reported via the final inspection report. Attribute # Amplifying Information

Print Inspector’s Name: ______________________________ Signature: _________________________________ Command: __________________________________________ Date: _________________________

p. 579

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-A-6 APPENDIX A APPENDIX A SECTION I-A3 SKED 3.2 SEER CHECKLIST GRADING ATTRIBUTES

* Indicates electronic versions acceptable.

1. Attribute 1 : Does the WC PMS file contain: 2. Attribute 1a. (*) : a. Current Service Brief? b. Is the latest FR PMS Service Brief available? 3. Attribute 1b. (*): a. Current and applicable 3-M messages, notices, and supplementary information? b. Are applicable messages and bulletins that provide additional guidance, information or areas of focus that pertain to MIPs or MRCs available? 4. Attribute 2: a. Do MIPs and MRCs accurately reflect e quipment configuration; are non-applicable MRCs correctly lined-out and are applicable MRCs active? (May be MIP standardization violations) b. Does WC meet TYCOM MIP standardization requirements? Are any MRCs listed on MIP lined-out that are applicable to installed equipment configuration and within the cognizance of the WC to perform maintenance? (Split MIP log will be verified against the LOEP and MIP.) c. Are applicable MRCs active on all applicable maintenance items? d. Are non-applicable MRCs lined-out? MRCs that are not applicable to the WC’s installed equipment configuration. e. Are line out justifications on MIPs accurate? 5. Attribute 3 (*): a. Does the WC retain an auditable r ecord of personnel PQS qualifications and designation letters? b. Does the WC have record of the followi ng: Designation letters for the 3MC, DIVO, Departmental 3-MA, LCPO and WCS; 3-M PQS completion validation for 3MC (307), DH (306), Departmental 3M Assistant (305), DIVO (304), LCPO (304), WCS (303), MP (301)? FLTMPS report, if available, must be used. If FLTMPS is not available, PQS watch station cover sheets signed by the XO or DH must be used. 6. Attribute 4 : a. Is the WC deck of MRCs, including cl assified MRC locator cards, complete and

p. 580

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-A-7 APPENDIX A current? (Per TYCOM direction) b. Does WC MRC deck contain all MRCs that are not lined-out on MIP? As a minimum, the deck will contain all quarterly checks and below, all R-checks, and all MRCs with fill in the blanks or pen and ink changes. Any MRC completed within the previous 13 weeks must be retained in the WC MRC deck. Verify SYSCOM MRC control number against MIPs per the 3-M Manual or TYCOM guidance? c. Does MRC location block contain one of th e following entries, as appropriate? (1) BLDG # with room #; (2) “See LGL,” (3) “See Metbench Calibration Management System (MCMS),” (4) “See Account Inventory Summary (AIS),” (5) “LGL attached.” d. Is the MRC SYSCOM correct and matc hes the SYSCOM number on the MIP? 7. Attribute 5: a. Are locally generated MRCs complete and current? b. Does the command perform local maintenance? c. Has the local maintenance been recently updated? d. Is there a locally generated LOEP with MIPs associated to these MRCs? e. Shore stations that do not have a lo cally generated MRC documentation mark as “NA”. 8. Attribute 6: a. Are blanks requiring installation data (inc luding MRC location block) filled in prior to use? Specific location must reflect BLDG # with Room #. b. Are all WC MRCs with blank fields or tables within the MRC procedure block requiring data completed? 9. Attribute 7: Are all administrative changes approved at the appropriate level? 10. Attribute 7a: FR approved by DH. (Verify using Journal tab.) Has the final approval of revisions (FR, ACNs, FBR, Document Information Transmittals (DIT), and administrative changes) been completed by DH? 11. Attribute 7b: a. Weekly closeouts are performed by close of business on the first workday of the week by the LCPO? b. Is the weekly closeout completed on the first workday of the week? c. Is the weekly closeout completed by LCPO? 12. Attribute 7c: All lineouts and MRC customization approved by the LCPO. Are all lineouts approved and initialed by LCPO?

p. 581

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-A-8 APPENDIX A 13. Attribute 7d: a. Are check notes reviewed, and alerts approved by the DH? b. Are check notes and alert details approved by DH? 14. Attribute 8a (*): a. Do LGLs contain required informati on (e.g., equipment name, equipment location, equipment serial number or unique identifier)? b. WCs with LGLs: Does the LGL have e quipment nomenclature, serial number or unique identifier, and location (BLDG # and Room #) block completed for each line item? c. If equipment manufacture serial numbe r is available, it must be used. 15. Attribute 8b: a. Are maintenance items in SKED associat ed to existing equipment configuration? b. Are maintenance items in SKED correctly associated with equipment configuration? 16. Attribute 9 (*): a. Are all situational (states, triggers, mete red) events being scheduled and executed in SKED? b. Are all local triggers and states executed as required? c. Are all required R-Checks listed on the acc ountability logs and scheduled in SKED? d. Are metered readings entered and tracked in SKED (if applicable)? 17. Attribute 10: a. Are check note entries acc urate, valid, and complete? b. For all entries on the WC schedule that are not marked complete, is there a corresponding check note entry? c. Does the check note entry begin with either: rescheduled, out of periodicity, non- accomplished, not applicable (NA) for situational checks and with the date the check went out of periodicity, the reason why the MR was not accomplished, or the reason check was not applicable? d. Cent (¢) sign entries will begin with “P erformed by” and followed by the detailed information of the outside activity completing the maintenance, JSN, work order or applicable documentation used to complete the maintenance. Proof of the completion will be maintained in the WC PMS file until the next accomplishment of the maintenance action. DH will sign for accountability of all maintenance actions completed by outside activities. 18. Attribute 11: a. Was maintenance assigned only to qualified maintenance personnel for MRCs requiring unique qualifications, NECs, or billet?

p. 582

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-A-9 APPENDIX A b. For MRCs that indicate or require unique qua lifications such as: Safety Petty Officer, Damage Control Petty Officer, gage calibration or NECs, does the assigned individual(s) hold that qualification or billet? (Utilize school completion certificates, position descriptions or FLTMPS for verification.) 19. Attribute 12: Current quarter and previous quarter 13-week reports? (Due to unreliability of SKED 3.2 ashore databases hard copy 13-week reports are required in the event of database corruption.) 20. Attribute 13: a. Is a check note made for maintenance actions not completed or rescheduled during the week and retained in SKED? b. Do all check note entries match all entries in SKED? 21. Attribute 14: a. Is a unique tag-out serial number or “tag-out not required” entered as a “check note” for maintenance actions requiring a lock out or tag-out and marked as complete? b. No entry is required for maintenance not completed. 22. Attribute 15: a. Have the minimum number of spot check s and monitored checks been accomplished? b. Are all required spot checks complete d per Table 19-4-3 of this chapter. 23. Attribute 16: a. Are FBRs being tracked in SKED, “Action Taken” block updated by WCS? b. Does the WC retain copies of FBR res ponses requiring changes to PMS documents until reflected in the FR? c. Are FBRs being tracked in SKED? d. Are FBR responses entered in SKED when received and action taken updated within seven days? e. If no outstanding FBRs, mark as NA. 24. Attribute 17 (*): a. Is the start of an inactive period correctly annotated and approved by DH? b. Does WCIEM tab annotate the proper IEM status? c. If WC has systems or equipment in IEM Status II , is a JSN, work documentation, DH authorization and outside activity or repair WC annotated? d. Did the WC obtain DH written authorizati on prior to placing equipment in IEM? e. If there is no equipment in IEM in the last 13 weeks, mark as NA. 25. Attribute 18 : a. Are all IEM requirements properly scheduled?

p. 583

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-A-10 APPENDIX A b. Does the WC annotate the proper scheduling of all applicable IEM maintenance (e.g., LU and PM)? c. If there is no equipment in IEM in the last 13 weeks, mark as NA. 26. Attribute 19: a. Is the completion of the in active period correctly annotated? b. Does the WC schedule annotate the pr oper scheduling when removing equipment from IEM (e.g., SU and OT)? c. If there was no equipment removed from IEM in the last 13 weeks, mark as NA.

p. 584

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-A-11 APPENDIX A APPENDIX A SECTION I-B1 COMMAND LEVEL EFFECTIVENESS REVIEW Using the attributes and grading criteria described below, conduct the CLER. Provide amplifying information for deficiencies causing point reduction on the remarks page. Command Date General Attributes Value Points 1. Does the 3MC maintain: a. A Change Accountability Log (including FBR Accountability Log in SKED)? 2 b. * A log tracking the assignment of MRCs from split MIPs to ensure all applicable MRCs are assigned (if applicable)? 3 c. A LOEP containing locally generated MIPs and a record of the associated MRC files? 2 d. * A current PMS (and where applicable TFR) DVD or downloaded file? 3 2. Does the command have a reliable system for backing up MDS and PMS data? 5 3. * Does the 3MC have an effective system in place to track, route and explain externally provided PMS changes? 3 4. Is there an effective system in use (Spot Check Program) whereby supervisory personnel periodically and routinely monitor PMS performance? 10 5. Have all FBRs entered in SKED been properly reviewed by the CoC and submitted off station within seven days? 3 6. Have CSMP reconciliations been conducted per JFMM and TYCOM instructions? 5 7. * Does the activity conduct internal audits (Quarterly Self- Assessments) of all WCs and retain for one year copies of deficiencies, corrections, and abatements? 15 8. * Does the 3MC provide weekly status reports to the 3-M Manager per specific TYCOM directives? 3 9. * Does the 3MC have an approved master copy of 3-M PQS specifically tailored for the command? 3 10. * Does the 3MC maintain an auditable record of PMS PQS for the command (e.g., copy of service record entries, signed copy of 3

p. 585

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-A-12 APPENDIX A PQS cover letter, officer verified divisional training record or FLTMPS report)? 11. Does the 3MC maintain the status of command FBRs, responses and follow up actions taken in SKED? 3 12. Does the activity conduct 3-M Pr ogram training per directives? 10 13. Does the 3MC have an active AWN account with proper permissions? 2 14. Does the 3MC retain one years’ worth of quarterly reports? 2 15. Are the quarterly reports si gned and dated by the CoC? 2 16. Are the Check Note Reports included? 1 Totals (Attributes evaluated as NA are not calculated) Total Points Available: (80) Total Points Awarded:_________ (Score = Points Awarded Divided by Points Available) SAT UNSAT Inspector Name and Command (Print and Sign) * Electronic Version Acceptable Sat = 80 percent or better Attribute Scoring: 80% or above = Satisfactory = Full Credit Less than 80% = Unsatisfactory = No Credit

p. 586

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-A-13 APPENDIX A APPENDIX A SECTION I-B2 COMMAND LEVEL EFFECTIVENESS REVIEW REMARKS Provide amplifying information describing the deficiencies and associated point deductions. Significant deficiencies will be reported via the final inspection report. Attribute # Amplifying Information

Print Name: _________________________________ Signature: _____________________________ Command: _______________________________________ Date: ____________________________

p. 587

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-A-14 APPENDIX A APPENDIX A SECTION I-B3 CLER CHECKLIST GRADING ATTRIBUTES

* Indicates electronic versions acceptable. 1. Attribute 1: Does the 3MC maintain: 2. Attribute 1a: a. A Change Accountability Log (inclu ding FBR Accountability Log in SKED)? b. Is the Accountability Log and FBR record in SKED updated? 3. Attribute 1b: a. A log tracking the assignment of MRCs from split MIPs to ensure all applicable MRCs are assigned (if applicable)? b. Is a log available and appr oved by the XO to track the assignment of MRC(s) from split MIPs? 4. Attribute 1c: a. A LOEP containing locally generated MIPs and a record of the associated MRC files? b. Does the 3MC maintain a LOEP that contains locally generated MIPs? c. Does the 3MC maintain a master file with the locally generated MRC documentation? d. Shore stations that do not have a locally generated LOEP or associated locally generated MRC documentation mark as “NA”. 5. Attribute 1d (*): a. A current PMS (and where applicab le TFR) DVD or downloaded file? b. Is the latest PMS FR and TFR loaded and finalized on the first Monday of the quarter or on the later date as authorized by TYCOM? c. Is the latest version of SKED implemented? 6. Attribute 2 (*): Does the command have a reliable system for backing up MDS and PMS data? a. Are back-ups and daily systems checks conducted? b. Are external back-ups available? c. Are multiple data points saved on NMCI or ONE-NET servers as required? 7. Attribute 3 (*): a. Does the 3MC have an effective system in place to track, route and explain externally provided PMS changes? b. Does the 3MC route, maintain and tr ack externally provided PMS changes?

p. 588

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-A-15 APPENDIX A 8. Attribute 4: a. Is there an effective system in us e (Spot Check Program) whereby supervisory personnel periodically and routinely monitor PMS performance? b. Does the 3MC maintain a Spot Check Matrix for the current week and the past 13 weeks? 9. Attribute 5: a. Have all FBRs entered in SKED been properly reviewed by the CoC and submitted off hull within seven days? b. Are all FBRs entered in SKED? c. Are all FBRs reviewed and processed off station (PMSMIS) within seven days? 10. Attribute 6: a. Have CSMP reconciliations been co nducted per JFMM and TYCOM instructions? b. Does the command or activity routinely s ubmit CSMP reports to the ISIC or TYCOM per TYCOM direction? 11. Attribute 7 (*): a. Does the activity conduct internal audits (Quarterly Self-Assessments) of all WCs and retain for a one year the copies of deficiencies, corrections, and abatement? b. Does the unit conduct quarterl y internal audits or self-assessments of all WC PMS? c. Are quarterly self-assessme nts retained for one year? d. Are complete quarterly self-assessment deficiencies and POAM submitted to ISIC or TYCOM? 12. Attribute 8 (*): a. Does the 3MC provide weekly status reports to the 3-M Manager per specific TYCOM directive? b. Does 3MC provide weekly status reports to the 3-M Manager ? c. Does 3MC retain the last 13 weeks of weekly reports? d. Does 3MC retain the cover pages of one y ears’ worth of weekly reports signed by the CoC? 13. Attribute 9: a. Does the 3MC have an approved master copy of 3-M PQS specifically tailored for the command? b. Does 3MC have a master copy of 3-M PQS specifically tailored for the command that is approved by the CO? c. Is the command using the latest version of 3-M PQS? 14. Attribute 10 (*):

p. 589

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-A-16 APPENDIX A a. Does the 3MC maintain an auditable record of PMS PQS for the command (e.g., copy of service record entries, signed copy of PQS cover letter, officer verified divisional training record, or FLTMPS report)? b. Does the 3MC will maintain a list of all assigned 3-M positions and PQS qualifications? c. Are all personnel qualified fo r their assigned 3-M positions? 15. Attribute 11: a. Does the 3MC maintain the status of command FBRs, responses and follow up actions taken in SKED? b. Are the FBR response actions noted in SKED Feedback Report Manager? c. Are command generated FBRs, respons es and action taken tracked in SKED. 16. Attribute 12: a. Does the activity conduct 3-M Program training per directives? b. Is 3-M training included in PB4T (Planning Board for Training). c. Is 3-M training scheduled and published in the POW or POD? d. Does the 3MC retain copies of 3-M trai ning muster sheets for a minimum of one year? 17. Attribute 13: Does the 3MC have an active AWN account with proper permissions? 18. Attribute 14: Does the 3MC retain one years’ worth of quarterly reports? 19. Attribute 15: Are the quarterly reports signed and dated by the CoC? 20. Attribute 16: Are the Check Note Reports included?

p. 590

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-A-17 APPENDIX A APPENDIX A SECTION II-A SPOT CHECK ACCOMPLISHMENT RATING (SCAR)

Using the basic definitions and guidelines described, determine the PMS Spot Check Accomplishment Rating (SCAR) for each WC. Enter the values determined on the Spot Check Monitor Form, section II-A of this appendix. For all completed maintenance (including daily, weekly, and bi-weekly) from the last 13 weeks. Every WC will receive at least one periodic and one situational documented spot check. The maximum spot checks accomplished during the inspection will be five per WC. 1. Complete an MRC Evaluation, SCAR Check Sheet , section II-A of this appendix, for each MRC selected. Based on the results, evaluate the overall effectiveness of the accomplishment of each MR selected. Enter a numeric evaluation of each assessment attribute and provide amplifying information describing the deficiencies and associated point deductions. Significant deficiencies will be reported via the final inspection report. 2. The SCAR Check Sheet reflects a series of questions to be asked to determine the accomplishment status of an MRC previously reported as accomplished. Although, the sheet may be used as a reference for conducting a real time monitored MRC evaluation, for the purposes of conducting a 3MI, all spot checks will be conducted on accomplished (historic) MRCs. 3. Due to the nature of MRC completion, supporting programs such as Tag-Outs and HAZMAT are encountered. Care should be taken to avoid expanding the spot check to a review of the processes of those programs thereby preventing the assessor from determining the accomplishment status of the MRC under review. 4. The following is expanded guidance for completion of the SCAR check sheet. Best practices or other policies not supported by source documentation will not be included in evaluating compliance: a. (1.a.) Determine if the MP is qualified to perform the maintenance task. PQS 301 is required for all MRCs but attention should also be paid to other qualifications required such as Quality Maintenance (see volume 5, part I, chapter 3, paragraph 3.4 of this manual) or graduation from a required school such as gage calibration technician. b. (1.b.) Determine if the correct TPMTE were used during the performance of the MRC. If the MP did not have the required TPMTE, it is unlikely that he or she would have been able to complete all the procedural steps of the MRC as required. If an item of TPMTE was required to perform a conditional step and that step was not required to be accomplished, it is not considered deficient. If the required test equipment required calibration, ensure that the calibration is within date and the equipment is of sufficient scale to accomplish the MRC. c. (1.c.) Determine if the MP maintained the correct equipment. d. (1.d.) Examine the MRC to determine that any locally applied changes are authorized by procedural notes, external correspondence, or allowed by reference (b).

p. 591

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-A-18 APPENDIX A e. (1.e.) Determine applicability of the MRC to the component that the MP signed for completion on the 13-Week Accountability Log. NOTE: IF A PROCEDURAL STEP WAS NOT COMPLETED, THE MRC SHOULD NOT HAVE BEEN REPORTED AS COMPLETE AND THEREFORE THE ATTRIBUTE GRADE SHOULD BE ZERO AND ALL SUBSEQUENT ATTRIBUTES SHOULD ALSO BE ZERO, EFFECTIVELY “FAILING” THE SPOT CHECK. f. (2.a.) From a variety of potential techniques, determine if the MP performed all the required steps of the MRC. This may be accomplished via re-enactment, a discussion regarding the steps or re-performance. The inspector should come away with a clear impression that all the steps of the MRC were either fully accomplished or not. NOTE: IF A REQUIRED TAG-OUT WA S NOT CONDUCTED IN SUPPORT OF ACCOMPLISHING THE MRC, THE MRC SHOULD NOT HAVE BEEN CONDUCTED AND REPRESENTS A SERIOUS SAFETY VIOLATION. THEREFORE, THE ATTRIBUTE GRADE SHOULD BE ZERO AND ALL SUBSEQUENT ATTRIBUTES SHOULD ALSO BE ZERO, EFFECTIVELY “FAILING” THE SPOT CHECK. g. (2.b.) If required by the MRC, veri fy that a Tag-Out was hung before the maintenance was performed. Ensure the isolation boundaries were appropriately identified and correctly positioned to ensure complete isolation of the maintained equipment. If no tag-out was required, write NA on the sheet. NOTE: FAILURE TO ADHERE TO A SA FETY PRECAUTION PROVIDED ON THE MRC CONSTITUTES A SERIOUS SAFETY VIOLATION AND THE FAILURE TO PERFORM THE MRC AS WRITTEN. THE ATTRIBUTE GRADE WILL BE ZERO AND ALL SUBSEQUENT ATTRIBUTES WILL ALSO BE ZERO, EFFECTIVELY “FAILING” THE SPOT CHECK. h. (2.c.) Determine compliance with all speci fic safety precautions listed on the MRC. If no safety requirements were invoked, write NA on the sheet. i. (3.a.) By physical examination of the maintained equipment, determine if maintenance of the nature required by the MRC had been performed. Take note of fasteners that would have had to be disturbed, dirt in filters, fresh oil, etc. to make a judgment as to whether the maintenance has been performed. NOTE: DUE TO THE POTEN TIAL LIABILITY INCURRED BY IMPROPER USE AND DISPOSAL OF HAZMAT, SOME WCS HAVE ASSIGNED SPECIALLY TRAINED PERSONNEL TO PROVIDE HAZMAT AND DISPOSAL SERVICES FOR SURPLUS MATERIAL INSTEAD OF THE MP. THIS IS ACCEPTABLE PROVIDED THE INSPECTOR CAN DETERMINE FULL COMPLIANCE. j. (3.b.) Determine through questioning and record verification that HAZMAT was properly used and disposed of as a means of determining whether the MRC was accomplished. Once the inspector has determined that the HAZMAT was used and

p. 592

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-A-19 APPENDIX A disposed of correctly, this attribute is considered fulfilled. If no HAZMAT was required to be utilized, write NA on the sheet. k. (3.c.) Determine if the MP could ha ve performed the MRC from a standpoint of being trained and proficient in the tasks called out for by the procedure. l. (4.a.) Determine if the MP filled out the 13-Week Accountability Log or annotated proper disposition of maintenance in SKED correctly for the accomplished MRC with the appropriate accomplishment date. Ensure that if a tag-out isolation was used; the tag serial number is recorded in the space allowed or as a check note in SKED. Ensure that the printed name and legal signature of the MP who performed the maintenance is recorded or, in case of group performed PMS, the MP in charge of the group. m. (4.b.) From reviewing th e discussions and findings during the spot check, determine if an FBR had been submitted if required. If no FBR was required, write NA on the sheet. n. (4.c.) Determine if a mate rial deficiency was noted during the PMS; if so, examine the CSMP to ensure the deficiency was documented. If no material deficiency was noted, write NA on the sheet. If material discrepancies are properly documented in the CSMP attribute graded as a two. Material discrepancies which are not documented in the CSMP will be entered with an automatic grade of zero. 5. When a Spot Check is determined to be belo w standards, the command undergoing inspection is likely to have numerous questions. To facilitate root cause analysis and the formulation of an effective corrective action plan, care should be taken to clearly identify factors contributing to deficiencies that led to the conclusion that the MRC was not conducted as written or not conducted at all.

p. 593

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-A-20 APPENDIX A APPENDIX A SECTION II-B SCAR CHECK SHEET Planned Maintenance System (PMS) 3-M Spot Check Form COMMAND DEPARTMENT EQUIPMENT WORK CENTER DATE PERFORMED MIP EVALUATED MRC EVALUATED

Maintenance Person: Spot Check Date: NOTES: 1. If an attribute marked with an “*” is evaluated as unsatisfactory, all subsequent attributes will be graded as "0". 2. Attribute marked with a pound sign “#” – Due to the potential liability incurred by improper use and disposal of HAZMAT, some WCs have assigned specially trained personnel to provide HAZMAT and disposal services for surplus material instead of the MP. This is acceptable provided the inspector can determine full compliance. Inspection Attribute Value Grade Notes Contact the MP assigned responsibility for the accomplishment of the MRC, have the individual deliver MRC, and determine the following by questions, personal observation, or both. 1. a.* Is the MP qualified (PQS) to perform the MR? 2 b. Did the MP present the correct tools, personal protective equipment, parts (NSN), material (Military Specification (Military Specification)) and calibrated test equipment? 3

c. Did the MP properly identify the equipment (location, equipment validation)? 4

d. Are there unauthorized changes or corrections to the MRC? 3 e. Is the MRC correct for the equipment maintained? 3 Demonstrated all steps of MR including all Notes, Warnings and Cautions according to the MRC. 2. a.* Followed all steps of the MRC. 5 b.* Correctly performed equipment Tag-Out. 5 c.* Followed all safety precautions. 5 Does the equipment condition reflect accomplishment of the MRC? 3. a. Is it apparent that maintenance was performed recently? 10 b.# Correctly demonstrat ed use and disposal of Hazardous Material. 3

p. 594

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-A-21 APPENDIX A c. Was the MRC within the capability of the assigned individual? 5 PMS Reporting 4. a. MP reported status of MR to the WCS if Completed or Not Fully Accomplished and made appropriate updates in SKED. 2

b. WC generated FBR for any problem with MRC. 2 c. Material deficiencies detected by the PMS action were recorded in MDS. 2

Attributes Evaluated as NA are not Calculated Total Points Available:_____________ Total Points Awarded:____________ Spot Check (SCAR) (Grade = Points Awarded ÷ Points Available): SCAR = Above Standards (90% or greater) At Standards (80-89.99%) Below Standards (less than 80%) Above Standards At Standards Below Standards Below Standard grade requires immediate accomplishment (if XO determines re-performance is required) monitored by a Chief Petty Officer

p. 595

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-A-22 APPENDIX A Additional Remarks:

Printed Name:_____________________________________________________________________________________

Signature:_________________________________________________________________________________________

Command:____________________________________________________ Date:______________________________

p. 596

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-A-23 APPENDIX A APPENDIX A SECTION III MAINTENANCE ACCOMPLISHMENT RATE (MAR) 1. The Maintenance Performance formula has been redefined to more effectively capture maintenance that was not scheduled. 2. The PAR and SAR reports are automatically generated by SKED. 3. The MAR grade will be determined utilizing the formula reflected and a date range consisting of the previous 13 weeks of maintenance. MAR = (PAR x .5) + (SAR x .5) MAR = PAR (If WC holds no situational maintenance) PAR = Comp ÷ (Comp + Lost + Alerts + Omitted) SAR = Comp ÷ (Comp + Lost + Omitted) 4. Omitted is defined as any maintenance action that should have been performed on any and every maintenance item and no matter the reason did not get scheduled. For example: a. Situational or state maintenance that did not get scheduled when the situation dictated. b. Improperly lined-out periodic checks. c. Non-accomplished IEM checks. d. Non-accomplished maintenance added vi a ACN, FBR, Preliminary PMS, etc.

p. 597

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-A-24 APPENDIX A APPENDIX A SECTION IV CURRENT MAINTENANCE PROJECT VALIDITY FACTOR (CVF) WORK CANDIDATE WORKSHEET CSMP VALIDITY FACTOR (CVF) WORK CANDIDATE WORKSHEET COMMAND:______________________________________________________DATE:______________________ DEPART:________________________DIVISION:________________________WORK CENTER:____________ JCN EQUIPMENT 1 2 3 4 5 6 7 8 9 10 CVF

CVF Average of all cells A V G A V G A V G A V G A V G A V G A V G A V G A V G A V G AVG

CSMP entry was reviewed with the following results: Score 1. Problem description adequate. 10 2. Recommended solution adequate. 10 3. Write-up reflects maintenance level assigned. 10 4. First (1st) and second (2nd) contact person assigned. 10 5. Correct CSMP summary. 10 6. Correct type of availability (maintenance assignment) 1, 2, 3 or 4 work candidates. 10 7. Priority code correct. 10 8. Write-up matches the configuration item and is written on the correct configuration item. 20 9. Was the correct special purpose or safety block selected with the correct values assigned? If selected, was the required Block 35 remarks present? 10 10. Does the work candidate reflect the current and correct status of the material deficiency? (physical verification, space walk-throughs, spot checks) Yes or No For attributes not required due to class or type differences, “NA” attribute and recalculate total value of each field.

p. 598

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-A-25 APPENDIX A NOTE IF ITEM #10 IS “NO”, THE WORK CANDIDATE WILL BE ZERO. CSMP Validity: Above Standards At Standards Below Standards Above Standards (90% or greater) At Standards (80-89%) Below Standards (less than 80%)

NOTE: ENTER ONLY NUMERIC PORTIO N OF JSN AFTER ENSURING THAT DEPARTMENT AND WC HEADER ARE FILLED IN.

p. 599

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-A-26 APPENDIX A APPENDIX A SECTION V-A SKED 3.2 PROFICIENCY FACTOR (SPF) WORKSHEET COMMAND DEPART DIVISION WC DATE Individual Evaluated: 3M Billet Assigned: Proficiency Required Proficie ncy Attribute Yes or No WORK CENTER ACTIONS MP WCS LCPO DIVO DH 3MC Y/N Y/N Y/N Y/N Y/N Y/N 1 X X X X X X Able to log on. 2 X X X X X X Able to open a WC. 3 X X X X X X Able to view th e Schedule, Review, Forecast, Situational, IEM, Journal and PMS Document displays.

4 X X X X X X Able to annotate disposition of maintenance. 5 X X X X X X Able to view previous 13-weeks. 6 X X X X X X Able to view Check Details. 7 X X X X X Able to schedule Spot Checks and update Spot Check results.

8 X X X X X X Able to enter and view Check Note remarks. SCHEDULE ACTIONS 9 X X X X X Able to add, delete or modify MIPs and MRCs in Revision Mode.

10 X X X Able to perform MRC lineout. 11 X X X X X Able to modify MRC line out justification. 12 X X X Able to approve MRC lineout. 13 X X X Able to perform weekly closeout. 14 X X X X Able to acknowledge PMS Alerts. 15 X X X X Able to reschedule checks. 16 X X X X Able to assign maintenance responsibilities. 17 X X X Able to modify equipment associations. 18 X Able to archive 13-weeks. EVENT LIST ACTIONS 19 X X X Able to create an Event List. 20 X X X Able to add checks to an Event List.

p. 600

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-A-27 APPENDIX A 21 X X X X Able to trigger a Local Event. 22 X Able to trigger a Global Event. FEEDBACK REPORT ACTIONS 23 X X Able to generate an FBR. 24 X X X X Able to review and approve an FBR. REVISION ACTIONS 25 X X X Able to start a revision. 26 X X X Able to approve a revision. 27 X X Able to finalize a revision. REPORTS 28 X X X X X Able to generate and view PMS reports. ADMINISTRATIVE ACTIONS 29 X Able to add users. 30 X X X X Able to edit users. 31 X X X Able to disable users. 32 X X X X Able to view and modify the CoC. TOTALS 8 19 26 23 18 32 Divide total Yes by Proficiency required totals for the billet held by the individual. Total Yes SKED PROFICIENCY FACTOR SAT = 85% or better MP WCS LCPO DIVO DH 3MC SPF (%):

COMMENTS

p. 601

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-A-28 APPENDIX A APPENDIX A SECTION V-B SPF DESCRIPTION AND GRADING ATTRIBUTES 1. Able to log on. a. Click on SKED 3.2 desktop icon. b. Enter username and password. c. Click “ Enter”. 2. Able to open a Work Center. a. On the view tab bar, click “ WORKCENTER”. A box opens. b. Click to highlight the WC to be open. c. Click “ Open” or double click the highlighted WC to open it. 3. Able to view the Schedule, Review, Fo recast, Situational, IEM, Journal and PMS Document display. a. From the WC toolbar, click “ Schedule”. b. From the WC toolbar, click “ Review”. c. From the WC toolbar, click “ Forecast”. d. From the WC toolbar, click “ Situational”. e. From the WC toolbar, click “ IEM”. f. From the WC toolbar, click “ Journal”. g. From the WC toolbar, click “ PMS Documents”. 4. Able to annotate disposition of maintenance. (Mark a check as complete etc.) a. From an open WC, in the grid, click to highlight the desired check. b. Right click the selected item and select the “Complete (Green X) Check” icon from the menu. c. The icon (Green X) will be displayed in the grid. d. To unmark the check, right click the same item and click the (Green X) again. NOTE: WHEN THE PIN ACCOUNTABIL ITY FEATURE IS ENABLED THE CREW MEMBER THAT WAS ASSIGNED THE MAINTENANCE MUST BE PRESENT TO INPUT PIN WHEN WCS MARKS THE CHECK COMPLETE. 5. Able to view previous 13-Weeks. a. From an open WC, in Schedule display vi ew, on the secondary tool bar, click on the “Quarterly” icon drop-down arrow. b. Click one of the available quart ers in the past to be reviewed.

p. 602

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-A-29 APPENDIX A c. Once done reviewing, click on the “ Quarterly” icon drop-down arrow and select the current quarter. 6. Able to view Check Details. a. From an open WC, in Schedule display vi ew, highlight a check in the grid and right click it. b. From the menu, select “ View Details”. c. From the “ Check Details” window, select the desired tab, such as General, SPMIG, MIP Document and MRC Document. d. Close when done. 7. Able to schedule Spot Checks and update Spot Check results. a. Able to update Spot Check results: (1) From an open WC, in Schedule display view, highlight a check that has been scheduled for a spot check. A circle with a yellow  (check mark), is the spot check icon. (2) Double click it. NOTE: A SPOT CHECK MUST HAVE BEEN ALREADY ASSIGNED ON THE SCHEDULE. (3) The check details box opens, sele ct the “Spot Checks”, click on the “Edit Spot Check” icon and a spot check window displays. (4) Fill in the scores of the spot check. The task will be in your task list. (5) Double click the task to edit the spot check results. b. Able to Schedule Spot Check. (1) On the view bar tab, click “ SPOT CHECK”. (2) On the secondary tool bar select “ Schedule Spot Check”. (3) The Spot Check scheduling wizard will appear . Click “Next”. (4) Select “ Spot Check”. (5) Select the person that will be conducting the spot check, then click “Next”. (6) Select the date the spot check will be conducted and the WC the spot check will be conducted in. (7) Select the check, click “ Next”. (8) Review the information and click “ Finish”. 8. Able to view and enter Check Note remarks . a. From an open WC, in Schedule display view; click to highlight the desired check. b. Right click the highlighted check. c. Select the “ Check Note” icon from the menu.

p. 603

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-A-30 APPENDIX A d. Enter your remarks (Lost, Not Applicable, Reschedule etc.). e. Click “ OK”. 9. Able to add, delete or modify MIPs and MRCs in Revision Mode. NOTE: THE WC MUST BE PUT IN RE VISION MODE, DONE BY THE LCPO (STEP #25 LCPO OR 3MC ONLY). PROCEDURES 12 THROUGH 16 ARE PERFORMED FROM THE REVISION EDITOR: a. Able to add a New MIP . (1) On the Revision Editor toolbar, click “ New MIP” icon. (2) The Add MIP dialog box opens. (3) Select the MIP to be added to your WC. NOTE: IF YOUR MIP IS NOT LISTED , ENTER THE MIP NUMBER IN THE BLANK PROVIDED IN THE LOWER PORTION OF THE SCREEN. THIS WILL ONLY BE AN ADMINISTRATIVE CHANGE UNTIL THE NEW MIP IS ADDED TO THE FR DVD. CLICK “OK”. THE NEW MIP WILL BE GREEN. b. Able to make a maintenance item active or inactive (Delete). (1) Follow the MIP outline to the de sired maintenance item and highlight it. (2) On the toolbar, click the “ Make Active or Inactive” icon. The maintenance item icon in the outline will become blue for active and gray for inactive. Clicking the button will toggle back and forth. NOTE: MAKING A MAINTENANCE ITEM ACTIVE OR INACTIVE WILL AUTOMATICALLY MAKE ALL MRCS FOR THAT MAINTENANCE ITEM ACTIVE OR INACTIVE TO MATCH THE MAINTENANCE ITEM. c. Able to add MRCs (Same as add cross MIP related MRCs) . Follow the MIP outline to the desired maintenance item and highlight the item. (1) On the toolbar, click the “ New MRC” icon. The add MRC wizard opens. (2) Click “ Next”. (3) Click the check box next to Check to select an MRC from the reference data. A check appears and the MIP Outline on the screen becomes active. (4) Follow the MIP Outline to the MRC to be added. Highlight the MRC and click “Next”. (5) Review the MRC details and make needed adjustments. Click “Next”. (6) Click “ Finish” and the MRC is added to the WC’s MIP Outline.

p. 604

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-A-31 APPENDIX A NOTE: STEPS 4 AND 5 MAY BE SKIPPED BUT THE INDIVIDUAL BEING EVALUATED NEEDS TO MANUALLY ENTER ALL DETAILS OF THE MRC IN STEP 6. d. Able to modify the details of a maintenance item or MRCs. (1) Follow the MIP outline to the desired maintenance item or MRC and highlight the item. (2) Modify or add data in the white gr ids only on the right pane of the window. The maintenance item or MRC icon on the MIP outline and the grid that has changed becomes yellow. NOTE: “BOLD” TEXT INDICATES A STATUS CHANGE FOR THAT MRC. THE MRC SYSCOM CONTROL NUMBERS (MRC CODE) MAY NOT BE EDITED. IF A REVISED DOCUMENT IS RECEIVED BECAUSE OF AN FBR OR DIT REPLY, THE “ADD MRC” FUNCTIONALITY IS USED TO ADD THE DOCUMENT. NOTE: DHs MUST APPROVE LINEOU TS BEFORE THEY ARE PRINTED. 10. Able to perform MRC lineout. a. From an open WC, click “ PMS Documents”. b. Expand the appropriate MIP folder and follow the path to the MRC. c. On the secondary toolbar, click “ Customize MRC”. The Customize MRC Document dialog box opens. d. Scroll through the MRC and double click and highlight the procedure lines that are to be omitted. e. To remove a lineout, double cl ick the procedure line again. f. Type the notes to appear on the MRC in the Tools, Parts and Materials Custom Note field. Click “OK”. g. Your custom note is now part of the M RC and all the icons in the organizational outline become red. (Not yet approved) 11. Able to modify MRC line out justification. a. From an open WC, click the “ PMS Documents” button on the top of the screen. b. Expand the MIP for the MRC that needs changes. c. Expand the tree for that MIP to get to the list of MRC(s) under that MIP. d. Highlight the MRC th at needs modification. e. Click on the “ Pencil” icon on the top left-hand corner of the screen (this the “customize MRC” icon). f. A “Customize MRC Document” box will come up containing the MRC selected. (1) Scroll through the MRC and click on th e procedural step(s) that need(s) to be lined-out. The affected procedural step will have a red line going through it.

p. 605

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-A-32 APPENDIX A The red line indicates that the lineout has been performed but not yet approved. Lineouts approved by LCPO or higher turn the lineout from red to blue. (2) In the Tools, Parts and Materials Custom Note on the bottom, refer to the specific procedural step lined-out and provide detailed justification for lineout (e.g., Step 1.a.(2)(a) – Step omitted per FBR 2025-18). (3) To reverse a lineout marked in red, click on the procedural step again. As long as the lineout is not yet approved, this will clear the lineout. 12. Able to approve MRC lineout. a. “MY TASKS” displays MRCs that have custom review and omit line outs which require lineout for a WC in your role in the CoC. Since multiple users may belong to the same role in the CoC, only one of the user’s needs to approve the lineout to remove it from everyone’s list. Lineouts appear in red, indicating they are not yet approved. When approving or disapproving lineouts, the requirement is to approve All or None of the lineouts. Partial lineouts are not allowed. b. Expand the Lineout approval list. c. Highlight the desired row. d. Double click the row; the Approve Customi zations details screen displays for the selected item. e. On the “View Details” toolbar, click “ Approve and Close or Reject and Close”. The task is removed from your “My Task” list. 13. Able to perform weekly closeout. a. From an open WC, on the “Tool bar”, click to open the WC menu. b. Scroll down to “Weekly Closeout” and c lick it. A window opens, if there are no issues in the WC to resolve, the “Close Out” icon at the top of the window will be active. c. Select it and the week will be closed out. d. If there are issues, they must be reso lved prior to the week being closed out. 14. Able to acknowledge PMS Alerts. a. “MY TASKS” displays PMS Alerts for MRCs that are out of periodicity. When PMS cannot be accomplished before going out of periodicity, the WCS must provide a reason, which should be specific and include well-defined details. The CoC, from the LCPO to the 3MC sees the alerts displayed in their “MY TASKS” list. Only one user needs to acknowledge the alert to remove it from everyone’s list. b. On the secondary toolbar at the top of the screen click on “Tasks”. c. Expand the PMS Alert list. d. Highlight the desired row, double cl ick it, or on the tool bar select “VIEW DETAILS” icon.

p. 606

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-A-33 APPENDIX A e. Click “ OK”. NOTE: IF “CANCEL” IS SELEC TED, THE PMS ALERT IS NOT ACKNOWLEDGED AND THEREFORE NOT REMOVED FROM THE TASK LIST. 15. Able to Reschedule Checks. Checks that are manually added or reschedule checks when the periodicity is weekly or greater. a. From an open WC in the gri d, right click a check, a menu will open. b. Scroll down to the “ Reschedule” calendar icon and click it. c. A calendar opens with the orig inally scheduled date highlighted. d. Click the date the check is to be rescheduled. ( Only the white dates are available for the check to be rescheduled to.) e. Click “ Next”. Click “Finish”. NOTE: A CHECK NOTE MU ST BE ENTERED FOR RESCHEDULED, OUT OF PERIODICITY, NON-ACCOMPLISHED CHECKS. 16. Able to assign maintenance responsibilities. a. From an open WC, in Schedule display view. b. In the grid, click to highlight the desired check. c. On the “Toolbar”, click “ Assign Crew Member” icon, or right click the desired check and select “Assign Crew” from the menu. d. Under the column heading for Crew Member, click the drop-down arrow to view available crew members. e. Click the crewmember’s name. f. Click the small box to apply changes. A checkmark will appear in this box. g. Click “ OK”. 17. Able to modify equipment associations. a. From an open WC, on the tool bar, click to open the WC menu. b. Select “ Edit Equipment Details”. c. Follow the MIP outline to the desire d maintenance item and highlight the item. d. Click the ellipses button in the SHIP RIN or CDM RIN row, which is found in the white grids. A dialog box will open. Use the drop-down menus to locate criteria or enter search text. Click “GO”. Highlight the row of data needed. Click “OK”. e. Alternately, from the Revision Editor: f. Follow the MIP outline to the desire d maintenance item and highlight the item. g. Click the ellipse button in the SHIP RIN or CDM RIN row, which is found in the white grids.

p. 607

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-A-34 APPENDIX A h. A dialog box will open. Use the drop-down menus to locate criteria or enter search text. Click “GO”. Highlight the row of data needed. Click “OK”. 18. Able to archive 13-weeks. NOTE: THIS IS PERFORMED ONLY BY THE 3MC. ALL WCS MUST BE UP TO DATE WITH THE LAST WEEK OF THE CURRENT QUARTER CLOSED OUT FOR THE QUARTER BEING ARCHIVED. WHEN THE 3MC ARCHIVES A QUARTER, A NEW QUARTER WILL BE CREATED. a. On the view tab bar, click “ ADMIN”. b. From the “Admin” drop-down on the top of screen, click “Archive Quarter”. c. If any WC has not closed out a week in the quarter being archived, a message will appear, and the archive process will not be allowed to continue until close issues are resolved. 19. Able to create an Event List. a. Local Event List. (1) Click on “Reports tab”. (2) Double click "Local Events" from the left-side menu. (3) Click “Next”. (4) Select your WC from the drop-down menu. Click “Next”. (5) Select your date ranges when prompted. Click “Next”. (6) Click "Finish" to run your report. b. Situational “ Event List”. (1) Click on “ Reports tab”. (2) Double click " Situational Events" from the left-side menu. Click “Next”. (3) Select your WC from the drop-down menu. Click “Next”. (4) Select your situational even t from the drop-down menu. Click “Next”. (5) Click " Finish" to run your report. 20. Able to add checks to an Event List. a. Click “ Add Trigger” on the toolbar. A dialog box opens. b. Select a trigger from the menu. Use the scroll bar to view all selections. c. Click the date the trigger is to occur. The trigger icon now displays on the EVENTS calendar. 21. Able to trigger a Local Event. a. From the Situational view, on the secondary toolbar, click “Events”. b. In the left pane, open the desired MIP outline.

p. 608

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-A-35 APPENDIX A c. Click to highlight the maintenance item. d. Click the “ADD TRIGGER” icon to launch the Add Trigger Wizard. e. From the list, highlight a trigger. Th en select the date for the trigger to occur. f. Click “OK”. 22. Able to trigger a Global Event. NOTE: THIS IS PERFORME D ONLY BY THE 3MC. 23. Able to generate an FBR. NOTE: THERE ARE SEVERA L WAYS TO CREATE AN FBR IN SKED 3.2. THE FOLLOWING IS JUST ONE WAY OF DOING IT. a. From an open WC, highlight a check from the grid. b. On the WC toolbar menu, scroll down to “ Submit Feedback Report” and click it. c. Select “ Technical MIP Changes or Technical MRC Changes”. d. The Feedback Report Wizard opens. e. Several choices will be availabl e for your selection. Choose one. Click “Next”. f. Enter any additional comments. Click “ Next”. g. Your information will be displayed, if ch anges are required, click the back button, or click “Finish”. 24. Able to review and approve an FBR. a. “My Tasks” displays FBRs awaiting your review and approval. b. Expand the FBR list. c. Highlight the desired row. d. Double-click the row, the FBR Details block opens. e. The ability to view, approve, modify, make urgent or reject the FBR is here. f. The LCPO, DIVO, and DH must review a nd sign the FBR before it goes to the 3MC. NOTE: THE 3MC CAN BYPA SS THE CoC IF REQUIRED TO GET THE FBR TRANSMITTED ASAP. 25. Able to start a revision. NOTE: THE LCPO WILL PUT THE WC IN REVISION MODE FOR THE WCS. a. Open the WC, on the “Toolbar”, click to open the “Work Center” menu. b. Scroll down to “ Start Revision” and click it. The Start Revision wizard opens. c. Click “ Next”. The Start Revision dialog box opens. d. Select the Revision Type. e. Enter a valid Revision Name. Click “ Next”.

p. 609

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-A-36 APPENDIX A f. Provide a revision reason. A reason for starting a revision for anything other than an FR is required. Click “OK”, click “Finish”. g. The Revision editor will load, and th e evaluated individual should now be in Revision Editor Mode. 26. Able to approve a revision. a. “MY TASKS” displays re visions ready for approval. b. Expand the revision approval list . Highlight the desired row. c. Double click the row; the Revision Editor opens. Expand the path to the revision. d. On the toolbar, click “ Approve” (Star icon) e. The Revision Editor screen closes and is removed from your task list. 27. Able to finalize a revision. a. Same as paragraph 26, except that if pe rformed by the DH or 3MC once they click on “Approve” (Star icon), the revision is finalized. b. Revisions should be approved (signed) by the LCPO and DIVO before being approved by the DH. When the DH goes in to approve the revision, they will see a window indicating whether the revision was approved by the LCPO and DIVO. The DH can choose to approve the revision regardless. 28. Able to generate and view PMS Reports. a. Open the “REPORTS” tab at the bottom right of the SKED 3.2 program. b. A window opens with two panes; the left-h and pane has all the reports available to view, the right-hand pane is blank, this is where your data will be displayed. c. Double click the report of your choice and follow the report wizard to display your requested data. 29. Able to add users. a. Select the Admin tab (Last tab on the lower right). b. Select User Manage ment from the top menu. c. Click “ Add User” icon. The Edit User Details, New User dialog box opens. d. Enter pertinent information for the new user. e. Click the General, Feedback Reports, and Work Center tabs to check allowed permissions. 30. Able to edit users. a. Select the Admin tab (Last tab on the lower right). b. Select User Manage ment from the top menu. c. Highlight a crewmember from the display grid, and double click it. d. The User Details box opens.

p. 610

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-A-37 APPENDIX A e. Update User information in the appropriate fields. f. Click “ OK” to save changes. 31. Able to disable users. a. Select the Admin tab (Last tab on the lower right). b. Select User Manage ment from the top menu. c. Highlight a crewmember from the display grid, and double click it. d. The User Details box opens. e. Click the Status Field arrow. Select disabled. f. Click “ OK” to save changes. 32. Able to view or modify the CoC. a. Select the Admin tab (Last tab on the lower right). b. Select CoC from the top menu. c. A screen displays for the activity and lists the username, role, rate, last name, first name, and signature. d. Click the plus sign at the far left to view by department, division, and WC. e. Select the “ Edit Chain of Command” icon (top left corner, under File menu). An Edit CoC display box opens. Edit accordingly (add or delete) DH, DIVO, LCPO, or WCS.

p. 611

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-A-38 APPENDIX A APPENDIX A SECTION VI 3-M INSPECTION COMMAND TOTAL SCORE (CTS)

The CTS is weighted equally between Departments. CNIC CTS = Sum of all Departments ÷ Total number of Departments (Example: CTS = N31 DTS + N32 DTS + N34 DTS ÷ 3) A minimum grade point of 80 is required for a passing score.

p. 612

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-B-1 APPENDIX B APPENDIX B DIVISION INACTIVE EQUIPMENT MAINTENANCE (IEM) PLAN

From: Division Leading Chief Petty Officer, To: Department Head, Subj: Division Inactive Equipment Maintenance (IEM) Plan Ref: (a) COMUSFLTFORCOMINST 4790.3 Encl: (1) Inactive Equipment Maintenance Plan Matrix 1. Per reference (a), the following systems and equipment will be placed in an IEM status in SKED while the command conducts. 2. Enclosure (1) lists all Systems and Equipment that this division will place in IEM for the upcoming maintenance period. This list was checked for accuracy and linked to the appropriate system/equipment restoration and key event. The IEM Plan is considered a living document; reviews will occur when key events timelines change. 3. A current copy of this plan will be provided to the command 3MC and be made available to the LMA, CTE and Project Superintendent.

//SIGNATURE// I.M. CHIEF

I concur with placing the Systems or Equipment identified in Encl (1) in an IEM Status.

//SIGNATURE// Department Head

p. 613

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-B-2 APPENDIX B

Enclosure (1)

System or Equipment MIP CAT 1 / 2 LU PM SU/OT Due MRs Restoration Key Event Estimated Restoration Date #1 Burner 5151/902 1 LU-3 LU-4 PM-1 PM-2 SU-2 SU-3 OT-1 A-8 43 Ventilation Restore 12/25/16

p. 614

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-4-C-1 APPENDIX C APPENDIX C FORMAT FOR REPORTING 3-M INSPECTIONS

4790 Ser Date From: Accomplishing Activity To: Commanding Officer (Command Name) Subj: REPORT OF 3-M INSPECTION OF Ref: (a) NAVSEAINST 4790.8 (series), Ships’ Maintenance and Material Management (3-M) Manual (b) COMUSFLTFORCOMINST 4790.3, Joint Fl eet Maintenance Manual, Volume VI, Chapter 19 Encl: (1) (as required) 1. Per references (a) and (b), a 3-M Inspection of (__________________________) was conducted during the period (Date) to (Date). 2. During this inspection, the following signi ficant deficiencies were discovered: a. (List) Specific department and WC deficiencies are provided in enclosure(s) (1) through ( ). 3. The following overall activity or departme nt numerical assessments are assigned:

a. 3-M Total Score __________________

b. 3-M Inspection __________________ (Above, At or Below Standards)

Copy to: Immediate Superior In Command (with enclosures) Type Commander (with enclosures)

p. 615

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-1 VOLUME VI CHAPTER 19-5 NAVAL SUBMARINE FORCES REFERENCES. (a) COMSUBLANT/COMSUBPAC INSTRUCTION 4790 - Maintenance And Material Management (3-M) (b) NAVSEAINST 4790.8 - Ships’ Maintenance and Material Management (3-M) Manual (c) COMSUBPAC INST S3501.6 - Submarine Preparations for Extended Deployments (d) NAVEDTRA 43241 - Personnel Qualification Standard for Ship’s Maintenance and Material Management (3-M) System (e) NAVEDTRA 43523 - Personnel Qualificati on Standard for Quality Maintenance Program LIST OF APPENDICES. A Format for Reporting 3-M Inspections B Inspection Criteria C Format for Reporting K-M RC End-of-Quarter Resolution D Division IEM Plan for Fleet and CNO Availabilities 19-5.1 APPLICABILITY. All content of reference (a) has been incorporated into this chapter to provide easier access to Maintenance and Material Management (3-M) guidance and requirements. This chapter applies to Submarine Groups and Submarine Squadron Commanders within the following assigned regions: a. Northeast Region. Commander, Submarine Squadron (COMSUBRON) 4 and COMSUBRON 12 in Groton, Connecticut, ships undergoing overhaul in Portsmouth Naval Shipyard, new construction submarines and shore based submarine support activities under Commander Submarine Force Atlantic (COMSUBLANT) cognizance. b. Mid-Atlantic Region. COMSUBRON 6 in Norfolk, Virginia, submarines undergoing overhaul in Norfolk Naval Shipyard, new construction submarines and shore based submarine support activities under COMSUBLANT cognizance. c. Southeast Region. Commander, Submarine Group (COMSUBGRU) 10, COMSUBRON 16 and COMSUBRON 20 in Kings Bay, Georgia, COMSUBGRU 8 in Naples, Italy, Diego Garcia, and shore based submarine support activities under COMSUBLANT cognizance. d. Northwest Region. COMSUBGRU 9, COMSUBRON 17, COMSUBRON 19 and Commander, Submarine Development Squadron 5 in Bangor, Washington, submarines being maintained in Puget Sound Naval Shipyard and shore based

CHAPTER 19-5

p. 616

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-2 submarine support activities under Commander Submarine Force Pacific (COMSUBPAC) cognizance. e. Southwest Region. COMSUBRON 11, Commanding Officer, Undersea Rescue Command in San Diego, California, and shore based submarine support activities under COMSUBPAC cognizance. f. Mid Pacific Region. COMSUBRON 1 and COMSUBRON 7 in Pearl Harbor, Hawaii, submarines undergoing overhaul in Pearl Harbor Naval Shipyard and shore based submarine support activities under COMSUBPAC cognizance. g. West Pacific Region. COMSUBGRU 7 in Yokosuka, Japan, COMSUBRON 15 in Guam and shore and tender based support activities under COMSUBPAC cognizance. 19-5.2 ROLES AND RESPONSIBILITIES. a. Commander Submarine Forces. Commander Submarine Forces assigns the responsibility for management of the Submarine Force Maintenance and Material Management (3-M) Program to COMSUBLANT and COMSUBPAC, Director for Maintenance and Material Readiness (N4). b. TYPE Commander. The Type Commande r (TYCOM) 3-M Office is comprised of the headquarters staff (N43) and Fleet representatives (TYCOM 3-M REP) to fulfill the TYCOM requirements of reference (b). The TYCOM exercises primary responsibility for the effective operation and support of the 3-M System. Areas of responsibility include but are not limited to the following: (1) Afloat Maintenance Data System (MDS). (a) Organizational Maintenance Management System (OMMS) and Automated Work Notification. (b) (R-Admin, R-Supply, Organiza tional Maintenance Management System – Next Generation (OMMS-NG)). (2) Ashore MDS. (a) Maintenance Figure of Merit family of systems. (b) Advanced Industrial Management for Regional Maintenance Centers. (c) Regional Maintenance Auto mated Information System. (d) Maintenance Resource Management System. (e) TRIDENT Logistical Data System. (3) Planned Maintenance System (P MS) Scheduling Software (SKED). (4) Alteration Management System. (a) Navy Data Enterprise. (b) Type Commander Alteration Management System. (5) Current Ship’s Maintenance Project (CSMP).

p. 617

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-3 (6) Master Job Catalog. (7) The screening and processi ng of feedback reports (FBR). (8) Maintaining an inspection data file per paragraph 19-5.5.2.f of this chapter. (9) Providing program enhancement requi rements to the Fleet Commander via N43. (10) Ensuring ships and units are manned with Navy Enlisted Classification (NEC) qualified 3-M Coordinators (3MC). (11) Analyzing 3-M inspection (3M I) and self-assessment data, identifying common concerns, conducting problem root cause analysis with the development and implementation of solutions. (12) Ensuring TYCOM inspection team me mbers are qualified to inspect assigned areas. c. TYCOM 3-M Regional Representatives. TYCOM 3-M Regional Representatives (3- M Rep) have been established at all submarine homeports. These positions were established to provide for the continuous monitoring of the 3-M Program on submarine assets and to assist submarine force activities and squadron commanders in the operation and administration of the 3-M Program. The 3-M Rep reports to the submarine force Maintenance Program Manager and organizationally supports the efforts of the ISIC and TYCOM. Areas of responsibility include but are not limited to the following: (1) Acting as team “lead” for all 3-M Inspections conducted on activities under their cognizance and using the format of Appendix A, provide inspection results to the ship or activity via the ISIC. (2) Originating all correspondence re lating to 3-M Inspections, periodic monitoring, and reporting of non-compliance with reference (b) and this manual. (3) Carrying out the duties and res ponsibilities of the TYCOM during PMS installations. (4) Monitoring MDS documents and repor ting deficiencies to the ISIC for corrective action. (5) Providing the followi ng support to the ISIC: (a) 3-M System monitoring. (b) TYCOM 3-M Assist Visits as described by reference (b). (c) PMS and MDS technical assistance. (d) On-site training in PM S, MDS and PMS Scheduling. (e) Assistance with the prepar ation and submission of FBRs. (f) Assistance in obtaining prom pt correction to faulty PMS documentation (liaison with an In Service Engineering Agent (ISEA).

p. 618

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-4 (g) On a case basis, provide authorizat ion to use modified (red lined) PMS documentation. (h) The review the ship’s K-MRC pl an for all Continuous Maintenance Availabilities (CMAV) to ensure compliance as discussed in Volume II, Part I, Chapter 4 of this manual. (6) Initiating 3-M Program reviews when concerns regarding 3-M performance arise. d. The ISIC is responsible for the routine monitoring and evaluation of the 3-M system for all assigned activities. ISICs will fully employ the TYCOM 3-M REP to assist the ISIC 3-M Maintenance Officer (3MO) in the execution of these responsibilities. 3-M related matters will be communicated directly to the TYCOM 3-M Rep for resolution. As an incentive for sound 3-M performance, major commanders will consider 3-M performance as part of the annual intra-squadron efficiency competition. Areas of responsibility include but are not limited to the following: (1) Designating a 3MO in writing. The 3M O is responsible for the satisfactory administration of 3-M Programs, per reference (b) and this chapter, for subordinate commands or activities. The 3MO will maintain staff PMS and Personnel Qualification Standards (PQS) records. (2) Monitoring and evaluating the 3-M Program for all assigned units in accordance with ISIC monitoring instruction. (3) Ensuring 3MIs are current. (4) Ensuring subordinate commands c onduct rigorous quarterly 3-M Self- Assessments and report results to the TYCOM 3MC. (5) Monitoring the status of troubled systems and Top Management Attention Items using the quarterly 3-M Self-Assessment. (6) Ensuring subordinate commands comply with standard Work Center (WC), division and department structure. (7) Tracking and monitoring 3-M ma jor milestones and training events, overseeing, and providing inspection teams and conducting 3-M Spot Checks during ISIC or staff visits. (8) Ensuring assigned maintenance coordi nators notify the tended activity of unsatisfactory work candidates submitted for action. (9) Ensuring material failures are adequa tely examined for the detection of 3-M system inadequacies. (10) Ensuring assigned staff has adequate knowledge of the 3-M system to detect inadequate 3-M performance during routine shipboard monitoring (i.e., PMS PQS 304 & 306). (11) Directing the performan ce of a 3MI or Assist Visit when concerns regarding 3-M performance arise. (12) Conducting a 3MI for all assigne d activities per this chapter.

p. 619

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-5 (13) Conducting routine monitoring to include: (a) Review and approval of pre-depl oyment PMS plans per reference (c). (b) Quarterly Maintenance Accomplishment Rate (MAR) Assessments and the direction of corrective actions for below standards performance. e. Commanding Officer or Officer In Charge. The Commanding Officer (CO) or Officer In Charge is responsible for establishing an aggressive Self-Assessment Program that validates the administration and execution of maintenance and detects improperly conducted maintenance or falsely reported accomplishments. f. Executive Officer. The Executive Officer (XO) is the command’s 3-M System Manager responsible to the CO for the overall management of the 3-M Program. The XO will: (1) Chair quarterly 3-M System meetings with Department Heads (DH) and the 3MC. (2) Brief the CO on the status of 3-M. (3) Integrate 3-M System training into the command’s training and qualification program. (4) Ensure personnel receive adequate and effective 3-M System training. (5) Ensure the effectiveness of the command’s 3-M Self-Assessment Program. (6) Act as the final review officer for shifts of maintenance responsibility between departments. g. Command Master Chief or Ch ief of the Boat. The Command Master Chief or Chief of the Boat will: (1) Attend the XO’s quarterly 3-M System meetings providing senior enlisted feedback. (2) Conduct PMS Spot Checks following the command’s policy to ensure required maintenance is being properly performed and documented. (3) Establish command’s Zone Inspection Program. h. Command 3-M Coordinator. Due to th e unique nature of submarine manning, the 3MC is routinely assigned as the availability coordinator and should, at a minimum, be a Chief Petty Officer (CPO). As both these functions are critical to the ship’s material readiness, careful consideration should be given prior to assigning the 3MC additional collateral duties. The 3MC will: (1) Serve as the key 3-M System assistant to the XO. (2) Maintain a file of 3-M System directives, newsletters, notes, and correspondence containing current 3-M program information and ensure distribution to WC personnel.

p. 620

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-6 (3) Maintain copies of the current Force Revision (FR) NAVY PMS Digital Video Disk (DVD), List of Effective Pages (LOEP) for every WC, changes issued between FRs in their original format and classified Maintenance Requirement Cards (MRC). Digital copies are allowed unless there have been changes between FRs. (4) Advise, monitor, and assist DHs, Division Officers (DIVO), Leading Chief Petty Officers (LCPOs) and Work Center Supervisors (WCS) in matters concerning the 3-M System. (5) Monitor the Ship’s 3-M PQS Program and maintain an auditable record of personnel qualified in 3-M PQS. (6) Maintain a master accountability log of all PMS changes. (7) Develop and maintain a Split Ma intenance Index Page (MIP) Log. (8) Administer the configur ation management program onboard the ship or unit. (9) Supervise the command’s 3-M Se lf-Assessment Program and provide a weekly status to the XO. (10) Develop and administer the ship or unit’s PMS Spot Check Program. (11) Generate a weekly PMS Spot Check assignment matrix for officers, CPOs, and designated supervisory personnel. (12) Ensure corrective actions are take n on all unsatisfactory PMS Spot Checks and report same to the XO as part of weekly PMS reporting. (13) Ensure a complete back up of the SKED system is made on removable media (e.g., DVD or CD-ROM) following completion of the FR update and retain as part of the PMS Master File. (14) Ensure that Global Stat es and Triggers are properly set at the command level. (15) Screen all FBRs, verify content, va lidity, serialize and forward within seven days of origination. (16) Maintain accountability of all submitted FBRs and actions taken until corrected or new PMS documentation is received. (17) Ensure the FBR originator and all ap plicable WCs are apprised of action taken and that changes or corrections are implemented when received. (18) Ensure 3-M documents such as Ship’s Maintenance Action Form OPNAV 4790/2K (2-Kilos), Ship’s Configuration Change Form OPNAV 4790/CK, etc. that require forwarding to a data processing activity are forwarded within seven days of origination or as operationally feasible. (19) Validate 3-M MDS data elements fo llowing the 3-M validation specifications. (20) Ensure 3-M documents returned fo r the correction of data are promptly revised and resubmitted.

p. 621

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-7 (21) Track the reporting of completed main tenance actions related to an alteration or as a result of a configuration change with timely processing of Automated Shore Interface configuration and logistic data. (22) Report up-line CSMP maintenance transactions and command’s equipment file corrections at least once a week. (23) Maintain outstanding copies of message work candidates and Supplemental OPNAV 4790/2L, paper or electronic. (24) If desired, assign a command 3-M Assistant (3MA). The 3MA will be qualified PQS 305 or 306. The command 3MC will assign the 3MA duties as necessary to fulfill the commands 3-M functions. The 3MA will report to the command’s 3-M Coordinator. i. Command Maintenance Availability Coordinator. The Command Maintenance Availability Coordinator shall be responsible for the coordination of all Fleet Maintenance Activity (FMA) repairs and coordinate closely with the 3MC. The Maintenance Availability Coordinator will also provide a single working level point of contact and coordinate the command’s requirements with the requirements of the FMA. These duties include: (1) Technical review of work requests submitted for FMA accomplishment. (a) Ensure readability a nd technical correctness. (b) Prevent duplication of work request s for Ship Alterations, Unrestricted Operation and other Master Job Catalog originated deferrals. (c) Ensure corrective maintenance described in Maintenance Action Form OPNAV 4790/2K Block 35 (Remarks) includes reference to the associated Maintenance Standard when applicable. (d) Collect Supplemental OPNAV 4790/ 2L requests for routine work (i.e., lagging, painting, label plates, tiling, etc.) from all WCs and prepare an integrated priority list for each type of routine work to maximize the FMA’s effectiveness. (2) Ensuring command preparations for an FMA availability are conducted per Volume II, Part I, Chapter 4 of this manual. (3) Meeting daily during an av ailability with the assigned Ship Superintendent to discuss the status of all active jobs. (4) Attending all FMA production, night work and management meetings. (5) Providing a daily FMA job status to each DH, DIVO and leading petty officer (LPO). (6) Prior to Work Package Execution Revi ew, conducting a joint meeting with the Performance Monitoring Team (PMT), TYCOM 3-M Representative and ISIC (typically at A-40) to review current K-MRC status, ensure the ship’s records match that of PMT and develop a K-MRC execution plan. (7) Establishment of a Planning Board for Maintenance (PB4M).

p. 622

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-8 j. Department Head. The DH is responsi ble to the XO for the operation and execution of the 3-M System within the department. Duties and responsibilities assigned to the DH are not be delegated. The DH will: (1) Designate departme ntal 3-M personnel. (2) Ensure maintenance is prioritiz ed to facilitate accomplishment. (3) Review and approve all depart ment PMS schedules and revisions. (4) Review maintenance action annotations. (5) Acknowledge weekly alerts if no DIVO is assigned to the WC. (6) Implement a Self-Assessment Program within the department to validate properly accomplished and reported maintenance. (7) Take corrective action on all “Unsatis factory” PMS Spot Checks and report to the XO via the 3MC as part of weekly PMS reporting. (8) Ensure all material deficiencies are documented and promptly reported. (9) Review and verify the content and va lidity of all FBRs, digitally sign FBRs within five days of origination. (10) Ensure the Configuration Mana gement Database accurately reflects equipment changes whether the action is performed by command personnel or outside activities. (11) Authorize placement of equipment in to an Inactive Equipment Maintenance (IEM) status, ensure PMS scheduling is annotated accordingly. (12) The review and approval of all depart ment work candidates within four days of creation; ensure completeness, accuracy, and the correct assignment of priority. (13) Review all work candidates in the departmental CSMP every 90 days. (14) Ensure that no classified data or Navy Nuclear Propulsion Information is reflected on 3-M documents designated for off hull distribution. (15) Conduct quarterly meetings with DI VOs, LCPOs and WCSs; provide status of departmental 3-M System to the XO. k. Department Leading Chief Petty Officer. The department LCPO is responsible for the proper operation of the 3-M System within their department. The department LCPO will: (1) Provide 3-M System guidance and training to DIVOs and division LCPOs within their department. (2) Participate in quarterly Self-Assessments. l. Division Officer. The DIVO is resp onsible to the DH for the execution of maintenance within the division. As submarine division officers rotate frequently, it is imperative that DIVOs aggressively gain the requisite 3-M Qualifications and proficiency required to effectively perform 3-M functions. The DIVO will review

p. 623

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-9 and approve all PMS and MDS documents within their division. This includes all SKED, OMMS-NG, and Propulsion-Organizational Maintenance Management System (P-OMMS) submissions to ensure all required 3-M system documents are submitted to the DH. The DIVO will: (1) Ensure all PMS scheduling changes ha ve been properly annotated and applied prior to DH review and finalization. (2) Review the 13-Week Accountability Log at the beginning of the PMS week and sign at the end of the week, if not using electronic accountability in SKED or when SKED is not available. (3) Review and verify the content and valid ity of PMS FBRs within three days of origination. (4) Ensure 3-M documents generated with in the division are complete, accurate and promptly submitted to the DH. (5) Conduct 3-M Self-Assessments as directed by the command’s policy. (6) Provide weekly updates to the DH con cerning the status of the 3-M System within the division. (7) Incorporate 3-M System training into the Divisional Training Plan. (8) Review divisional work candidates a nd the CSMP for validity and accuracy. (9) Conduct monthly briefings for the DH on the status of all work candidates. (10) Acknowledge PMS Alerts. m. Division Leading Chief Petty Officer. The division LCPO is responsible for the proper operation of the 3-M System within their division. The division LCPO will: (1) Supervise WCSs in the execution of daily maintenance. (2) Ensure WCSs are properly trained, equipped and are knowledgeable of all WC divisional equipment maintenance requirements. (3) Ensure divisional personnel are pr operly trained and qualified to conduct maintenance. (4) Verify all divisional WC equipment is covered by PMS. (5) Ensure PMS is properly scheduled and conducted, including all underway and special evolution situational “R” checks. (6) Review WC PMS records (e.g., FRs, Advanced Change Notices (ACNs) and PMS FBRs and Responses), approve all lineouts and additions on the LOEP, MIP, and PMS schedules prior to DIVO and DH reviews. Ensure proper justification is noted on each lineout. (7) Review and approve non-applicable procedural steps lined-out on MRCs. (8) Review and sign the 13-Week Accountab ility Log at the end of the PMS week and ensure checks added that week are hand-written into the blank

p. 624

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-10 accountability log, if not using electronic accountability in SKED or when SKED is not available. (9) Review the PMS Scheduling Forecasti ng Report to ensure that all Tools, Parts, Material and Test Equipment (TPMTE) are available to support upcoming maintenance actions. (10) Provide the DIVO a weekly status of the division’s Self-Assessment Program, CSMP and PMS. (11) Ensure the Configuration Management Database reflects the ship’s current configuration. (12) Ensure FBRs are submitted reques ting LOEP changes to reflect system, equipment and component installs or removals. (13) Review and verify the content and va lidity of PMS FBRs within two days of origination. (14) Ensure the divisional CSMP accu rately reflects material conditions. (15) Review and approve work candidates, act as the second point of contact for work candidates and provide the DIVO a weekly brief on the status of all work candidates in the CSMP. (16) Ensure proper testi ng and inspection of work done by outside activities prior to job acceptance. (17) Coordinate repair activ ities within the division. (18) Review all quarterly Self-Assessmen ts and promptly correct discrepancies found within the division. (19) Review, approve and close out week ly schedules. This closeout of the previous week’s schedules must occur on the first day of the following week (i.e., Monday). (20) Review Check Notes for required and updated information. (21) Write PMS Alert details to include why planning allowed loss of periodicity and the plan to complete PMS. n. Work Center Supervisor. The WCS will be a senior petty officer assigned to the WC and qualified per reference (d). The WCS will: (1) Record all equipment deficiencies within their WC, utilizing OMMS-NG and P-OMMS to ensure all required 3-M System documents are submitted to the division LCPO. (2) Ensure WC personnel have complete d 3-M PQS training commensurate with position held. (3) Ensure PMS covers all maintenance worthy equipment in the WC. (4) Maintain an accurate and current LOEP.

p. 625

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-11 (5) Ensure 3-M System WC files and pu blications are complete, current, and available to WC personnel. (6) Ensure WC initiated 3-M documentation is correct, legible, promptly prepared and submitted. (7) Maintain a 13-Week Accountability Log containing the current and previous 13-Week Log, if not using electronic accountability in SKED or when SKED is not available. (8) Prepare weekly WC schedule, obtai n required approval, assign maintenance personnel, and update schedule to reflect status. (9) Ensure equipment changes, adds and removals are reflected in the Configuration Management Database and, if not, report via Configuration Change Form 4790/CK to the Configuration Data Manager. (10) Ensure FBRs are submitted whenever: (a) Maintenance requirements are not fully understood. (b) Errors are believed to exist. (c) Entries in the TPMTE block are wrong or inadequate. (d) Additional coverage is needed. (e) Performance of the maintenance requirement would cause a hazardous condition to exist. (11) Ensure prompt reporting of all material deficiencies and completed maintenance actions. (12) Ensure Periodic Maintenance Requirements scheduled for command accomplishment are completed and reported as required. (13) Ensure test and measurement equi pment or other portable support equipment is delivered for test or calibration as scheduled. (14) Ensure the DIVO and division LCPO or LPO are advised of all 3-M System activity within the WC. (15) Review the PMS Scheduling Forecasti ng Report to ensure that all TPMTE is available to support upcoming maintenance actions. (16) Ensure all WC weekly schedules are updated daily. (17) Use the Edit Equipment Details f unction of SKED to the maximum extent possible to associate maintenance items to the Configuration Data Managers Database - Open Architecture database embedded in SKED 3.2 for configuration items. The association should be made to the highest level (piece) of the applicable equipment being maintained (i.e., #1 Torpedo Tube vice the Slide Valve). o. Damage Control Petty Officer and Safety Petty Officer. The Damage Control Petty Officer and Safety Petty Officer will be a warfare qualified petty officer 3 rd class or

p. 626

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-12 above and responsible for the accomplishment of damage control and safety related PMS. p. Maintenance Personnel. Maintenance personnel will perform all PMS as assigned utilizing PMS documents in SKED and ensure Check Notes contain amplifying information and tagout identifiers as required. Maintenance personnel will: (1) Perform assigned maintenance. (2) Notify the WCS when: (a) An MRC is not fully understood, ap pears to be incorrect or cannot be accomplished as written. (b) There are issues with the TPMTE block of the MRC. (c) The technician has doubts concerning his or her ability to perform the maintenance. (d) Equipment deficiencies or casualties are discovered. (e) Factors exist which would make performance of the maintenance unwise or dangerous. (3) Initiate FBRs when discrepancies ar e discovered during the performance of an MRC. (4) Inform the WCS when planned main tenance requirements are complete. (5) Annotate the PMS schedule to refl ect accomplishment of maintenance. (6) Sign 13-Week Accountability Log (if not using electronic accountability in SKED or when SKED is not available). 19-5.3 QUALIFICATIONS. All personnel assigned to billets associated with the 3-M system must be 3-M PQS qualified for the assigned billet per reference (d). Evidence of qualification in support of 3-M requirements must be maintained by the command in an auditable fashion. In addition to 3-M PQS qualifications, all personnel assigned to accomplish 3-M related maintenance on systems listed in Volume V, Part 1, Chapter 2 Paragraph 2.2.1 of this manual, must be qualified per reference (e). Table 19-5-1 reflects the PQS qualifications required to fill SUBFOR 3-M billets.

p. 627

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-13

Table 19-5-1 - Required PQS Qualifications 3-M Coordinator PQS-307 3-M Assistant PQS-306 Department Head PQS-306 Department LCPO PQS-305 Division Officer PQS-304 Division LCPO PQS-304 Work Center Supervisor PQS-303 Repair Parts Petty Officer PQS- 302 or RPPO Continuing Training and Qualifications Software Maintenance Personnel PQS-301 19-5.4 PLANNED MAINTENANCE. 19-5.4.1 Minimum Standards. MRC accomplishment is critical for maintaining equipment in a ready state and achieving expected service life. The maintenance tasks directed by MRCs are the minimum standards for organizational shipboard planned maintenance and therefore equipment degradation can be assumed if maintenance is deferred. The following provisions are provided to maximize on time performance of PMS and provide increased Fleet latitude in maintaining equipment. a. MRCs are prepared as instructions to complete a maintenance task based upon the premise that the personnel assigned to perform the task have sufficient knowledge of the rate listed on the card and are qualified to perform maintenance as directed by the MRC. The MRC will be accomplished in sequential order, adhering to all Warnings, Cautions and Notes. Routine sub-steps (e.g., fastener removal, steps to don and remove Personnel Protective Equipment, turning on a vacuum) may or may not be included in the MRC and their absence should not prevent the maintainer from completing the maintenance task. b. Per Naval Sea Systems Command (NAVSEA), procedures are written at a level of detail based on the assumption maintenance personnel are trained, qualified, and supervised by experienced leadership to execute the maintenance consistently and expertly. They exist to provide a common standard, specify acceptance criteria, communicate warnings, and cautions specific to the maintenance and provide proven maintenance practices. They are not intended to: (1) Supplement or duplicate rules and pr ocedures that must be followed for hazards generally associated with the equipment (Hazardous Material

p. 628

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-14 Handling, Electrical Shock Risk Management, etc.) but not specifically associated with a step of the procedure. (2) Identify every process and every wa rning associated with the maintenance environment of the component being maintained (aloft, in tanks, near an active flight deck, in a heat stress area, etc.) (3) Specify every possible action of the maintainer. c. Leadership will uphold standards for comply ing with maintenance procedures. This standard does not mean the maintainer is expected to robotically follow the MRC word-by-word. Leadership, trainers, monitors, auditors, and inspectors should not expect it. The key word here is intent. The objective is to perform the intent of each step, not necessarily step-by-step performance. d. If a step is missing that is necessary to complete the task, and that step is not obvious to the Maintenance Person (MP), a FBR should be submitted. e. MRC completion status is dependent on the accomplishment of all procedural steps on all the equipment listed on the MRC or its accompanying Equipment Guide List or Location Guide List. f. The performance of additional rational ac tions during the accomplishment of an MRC is authorized. Examples of such actions include turning on and off items utilized during the performance of the MRC, vacuum cleaners, test equipment, etc. and general housekeeping such as cleaning up or containing spilled fluids or dirt. g. The substitution of any tools, materials or test equipment not held by the activity should be considered prior to deciding to defer the maintenance until the exact tools, materials or test equipment listed on the MRC are procured. This is especially critical for frequently required maintenance where several performance cycles can be missed while waiting for supply to provide the correct items. Substitution requirements are provided by reference (b) and other technical documents. 19-5.4.2 Functional Components. a. PMS Master File. The Master File, maintained by the units 3MC, contains information relative to PMS requirements that are specific to equipment for which the command is responsible. The Master File provides for duplicate issue of missing MIPs and MRCs, contains supplementary information provided by Naval Sea Logistics Center (NSLC) Detachments Norfolk or San Diego and serves as a repository for changes received between FR distributions, which must be retained on file until the changes are reflected in a subsequent FR. Master File content is delineated in Appendix B section I-B, Command Level Effectiveness Review (CLER). b. Work Center PMS File. The WC File provides a ready reference of planned maintenance requirements and information to be retained in the working area for use by the WCS and maintenance personnel. The WC File contains only the documents and information applicable to a specific WC. The content of the WC File is

p. 629

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-15 delineated in Appendix B Section I-A, Scheduling and Execution Effectiveness Review (SEER). c. PMS Administrative Requirements. In lieu of a WC or Master File the following should be retained: (1) Work Center (a) Current classified MRCs. (b) Recently completed K-MRC data sheets. (c) Current Tailored Force Revision (TFR) reports. (2) 3-M Coordinator (a) SKED 3.2 Help file. (b) Split MIP Tracking Log (updated to current FR). (c) Applicable 3-M Instructi ons (Ship, ISIC, and TYCOM). (d) Current 3-M messages and guidance. (e) Current 3MC TFR Reports. (f) Master classified MRCs. (g) Current SKED Database back- up files on DVD or CD-ROM and an Excel spread sheet from the SKED report Checks and Maintenance Outlook Report of all WCs, for the current and next future quarter. (h) 3-M Program short and long range training plan approved by the XO. (3) The following post-quarter SKED reports will be generated on a ship-wide basis by the 3MC and forwarded to the ISIC by the 3 rd Monday of the quarter (as conditions permit). These reports will be analyzed and electronically routed through the applicable DH to the XO. These reports will be retained as objective quality evidence, by the 3MC for four quarters. (a) PMS Analysis Spreadsheet (b) Calibration H Report (last completion) (c) Spot Checks – Passed & Failed Reports (d) Checks – K-MRCs (Active) Report (e) Tailored Force Data (.tfd file) d. Performance Monitoring Requirements. M RCs that are K coded require PMT data collection. As the submission of the data sheet(s) to the PMT is a procedural step of the MRC, the MRC cannot be considered completed until the data sheet(s) is submitted to the 3MC or the local PMT field office by the most expeditious means or format. Electronic is preferred. WCs will maintain a copy of the most recent performance data sheet(s). Data sheets are maintained until maintenance action is

p. 630

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-16 documented complete in the Submarine Maintenance Monitoring Information System and reflected in the monitoring period planning and tracking report. (1) K-MRC in-periodicity completion pe rcentage must be a minimum of 90 percent. (2) 3MC will provide the Checks – K-MRCs Active Report (Excel Format) at the end of each quarter to the PMT for reconciliation. The ship will coordinate with the PMT to correct schedule disparities. (3) LCPOs will keep the PMT apprised of all K-MRC IEM beginning and ending dates. (4) The CO will review and provide a quarterly summary report of K-MRC accomplishment using Appendix C of this chapter or naval message to the ISIC by the 3 rd Monday of the quarter. e. Interim MRC Procedures. The ship may develop interim MRC procedures based on experience and applicable technical manuals in support of equipment or systems without PMS coverage until formal documentation is received. Before scheduling preliminary MIP requirements, the WCS and the DH must verify their applicability to installed equipment. f. Weekly Status Report. The weekly PMS monitoring status reports will be retained, electronically if desired, by the 3MC for the current and previous quarter. These reports from the 3MC to the XO will contain, as a minimum, the information cited in paragraphs 19-5.4.2.f.(1) through (6) of this chapter. (1) Completed Spot-Check a nd Monitored MRC results. (2) Completed WC audits and results. (3) The number of FBRs over seven days ol d that have not been reviewed by the Chain Of Command (CoC). (4) Abatement and corrective actions completed as a result of a monitoring program finding. (5) IEM Details Summary Report. (6) Overdue (Alerting) MRCs a nd plan of corrective action. g. Change Service Accountability Log. The Change Service Accountability Log (CSAL) (Figure 19-5-1) provides a definitive record of all changes to a command’s 3- M Program. Whenever a change to a command’s 3-M Program is directed (be it from an FR, FBR, ISIC direction, etc.), the change will be routed to the concerned WCS(s) via a memorandum. Whenever such a memorandum is issued, it must be recorded in the CSAL. Once the WCS reports the directed change has been completed, the 3MC will file the WCS’s response and annotate in the CSAL that the action is complete. (1) The CSAL is comprised of the actual l og sheet, a copy of all memos routed to the WCS and the memo from the WCS to the 3MC indicating completion. (2) The importance of the CSAL cannot be overstated. Basically, it provides for a day-to-day, year-to-year record of changes to a command’s planned

p. 631

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-17 maintenance program. It is also a turnover document at deployment sites, allowing a current command to quickly identify all changes from a previous command. Finally, it will be inspected during all command 3-M assessments and inspections, providing visibility as to how well a command manages 3-M from one inspection to another. Figure 19-5-1 - Change Service Accountability Log FR Change Number or Authority Date RCVD Cognizant Dept. or WC Date Cover Sheet Issued Date Cover Sheet Returned Date Master File Updated or Item Closed Summary of Change

19-5.4.3 Submarine Safety, Scope of Certification, Flight Critical Components and Survivability and Escape. a. Submarine Safety. MRCs that direct wo rk or entry within the Submarine Safety (SUBSAFE) Certification Boundary require Re-Entry Control (REC) to be invoked. SUBSAFE MRCs are annotated on the MIP with either an “RS” (re-entry control required) or “XS” (no re-entry control required) in the “OTHER” column. b. Scope of Certification. MRCs that dire ct work or entry within the Scope of Certification (SOC) Boundary also require REC to be invoked. SOC documentation is applicable and governing to Dry Deck Shelter (DDS) host platforms and must be loaded to WC WK02 for those platforms. SOC MRCs are annotated on the MIP with either an “RD” (re-entry control required) or an “XD” (no REC required) in the

p. 632

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-18 “OTHER” column. Non-DDS platforms need not establish WK02 nor are they governed by SOC directives. c. Submarine Flight Critical Component. MRCs which work within the Submarine Flight Critical Component Boundary where REC documentation is required are annotated on the MIP with an “RF” in the “OTHER” column. d. Survivability and Escape Equipment. Survivability and Escape Equipment and supporting maintenance has come under increased scrutiny since the loss of the Russian submarine KURSK. All MIPs and associated MRCs dealing with Survivability and Escape Equipment are to be loaded to WCs per table 19-5-2. Table 19-5-2 - Load-out of Survivability and Escape Related MIPs MIP SYSTEM REQUIRED WC 5940/908 Submarine Escape and Immersion Equipment (SEIE), Escape Trunk EA01 (SSN 688 Class) 5940/906 Submarine Escape and Immersion Equipment (SEIE), Escape Trunk EA01 (SSBN and SSGN 726 Class) 5940/905 Submarine Escape and Immersion Equipment (SEIE), Escape Trunk EA01 and WK02 (SSN 774 Class, SOF) 5940/904 Submarine Escape and Immersion Equipment (SEIE), Escape Trunk EA01 (SSN 774 Class, non- SOF) 5940/901 Submarine Escape and Immersion Equipment (SEIE), Escape Trunk EA01 (SSN 21 Class) 5940/007 Backup Oxygen Redistribution System EA01 (SSBN/SSGN 726 Class) 5940/006 Submarine Survivability Life Support Systems ExtendAir EA01 (SSN 774 Class only) 5940/005 Submarine Escape, Rescue, and Survival Equipment SEIE and Crash Bags WK01 (WF01 for SSN 774 Class) 5940/003 Manual Reverse Osmosis Desalinator (MROD) RL01 (SSBN and SSGN 726 Class and 21 Class only) 5940/002 Atmospheric Sampling, Submarine Survivability Life Support Systems NE01 5940/001 Lithium Hydroxide (Li OH) Curtain Kits, EA01 4413/015 Submarine Emergency Position Indicating Radio Beacon (SEPIRB) OC01 5882/021 Helicopter Transfer Kit,(Sub marine) WK01 (WQ01 for SSN 774 Class) 19-5.4.4 Related Maintenance. Related maintenance, so designated by the ISEA or Technical Warrant Holder, is determined from the MIP. The “RELATED MAINT” column of the MIP

p. 633

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-19 reflects related maintenance requirements. Related requirements are positioned on the MIP to line up directly across from the MRC to which they are related. Related maintenance requirements are also identified in the TPMTE section of the MRC under “MISCELLANEOUS”. a. Related Maintenance Categories. (1) Mandatory Related. Mandatory relate d maintenance requirement(s) are those maintenance actions that must be accomplished concurrently with another maintenance requirement. The mandatory relationship is indicated with the use of the # sign. If the mandatory related maintenance resides on the same MIP, it will be reflected in the RELATED MAINT column as “periodicity#” (e.g., M-3#). If the related maintenance resides on another MIP, it will be reflected as “MIP:periodicity#” (e.g., IC-013/033:M-4#). Mandatory related maintenance requirements are automatically scheduled by SKED. NOTE: MANDATORY RELATED REQUIREMENTS MUST BE LINKED IN SKED TO BE AUTOMATICALLY SCHEDULED. (2) Convenience Related. Convenience related maintenance requirement(s) are those maintenance actions that can be accomplished concurrently with another maintenance requirement to save time (preliminary steps and tag-outs already accomplished) or for work force considerations. If the convenience related maintenance resides on the same MIP, it will be reflected in the RELATED MAINT column as “periodicity” (e.g., M-5). If the related maintenance resides on another MIP, it will be reflected as “MIP:periodicity” (e.g., EL- 010/001:M-4)). In both cases, the # symbol is omitted. The WCS manually schedules convenience related requirements. (3) Conditional Related. Conditional related maintenance requirement(s) are those maintenance actions that are performed when specific conditions are present or specified parameters are not met on the referencing MRC. Conditional related maintenance will appear on the MIP in the same manner as convenience related maintenance. The WCS manually schedules conditional related requirements. (4) None. No related maintenance is reflected as “None” in the “RELATED MAINT” column. b. Work Center Supervisors Actions. WCSs are encouraged to review their schedules on a regular basis for opportunities to perform other PMS when an equipment or system has maintenance actions scheduled. Rescheduling of PMS to take advantage of other system maintenance that may be convenience related is highly recommended. (1) If an MRC has related maintenance fr om another MIP, review the related MIP and MRC and determine if it requires assistance from another WC. (2) If the related MIP and MRC does not require assistance from another WC and is not on the lead WC LOEP, submit an FBR to have it added to the LOEP. (3) If the related MIP and MRC requires assistance or completion by another WC and is mandatory, convenience or conditional related then it should also be on

p. 634

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-20 the lead WC LOEP. If it is not on the lead WC LOEP, submit an FBR to have it added to the LOEP. If the related MRC requires technical assistance, a special NEC, or another rating, that is not part of the lead WC, then the person with the technical training, special NEC or required rating should be temporarily added to the lead WC “Crew List” and assigned the related maintenance in either an assist or performance role. All WCSs involved will collaboratively plan the required maintenance and may adjust schedules based upon individual workload. When the maintenance is completed, the lead WCS will mark the MRC as completed. 19-5.4.5 Inactive Equipment Maintenance. a. Inactive Equipment. A piece of equipm ent or system intentionally placed in a hibernated state for a specific period with the intention of reactivating that equipment or system at the end of that period. (1) Status I. Equipment that will: (a) Remain onboard, (b) Is not scheduled for corrective maintenance or overhaul, or (c) Will be inactive during extended shutdown periods and maintenance availabilities as determined by the DH. Example: Submarine CO 2 Removal Plant in wet or dry lay-up. NOTE: PERFORM A “WET LAY-UP”, SUCH AS THE CO 2 REMOVAL PLANT FILLED WITH DISTILLED OR DEMINERALIZED WATER, PRIOR TO ENTERING PORT WHEN THE SHIP IS EXPECTED TO BE IN PORT FOR 7 TO 45 DAYS OR A “DRY LAY-UP”, CO2 REMOVAL PLANT LEFT EMPTY AFTER FLUSHING AND DRAINING, PRIOR TO ENTERING PORT WHEN THE SHIP IS EXPECTED TO BE IN PORT FOR GREATER THAN 45 DAYS, OR PRIOR TO ENTERING PORT WHEN MAINTENANCE REQUIRING THE REMOVAL OF ALL CO 2 REMOVAL PLANT FLUID IS EXPECTED. (2) Status II. Equipment that is inactive and: (a) Subject to corrective maintenan ce, overhaul, or removal for safe storage, (b) Temporarily transferred to another activity for maintenance responsibility for extended shutdown periods as determined by the DH, Example: Submarine Refrigeration Compressor removed for depot level overhaul. (c) When system(s) components are scheduled for replacement. b. Implementation and Responsibility. Wh ile inactive, minimum maintenance is performed to ensure the success of the reactivation. The IEM section of the MIP will cover this maintenance. However, consideration should also be given to active PMS

p. 635

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-21 maintenance checks that can be manually added and performed during this period of inactivity. (1) The ship will develop an IEM pl an for all inactive equipment during availabilities lasting 21 days or longer. The plan will include reason for inactivation, duration, impact to division maintenance schedule and reflect integration with the Lead Maintenance Activity (LMA) work schedule and operational recovery. DH approval of this plan will be documented in the SKED IEM remarks. Use Appendix D. (2) In accordance with the appropriate SWLIN 044 and using the applicable Preventive Maintenance Manual, submarines in CNO availabilities will negotiate operational control requirements with the maintenance activity at the arrival conference, to define responsibility for IEM. IEM periodic maintenance requirements and any applicable active PMS maintenance checks must be added manually at the appropriate frequency. (3) To implement procedures for the accomplishment of PMS for equipment declared in an inactive status, current PMS schedules are modified to annotate the requirements listed in the IEM section of the MIP. For advance planning and scheduling of maintenance to take place, it is necessary to determine and identify the extent to which unit or Ship’s Force personnel will conduct PMS during an inactive period. MIPs in each WC will be reviewed to determine if equipment has IEM coverage (e.g., Lay-Up (LU), Periodic Maintenance (PM), Start-Up (SU) and Operational Test (OT)), if the coverage is adequate, and what procedures to follow if there is no IEM coverage on the MIP or provided coverage appears inadequate. The DH is responsible for determining equipment IEM status. When placing a system or equipment in IEM status, the DH will also determine the IEM start date to be reflected in SKED. The IEM end date will not be applied in SKED until the system or equipment is ready to be brought out of IEM status. All periodic PMS that would have been scheduled during the IEM period should be reviewed for applicability, with applicable maintenance accomplished prior to operating equipment. (4) IEM procedures are listed on MIPs and separated from operational PMS by a horizontal line. The IEM section is titled “Inactive Equipment Maintenance” and is prefaced by the following statement: “The following requirements will be scheduled when equipment is inactivated for periods of prolonged idleness.” When there are no IEM requirements the words “None required” will appear under the IEM Section of the MIP. When IEM procedures are inadequate, submit an FBR. The unit or ship should consider all factors that affect equipment deterioration and take necessary precautionary measures. These factors include environmental conditions, equipment location, susceptibility to damage or other factors that cannot be anticipated when IEM procedures were originally developed by the cognizant ISEA or design activity. (5) The lack of IEM requirements on a MI P does not prohibit placing that system or equipment into an inactive state. Additionally, certain locations require

p. 636

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-22 precautions and maintenance not required force-wide. The unit or ship should consider all factors that affect equipment deterioration and take necessary precautionary measures. The WCS or LCPO is responsible for identifying factors that are inadequate and may require additional preparation and maintenance of the inactive equipment while reporting same to the DH for approval. Factors may include environmental conditions, equipment location or susceptibility to damage. For those actions that are recurring in nature, the WCS should submit an FBR for possible MRC development. c. IEM Scheduling. SKED provides the capability to perform IEM scheduling. (1) Status I. The scheduling of main tenance for Status I inactive equipment utilizes conventional PMS scheduling techniques. LU checks will automatically be added to the schedule at the beginning of IEM by SKED. PM checks will be manually added to the schedule by the WCS for the period of IEM following the guidelines of the MIP. At the conclusion of IEM, SU checks and routine PMS will automatically be added to the schedule by SKED. SU checks must be accomplished the week IEM ends. All periodic checks added at the end of IEM, can be moved to the right, not to exceed the allowable date range. Since the MRC date range cannot be applied to the left (into the IEM period), the MRC date range can only be moved to the right and therefore only the plus value of the specific range, i.e., the date range for a monthly is 21-41 days. The requirement can only be moved or scheduled ten days to the right and will not go into “alert” until after the tenth day. This allows the MP or WCS scheduling flexibility within the plus side of the date range of the MRC. (2) Status II. The scheduling of main tenance for Status II inactive equipment utilizes conventional PMS scheduling techniques, however, not all scheduled IEM PMS may need to be accomplished by the unit or Ship’s Force. LU checks will automatically be added to the schedule at the beginning of IEM by SKED and may be marked “NA” if the LU check did not support the equipment being removed from the ship or unit or “Accomplished by Higher Authority” symbol if completed by the intermediate or depot level maintenance activity. PM checks may be required to be schedule during the IEM period. At the conclusion of IEM, SU checks and routine PMS will automatically be added to the schedule by SKED. SU checks must be accomplished the week IEM ends and may be marked with the “Accomplished by Higher Authority” symbol if they were completed by the intermediate or depot level maintenance activity. Routine PMS added at the end of IEM may also be marked with the “Accomplished by Higher Authority” symbol if they were completed by the intermediate or depot level maintenance activity. All periodic checks added at the end of IEM, can be moved to the right, not to exceed the allowable date range. Since the MRC date range cannot be applied to the left, the MRC date range can only be moved to the right and therefore only the plus value of the specific range, i.e., the date range for a monthly is 21-41 days. The requirement can only be moved (scheduled) ten days to the right and will not go into “alert” until after

p. 637

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-23 the tenth day. This allows the MP or WCS scheduling flexibility within the plus side of the date range of the MRC. 19-5.4.6 Scheduling. PMS is a portion of the command’s 3-M Program that provides, in one authoritative system, the scheduling information and technical procedures governing planned maintenance. PMS provides a simple method for scheduling and documenting the execution of planned maintenance procedures. Fleet policy and scope are provided in chapter 19 of this volume. NOTE: WHERE THE GOAL OF 100 % ACCOMPLISHMENT CANNOT BE REACHED, THE UNIT’S COC MUST BE KEPT INFORMED OF THE CIRCUMSTANCES THAT PREVENT ACCOMPLISHMENT OF SCHEDULED MAINTENANCE. a. Situational maintenance scheduling will be managed utilizing the tools provided by the computer based PMS scheduling software employed by the activity. All event driven situational requirements will be “triggered” when required and performed per reference (b). b. The creation and use of generic crewmemb ers such as “Torpedoman of the Watch” and “Engineering Laboratory Technician” is not authorized. For those instances where the watchstander performs the MRC, the senior watchstander’s name will be indicated in SKED. c. The MP will be assigned prior to co mmencing the week and must complete the maintenance as directed. If a different person is required, the WCS will reassign the PMS accordingly. d. Systems with many multiple components (g reater than 30) can use general spaces (Crew’s Mess, Turbine Generator Lube Oil, Locker#) for terms to designate maintenance items (drain funnels, Emergency Air Breathing masks, photo luminescent marking and battle lanterns). e. “H” coded MRCs, having calibration mainte nance items listed in tables, will be listed as individual SKED equipment maintenance items. The instrument serial number must match the Calibration Requirements List system designator (i.e., AHP-100-GA- 001). All “H” coded MRCs will be considered overdue based on the due date annotated on the calibration label regardless of MRC date ranges allowed by reference (b) and reflected in Table 19-5-3. f. Check Notes are required in SKED under the following circumstances. (1) When PMS is marked as “lost”. (2) When PMS is marked as not-applicable. (3) When PMS is marked with the ‘¢ ’ symbol, “satisfied by Higher Level Maintenance.” (4) When PMS requires a tag-out, the tag-out program of record identifier will be entered. g. Alert Notes will be in the format of paragraph 19-5.4.10 of this chapter.

p. 638

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-24 h. After the FR is approved, the 3MC will conduct quarter archival to maintain one completed quarter, one current quarter, and at least four future quarters. This permits the ability to review past records and forecasting of upcoming maintenance actions. 19-5.4.7 SKED. The use of SKED version 3.2 or subsequent versions for PMS scheduling constitutes full compliance with all administrative provisions of the 3-M Manual. a. Guidance for use of SKED is provided vi a the SKED users guide with help menus, and wizards associated with SKED functionality. b. The Navy PMS DVD or CD-ROM is used to update the command or unit’s SKED PMS data. c. The SKED program uses days to schedule and keep track of calendar periodicities. MRCs are displayed as out of periodicity when they fall outside the established date ranges in the SKED program. These date ranges are as reflected in Table 19-5-3. Table 19-5-3 - SKED Periodicity – Date Ranges Periodicity Date Range Daily None 2D None 3D None Weekly None 2W 9 - 19 days 3W 14 - 28 days Monthly 21 - 41 days 2M 41 - 83 days Quarterly 61 - 121 days 4M 83 - 165 days Semi-Annually 121 - 243 days 8M 165 - 331 days 9M + or - 90 days from scheduled date Annual + or - 90 days from scheduled date Multi-month after annual + or - 90 days from scheduled date 19-5.4.8 SKED Server Failure. In the event of a SKED server failure, operation of PMS performance and tracking is as follows: a. Retrieve Maintenance Outl ook Report that was created following approval of current FR. b. The WCS or LCPO will maintain the a ssignment of PMS with the Maintenance Outlook Report until server is restored.

p. 639

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-25 c. Print assigned MRCs from the PMS viewer program that is located on the FR DVD. d. Document and retain accomplished main tenance on printed blank 13-Week Reports that are in the documents folder on the FR DVD. e. When the server is restored, update SKED based on accomplished maintenance documented on 13-Week Reports. 19-5.4.9 Accomplishing PMS. Maintenance personnel use MRCs to accomplish assigned planned maintenance as described here: a. From SKED “My Task” view , review the 13-Week Report. b. Determine maintenance task(s) assigned. c. Determine when the maintenance task(s) are due. d. Determine what tools, parts, material, te st equipment or supplies are needed. For MRCs that contain inspections and then maintenance actions based upon the inspection findings, the TPMTE needed to perform the follow-on maintenance caused by the inspection findings does not need to be obtained prior to performing the MRC but rather, may be obtained as needed. e. Perform the maintenance on schedule. f. Notify the WCS immediately whenever one or more of the following conditions exist: (1) Anything on an MRC is not fully understood, appears to be incorrect or cannot be accomplished as written. (2) TPMTE prescribed by the MRC is not av ailable, is not correct or questions about substitutions arise. (3) Any doubt exists about your capabilit y, training, or experience to properly perform the maintenance requirement as prescribed. (4) Factors exist which would make perf ormance of the maintenance requirement unwise or dangerous, for example, disassembly of equipment needed for operations, radiation when prohibited, situations causing safety hazard to exist, etc. (5) Equipment deficiencies or casualties are discovered. (6) Any provisions or requirements on the MRC cannot be accomplished as prescribed. See para. 19-5.4.1 of this chapter for clarification g. If an MRC can be completed step by step as written, then the maintenance action can be signed off as completed. Report completed planned maintenance actions to the WCS, update the PMS schedule to reflect the completed maintenance, annotate and sign the 13-Week Report (if used). If multiple maintenance personnel are assigned to a single maintenance action, the most senior person assigned must update the PMS schedule, annotate, and sign the 13-Week Report or Check Note if using SKED 3.2 electronic accountability. h. Maintenance actions not fully completed will be reported to the WCS. However, if material deficiencies or casualties which are unrelated to that MR are discovered, the

p. 640

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-26 MR can be checked off provided the MR was fully completed, but the discrepancy must be reported via MDS. 19-5.4.10 Non-Accomplished PMS Categories. The WCS or LCPO will add a brief description for each Alert Note for non-accomplished categories using subparagraphs 19-5.4.10.a through 19-5.4.10.g of this chapter. a. System or Equipment Failure. System or equipment is not operational or in a reduced operational status thus preventing maintenance from being accomplished. CSMP Job Sequence Number (JSN) required in additional text description. b. Inadequate Maintenance Procedures. MRC procedure or steps cannot be accomplished to a point where the maintenance can be considered accomplished. FBR number required in additional text description. c. Ship Operational Requirements. Operat ions prevent the maintenance from being accomplished. Requires additional text description. d. System or Equipment Operational Require ments. Required operation of system or equipment prevents maintenance from being accomplished. Requires additional text description. e. Lack of Hazardous Material. Correct h azardous material (HAZMAT) not available at the time maintenance was to be performed. CSMP JSN required in additional text description. f. Missing or Incorrect TPMTE. Correct or calibrated TPMTE was not available at the time maintenance was to be performed. CSMP JSN required in additional text description. g. Other. Requires additi onal text description. 19-5.4.11 Accountability. The credibility of the Navy PMS program relies heavily on the individual accomplishing the maintenance. The required dedication and integrity of that individual cannot be overstressed. a. To maintain accountability, personnel ar e required to sign for the completion of assigned maintenance in an Accountability Log (if used). The WCS is required to review and sign the Accountability Log weekly to verify the accuracy and completeness of entries. Accountability sheets will be maintained in the WC PMS File for a period of not less than 13 weeks. b. Electronic accountability will be utili zed by ships employing SKED 3.2. When an individual updates the disposition of a check, this is the same as signing and dating a check completion on a 13-Week Accountability Sheet. The disposition of a check will become permanent when the weekly closeout is performed. All PMS maintenance assigned to a MP is presented to them immediately upon SKED 3.2 log- on. The CoC review can be tracked on the Weekly Closeout Signature Sheet. Therefore, there is no need to print and sign the 13-Week Accountability Form.

p. 641

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-27 19-5.4.12 Force Revision Implementation. In addition to the requirements of reference (b), the following steps ensure the most efficient and thorough implementation of an FR: a. MRC deletions on MIPs will be marked to indicate the reason for deletion: (1) Scheduling aids (SA). Indi cate applicable scheduling aid. (2) Split MIP. Indicate responsible WC if the MRC is applicable to the ship, the responsible WC designation will be used versus a scheduling aid. (3) “Other” includes approved responses to FBRs, ACNs, Message Date-Time- Group, dual periodicity. Indicate guiding notation for deletion: “SA-1” or “Note 1”, configuration change number. b. The FR will be completed on or before th e first Monday of the new calendar quarter. When operational schedules do not provide adequate time to implement the revision prior to the start of the quarter, the XO may direct an alternate implementation date. This deferred FR will be reported to the ISIC unless deployed. If two or more FRs were not available while the unit was deployed, only the most recent FR will be installed and implemented. c. It is advisable to complete the FR process through DH approval before conducting quarterly audits by a chief or more senior. d. The 3MC will: (1) Update PMS and TFR data into SKED prior to routing the change documentation to WC. (2) Route the FR to WCS for implementa tion. (See Figures 19-5-2 and 19-5-3 of this chapter for an example of a routing memorandum and an FR implementation checklist, respectively.) (3) Delete SKED FBRs after reflection within the FR. (4) When the FR is approved, the 3MC will generate and forward the ship’s Tailored Force Revision Data (.tfd) file to the TYCOM 3-M Rep by the 3rd Monday of the quarter. The 3MC will provide the SKED TFD file to the TYCOM 3-M REP immediately following completion of FR in all WC. e. The WCS, upon receipt of the ch ange document from the 3MC, will: (1) Apply changes to the WC PMS sche dule utilizing SKED Revision Editor. (2) Route revision changes to division LCPO for review and concurrence. f. The division LCPO will: (1) Verify that all PMS changes have be en properly applied to the WC schedule utilizing SKED Revision Editor. (2) Submit PMS schedule to the DIVO for review and concurrence. g. The DIVO will: (1) Verify that all PMS changes have be en properly applied to the WC schedule utilizing SKED Revision Editor.

p. 642

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-28 (2) Submit PMS schedule to DH for review and approval. h. The DH will: (1) Verify that all PMS changes have be en properly applied to the WC schedule utilizing SKED Revision Editor. (2) Review and approve WC PMS schedules. i. The WCS makes final entries in the WC Record of Change Log, completes the PMS Change Documentation Routing Memorandum, and returns it to the 3MC. j. The 3MC updates the CSAL and notifies the XO that the FR has been installed after receiving all FR PMS Change Documentation Routing Memorandums from the WCs.

p. 643

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-29 Figure 19-5-2 - Force Revision Routing Memorandum MEMORANDUM From: 3-M Coordinator To: __________ Work Center Supervisor Subj: FORCE REVISION PACKAGE X-XX Encl: (1) Force Revision Implementation Checklist (2) List of Effective Pages (LOEP) 1. Force Revision Serial: X-XX has arrived from NSLC. 2. The SKED Force Revision (FR) update is complete. Begin your work center FR implementation using Enclosures (1) and (2); complete through your Department Head no later than Day/Month/Year. 3. Corrections, including those to LOEP, MIP and MRC, should be made immediately. Make certain ACNs and FBR responses are reflected in the FR. If not, maintain the copies and changes to your MIP(s) and MRC(s) until reflected in a subsequent FR. 4. MRCs with procedural line-outs previously approved by the LCPO must again be reviewed by the LCPO to confirm they continue to meet the requirements of Volume VI, Chapter 19 of this manual. Specifically, in the procedure block, Work Center Supervisors may line-out the non-applicable line items that do not pertain to current equipment or configuration when the step includes the words “if applicable” or a note identifies steps to be omitted. These items must be reviewed and approved by the division LCPO. As these changes are work center and maintenance item specific, submission of an FBR is not required.

R/

3MC

p. 644

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-30 Figure 19-5-3 - Force Revision Implementation Checklist MEMORANDUM From __________ Work Center Supervisor To: 3-M Coordinator Subj: FORCE REVISION IMPLEMEN TATION CHECKLIST COMPLETION 1. The following actions have been accomplished in SKED to implement Force Revision X-XX. Task Description Initial Verified all equipment is listed under each MIP. Verified new or changed MRCs (green or yellow) are added to the correct Maintenance Item (equipment).

Verified all applicable MRCs for each piece of equipment are active. Verified all MRC’s have associated “Related Maintenance” attached. Verified that Safety of Ship is toggled to “YES” if applicable. Verified that all MIP lineout’s have a technical reason documented for deletion. (Select the “Pencil” Icon on top row)

Verify Maintenance Item Serials & Locations are correct. Upon completion of implementation Marked Complete for digital approval by: LCPO, Division Officer and Department Head. LCPO DIVO DH 2. After DH approval: LCPO run SKED report PMS Documents and Customized MRCs – Line-outs. Verify each procedural lineout meets JFMM volume VI chapter 19, paragraph 19.6.11 requirements.

WCS create an excel spread sheet from the Maintenance Outlook Report as a minimum electronic backup forecasting as many quarters in advance as available and store it on your hard drive (not a LAN drive) in the event of the LAN crashing.

WCS select “Work Center” from the upper menu and “Update Unassigned Slots.” Initially, any MRC without ownership will be assigned to the WCS. Reassignment by the WCS or LCPO will follow.

3. Printing requirements for MRCs are determined by individual command policy. Printed MRCs must come from “PMS Documents” (not PMS Viewer). 4. The only required documents in the WC PMS File are: a. Classified MRCs. b. MRCs required by the command. c. MRCs with pen & ink changes authorized by ACNs or answered FBRs. d. K-MRC performance data (if no digital record).

p. 645

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-31 5. Approval Signatures: Position Signature LCPO DIVO DH 3MC

19-5.4.13 Planned Maintenance System Feedback Reports. PMS FBRs are used to identify problems with PMS documentation or to request the addition or deletion of PMS coverage. Issues with the periodicity, rates, man-hours, TPMTE and procedure may all be reported via an FBR. An FBR is also used to request copies of classified MRCs, request the addition or deletion of an MRC (maintenance requirement) to or from a MIP, splitting a MIP between WCs, shifting of maintenance responsibility or to request PMS coverage for newly installed systems or equipment. Paragraphs 19-5.4.13.a through 19-5.4.13.j of this manual provide amplifying information dealing with the issues that may prompt the submission of an FBR. a. Periodicity. An FBR can be used to reque st the increase or decrease in the frequency of a maintenance action, i.e., an MRC. However, the originator needs to keep in mind that the ship or unit has the prerogative to increase the frequency because of harsh weather, unusual operating conditions or corrective maintenance and associated testing requirements. A 726 Class submarine submitted an FBR requesting the frequency of cleaning a specific electronics cabinet filter be increased from quarterly to monthly. Research revealed this MRC was applicable to all 726 Class units and no other ship had submitted a similar request. In fact, two other units had requested the frequency be decreased to semi-annual. It was determined that the submitting unit was in an extended upkeep period and increased foot traffic by shipyard personnel near the electronic cabinet was the most likely cause of the filter becoming clogged. The ship was authorized to increase the frequency to support the extended upkeep period and the periodicity of the MRC was not changed. b. Rates. The Rates block on the MRC repr esents the developer’s recommendation of the skill level (rate and rank) best suited to accomplish the maintenance action. The key word is recommendation. Qualified personnel other than the rate and ranking specified may be assigned. When an NEC is assigned or Damage Control Petty Officer or Safety Petty Officer, substitution of other personnel is not allowed other than those exceptions as noted in reference (b). An FBR requesting the rate on an MRC be changed from an ET2 to an FT2 will probably not pass TYCOM screening, yet an FBR requesting the addition or deletion of personnel will generally pass to the cognizant technical activity for review. c. Man-hours. The MRC reflects the average time per equipment, per person. It does not reflect or account for gathering and putting away tools, tag-outs or time removing and replacing interferences. From a maintainer’s perspective, this is not an accurate

p. 646

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-32 representation of the time required to accomplish the maintenance action. The Future of PMS initiative will attempt to do a better job of accounting for this additional time but until then, FBRs should be submitted only when the allotted time per equipment is significantly out of synch with the actual time required. For example, an MRC calls out 0.5 man-hours per equipment, but it takes 1.0 man-hours. d. Tools, Parts, Material and Test Equipm ent. TPMTE FBRs should be submitted when the procedure calls for an item not listed in the TPMTE block or when the TPMTE block lists an item not called out in the procedure. Updating the MRC to reflect common hand tools, administrative or office supplies and basic housekeeping items is addressed in paragraph 19-5.4.13.k.(1) of this chapter. e. Procedure. Procedures are written at a level of detail based on the assumption maintenance personnel are trained, qualified, and supervised by experienced leadership to execute the maintenance consistently and expertly. MRCs exist to provide standardized proven procedures, specify consistent acceptance criteria and to communicate warnings and cautions relative to the specific maintenance action. They are not intended to specify every possible action of the maintainer. There may be instances where an obvious typographical error exists on the MRC. For example turn switch to “ON”. However, the switch may already be “ON” and the intent of the step is to turn unit off. The card should read “Turn switch to OFF”. This type of error should not prevent the scheduling or performance of maintenance. However, in this situation, the accomplishment of the MRC is not possible until the WCS reviews the error and concurs that it is safe to proceed. A temporary notation including the reason for the correction must be made on the MRC, initialed by the WCS and an FBR submitted. Extreme caution will be taken when reviewing MRCs for this type of error. Errors must be obvious typographical errors and a PMS FBR must be submitted immediately upon discovered. Do not permanently alter the MRC until authorized by the applicable Systems Command, ISEA or NSLC Detachment. If a step is missing that is necessary to complete the task, and that step is not obvious to the MP, submit an FBR to have it added. An FBR submitted to request procedural changes should include the originators contact information and supporting rationale or justification. If, however, a step is missing that is clearly obvious, an FBR only serves to overload a process that should be focused on more technical issues. f. Duplicate MRCs. Unclassified MIPs a nd MRCs are now available from the DVD. Copies of classified MRCs still require an FBR request due to handling requirements. g. Addition or Deletion of an MRC. During the life cycle of a system, equipment, or component it may become necessary to add a maintenance action to prevent an age related functional failure or to delete a maintenance action due to inherent reliability not foreseen during maintenance development. An FBR submitted to request the addition or deletion of an MRC should include the originator’s contact information and supporting rationale or justification. h. Newly Installed or Removed Equipment. While an FBR request for PMS coverage will provide initial maintenance coverage or deletion of MIP(s) because of equipment removal, submission of a Configuration Change Form OPNAV 4790/CK is still required to initiate the rest of the logistic support change process. This point cannot

p. 647

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-33 be overstressed; the submission of the FBR does not relieve the ship or unit from initiating a Configuration Change Form OPNAV 4790/CK. The Configuration Change Form OPNAV 4790/CK initiates supply support, CDMD-OA changes, ship selected record drawing updates and class maintenance plan updates. i. Splitting a MIP. There are instances in which a MIP includes MRCs for more than one WC to perform. When this occurs, a decision is required by the command as to whether the MIP will be split or will be scheduled singly by one WC. Only the XO can authorize the splitting of a MIP if an MRC requires another WC to perform the entire maintenance action. If the decision is made not to split the MIP, then the MRs will be accomplished through the coordination of WCSs. (1) If the MIP is split, the following procedures apply: (a) Submit to the XO a Non-Technical PMS FBR requesting approval to split the maintenance responsibility. (b) Upon receipt of the XO’s concurrence, the 3MC will make an annotation in the remarks block of the FBR stating, “XO concurs with splitting MIP maintenance responsibility”. (2) Upon receipt of the FBR approval: (a) Utilizing the SKED Revision Edito r, delete the MRC from the MIP and show the reason for deletion as the designation of the WC assuming responsibility. (b) If the WC assuming responsibil ity does not reflect the MIP and maintenance items, utilize the SKED Revision Editor to add them. Schedule only the MRC(s) that pertain to the WC. Reflect remaining as deleted with the reason for deletion the designation of the parent WC. (3) If the situation occurs where a WC removes a split MIP, the following procedures apply: (a) Submit an XO approved, non-technical PMS FBR reporting the decision to remove the split maintenance responsibility. Upon receipt of the XO’s concurrence, the 3MC will make an annotation in the remarks block of the FBR “XO concurs with removing split MIP maintenance responsibility”. (b) Upon receipt of FBR approval, utilize the SKED Revision Editor, remove the MIP, MRC(s) and maintenance item(s) from the WC no longer involved. Ensure that the lead WC assumes full responsibility for the MIP and MRC(s) and annotates their schedules accordingly. j. Shift of Maintenance Responsibility. Indi vidual ships or units sometimes consider it necessary to shift maintenance responsibility from one WC to another, to combine two or more existing WCs or to split an existing WC. These requests for changes of PMS maintenance responsibility require XO concurrence and may require final approval by the applicable TYCOM. Due to the considerable administrative burden,

p. 648

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-34 requests to accommodate a temporary situation such as short-term assignment of two WCs to one supervisor should not be submitted. (1) The following factors should be carefully considered before submitting such requests: (a) Composition of WCs by size and ratings. (b) Scope of maintena nce responsibilities. (c) WC workload. (d) Ease of administration of a WC as a cohesive maintenance group. (e) Importance of WC grouping to equipment maintenance responsibilities, PMS scheduling, MDS reporting and CSMP listings. (2) When changes in maintenance respon sibility are considered necessary, the following procedures apply: (a) Submit a PMS FBR (non-techni cal). Indicate from which WC(s) equipment is to be deleted and to which it is to be transferred. Upon receipt of the XO’s concurrence, the 3MC will make an annotation in the remarks block of the FBR “XO concurs with the shift of maintenance responsibility.” (b) WC or equipment changes will also be reported in the OMMS system via a Configuration Change Form OPNAV 4790/CK through the CSMP up-line reporting process. (3) Upon receipt of the FBR approval, perform the following actions: (a) The PMS Master File is updated to reflect deletion of the MIP from one WC and addition to the WC receiving the responsibility. The originating FBR serial number is annotated on the affected line item on the LOEP for both WCs. The PMS Master File must contain a record of deleted equipment until the change is reflected in a future FR. (b) Utilizing the SKED Revision Editor, load the affected MIP(s) and MRC(s) to the WC receiving maintenance responsibility. Delete the MIP(s) and MRC(s) from WC shifting responsibility. (c) Utilizing SKED, perform a revisi on to move the equipment from the original WC’s current schedule to the WC receiving the maintenance responsibility. Data is exported from one and imported to the other maintaining equipment history. k. MRC Changes Not Requiring Feedback Reports. The only MRC modifications shipboard or unit personnel may make without submitting a PMS feedback report are as listed in subparagraphs 19-5.4.13.k.(1) and (2) of this chapter. (1) TPMTE Block.

p. 649

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-35 (a) Common hand tools, administra tive or office supplies and basic housekeeping items may be substituted or added by the WCS. The WCS may add notes to the MRC to reflect these substitutions. In the case where specific common tools are called out by description, substitutions are not authorized. For example, substitutions such as using synthetic fiber brushes in place of animal hairbrushes or rags and paper towels in place of lint free cloths are not allowed. (b) Approved parts, materials and miscellaneous item substituted from the supply system, technical manual, or Military Specification, etc., which meet or exceed the requirements may be used. Ensure that substitutions satisfy both the basic maintenance and safety requirements of the MRC. If there is any doubt, a PMS FBR should be submitted specifying substitution desired and reason. (c) Test equipment or certified tools, which meet or exceed the Sub- Category code requirement, may be used. (d) When an MRC pertains to multiple configurations of equipment and the TPMTE block contains tools, parts, test equipment and materials for each unique configuration, the TPMTE block may be tailored for the unit’s specific configuration by lining out the items that do not pertain to equipment held. (e) Exception to TPMTE block change: If an item listed in the TPMTE block is not called for in the procedure block, submit an FBR explaining the circumstances. Conversely, if a tool, piece of test equipment, part or material is called for in the procedure block and is not listed in the TPMTE block an FBR should be submitted. (2) In the procedure block, WCSs may line-out the non-applicable line items (alternate procedures) that do not pertain to current equipment or configuration when the step includes the words “if applicable” or a note identifies steps to be omitted. These items must be reviewed and approved by the division LCPO. As these changes are WC and maintenance item specific, submission of an FBR is not required. If a step or steps in the procedure block have been lined-out and tools, parts, material, or test equipment in the TPMTE block pertain only to that step or steps, then they will be lined-out as well with a reference to the step or steps lined-out and approved by the division LCPO. Warnings, cautions, and notes associated with the lined-out step or steps will also be lined-out. l. Types of Feedback Reports. There are two types of FBRs, Technical and Non- Technical. (1) Technical. These FBRs are used to report technical discrepancies inhibiting PMS performance. Technical feedbacks normally adjudicated by an ISEA responsible for the system or equipment covered by the PMS documentation require all the supporting information the originator can provide. The originator should identify the issue, providing as much supporting technical

p. 650

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-36 information, such as Allowance Parts List, Reparable Identity Code, and drawing or Hierarchical Structure Code as available and a proposed response or solution if known. Most importantly, provide point of contact information, including name and phone number so that the ISEA can contact the originator should they have questions. The FBR must be accurate and complete to “stand alone”, that is, the FBR will be understood without additional explanation. The better the FBR describes the problem, the more likely the originator will receive a timely response. There are two sub-categories of technical FBRs: (a) Routine. An FBR will be consid ered routine when it relates to the technical requirements of PMS. It is used to report technical discrepancies or request clarification of procedures. (b) Urgent FBR. An FBR will be considered urgent when it relates to the technical requirements of PMS and involves safety of personnel, safety of ship or the potential for equipment damage. Urgent FBRs will be forwarded by naval message containing a PMS FBR serial number, to both NSLC Detachments Norfolk and San Diego, with info to the cognizant Systems Command, TYCOM and the Naval Safety Center. The message must describe the unsafe procedure(s) or condition(s), must identify the MIP and MRC involved and reflect the serial number of the FBR generated in SKED or Planned Maintenance System - Management Information System. Once the message has been sent, include the date-time-group of the message in the FBR and submit. (2) Non-technical. These FBRs are intende d to support PMS requests that do not require technical review, including WC changes. Non-technical FBRs are submitted to request classified or other PMS documentation which cannot be obtained locally or to request clarification of issues not of a technical nature. m. Feedback Report Submission. (1) All SKED users will submit FBRs via SKED using the Feedback Report Wizard. Non-SKED users may submit FBRs via the PMSMIS web site at https://pmsmis.navy.mil/ by selecting the Feedback Tab and Feedback Report Wizard from the drop-down tab. Non-SKED users accessing this web site for the first time will need to request an account. Click on File Manager and select New User Account Request. This displays options to select a form and readme file, which can be downloaded, filled out and sent via e-mail as directed in the readme file. An e-mail will be sent confirming your account and providing access to the main screen. The Anchor Desk web site can also be used to submit FBRs. (2) Submarines transmit FBRs to their homeport TYCOM 3-M Representative as a text file attachment via email. 3MCs will change the default SEAJAX e- mail address that is programmed into SKED to the 3MC@ email alias address of their command.

p. 651

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-37 n. Feedback Report Screening (Shipboard or Activity). (1) Initial screening is accomplished by th e originator or WCS who is responsible for ensuring all data is accurate and complete. (2) The division LCPO or DIVO accomp lishes the second level screening and verifies the content and validity of the FBR within three days of origination. (3) The DH, next to screen the FBR, is responsible for verifying the content and validity of the FBR and digitally signing FBRs within five days of origination. (4) The 3MC is responsible for screen ing, serializing, and forwarding FBRs within seven days of origination. The 3MC will also: (a) Maintain accountability for all PM S FBRs submitted and actions taken until updated PMS documentation is received. (b) Ensure that the originator and all applicable WCs are kept apprised of action taken and ensure the originating and other applicable WCSs implement the changes or corrections when received. o. Feedback Report Screening (E xternal to Hull or Activity). (1) FBRs are next processed by the TYCOM. The TYCOM will verify the content and validity of the FBR and either return the document to the originator or pass it on for further processing and resolution. Submarine Force FBRs are screened by Submarine Maintenance, Engineering, Planning and Procurement (SUBMEPP) Activity. (2) SUBMEPP will return an FBR to the originator under the following conditions: (a) An answer currently recorded in the Submarine Technical Feedback Report History Tracking Program satisfies the proposed FBR. The FBR will be returned with authorization to implement the previously received response or rationale is provided justifying the non- concurrence. (b) A similar request has already been submitted and submission of another duplicate request will add no value to the process. (c) The FBR requests actions contrary to the direction of this manual or reference (b). (d) The request does not adequately a ddress or identify the problem. In cases of this nature, the FBR is returned to the originator for amplifying information. This will be a last resort for submarine force units, as SUBMEPP will attempt to contact the originator to better define the issue. p. Feedback Processing Activities. (1) The central control points for processing FBRs are the Planned Maintenance System Coordinating Activities (PMSCA). Depending on the type of FBR and level of technical authority necessary to answer the FBR, the PMSCA will

p. 652

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-38 either respond to the originator with a resolution or forward the FBR to the appropriate technical authority for action. (2) ISEAs are those activi ties designated by NAVSEA as the technical experts for specific systems or equipment. Naval Surface Warfare Center, Philadelphia Detachment is the ISEA for the majority of non-nuclear hull, mechanical and electrical equipment installed on most ships. ISEAs under the direction of the NAVSEA Technical Warrant Holder adjudicate the FBR request and forward the response to the PMSCAs. The PMSCA provides the final response to the originator and updates the PMS database to reflect ISEA changes. PMS changes are issued with the next available FR. q. Feedback Processing. FBRs are processed per NAVSEA policy: (1) Urgent FBRs. (a) The PMSCA will provide a message response to all urgent FBRs within one working day of receipt. If the FBR is forwarded to a Design Activity or ISEA for resolution, then the Design Activity or ISEA will provide a message response informing the originator of specific actions or required changes because of the adjudication of the FBR within one working day of receipt. This message response must be addressed to the originator and distributed to all TYCOMs of units holding the affected documentation. TYCOMs will forward this message to all commands that could be affected by the PMS change. (b) The PMSCA will distribute revised PMS documentation to all affected users within 30 calendar days of receipt of the FBR, via special issue or Advance Change Notice (ACN). (2) Routine FBRs. (a) The PMSCA will perform technical review, research, and provide a response to routine FBRs where resolution does not require technical authority action. (b) FBRs that the PMSCA cannot resolve will be sent to the cognizant Design Activity or ISEA. The cognizant Design Activity or ISEA will provide the response to the appropriate PMSCA describing the action taken. The PMSCA will provide the response to the originator by electronic means. (c) Distribution of the revised MRC to the originator and other affected users will be accomplished via ACN or the next available FR. (d) Reference (b) calls for technica l review activities and ISEAs to provide FBR responses in less than 21 working days from time of receipt. In addition, NAVSEA has established a goal of providing answers to FBRs in one day. While some FBRs will require extensive research and days, weeks or in some cases months to resolve, the vast majority of FBRs can and should be answered much sooner. One day

p. 653

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-39 may be overly optimistic, but the intent is to put the emphasis back on the timely resolution of FBRs. (e) If no revision to PMS documenta tion is required, pertinent comments will be provided in the response to the PMSCA. When not concurring with the feedback report, the rationale for the non-concurrence must be provided to the PMSCA. NOTE: IT IS POSSIBLE AN FBR RESPON SE MAY NOT MAKE A SPECIFIC FR BASED ON THE DATE THE RESPONSE WAS RECEIVED BY NSLC. PROCESSING TIME AND HANDLING MAY CAUSE THE REVISED DOCUMENTATION TO MISS AN FR CUTOFF DATE. HOWEVER, SINCE ALL FRS ARE NOW RECEIVED QUARTERLY, IF A REVISION MISSES THE CURRENT FR CUTOFF WINDOW, THE REVISED DOCUMENTATION WILL BE AVAILABLE WITHIN THE NEXT THREE MONTHS. r. Feedback Response Implementation. Units will implement responses to FBRs based on the category and content as determined by the unit’s 3MC. (1) Urgent FBR. Within 24 hours of receipt of FBR response. (2) Urgent FBR with an ACN. With in 24 hours of receipt, the ship will implement an administrative change to incorporate the new PMS documentation. These revised documents will be utilized to conduct maintenance until the revised PMS documentation is incorporated into the next FR. (3) Routine FBR: (a) Technical. The response deals wi th content such as a revision to technical specifications, tolerances, test equipment, materials, acceptance criteria or the sequence of procedural steps. These changes need to be implemented within two weeks of receipt of the FBR response or prior to the next scheduled accomplishment date should that date fall within the two-week window. (b) Administrative. The response deals with issues that do not affect the technical content or procedural steps. Administrative changes might be added steps to provide a better degree of clarity, formatting revisions to tables or figures that do not change technical content, or updating of Notes, Warnings or Cautions that do not impact the performance of the MRC. These changes do not need to be implemented prior to receipt of the next FR. If the next FR does not reflect the revised documentation, implementation is required before the next scheduled accomplishment date of the MRC. (4) Routine FBR with an ACN: (a) Technical. These changes need to be implemented via an administrative change within two weeks of receipt of the FBR response or prior to the next scheduled accomplishment date should

p. 654

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-40 that date fall within the two-week window. These revised documents will be utilized to conduct maintenance until the revised PMS documentation is incorporated into the next FR. (b) Administrative. These changes do not need to be implemented prior to receipt of the next FR. If the next FR does not reflect the revised documentation, implementation is required via an administrative change before the next scheduled accomplishment date of the MRC. 19-5.4.14 Transferring Dry Deck Shelter. Transferring of DDS PMS from Logistics Support Unit (LOGSU) to the host submarine. a. SSGNs operating SKED in dual Unit Identi fication Code mode will take the shelter WC out of IEM and update maintenance item MRC due dates. Track PMS in shipboard SKED and provide DH reviewed End of Quarter (EOQ) Reports to LOGSU. b. All other units receiving a LOGSU maintained asset operating incompatible SKED database will: (1) When the DDS is transferred to the host submarine the Seal Delivery Vehicle Team that is transferring custody will transfer the DDS division SKED program on a laptop, a paper copy of the current quarter List View, 13-Week Accountability Sheets and WC Space Manual to the receiving command 3MC. Any time the DDS is transferred between commands, a Scheduling and Execution Effectiveness Review (SEER) will be conducted on the WC by both commands. (2) The ship will maintain the DDS WCs under the cognizance of the Special Operations Force (SOF) Division using the DDS SKED Laptop. (3) All FRs, administrative changes an d PMS performed will be documented on the DDS laptop by the WCS and approved by the weapons officer. All records of audits and reviews will be retained between ship’s 3-M Inspections. (4) Backups of the DDS SKED Laptop w ill be performed monthly and stored on media external to the DDS SKED Laptop hard drive. At a minimum, the external media will be labeled with DDS WC, host ship’s hull number, and date of backup. 19-5.4.15 Planning Board for Maintenance. Ships will develop a maintenance plan encompassing the entire Pre-Overseas Movement and Patrol Cycle timeline to include the first post deployment CMAV or Post Patrol Refit for the PB4M schedule. For submarines homeported in Guam this maintenance plan will cover the next two scheduled CMAV periods. This plan will be forwarded to the squadron 3MO by the end of post deployment stand down, crew turnover for SSBN and SSGN and prior to A-90 for submarines homeported in Guam. The squadron 3MO will review and forward this plan to the Squadron Engineer and Squadron Material Officer, PMT, FMA and TYCOM N4. Ships will review and update their plans upon the completion of each CMAV or Refit and forward this update prior to A-60 of the next CMAV.

p. 655

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-41 To successfully plan and execute all maintenance during the submarine maintenance cycle each ship will utilize the following maintenance planning tools: a. SKED Forecasting b. K-MRC Active Report c. OMMS-NG d. P-OMMS e. Calibration Requirements List f. METBENCH Calibration Management System Report g. PMR Periodic Maintenance Requi rements schedule and inventories h. Unrestricted Operations listing i. PMT Submarine Maintenance Monitoring Information System list j. Type Commander Alterati on Management Systems Report k. Production Status Report or equiva lent status report provided by LMA. 19-5.4.16 Assessment Procedure MRCs. Assessm ent Procedure (AP) MRCs need not be scheduled within SKED, but they will be maintained “active” through the FR and TFR process. AP MRCs need only be printed on an “as needed” basis for use by assessment personnel or Ship’s Force. The record of completed AP MRCs by off-ship personnel is recorded on the work candidate and Ship’s Force participation is recorded in their completion remarks of that work candidate. There is no need for recording Ship’s Force participation in an assessment event on their PMS schedule within SKED. FBRs submitted requesting deletion of a MIP that only contains AP MRCs will be disapproved and returned to the originator. 19-5.5 MAINTENANCE AND MATERIAL MANAGEMENT AFLOAT AND ASHORE EVALUATION CRITERIA. 19-5.5.1 Self-Assessments. The ability of an activity to perform critical self-assessments is instrumental to the success of the command’s PMS program. The PMS Self-Assessment Program needs to address all aspects of 3-M. a. TYCOM Policy. Each activity must perfor m a complete 3-M Self-Assessment at the mid-point of the 3-M inspection cycle and retain results until the next 3-M Inspection. The 3-M checklists contained in Appendix B will be utilized and retained until the next formal 3-M Inspection. Utilization of TYCOM, ISIC and 3-M Representative personnel to assist the command is encouraged and should be requested. As the Self- Assessment senior member, the XO will ensure that personnel performing the audits have adequate knowledge of 3-M practices and procedures to ensure a thorough review. The CO will receive a formal briefing of the findings of the Self-Assessment and intended corrective actions. The ship’s mid-term 3-M Self-Assessment and Abatement Program will include all aspects of reference (b) utilizing all the

p. 656

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-42 inspection sheets of Appendix B. 3MCs will retain the command’s mid-term Self- Assessment Report until the next 3MI. b. Self-Assessment Elements. The major program elements of a Self-Assessment include an evaluation of the PMS Performance Rate (PPR) and CSMP Validity, monitoring MRC performance, and conducting PMS Spot-Checks, WC audits, and deficiency abatement. 3MCs will retain monitored PMS results, Spot Checks and WC audits from the last completed quarter in either hard copy or digital format for review supporting the Self-Assessment. (1) Monitored MRC. Supervisory pers onnel must periodically monitor the performance of PMS to provide feedback and training to maintenance personnel and to enforce command maintenance standards. Personnel charged with monitoring must be a System Matter Expert for the system, equipment, or component for which the MRC applies. LCPOs, LPOs or personnel with similar system knowledge are appropriate. Monitored checks can be used for on the job training to teach the “right way” to conduct maintenance. These monitored MRCs will be documented as a monitored evolution and findings will be provided to the WC’s CoC for inclusion into training and deficiency abatement. The value of monitor maintenance cannot be overstated, and commands are encouraged to establish a robust monitored maintenance program. (2) PMS Spot Check. PMS Spot Checks are utilized to validate that previously scheduled and accomplished MRCs were performed and the degree to which they were performed. The checklist contained in Appendix B section II, is the tool supervisory personnel utilize to determine the accomplishment status of a completed MRC. Deficiencies noted and the final grade will be provided to the WC’s CoC for abatement. The WCS will record the Spot Check grade into SKED to generate the Spot Check Accomplishment Rating (SCAR) for the quarterly PMS Performance Report. Spot Checks will involve all elements of the CoC to include the CO, Chief Of The Boat, Command Master Chief, XO, 3MC, department CPOs, DHs, DIVOs, divisional CPOs, and First- Class Petty Officers. By following the checklist, the inspector can determine if the sailor is competent, if the maintenance was accomplished, if required TPMTE was available and used, and were safety precautions followed. The focus of a spot check should be directed more to the material condition of the gear and less on the administrative issues related to the maintenance requirement. (a) Avoid Spot-Checks of MRCs with insufficient complexity. Performing a Spot-Check on a 3 or 5 step MRC does not provide the CoC an accurate picture of the health of the command’s maintenance program. Selected MRCs should be of sufficient content to provide the auditor with evidence of satisfactory performance (e.g., tag-outs, QA packages, parts required, off-hull reporting, test equipment, safety equipment, etc.).

p. 657

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-43 (b) Spot-Checks evaluated as “below standards” will require immediate training and re-performance as determined by the XO. Any re- accomplishment of the MRC must be monitored by the LCPO to ensure noted deficiencies are not repeated. (c) The minimum number of Spot Checks or Monitored evolutions conducted per quarter will be based on Tables 19-5-4 and 19-5-5 of this chapter. WCS Spot Checks or Monitors, E-5 & above, may be used to meet these requirements only when no LCPO or DIVO is available. The number of spot and monitored checks for ships in CNO availabilities will be determined at the command’s discretion. (d) The spot-checker or monitor wi ll ensure that the Spot-Check or monitored data is immediately entered into SKED. When applicable, a brief synopsis of any deficiencies resulting from the Spot-Check will be indicated within the Spot Check. (e) The minimum number of Spot-Checks and Monitored Maintenance actions required for Submarine Force surface ships, auxiliary and shore commands (AS, ARDM, URC Class ships) are based on number of MIPs in the WC, Table 19-5-6 refers.

p. 658

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-44 Table 19-5-4 - Submarine Spot Checks and Monitoring per Quarter DIVISION NUMBER DIVISION NUMBER DIVISION NUMBER DS01* 3/1 DS02* 3/1 DS03* 3/1 DS04* 3/1 DS05* 3/1 DS06* 3/1 DV01 2/1 EA01 9/3 EDC1 6/2 EE01 9/3 EM01 9/3 MA01 2/1 ME01 2/1 MH01 2/1 MN01 2/1 MV01 2/1 MV02 2/1 NE01 6/2 OC01 6/2 OC02 3/1 OC03 3/1 RC01 2/1 RC01 (774CL) 4/1 RL01 2/1 SS02 1/1 WF01 5/1 WF02 2/1 WI01 8/2 WK01 6/2 WK02 3/1 WM01 2/1 WQ01 8/2 * Only when shelters are installed on host units greater than 30 days. Table 19-5-5 - Submarine Force Surface Ships and Shore Commands Spot Checks and Monitoring # of MIPs in Work Center Minimum # of Spot Checks Minimum # Monitoring 2 1 1 3-4 2 1 5-7 3 1 8-9 4 1 10-11 5 1 12 6 2 13 7 2 14 8 2 >15 9 3

p. 659

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-45 (3) Work Center Audits. Each WC must receive an audit once per quarter by a supervisory individual, (CPO) or above. Deficiencies noted from this audit will be reported to the WC’s CoC for abatement. The 3MC will report recurring deficiencies to the XO for further investigation and corrective action. (4) Deficiency Abatement. The status of discovered deficiencies will be kept current within the monitoring program. Recurring deficiencies must be reported to the XO for further investigation and corrective action. Deficiencies that have been reported as corrected will be subject to follow up monitoring to ensure corrective action was effective and results of the follow up monitoring will be reported to the XO. The ship’s 3-M Abatement Program will include the previous quarter’s audits, Spot-Checks, monitored evolutions and CSMP validity audits noting trends and corrective actions. 19-5.5.2 Inspections. The goal of the 3MI is to evaluate the effectiveness of the ship’s 3-M Program. It is critical that the inspection be conducted in a similar fashion in every homeport and across the force. Inspections will be completed once commenced. Early below-standards indications will not be used to change an inspection into an assistance visit. The current sheets are available on the COMSUBPAC Secret Internet Protocol Router Network webpage at https://cffo.fleetforces.navy.smil.mil/csp-nf/N4/N43 -> 3M -> 3M Inspection PMS-MDS Forms. a. Frequency of Inspections. The TYCOM or ISIC command exercising administrative control will conduct a complete inspection of each command under their cognizance as follows: (1) Every Fleet Response Training Plan preferably within Pre-Overseas Movement 1 or Optimize Report Plan cycle. (2) SSBNs and SSGNs will execute 3MIs within 24 months with Kings Bay crews receiving independent inspections. (3) Forward Deployed Naval Forces wi ll execute 3MIs every 24 months. (4) When deemed necessary by the TYCOM, ISIC or the unit’s CO. (5) SUBFOR ships undergoing a CNO availability will have their 3MI deferred six months following sea trials. (6) SUBFOR shore commands will execute 3MIs every 24 months. (7) The ISIC will submit a 3MI periodici ty extension request via the TYCOM 3- M REP to the TYCOM 3-M Office if a 3MI will exceed the Fleet Response Training Plan or Optimize Report Plan cycle or 24 months has elapsed since the last inspection. The TYCOM, when replying to the request for extension, will include Commander, United States Fleet Forces Command N43 or Commander Pacific Fleet N43, as applicable, as information addressees. Only the TYCOM can authorize such an extension. b. Inspection Team Composition. (1) Senior Member. The senior member will be a deputy from the squadron staff.

p. 660

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-46 (2) Team Leader. The inspection team leader will be the TYCOM 3-M Representative who will concur with the assignment of inspection team members. The team leader will ensure inspection attributes are evaluated in a manner consistent with current guidance and directives provided by Commander Submarine Forces and provide guidance to the inspection team members to ensure a common process. (3) Team Members. Team members w ill consist of squadron staff and support staff personnel who are adequately trained in the area to which they are assigned to assess. They will report findings to the team leader. PMT personnel may also report findings to the PMT Officer In Charge as they pertain to PMT data collection subsequent to PMS. c. Method for Assignment of Numerical Evaluations. The minimum performance requirements are as identified below: (1) Formula Acronyms: (a) CLER = Command Level Effectiveness Review (b) CTS = Command Total Score (c) CVF = CSMP Validity Factor (d) DTS = Department Total Score (e) MAR = Maintenance Accomplishment Rate (f) MDS = Maintenance Data System (g) MPR = MDS Performance Rate (h) PAR = Periodic Accomplishment Rate (i) PPR = PMS Performance Rate (j) SAR = Situational Accomplishment Rate (k) SEER = Scheduling and Execution Effectiveness Review (l) SCAR = Spot Check Accomplishment Rating (2) CTS must 80 percent or higher. (3) Each department is required to m eet the DTS minimum of 80 percent. (4) Any CTS or Work Center Score ev aluated below 80 percent will be re- evaluated within six months of receiving the signed letter from the inspecting activity. (5) CTS Formula: CTS = DTS x .8 + CLER x .2 DTS = Work Center Score x Weight Factor Work Center Score (80% of CTS) = PPR x .75 + MPR x .15 +SEER x .05 +AAR x .05

p. 661

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-47 PPR = MAR x .8 + SCAR x .2 MAR = PAR x .6 + SAR x .4 SCAR = (3MI Spot Check x .5) + (% of Self-Assessment Spot and Monitored Checks Completed x .5) MPR = MDS + CVF (6) Ranking Standards. (a) Commands and WCs will be evalua ted as “Above Standards” overall in 3-M if the unit’s total score is 90% or higher. (b) Commands and WCs will be evaluate d as “At Standards” overall in 3- M if the unit’s total score is between 80% and 89.99%. (c) Commands and WCs will be evalua ted as “Below Standards” overall in 3-M if the unit’s total score is less than 80%. (d) All calculations will be rounded to two decimal places. (7) Table 19-5-6 will be used to determine divisional weighting factor for submarine commands. Non-submarine commands will use scheduled maintenance from the last 13 weeks to determine divisional weighting factor.

p. 662

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-48 Table 19-5-6 - Divisional Weighting Factors Work Center 688 21-22 23 774 SSBN SSGN DV01 1 1 1 1 0 1 EA01 13 13 12 13 14 13 EDC1 4 4 4 4 4 4 EE01 13 13 12 9 12 12 EM01 13 13 12 13 11 11 MA01 0 0 2 0 0 0 ME01 0 0 2 0 0 0 MH01 1 1 1 1 2 2 MN01 0 0 1 0 0 0 MV01 0 0 1 0 0 0 MV02 0 0 3 0 0 0 NE01 8 8 8 8 6 6 OC01 6 7 8 6 3 3 OC02 8 8 7 8 9 8 OC03 4 4 3 4 3 3 RC01 1 0 0 5 2 2 RL01 2 1 2 2 3 3 SS02 0 0 0 0 1 0 WF01 4 4 3 4 4 3 WF02 0 0 0 0 0 2 WM01 0 0 0 0 3 3 WI01 11 12 9 11 10 10 WK01 3 3 2 0 5 5 WK02 0 0 0 3 0 1 WQ01 8 8 7 8 8 8 Total 100 100 100 100 100 100

p. 663

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-49 d. Inspection Procedures. Appendix B provide s a standard means for evaluating the 3- M Program aboard ship and shore commands. These procedures, centered on a set of core attributes applicable to all, are used to conduct 3-M Inspections. Inspection procedures are divided into five major areas: (1) Section I - Work Center and Command Effectiveness Reviews. (a) Scheduling and Execution Effectiveness Review. (b) Command Level Effectiveness Review. (2) Section II – Spot Check Accomplishment Rating. (3) Section III - Assessment of Ma intenance Accomplishment Rate. (4) Section IV - Maintenance Data System. (5) Section V - 3-M Inspec tion Command Total Score. e. Inspection Reporting. Significant defici encies and numerical assessments are reported to the assessed unit’s CO, ISIC and TYCOM using the format shown in Appendix A of this chapter. Reporting may be accomplished on the entire unit or on a departmental basis.(1) All correspondence pertaining to the 3MI will be routed via the squadron commander and a copy provided to TYCOM N4 for trend analysis. (2) Significant deficiencies require a report of corrective actions taken by the unit to be forwarded to the TYCOM via the ISIC within 30 days following the inspection. (3) 3-M performance graded as “Below St andards” will be re-inspected following the completion of corrective actions. Subsequent repeat “Below Standards” will include a CO summary discussing the inadequacy of applied corrective action in correcting the deficient area. (4) Each TYCOM will report the findings of the previous year’s inspections to Commander, United States Fleet Forces Command N43 or Commander Pacific Fleet N43 (as applicable) at the end of the calendar year. f. Inspection Data Retention. COMSUBLA NT and COMSUBPAC are to maintain an inspection data file for each unit. As each command is evaluated, the individual evaluation standards and calculated values identified will be recorded in the data file with a copy of the inspection report provided to the inspected command. Sections I through V of Appendix B provide specific criteria to be used in the assessment of each command.

p. 664

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-A-1 APPENDIX A APPENDIX A FORMAT FOR REPORTING 3-M INSPECTIONS

4790 Ser Date From: Accomplishing Activity To: Commanding Officer (Command Name and Hull Number (if applicable.) Subj: REPORT OF 3-M INSPECTION OF Ref: (a) NAVSEAINST 4790.8 - Ships’ Mainte nance and Material Management (3-M) Manual (b) COMUSFLTFORCOMINST 4790.3 - Jo int Fleet Maintenance Manual, Volume VI, Chapter 19 Encl: (1) (as required) 1. Per references (a) and (b), a 3-M Inspection of (__________________________) was conducted during the period (Date) to (Date). 2. During this inspection, the following signi ficant deficiencies were discovered: a. (List) Specific department and WC deficiencies are provided in enclosure(s) (1) through ( ). 3. The following overall ship or departme nt numerical assessments are assigned: a. 3-M Total Score __________________ b. 3-M Inspection __________________ (Above, At or Below Standards)

Copy to: Immediate Superior In Command (with enclosures) Type Commander (with enclosures)

p. 665

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-B-1 APPENDIX B APPENDIX B INSPECTION CRITERIA

p. 666

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-B-2 APPENDIX B APPENDIX B SECTION I-A SCHEDULING AND EXECUTION EFFECTIVENESS REVIEW (SEER) Complete the SEER checklist below for each WC. Enter a numeric evaluation of each inspection attribute and provide amplifying information to describe the deficiencies driving point deductions on the “Remarks” page provided. Significant deficiencies will be reported via the final inspection report. Command Department Divisi on Work Center Date General Attributes Value Points 1.

Do MIPs and MRCs accurately reflect equipment configuration, are nonapplicable MRCs correctly lined-out and are applicable MRCs active? (May be MIP standardization violations) 10 2. * Does the WC retain an auditable record of personnel PMS qualifications? 5 3. Are K-MRC data sheets main tained; last completed? 10 Maintenance Requirement Card (MRC) Deck 4. Is the WC deck of printed MRCs, ACNs, and Preliminary MRCs complete and current? 2 5. Are classified MRCs complete and current? 2 6. Are blanks requiring Ship's Force data filled in prior to use? 3 Chain of Command SKED Administration 7. . Is the FR approved by DH? (Ver ify using journal tab.) 3 Equipment Configuration 8. a.* Do LGLs contain required info rmation (e.g., equipment name, equipment location, and either an equipment serial number or unique identifier)? 3 b.* Are maintenance items in SKED associated to existing equipment configuration? 3 c. Are H-coded calibration items lis ted as individual SKED equipment maintenance items? 3 d. Are calibration items associat ed to the correct MRC? 3

p. 667

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-B-3 APPENDIX B Situational Requirements 9. Are all situational ev ents being scheduled and executed in SKED? Document omitted situational checks in Block 16. a.* All applicable Local States. 4 b.* All applicable Triggers. 3 c.* All Metered Events. 3 PMS Execution and Accountability 10. Are Check Note entries accu rate, valid, and complete? 3 11. Was maintenance assigned only to qualified maintenance personnel? 4 12. Was currently scheduled, previously completed, and unscheduled maintenance entered in SKED? Document omitted periodicities in Block 16. 10 13. Is a tagout identifier recorded in “Check Notes” for maintenance actions marked as complete that required Tag-outs? 10 14. Have the minimum number of Spot and Monitored Checks been accomplished? 8 15. Is K-MRC completion rate within periodicity at 90% or above? 15 16. Record number of omitted checks: Periodic_________ Situational ___________

FBR File 17. Are FBRs accurate and processed timely in SKED; “Action Taken” block updated by WCS? 2 18. Are feedback responses with an ACN processed timely in SKED: “Response” block and MRC Customization” updated by WCS? 3 Inactive Equipment Maintenance (IEM) 19. Is the start of an inactive period (CAT I & II) correctly annotated and approved by Department Head? 3 20. Are IEM requirements properly scheduled? (CAT I only) 5

p. 668

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-B-4 APPENDIX B 21. Is IEM for maintenance periods gr eater than 21 days approved in writing by DH? 2 22. Is the completion of the inactive period correctly annotated? 3 * Electronic Versions Acceptable Totals (Attributes evaluated as NA are not calculated)

Total Points Available: 125

Total Points Awarded _______

SAT UNSAT

At Standard = 80 percent (Partial Credit of attributes based upon Inspector’s evaluation)

p. 669

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-B-5 APPENDIX B SEER REMARKS

Provide amplifying information describing the deficiencies and associated point deductions. Significant deficiencies will be reported via the final inspection report.

Attribute # Amplifying Information

Print Name: ____________________________ Signature: ___________________________ Command: __________________________________________ Date: __________________

p. 670

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-B-6 APPENDIX B APPENDIX B SECTION I-B COMMAND LEVEL EFFECTIVENESS REVIEW (CLER) Using the attributes and grading criteria described below, conduct the CLER for the ship. Provide amplifying information for deficiencies causing point reduction on the remarks page. Command Date PMS Attributes Value Points 1. Does the 3MC: a. Maintain an external Change Accountability Log? 6 b. * Maintain a log tracking the assignment of MRCs from split MIPs to ensure all applicable MRCs are assigned and updated with current FR? 3 c. * Maintain all classified MRCs? 2 d. * Maintain a current PMS (and where applicable TFR) DVD or downloaded file? 3 e. Maintain SKED Default Permissions, CoC and user roles per TYCOM guidance? 4 f. * Have an approved master copy of 3-M PQS specifically tailored for the command? 3 g. * Provide weekly status repor ts to the 3-M Manager? 3 h. Provide End of Quarter (EOQ) Summaries to the 3-M Manager and ensure the summaries are reviewed by DHs and deficiencies abated? 3 i. Generate ship-wide EOQ reports and forward to the ISIC by the 3rd Monday of the quarter? 4 j. * Generate ship-wide post-quarter SKED reports and forward to the ISIC by the 3rd Monday of the quarter? 4 k. Generate and forward the ships Tailored Force Revision Data file (.tfd) to the TYCOM 3-M Rep by the 3rd Monday of the quarter? 5 l. * Have an effective system in place to track, route and explain externally provided PMS changes? 3

p. 671

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-B-7 APPENDIX B m. Conduct end of quarter archives to maintain one completed quarter, one current quarter, and at least four future quarters? 2 n. Maintain the status of command FBRs, responses and follow up actions taken in SKED? 3 o. Maintain the status of command FBRs with ACNs responses and follow up actions taken in SKED? PMS documents retained until FR update? 4 p Capture Global Trig gers and States? 15 q. Ensure all 3-M databases are being routinely maintained? (Use the RAF computation sheet) 8 2. Is a complete back up of the SKED Database Recovery Files and Maintenance Outlook Report created on removable media (DVD or CD-ROM) following completion of the FR? 8 3. Is there an effective system in use (Spot Check Program) for supervisory personnel to monitor PMS performance periodically and routinely? 10 4. Have CSMP reconciliations been conducted quarterly? 5 5. * Does the command conduct quarterly SEER internal audits of all WCs? (Retain latest copies of deficiencies, corrections, and abatement for current & previous quarter) 10 6. * Does the command maintain an auditable record of PMS PQS? 3 7. * Does the command conduct 3-M Program training PER TYCOM, ISIC and command directives? 10 8. Was maintenance completed with all Safety Precautions accomplished? 10 9. Did the command conduct a mid-term 3-M Self-Assessment? (ISIC or command to include actions and abatements) 10 10. Does the command track K-MRCs and verify completion (reconciliation) with the local agency quarterly? 10 11. Does the CO provide a quarterly K-MRC summary report to the ISIC? 5 * Electronic Version Acceptable

p. 672

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-B-8 APPENDIX B Totals (Attributes evaluated as NA are not calculated) Total Points Available:__156_______ Total Points Awarded:____________ SAT UNSAT At Standard = 80 percent (Partial Credit of attributes based upon Inspector’s evaluation)

p. 673

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-B-9 APPENDIX B CLER REMARKS Provide amplifying information describing the deficiencies and associated point deductions. Significant deficiencies will be reported via the final inspection report.

Attribute # Amplifying Information

Print Name: _______________________________ Signature: _____________________________ Command: ____________________________________________ Date: __________________

p. 674

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-B-10 APPENDIX B APPENDIX B SECTION II-A SPOT CHECK ACCOMPLISHMENT RATING (SCAR) Using the basic definitions and guidelines described, determine the PMS Spot Check Accomplishment Rating (SCAR) for each WC. Enter the values determined on the SCAR Check Sheet, section II-A of this appendix. The SCAR for each WC will be made up of two parts. Fifty percent of the grade will be based on the results of the 3MI spot checks and fifty percent of the grade will be based on the percentage of completed self-assessment spot and monitored checks. At a minimum, the last completed quarter of self-assessment spot and monitored checks will be reviewed. SCAR = (3MI SC x .5) + (% of Self-Assessment Spot and Monitored Checks Completed x.5) The number of Spot Checks has been established at: Division Number Division Number Division Number DDS 2 DV01 2 EA01 4 EDC1 3 EE01 4 EM01 4 MA01 2 ME01 2 MH01 2 MN01 2 MV01 2 MV02 2 NE01 3 OC01 3 OC02 3 OC03 2 RC01 2 RC01(774CL) 3 RL01 2 SS02 2 WF01 2 WF02 2 WI01 4 WK01 2 WK02 3 WM01 2 WQ01 3 Specifically: Periodic and situational for all completed maintenance (including Daily, Weekly, and bi-weekly) from the last 13 weeks. If a WC did not perform any maintenance in the last 13 weeks, the SCAR portion will be NA. 1. Complete an MRC evaluation, SCAR Check Sheet , Section II-A of this appendix, for each MRC selected. Based on the results, evaluate the overall effectiveness of the accomplishment of each MR selected. Enter a numeric evaluation of each assessment attribute and provide amplifying information describing the deficiencies driving associated point deductions. Significant deficiencies will be reported via the final inspection report. 2. The SCAR Check Sheet reflects a series of questions to be asked to determine the accomplishment status of an MRC previously reported as accomplished. Although the sheet may be used as a reference for conducting a real time monitored MRC evaluation, for the purposes of conducting a 3MI, all spot checks will be conducted on accomplished (historic) MRCs. 3. Due to the nature of MRC completion, suppor ting programs such as Tag-Outs and HAZMAT are encountered. Care should be taken to avoid expanding the spot check to a review of the processes of those programs thereby preventing the assessor from determining the accomplishment status of the MRC under review.

p. 675

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-B-11 APPENDIX B 4. The following is expanded guidance for comp letion of the SCAR Check Sheet. Best practices or other policies not supported by source documentation will not be included in evaluating compliance: a. (1.a). Determine if the MP is qualified to perform the maintenance task. PQS 301 is required for all MRCs but attention should also be paid to other qualifications required such as Quality Maintenance (see volume V, Part I, Chapter 3, paragraph 3.4 of this manual) or graduation from a required school such as gage calibration technician. b. (1.b). Determine if the correct TPMTE were used during the performance of the MRC. If the MP did not have the required TPMTE, it is unlikely that he or she would have been able to complete all the procedural steps of the MRC as required. If an item of TPMTE was required to perform a conditional step and that step was not required to be accomplished, it is not considered deficient. If the required test equipment required calibration, ensure that the calibration is within date and the equipment is of sufficient scale to accomplish the MRC. c. (1.c). Determine if the MP maintained the correct equipment. d. (1.d). Examine the MRC to determine that any locally applied changes are authorized by procedural notes, external correspondence, or allowed by reference (b). e. (1.e). Determine applicability of the MRC to the component that the MP signed for completion. NOTE: IF A PROCEDURAL STEP WAS NOT COMPLETED, THE MRC SHOULD NOT HAVE BEEN REPORTED AS COMPLETE AND THEREFORE THE ATTRIBUTE GRADE SHOULD BE ZERO AND ALL SUBSEQUENT ATTRIBUTES SHOULD ALSO BE ZERO, EFFECTIVELY “FAILING” THE SPOT CHECK. f. (2.a). From a variety of potential techniques, determine if the MP performed all the required steps of the MRC. This may be accomplished via re-enactment, a discussion regarding the steps or re-performance. The inspector should come away with a clear impression that all the steps of the MRC were either fully accomplished or not. NOTE: IF A REQUIRED TAG-OUT WA S NOT CONDUCTED IN SUPPORT OF ACCOMPLISHING THE MRC, THE MRC SHOULD NOT HAVE BEEN CONDUCTED AND REPRESENTS A SERIOUS SAFETY VIOLATION. THEREFORE, THE ATTRIBUTE GRADE SHOULD BE ZERO AND ALL SUBSEQUENT ATTRIBUTES SHOULD ALSO BE ZERO EFFECTIVELY “FAILING” THE SPOT CHECK. g. (2.b). If required by the MRC, verify that a tag-out was hung before the maintenance was performed. Ensure the isolation boundaries were appropriately identified and correctly positioned to ensure complete isolation of the maintained equipment. If no tag-out was required, write NA on the sheet. NOTE: FAILURE TO ADHERE TO A SA FETY PRECAUTION PROVIDED ON THE MRC CONSTITUTES A SERIOUS SAFETY VIOLATION AND THE FAILURE TO PERFORM THE MRC AS WRITTEN. THE ATTRIBUTE

p. 676

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-B-12 APPENDIX B GRADE WILL BE ZERO AND ALL SUBSEQUENT ATTRIBUTES WILL ALSO BE ZERO, EFFECTIVELY “FAILING” THE SPOT CHECK. h. (2.c). Determine compliance with all specific safety precautions listed on the MRC. If no safety requirements were invoked, write NA on the sheet. i. (3.a). By physical examination of the maintained equipment, determine if maintenance of the nature required by the MRC had been performed. Take note of fasteners that would have had to be disturbed, dirt in filters, fresh oil, etc. to make a judgment as to whether the maintenance has been performed. NOTE: DUE TO THE POTEN TIAL LIABILITY INCURRED BY IMPROPER USE AND DISPOSAL OF HAZMAT, SOME WCS HAVE ASSIGNED SPECIALLY TRAINED PERSONNEL TO PROVIDE HAZMAT AND DISPOSAL SERVICES FOR SURPLUS MATERIAL INSTEAD OF THE MP. THIS IS ACCEPTABLE PROVIDED THE INSPECTOR CAN DETERMINE FULL COMPLIANCE. j. (3.b). Determine through questioning and record verification that HAZMAT was properly used and disposed of as a means of determining whether the MRC was accomplished. Once the inspector has determined that the HAZMAT was used and disposed of correctly, this attribute is considered fulfilled. If no HAZMAT was required to be utilized, write NA on the sheet. k. (3.c). Determine if the MP could have performed the MRC from a standpoint of being trained and proficient in the tasks called out for by the procedure. l. (4.a). Determine if the MP filled out the 13-Week Accountability Log or annotated proper disposition of maintenance in SKED correctly for the accomplished MRC with the appropriate accomplishment date. Ensure that if a tag-out isolation was used, the tag serial number is recorded in the space allowed or as a check note in SKED. Ensure that the printed name and legal signature of the MP who performed the maintenance is recorded or, in case of group performed PMS, the MP in charge of the group. m. (4.b). From reviewing the discussions and findings during the spot check, determine if an FBR had been submitted if required. If no FBR was required, write NA on the sheet. n. (4.c). Determine if a material deficiency was noted during the PMS; if so, examine the CSMP to ensure the deficiency was documented. If no material deficiency was noted, write NA on the sheet. If material discrepancies are properly documented in the CSMP attribute graded as a two. Material discrepancies which are not documented in the CSMP will receive an automatic grade of zero. 5. When a Spot Check is determined to be below standards, the command undergoing inspection is likely to have numerous questions. To facilitate root cause analysis and the formulation of an effective corrective action plan, care should be taken to clearly identify factors contributing to deficiencies that led to the conclusion that the MRC was not conducted as written or not conducted at all.

p. 677

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-B-13 APPENDIX B APPENDIX B SECTION II-B SPOT CHECK ACCOMPLISHMENT RATING (SCAR) CHECK SHEET

Planned Maintenance System (PMS) 3-M Spot Check Form COMMAND DEPARTMENT EQUIPMENT WORK CENTER DATE PERFORMED MIP EVALUATED MRC EVALUATED

Maintenance Person: Spot Check Date:

NOTES: 1. If an attribute marked with an “*” is evaluated as unsatisfactory, all subsequent attributes will be graded as “0”. 2. Attribute marked with a pound sign “#” – Due to the potential liability incurred by improper use and disposal of HAZMAT, some WCs have assigned specially trained personnel to provide HAZMAT and disposal services for surplus material instead of the MP. This is acceptable provided the inspector can determine full compliance.

Inspection Attribute Value Grade Notes Contact the MP assigned responsibility for the accomplishment of the MRC, have the individual deliver MRC, and determine the following by questions, personal observation, or both. 1. a.* Is the MP qualified (PQS) to perform the MR? 2 b. Did the MP present the correct tools, Personal Protective Equipment (Personnel Protective Equipment), parts (NSN), material (Military Specification) and calibrated test equipment?

3

c. Did the MP properly identify the equipment (location, equipment validation)? 4 d. Are there unauthorized changes or corrections to the MRC? 3 e. Is the MRC correct for the equipment maintained? 3 Demonstrated all steps of MR including all Notes, Warnings and Cautions according to the MRC. 2. a.* Followed all steps of the MRC. 5 b.* Correctly performed equipment Tag-Out. 5 c.* Followed all safety precautions. 5

p. 678

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-B-14 APPENDIX B Does the equipment condition reflect accomplishment of the MRC? 3. a. Is it apparent that maintenance was performed recently? 10 b.# Correctly demonstrated use and disposal of Hazardous Material. 3 c. Was the MRC within the capability of the assigned individual? 5 PMS Reporting 4. a. MP reported status of MR to the WCS if Completed or Not Fully Accomplished and made appropriate updates in SKED.

2

b. WC generated FBR for any problem with MRC. 2 c. Material deficiencies detected by the PMS action were recorded in MDS. 2

Attributes Evaluated as NA are not Calculated Total Points Available:____________ Total Points Awarded:_________________________ Spot Check (SCAR) (Grade = Points Awarded ÷Points Available): SCAR =_____________ Above Standards (90% or greater) At Standards (80-89.99%) Below Standards (less than 80%) Above Standards At Standards Below Standards Below Standard grade requires immediate accomplishment (if XO determines re-performance is required) monitored by a Chief Petty Officer

p. 679

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-B-15 APPENDIX B Additional Remarks:

Print Name: ____________________________________ Signature: _________________________________________

Command: ______________________________________________ Date: ____________________________________

p. 680

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-B-16 APPENDIX B APPENDIX B SECTION III MAINTENANCE ACCOMPLISHMENT RATE (MAR)

1. The Maintenance Performance formula has been redefined to more effectively capture maintenance that was not scheduled. 2. The PAR and SAR reports are automatically generated by SKED. 3. The MAR grade will be determined utilizing the formula reflected and a date range consisting of the previous 13 weeks of maintenance.

MAR = (PAR.6 + SAR.4) PAR = Comp ÷ (Comp + Lost + Alerts + Omitted) SAR = Comp ÷ (Comp + Lost + Omitted)

4. “Omitted” is defined as any maintenance acti on that should have been performed on any and every maintenance item and no matter the reason did not get scheduled. For example: a. Situational or state maintenance that did not get scheduled when the situation dictated. b. Improperly lined-out periodic checks. c. Non-accomplished IEM checks. d. Non-accomplished maintenance added vi a ACN, FBR, Preliminary PMS, etc.

p. 681

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-B-17 APPENDIX B APPENDIX B SECTION IV-A1 CURRENT SHIP'S MAINTENANCE PROJECT VALIDITY FACTOR (CVF) CHECKLIST CURRENT SHIP’S MAINTENANCE PROJECT VALIDITY FACTOR (CVF) CHECKLIST COMMAND:______________________________Date:___________________Work Center:_____________

E A 0 1

CSMP Validity (Raw Data) Value 1. Number of TA-1 Work Candidates 2. Number of TA-2 Work Candidates 3. Number of TA-3 Work Candidates 4. Number of TA-4 Work Candidates 5. Total Work Candidates (Sum 1,2,3,4) 6. Number of TA-2 Work Candidates over 180 days old 7. Number of TA-4 Work Candidates over 180 days old

8. Aged Work Candidates (WCO): (Sum of 6 and 7) 9. Ship's Force Material Correction Rate: WCO/3 (Aged TA4) (#7÷3)÷#4 10. CSMP Validity review results from CVF Sheet. 11. Number of Ship's Force (TA-4) Work Candidates greater than seven days old requiring parts and the parts are not yet ordered.

12. Total Work Candidate Deficiencies (WCD): #11÷#4 13. Work Candidate Multiple Average: #9, #10

p. 682

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-B-18 APPENDIX B 14. Number of material deficiencies noted on ship spot- checks not documented in CSMP or number of jobs in the CSMP that require controlled system marking (SS, FBW, SOC) that are not appropriately marked.

15. Spot-check Deductions #14÷#5 16. CSMP Validity Average #13 & #15 SAT/UNSAT

p. 683

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-B-19 APPENDIX B APPENDIX B SECTION IV-A2 CURRENT SHIP’S MAINTENANCE PROJECT VALIDITY FACTOR (CVF) WORK CANDIDATE WORKSHEET CSMP VALIDITY FACTOR (CVF) WORK CANDIDATE WORKSHEET COMMAND:______________________________________________________DATE:__________________ DEPARTMENT:_____________________________________________WORK CENTER:________________ JCN CSMP Summary MNO* 1 2 3 4 5 6 7 8 9 CVF 100.00

CVF

CSMP entry was reviewed with the following results: Jobs Reviewed:_______ MNO*________ Minus Points 1. Was the work candidate written against the correct configuration item? #1 Qty: 20 2. Problem Description and Recommended Solution inadequate. [PARTIAL CREDIT] #2 Qty: 20 3. Deferral Reason correct. #3 Qty: 5 4. Current Status not updated on TA-4 JSNs. #4 Qty: 10 5. Write up does not reflect maintenance level assigned. [PARTIAL CREDIT] #5 Qty: 10 6. Incorrect CSMP Summary. #6 Qty: 10 7. Priority code incorrect. [PARTIAL CREDIT] #7 Qty: 5 8. Does the Work Candidate equipment status code match problem description? #8 Qty: 10 9. When required, was the correct special purpose or safety block selected? #9 Qty: 10

*Enter N if parts needed but not ordered.

p. 684

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-B-20 APPENDIX B NOTE: ENTER ONLY NUMERIC PORTION OF JSN AFTER ENSURING THAT DEPARTMENT AND WC HEADER IS FILLED IN. 1. One hundred percent of CSMP jobs for review not to exceed 25 jobs. 2. WCs (EA01, EM01, NE01, OC01, OC 03, WI01, WK02, WM01 & WQ01) having SUBSAFE, Fly-by-Wire (FBW) or Scope of Certification (SOC) controlled systems: Scan, top-down, 100% of CSMP for any system having "SS," "FBW" & "SOC" boundaries.

p. 685

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-B-21 APPENDIX B APPENDIX B SECTION IV-B REPORTING AND AUTOMATED SHORE INTERFACE PROCESSING CONFIDENCE FACTOR (RAF) REVIEW

COMMAND:

DATE: OMMS-NG AND P-OMMS-NG SYSTEM MAINTENANCE REVIEW: Points Score 1. Is the import correction queue empty? 4 2. Have Inactive and Archive been run in the last 15 days (30 days for P-OMMS)? 4 3. Does the Review and Approval queue have Work Candidates older than 7 days? 10 4. Does the 3MC have a tracking system for up-line reporting? 4 5. Is there an effective process in place that deletes users as they transfer from the command? 4 6. Are copies of the “.uru” and “.pts” files maintained on file for one year? 4 CONFIGURATION MANAGEMENT 7. Monthly follow-up action had been initiated with the Configuration Data Manager for “CKs” 10 awaiting response more than 180 days.

Total Points Available: 40 Total Points Awarded: RAF 120 Inspector Notes: Print Name: __________________________ Signature: ____________________________ Command: ____________________________________ Date: ______________________

p. 686

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-B-22 APPENDIX B APPENDIX B SECTION V COMMAND TOTAL SCORE (CTS)

1. The FINAL GRADE consists of two parts and weighted as follows: a. Department Total Score account s for 80% of the final grade. b. CLER accounts for 20% of the final grade. 2. OVERALL GRADE is computed as: CTS = DTS.8 + CLER.2 DTS = Work Center Score x Weight Factor Work Center Score (80% of CTS) = PPR.75 + MPR.15 + SEER.05 +AAR.05 PPR = MAR.8 + SCAR.2 MAR = PAR.6 + SAR.4 SCAR = (3MI Spot Check x.5) + (% of Self-Assessment Spot and Monitored Checks Completed x.5) A minimum grade point of 80 is required for a passing score.

p. 687

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-C-1 APPENDIX C APPENDIX C FORMAT FOR REPORTING K-MRC END-OF-QUARTER RESOLUTION

4790 Ser Date From: Commanding Officer (Commands Name and Hull Number) To: Commander (Commands ISIC)

Subj: REPORT OF OUT OF PERIODICITY K-MRC FOR THE QUARTER ENDED (Date)

Ref: (a) NAVSEAINST 4790.8 - Ships’ Main tenance and Material Management (3-M) Manual Per reference (a), the ship reports the following K-MRCs are out of periodicity at the end of the previous quarter and will be adjudicated as follows:

Work Center MIP MRC Component Last Accomplishment Root Cause and Projected Accomplishment Date EA01 EE01 EM01 NE01 OC01 WF01 WI01 WQ01 /s/ Commanding Officer

p. 688

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-D-1 APPENDIX D APPENDIX D DIVISION IEM PLAN FOR FLEET AND CNO AVAILABILITIES

From: Division Leading Chief Petty Officer, USS SUBMARINE (SSN XXX) To: Department Head, USS SUBMARINE (SSN XXX)

Subj: Division Inactive Equipment Maintenance (IEM) Plan for Fleet or CNO Availability

Ref: (a) COMUSFLTFORCOMINST 4790.3 – Joint Fleet Maintenance Manual

Encl: (1) Inactive Equipment Maintenance Plan Matrix

1. Per reference (a), the following systems or equipment will be placed in an IEM status in SKED while the command conducts Fleet or CNO Availability.

2. Enclosure (1) lists all Systems and Equipment that this division will place in IEM for the upcoming maintenance period. This list was checked for accuracy and linked to the appropriate system or equipment restoration and key event. The IEM Plan is considered a living document; reviews will occur when key events timelines change.

3. A current copy of this plan will be provided to the command 3MC and be made available to the LMA, CTE, and Project Superintendent.

//SIGNATURE// I.M. CHIEF

4. I concur with placing the Systems or Equipment identified in Encl (1) in an IEM Status.

// SIGNATURE// Department Head

p. 689

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022 VI-19-5-D-2 APPENDIX D

INACTIVE EQUIPMENT MAINTENANCE PLAN MATRIX

ENCLOSURE (1)

System or Equipment MIP CAT 1 / 2 LU PM SU and OT Due MRs Restoration Key Event Estimated Restoration Date #1 Burner 5151/902 1 LU-3 LU-4 PM-1 PM-2 SU-2 SU-3 OT-1 A-8 43 Ventilation Restore 12/25/16

p. 690

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-1

VOLUME VI CHAPTER 19-6 NAVAL SURFACE FORCES REFERENCES. (a) OPNAVINST 4790.4 - Ship's Maintenance a nd Material Management System Policy (b) NAVSEAINST 4790.8 - Ships’ Maintenan ce and Material Management (3-M) Manual (c) COMNAVSURFPAC/COMNAVSUR FLANTINST 3502.3 - Surface Force Readiness Manual (d) NAVEDTRA 43241 - Personnel Qualification Standard for Ship’s Maintenance and Material Management (3-M) System (e) NAVEDTRA 43119 - Personnel Qualification Standard for Damage Control (DC) Watches (f) NAVEDTRA 43523 - Personnel Qualificati on Standard for Quality Maintenance Program (g) NAVSEA S0400-AD-URM-010/TUM - Tag-Out Users Manual (h) COMNAVSURFPAC/COMNAVSUR FLANTINST 3502.7 - Surface Force Readiness and Training Manual (SFTRM) 19-6.1 APPLICABILITY. All content of the Commander Naval Surface Force Pacific Fleet (COMNAVSURFPAC) and Commander Naval Surface Force Atlantic Fleet (COMNAVSURFLANT) 3-M Instruction has been incorporated into this chapter to provide easier access to 3-M guidance and requirements. 19-6.2 PURPOSE. To issue Maintenance and Material Management (3-M) program requirements within COMNAVSURFPAC and COMNAVSURFLANT. The 3-M program is executed per references (a) through (h) and as clarified by this instruction. The goal is to maintain an effective unit maintenance program that will ensure a high state of material readiness. 19-6.3 ROLES AND RESPONSIBILITIES. a. Type Commander. The Type Co mmander (TYCOM) exercises primary responsibility for the effective operation and support of the 3-M System. Areas of responsibility include but are not limited to the following: (1) Ensure each unit has authorized programs: (a) Maintenance Data System (MDS) system installed. (b) Planned Maintenance System (PMS) Scheduling (SKED software). (2) Ensure ships and units are manned wi th Navy Enlisted Classification (NEC) qualified Maintenance and Material Management Coordinators (3MC). (3) Be the certifying authority of all 3-M certifications. (4) Oversee surface Force 3-M representatives, including periodically observing 3-M representatives conducting 3-M Virtual Assessments (VA) and training

CHAPTER 19-6

p. 691

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-2

events. (5) Review and approve curriculum c ontent for Maintenance University and Surface Force Representative 3-M Training. b. Immediate Superior In Command. The Im mediate Superior in Command (ISIC) is responsible but are not limited to reviewing the status of assigned unit’s 3-M pillars from detailed reports provided from Surface Force 3-M Representatives assigned to units. c. Afloat Training Group. Afloat Training Group will fill the role as the Surface Force 3-M Representatives and areas of responsibility include but are not limited to the following: (1) Monitor the assigned unit’s Main tenance Accomplishment Rate (MAR) utilizing the 3-M 365 Virtual Snap-Shot Report weekly. (2) Monitor the assigned unit’s Spot Ch eck Program utilizing the 3-M 365 Virtual Snap-Shot Report weekly. (3) Monitor the assigned unit’s Curren t Ships Maintenance Project (CSMP) management utilizing the 3-M 365 CSMP Self-Sufficiency Report monthly at a minimum. (4) Monitor the assigned unit’s Know ledge, Skills, and Experience (KSE) utilizing the 3-M 365 KSE Analysis Report quarterly at a minimum. (5) Train assigned units on conducting CSMP Reconciliation and aligning the CSMP in the MDS. (6) Conduct command level training for all assigned Work Center Supervisors, Leading Chief Petty Officers, Division Officers and Department Heads as required to maintain the KSE. (7) Conduct Command Level Effectiveness Reviews (CLERs) for all subordinate commands quarterly per 3-M 365 Surface Force Representative standard operating procedure. (8) Schedule and participate in Program Va lidations for unit’s failing to meet 3-M 365 Pillar of Performance standards. (9) Assist assigned units with prepar ing to enter or exit a Chief of Naval Operations Availability as defined in Volume II, Part I, Chapter 3 of this manual. (10) Submit a bi-weekly report to TYCOM containing all assigned unit performance metrics. (11) Submit training muster sh eets to TYCOM as required. d. Commanding Officer or Of ficer in Charge. The Commanding Officer (CO) or Officer In Charge (OIC) is responsible for maintaining an effective 3-M program. The CO or OIC will: (1) Designate a 3MC in writing.

p. 692

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-3

(2) Conduct rigorous 3-M self-assessments. (3) Chair the Planning Board for Maintenance (PB4M). (4) Ensure material deficiencies are properly documented in the CSMP and tracked to resolution. (5) Conduct Spot Check the Spot Checker assessments to perform a Quality Assurance evaluation of the command’s Spot Check Program. (6) Assault Craft Unit, Beach Master Unit, Naval Beach Unit and Amphibious Construction Battalion may designate the detachment OIC to perform Department Head (DH) 3-M functions. All designations must be in writing and signed by the CO. (7) Ticonderoga and Arleigh Burke Class COs may designate in writing the Weapons Officer to perform DH 3-M functions for the following Work Centers (WC): CA01, CA02, CG01, CG02, CG03, CG04, CM01, CM02, and CM03 only. (8) Surface Force ships may have a billeted Plans and Tactics Officer. Plans and Tactics (PT) department will be an MDS only department. The PT department will NOT have responsibility for maintenance, PMS, or configuration management. e. Executive Officer. The Executive Officer (XO) is the command’s 3-M System Manager responsible to the CO for the overall management of the 3-M Program. The XO will: (1) Chair quarterly 3-M System meetings with DH and the 3MC. (2) Brief the CO on the status of 3-M. The brief will include results from the Virtual Snap-Shot, CSMP Reconciliation, CSMP Self-Sufficiency, and KSE Reports. (3) Serve as the CO’s principal assistan t for management of all on-ship (TA 4) maintenance. (4) Maintain an aggressive 3-M spot ch eck program involving all levels of the Chain of Command (CoC) from the First Class Petty Officer (FCPO) to the CO. (5) Conduct Spot Check the Spot Checker assessments to perform a Quality Assurance evaluation of the command’s Spot Check Program. (6) Authorize shifts of maintenance responsibility between departments. (7) Maintain a command Zone Inspection program. f. Command Master Chief. Th e Command Master Chief will: (1) Attend the XO’s quarterly 3-M System meetings providing senior enlisted feedback. (2) Conduct Spot Check the Spot Checker assessments to perform a Quality

p. 693

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-4

Assurance evaluation of the command’s Spot Check Program. g. Command 3-M Coordinator. The 3MC will: (1) Serve as the key 3-M System assistant to the XO. (2) Maintain current directives , policies, and instructions. (3) Send Virtual Snap Shot, CSMP Reconc iliation, CSMP Self Sufficiency results to the Surface Force 3-M Representative. A Plan of Actions and Milestones will be submitted for all scores from Virtual Snap-Shot and CSMP Self Sufficiency in “Red” (below standards) and discrepancies identified from the CSMP Reconciliation report. (4) Monitor the Ship’s 3-M Personnel Qu alification Standards (PQS) Program and maintain an auditable record of personnel qualified in 3-M PQS. In ships R-Admin, ASM or any other installed program that tracks PQS and training, develop following training items for capture of TYCOM training as below: (a) 3-M TYCOM Office direct. (b) 3-M Advance SKED ANTECH. (c) 3-M Advance MDS fr om COMNAVSURFPAC N41. (d) 3-M TYCOM Representative traini ng for Work Center Supervisor (WCS), Lead Chief Petty Officers (LCPO), DIVO and DH. (e) Maintain command Change Serv ice Accountability Log (CSAL). (f) Develop and maintain the master split Maintenance Index Page (MIP) tracker and ensure applicable split MIPs are appropriately assigned to affected WCs. (g) Ensure the Technical Librarian is maintaining the Naval Sea Systems Command (NAVSEA) Advanced Technical Information Support (ATIS) and WebATIS program are operational. (h) Develop and administer the ship or unit’s PMS Spot Check Program. (i) Ensure a complete back up of the SKED system is made on removable media (e.g. Digital Video Disk (DVD) or Compact Disk (CD)) following completion of the FR update and retain as part of the PMS Master File. If the 3MC is able to access locally stored report if network is down, then not required to save to external source. (j) Ensure command’s 26-week maintenance outlook report is electronically saved on removable media (e.g. DVD or CD) after all WCs have closed out weekly from SKED. If the 3MC is able to access locally stored report if network is down, then not required to save to external source. (k) Notify Surface Force 3-M Representative anytime Naval Tactical Command Support System (NTCSS), Maintenance Figure of Merit, Automated Work Notification (AWN), ATIS or SKED are

p. 694

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-5

unavailable. (l) Maintain an effective MDS program. (m) Maintain an effective PMS program. (n) Request authorization to delay implementation of the Force Revision to TYCOM Force 3MC via the Surface Force 3-M Representative. (o) Maintain access to the following programs: 1 RADWEB 2 PMS-MIS 3 WEBATIS 4 MCMS 5 ATM (Ashore AWN for AWN Platforms only) 6 COMNAVSURFPAC 3-M SharePoint h. Ship’s Maintenance and Material Officer . The Ship’s Maintenance and Material Officer (SMMO) has cognizance of the material condition of the ship. In that capacity, the SMMO will: (1) Coordinate the execution of PB4M. (2) Serve as the CO’s principal assistan t for management of all off-ship (TA 1, TA 2 and TA 3) brokered maintenance. (3) Conduct monthly command CSMP to shore Validation Screening and Brokering (VSB) file reconciliation. (4) Develop and provide Ship’s Force wo rk package to the executing activity and assist in coordinating Ship’s Force work with the executing activity during availabilities. (5) Review all work candidates for WC ES01 monthly. Ensure TA 1, 2 and 3 jobs are planned for upcoming availabilities. Ensure all TA 4 jobs are sent to correct work centers and are rewritten under the work center with reference to ES01 job. Once a new job is written to correct material deficiency, close the original ES01 job. (6) Conduct the DH review for WC ES01. (7) Ensure the ship’s initial conditions ar e established for work prior to start by outside activities. (8) Responsible for all PMS conducted by outside activities and documented utilizing the Personal Identification Number (PIN) feature in SKED. (9) Maintain access to VSB. i. Training Officer (1) Implement a short-range and long- range training plan per reference (a).

p. 695

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-6

(2) Update the Training and Operatio nal Readiness Information Services - Training Figure of Merit for 3-M 365. Repetitive Exercise (RE) RE-01-RE-03 report monthly and RE-04-RE-05 report quarterly. j. Department Head. The DH is respon sible to the XO for the operation and execution of the 3-M System within the department. Duties and responsibilities assigned to the DH are not to be delegated. The DH will: (1) Designate and assign the departme ntal 3-M Assistant (3MA) and WCS. (2) Ensure maintenance is priori tized to facilitate accomplishment. (3) Review and approve all depart ment PMS schedules and revisions. (4) Responsible for all on-ship TA 4 Wo rk Candidates within the department. (5) Review maintenance action annotations. (6) Review and acknowledge weekly check notes and PMS alerts. (7) Take corrective action on all unsatis factory PMS spot checks and report to the 3MC as part of weekly PMS reporting. (8) Ensure all material deficiencies are documented and promptly reported. (9) Review and verify the content and validity of all Feedback Reports (FBR), digitally sign FBRs within four days of origination. (10) Authorize placement of equipment in to an Inactive Equipment Maintenance (IEM) status, ensure PMS scheduling is annotated accordingly. (11) The review and approval of all depart ment work candidates within four days of creation; ensure completeness, accuracy and the correct assignment of priority. (12) Conduct quarterly meetings with Division Officers (DIVO), LCPO and WCS and provide status of departmental 3-M System to the XO. k. Departmental 3MA. The Department al 3MA is responsible to the DH for the operation and execution of the 3-M System within the department. The departmental 3MA will: (1) Assist the 3MC in the proper ex ecution of the 3-M Program within the department. (2) Serve as the department’s 3-M Pr ogram technical expert and advisor. (3) Supervise and coordinate the 3-M Self-Assessments for the department. (4) Assist 3MC with command 3-M Training. (5) Assist 3MC in executing quality co mmand spot check program (spot check the spot checker). l. Division Officer. The DIVO is re sponsible to the DH for the execution of maintenance within the division. The DIVO will: (1) Ensure all PMS scheduling changes have been properly annotated and applied

p. 696

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-7

prior to DH review and finalization. (2) Review, approve, and clos e out weekly schedules. (3) Review maintenance to ensure it is level loaded from week to week and among assigned maintenance personnel to not overload particular weeks or personnel. (4) Review and verify the content and va lidity of PMS FBRs within three days of origination. (5) Ensure 3-M documents generated wi thin the division are complete, accurate and promptly submitted to the DH. (6) Conduct 3-M Self-A ssessments as directed by the command’s policy. (7) Provide weekly updates to the DH c oncerning the status of the 3-M System within the division. (8) Incorporate 3-M System traini ng into the divisional training plan. (9) Review with LCPO all divisional work candidates and the CSMP for validity and accuracy prior to approval. (10) Conduct space walkth roughs of all divisional spaces at least weekly and ensure all equipment and material discrepancies discovered are documented in the CSMP. m. Division Leading Chief Petty Officer. The division LCPO is responsible for the proper operation of the 3-M System within their division. The division LCPOs will: (1) Ensure quality maintenance is perf ormed on all equipment in their WCs and divisions per procedural documentation. (2) Supervise WCs in the ex ecution of daily maintenance. (3) Ensure WCs are properly trained, equipped and are knowledgeable of all WC divisional equipment maintenance requirements. (4) Ensure PMS is properly scheduled and conducted, including all underway or special evolution situational “R” checks. (5) Ensure that when equipment fails PMS, due to material deficiency or equipment discrepancy(s), the failure is properly entered into the CSMP. (6) Implement Force Revision reviews. (7) Review and electronically approve n on-applicable procedural steps lined-out on Maintenance Requirement Cards (MRC). (8) Review the PMS Scheduling Forecas ting Report to ensure that all Tools, Parts, Material and Test Equipment (TPMTE) are available to support upcoming maintenance actions. (9) Review and verify the content and validity of PMS FBRs within two days of origination and implement response as required.

p. 697

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-8

(10) Review and approve wo rk candidates, and serve as the second point of contact on all work candidates. Brief the DIVO weekly on the status of all work candidates in the CSMP. (11) Ensure proper tes ting and inspection of work done by outside activities prior to job acceptance. (12) Review check notes fo r required and updated information. (13) Write PMS alert deta ils to include plan of action to accomplish maintenance. (14) Conduct space walkth roughs of all divisional spaces at least weekly and ensure all equipment and material discrepancies discovered are documented in the CSMP. (15) In the absence of the DIVO, comp lete weekly close out of maintenance in SKED. n. Work Center Supervisor. The WCS must be a senior petty officer assigned to the WC and qualified per reference (d). The WCS will: (1) Maintain a detailed working knowledge of all equipment deficiencies within the WC. (2) Ensure WC personnel have completed 3-M PQS qualifications and training commensurate with position held. (3) Maintain an accurate and current List Of Effective Pages (LOEP). (4) Ensure 3-M system WC files and publications are complete, current and available to WC personnel. (5) Maintain a 13-Week Accountability Log containing the current and previous 13-Week Log (if not using electronic accountability in SKED or when SKED is not available). (6) Ensure equipment changes, adds, removals are reflected in the Configuration Management Database and, if not, report to the 3MC. (7) Ensure FBRs are submitted whenever: (a) Maintenance requirements are not fully understood. (b) Errors are believed to exist. (c) Entries in the TPMTE block are wrong or inadequate. (d) Additional coverage is needed. (e) Performance of the maintenance requirement would cause a hazardous condition to exist. (8) Ensure prompt reporting of all material deficiencies and completed maintenance actions. (9) Ensure the DIVO and LCPO or Lead Petty Officer (LPO) are advised of all 3- M system activity within the WC.

p. 698

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-9

(10) Ensure Equipment Verification and Validations are submitted for equipment prior to CSMP entry. (11) Ensure all SKED schedules are updated daily. (12) Ensure WC personnel make necessary preparations and ensure presenters and spaces are ready for zone inspection. o. Damage Control Assistan t. The Damage Control Assistant will be the principal advisor to the XO for all matters pertaining to damage control maintenance including scheduling, performance and the technical aspects of planned maintenance for all damage control equipment. The Damage Control Assistant will: (1) Provide a comprehensive weekly training and qualification program for Damage Control Petty Officers. (2) Schedule and control the performance of planned and corrective maintenance of damage control equipment requiring outside or off hull assistance. (3) Advise DHs of scheduled dates for maintenance actions requiring coordination between departments or throughout the ship for Damage Control systems. (4) Coordinate PMS on damage control gear not assigned to a WC, division, or department. p. Maintainer. Maintenance personnel w ill perform all PMS as assigned utilizing PMS documents in SKED and ensure check notes contain amplifying information and tag- out identifiers as required. Maintenance personnel will: (1) Review PMS assignments, perfor m quality maintenance per procedural documentation, and properly document completion. (2) Notify WCS when: (a) MRC is not fully understood, appear s to be incorrect or cannot be accomplished as written. (If a need to deviate from documented procedures is perceived, “stop.” Inform the WCS, LPO and LCPO. Do not proceed until the CoC has resolved the apparent discrepancies and provided guidance.) (b) There are issues with the TPMTE block of the MRC. (c) The technician has doubts concerning his or her ability to perform the maintenance. (d) Equipment deficiencies or casualties are discovered. (e) Factors exist which would make performance of the maintenance unwise or dangerous. (3) Initiate FBRs when discrepancies are discovered during the performance of an MRC.

p. 699

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-10

19-6.4 SHIPBOARD MAINTENANCE 19-6.4.1 Preventative Maintenance System. PMS constitutes the scheduling and accomplishment of all periodic and situational maintenance conducted on shipboard equipment. All PMS is scheduled and completion reported via the SKED program. a. Qualifications and Accountability. The key to a successful 3-M Program is having highly-trained, knowledgeable, and qualified maintenance personnel accomplishing the maintenance. All personnel must complete the corresponding Personnel Qualification Standards (PQS) for their assigned billet associated to the 3-M program per references (c), (d) and (e). b. SKED guidance and utilization. (1) Guidance for use of SKED is provide d via the SKED users guide with help menus, and wizards associated with SKED functionality. (2) The Navy PMS DVD or CD-ROM is used to update the command or unit’s SKED PMS data. Electronic backup of the command or unit’s SKED database will be used to restore SKED databases. (3) The SKED program uses days to schedule and keep track of calendar periodicities. MRCs are displayed as out of periodicity when they fall outside the established date ranges in the SKED program. These date ranges are as reflected in Table 19-6-1 of this chapter. 19-6.4.2 SKED Program Failure And Restoration. SKED Program failure. In the event of a SKED failure, operation of PMS performance and tracking is as follows: a. The 3MC will notify CoC and TYCOM i mmediately upon loss of system, or if planned outage will last longer than seven days and report status of backups. b The 3MC will utilize electronically saved copy of 26-week outlook report, situational requirements page, MIPs, MRCs available on Tailored Force Revision (TFR) DVD and distribute to WCs. c. Work Center Supervisors will utilize pape r 13-week accountability logs (available on FR DVD) and will manually fill out maintenance required within their WCs and sign for completed maintenance. d. Work Center Supervisors will verify situational requirements page to ensure they do not miss scheduling situational checks. e. Work Center Supervisors will ensure MPs annotate tag-out number in the required block. Work Center Supervisors will identify checks that have mandatory related maintenance, and ensure there is an alphanumeric code assigned to parent check and all associated related checks. f. LCPOs will review and sign the 13-Week Accountability Log at the end of the PMS week and ensure checks added that week are hand-written into the blank accountability log. g. DIVOs will review sheets weekly to ensure 13-week accountability logs are complete.

p. 700

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-11

h Once SKED is confirmed back in operati on, the 3MC will notify all hands. In the event of a SKED restoration, operation of PMS performance and tracking is as follows: (1) Each WCS will have to manually arrange SKED to match 13-week accountability logs. Maintenance personnel will use SKED PIN as applicable to annotate completion of maintenance. Check notes and alert notes will be made per standard SKED entries as directed by sub-paragraph 19-6.4.9.f of this chapter (2) Once SKED has been updated to th e current week, normal accounting for maintenance will resume. (3) If the 3MC turned off SKED PIN fe ature to ease the burden of catching the system back up, then paper 13-week accountability logs will have to be maintained for 13 weeks. They can be scanned and kept on the WC’s electronic folder on the LAN, Intranet. (4) If the 3MC did not turn SKED PIN feature off, once SKED matches the 13- week accountability logs exactly, then the paper reports can be disposed of. The WCS or LCPO will maintain the assignment of PMS with the Maintenance Outlook Report until SKED is restored. (5) Re-enable SKED PIN feature if previously turned off. 19-6.4.3 Minimum Standards. MRC accomplishment is critical for maintaining equipment in a ready state and achieving expected service life. The maintenance tasks directed by MRCs are the minimum standards for organizational (shipboard) preventative maintenance and therefore equipment degradation can be assumed if maintenance is deferred. The following provisions are provided to maximize on time performance of PMS and provide increased fleet latitude in maintaining equipment. a. MRCs are prepared as instructions to complete a maintenance task based upon the premise that the personnel assigned to perform the task have sufficient knowledge of the rate listed on the card and are qualified to perform maintenance as directed by the MRC. The MRC will be accomplished in sequential order, adhering to all Warnings, Cautions and Notes. Routine sub-steps (e.g., fastener removal, steps to don and remove Personnel Protective Equipment (PPE), turning on a vacuum) may or may not be included in the MRC and their absence should not prevent the maintainer from completing the maintenance task. b. Per NAVSEA, procedures are written at a level of detail based on the assumption maintenance personnel are trained, qualified and supervised by experienced leadership to execute the maintenance consistently and expertly. They exist to provide a common standard, specify acceptance criteria, communicate warnings and cautions specific to the maintenance and provide proven maintenance practices. They are not intended to: (1) Supplement or duplicate rules and pr ocedures that must be followed for hazards generally associated with the equipment (Hazardous Material Handling, Electrical Shock Risk Management, etc.) but not specifically

p. 701

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-12

associated with a step of the procedure. (2) Identify every process and every wa rning associated with the maintenance environment of the component being maintained (aloft, in tanks, near an active flight deck, in a heat stress area, etc.). (3) Specify every possible action of the maintainer. c. Leadership will uphold standards for comply ing with maintenance procedures. This standard does not mean the maintainer is expected to robotically follow the MRC word-by-word. Leadership, trainers, monitors, auditors and inspectors should not expect it. The key word here is “intent”. The objective is to perform the intent of each step (not necessarily step-by-step) performance. d. If a step is missing that is necessary to complete the task and that step is not obvious to the Maintenance Person (MP), an FBR should be submitted. e. MRC completion status is dependent on the accomplishment of all procedural steps on all of the equipment listed on the MRC or its accompanying Location Guide List. f. The performance of additional rational actions during the accomplishment of a MRC is authorized. Examples of such actions include turning on and off items utilized during the performance of the MRC (vacuum cleaners, test equipment, etc.) and general housekeeping (cleaning up or containing spilled fluids or dirt). g. The substitution of any tools, materials or test equipment not held by the activity should be considered prior to deciding to defer the maintenance until the exact tools, materials or test equipment listed on the MRC are procured. This is especially critical for frequently required maintenance where several performance cycles can be missed while waiting for supply to provide the correct items. Substitution requirements are provided by reference (a) and other technical documents. 19-6.4.4 Functional Components. a. PMS Master File. The Master File, main tained by the ship or unit’s 3MC, contains information relative to PMS requirements that are specific to equipment for which the command is responsible. The Master File provides for duplicate issue of missing MIPs and MRCs, contains supplementary information provided by NAVSEA Logistics Center (NAVSEALOGCEN) Detachments Norfolk or San Diego and serves as a repository for changes received between FR distributions, which must be retained on file until the changes are reflected in a subsequent FR. b. PMS Administrative Requirements. In lie u of a WC or Master File the following should be retained: (1) Hard copy Change Service Accountabili ty Log: The CSAL will now shift to only 3MC managing one CSAL electronically stored on Local Area Network (LAN), Intranet or SKED help tab etc. that all hands have access to view. This will hold all command changes (Force Revision (FR) dates, Advanced Change Notice (ACN), FBRs, Significant system down time, etc.) to the 3-M Program. The WC Journal Tab in SKED houses all the changes the WC has made to their individual program (revisions, lineouts, custom notes, weekly

p. 702

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-13

closeouts, alert acknowledgements, check notes, alert notes, etc.). (2) Service Brief: Will be electronically stored on LAN, Intranet or SKED help tab etc. that all hands have access to view. (3) Qualifications, Designation letters and NECs: Will be stored electronically in each WC’s folder stored on LAN or Intranet in a .pdf document that can be electronically signed by required personnel (DH, DIVO, and OIC etc.). (4) Feedback Report Log: The FBR Log will be maintained in each WC’s folder located on LAN or Intranet. This will house all external feedback responses that apply to the WC. There will also be an FBR response memo that will be saved to this folder for each FBR when the WC implements the FBR into their WC MRCs. This will also match the 3MC’s CSAL. Upon FBR implementation, a custom note on the affected MRC will be created that will house the FBR number; changes directed or can paste the entire FBR response. If ACNs are applicable to an MRC that replaces the existing MRC a custom note will be made on affected MRC that states the ACN number and statement: This MRC is superseded by ACN number and can be electronically found: (list where WC electronic folder is kept). The superseded MRC will be printed only if it contains the Location Guide List, and the ACN MRC will be printed and utilized. All internal FBRs are tracked in SKED FBR Tab. Ensure these are implemented the same as external FBRs noted above. (5) List Of Effective Pages PMS-5: The 3MC will keep all WC LOEPs as part of the Master File. The WC’s LOEP will be verified by using the SKED LOEP Manager, all listed MIPs should say “normal”, if “On WC not on LOEP” or “Not on WC on LOEP” is listed, and the FBR log should be reviewed for approved FBRs that added or removed the MIP from the WC. (6) Maintenance Index Page: Electroni cally stored in SKED. Lineouts are approved when LCPO or DIVO, and DH review and approve any revisions in SKED. If the lineout approval report in SKED is ran, it will only list the person who selected “Mark Complete”, not who approved the lineouts. To ensure the required approval level is identified for lineout approval, the LCPO will select “Mark Complete” on any revision. If there is a FBR that is applied to a MIP to change Situational Reference numbers, ensure that the changed Scheduling Aid (SA) code references the FBR that approved the change. This will be verified against the FBR log or SKED FBR tab. If there was an ACN that updated the MIP, then ensure the .pdf copy is saved to the WC’s folder and available for all maintenance personnel to utilize. (7) Maintenance Requirement Card deck: Th is will be electronically stored in SKED PMS Documents and will be printed out of PMS Documents each time maintenance is conducted unless you have portable laptops or hand held computers that have PMS documents and is available to the command. Custom notes must be utilized for any fill in data that is required on the MRC, any FBR changes that may apply, or any information that will assist the MP in

p. 703

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-14

conducting the maintenance. Custom lineouts on the MRC are also allowed when the FBR directs or the MRC states if applicable on steps or note on MRC that directs WCS to line out steps that are not applicable. MRCs with either of these changes will have the LCPO approval with name documented on the MRC. (8) Forecasting Report: Will be electronically sent to Supply before the start of each quarter to ensure the WC has all the proper tools, parts and Hazardous Material (HAZMAT) required. There is no need to maintain these reports. If using these reports to verify tools, parts, etc. it can be generated within SKED. (9) Space Inspection Sheets: Sheets are electronic and are on the FR disc if command does not have electronic version. These will be updated to reflect space requirements and discrepancies noted as described in the MRC. These will be maintained in WC folder on LAN, Intranet per the MRC prescribed timeline. (10) All required instructions and references (OPNAV 5100.19, NSTM 670, NSTM 300, PPE Glove matrix, PPE Eye protection matrix, respirator matrix, etc.) will be electronically stored on LAN, Intranet or SKED help tab etc. that all hands have access to view. Individual WC tech manuals and other reference material will be kept electronically in their WC folder on the LAN, Intranet or on ATIS. (11) HAZMAT receipts can be electroni cally saved from Hazardous Inventory Control Systems for Windows (HICSWIN) program if applicable. Reports can be generated from HICSWIN for any period the WC will need. 19-6.4.5 3-M Coordinator. a. 3MC will create electronic folders on the LAN, Intranet for each WC and for 3MC. b. 3-M messages and notices: These will be kept in a central location on LAN, Intranet or SKED help tab etc. that all hands have access to view. Each WC will have their own 3-M folder that will house extra applicable messages, documentations, notices and equipment advisories that applies only to their individual WC. c. 3MC will establish an electronic CSAL a nd ensure everyone has access to view it. The CSAL is vital to documenting any changes that occur within the commands program. (FBR number, date of change, date when entire command has fully implemented it across the command, any ACN, any external FBR, down time of SKED or MDS, etc.). d. 3MC will utilize SKED for tr acking all internal FBRs. 3MC will utilize electronic email to route all FBRs and to ensure WCs get the FBR installed and CoC are aware

p. 704

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-15

when the FBR has been implemented (means of tracking). This will be saved electronically in 3MC FBR log folder and in the WC electronic folder. e. 3MC will keep current electronic copy of PMS-22 report, compare, and reconcile all FBRs against SKED. Any FBR over 60 days need to be verified they are still valid and not corrected by FR. f. 3MC will ensure command spot check matrix is accessible to crew and is current and updated weekly. g. 3MC will ensure 3-M PQS is current, tailored, electronically kept and approved by the CO. h 3MC will provide Training Officer with a short-range and long-range training plan. i. 3MC will ensure an electronic event lis ting is available and updated weekly and maintain history of 13 weeks of events. j. 3MC will ensure all designation letters are electronically generated and signed by required official and kept in 3MC electronic folder or respective WC folder. Multiple personnel can be listed on designation letters; one designation letter per individual is not required. k. Weekly reports are not required from WCs or divisions and will not be generated by any WC or division. WCs will be reviewed daily and closed out weekly in SKED by WC CoC. DHs will acknowledge all alerts in SKED on the day the week is closed out and review status of departmental maintenance disposition. l. 3MC will generate weekly Virtual Snap-Shot electronically and all required files will be saved electronically to weekly folders (folder per corresponding week). This location will be listed on the Virtual Snap-Shot report. m. 3MC will route weekly Virtual Snap-Shot electronically to CoC and Surface Force 3- M Representative and will maintain for 13 weeks. n. Interim MRC Procedures. The ship may develop interim MRC procedures based on experience and applicable technical manuals in support of equipment or systems without PMS coverage until formal documentation is received. Before scheduling preliminary MIP requirements, the WC CoC and the DH must verify their applicability to installed equipment and approved by the CO. o. Change Service Accountability Log. The CSAL provides a definitive record of all changes to a command’s 3-M program. Whenever a change to a command’s 3-M program is directed (be it from a FR, FBR, etc.), the change will be routed to the concerned WC(s) via a memorandum. Whenever such a memorandum is issued, it must be recorded in the CSAL. Once the WC reports the directed change has been completed, the 3MC will file the WC’s response and annotate the CSAL that the action is complete. (1) The CSAL is comprised of the actual l og sheet, a copy of all memos routed to the WCs and the memo from the WC’s CoC to the 3MC indicating completion.

p. 705

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-16

(2) The importance of the CSAL cannot be overstated. In essence, it provides for a day-to-day, year-to-year record of changes to a command’s planned maintenance program. It is also a turnover document at deployment sites, allowing a current command to quickly identify all changes from a previous command. Finally, it will be inspected during all command 3-M assessments and inspections, providing visibility as to how well a command manages 3-M from one inspection to another. 19-6.4.6 Related Maintenance. Related maintenance, so designated by the In Service Engineering Activity (ISEA) or Technical Warrant Holder, is determined from the MIP. The RELATED MAINT column of the MIP reflects related maintenance requirements. Related requirements are positioned on the MIP to line up directly across from the MRC to which they are related. Related maintenance requirements are also identified in the TPMTE section of the MRC under MISCELLANEOUS. NOTE: MANDATORY RELATED REQUIREMEN TS MUST BE LINKED IN SKED TO BE AUTOMATICALLY SCHEDULED. a. Related Maintenance Categories. (1) Mandatory Related. Mandatory relate d maintenance requirements are those maintenance actions that must be accomplished concurrently with another maintenance requirement. The mandatory relationship is indicated with the use of the # sign. If the mandatory related maintenance resides on the same MIP, it will be reflected in the RELATED MAINT column as “periodicity#” (e.g., M-3#). If the related maintenance resides on another MIP, it will be reflected as “MIP: periodicity#” (e.g., IC-013/033: M-4#). Mandatory related maintenance requirements are automatically scheduled by SKED. (2) Convenience Related. Convenience related maintenance requirements are those maintenance actions that can be accomplished concurrently with another maintenance requirement in an effort to save time (preliminary steps and tag- outs already accomplished) or for work force considerations. If the convenience related maintenance resides on the same MIP, it will be reflected in the RELATED MAINT column as “periodicity” (e.g., M-5). If the related maintenance resides on another MIP, it will be reflected as “MIP: periodicity” (e.g., EL-010/001: M-4)). In both cases, the # symbol is omitted. The WCS manually schedules convenience related requirements. (3) Conditional Related. Conditional related maintenance requirements are those maintenance actions that are performed when specific conditions are present or specified parameters are not met on the referencing MRC. Conditional related maintenance will appear on the MIP in the same manner as convenience related maintenance. The WCS manually schedules conditional related maintenance. (4) None. No related maintenance is reflected as “None” in the RELATED MAINT column.

p. 706

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-17

b. Work Center Supervisor Actions. WCS will review their schedules on a regular basis for opportunities to perform other PMS when an equipment or system has maintenance actions scheduled. Rescheduling of PMS to take advantage of other system maintenance (convenience related) is highly recommended. (1) If an MRC has related maintenance fr om another MIP, review the related MIP and MRC and determine if it requires assistance from another WC. (2) If the related MIP and MRC does not require assistance from another WC and is not on the lead WC LOEP, submit an FBR to have it added to the LOEP. (3) If the related MIP and MRC requires assistance or completion by another WC and is mandatory, convenience or conditional related then it should also be on the lead WC LOEP. If it is not on the lead WC LOEP, submit an FBR to have it added to the LOEP. If the related MRC requires technical assistance, a special NEC, or another rating that is not part of the lead WC, then the person with the technical training, special NEC or required rating should be temporarily added to the lead WC “Crew List” and assigned the related maintenance in either an assist or performance role. All WCSs involved will collaboratively plan the required maintenance and may adjust schedules based upon individual workload. When the maintenance is completed, the lead WC will mark the MRC as completed. 19-6.4.7 Inactive Equipment Maintenance. a. Inactive Equipment. Equipment should onl y be placed into IEM when in an inactive or out of commission status of seven days or longer. Inactive status is defined as tagged out or removed from service regardless of the equipment having associated Lay Up (LU), Periodic Maintenance (PM), Operational Test (OT), or Start Up (SU) maintenance checks. Equipment maintained by multiple WCs will be placed into or removed from IEM using the same date. (1) Status I. Equipment that will: (a) Remain onboard. (b) Is not scheduled for corrective maintenance or overhaul. (c) Will be inactive during extended shutdown periods and maintenance availabilities as determined by the DH. (Example: Main lube oil cooler in freshwater lay-up.) NOTE: PERFORM A “FRESHWATER L AY-UP” (LUBE OIL COOLER FILLED WITH FRESHWATER) IF LUBE OIL COOLING IS NOT REQUIRED FOR SEVEN DAYS OR LONGER. THE SEAWATER SIDE OF THE MAIN PROPULSION LUBE OIL COOLER SHOULD BE FILLED WITH FRESHWATER AS SOON AS POSSIBLE TO MINIMIZE MARINE GROWTH AND FOULING. (2) Status II. Equipment that is inactive and: (a) Subject to corrective maintenan ce, overhaul or removal for safe

p. 707

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-18

storage. (b) Temporarily transferred to another activity for maintenance responsibility for extended shutdown periods as determined by the DH. Example: Refrigeration compressor removed for depot level overhaul. (c) When system(s) components are scheduled for replacement. b. Implementation and Responsibility. Wh ile inactive, minimum maintenance is performed to ensure the success of the reactivation. The IEM section of the MIP will cover this maintenance. (1) To implement procedures for the accomplishment of PMS for equipment declared in an inactive status, current PMS schedules are modified to annotate the requirements listed in the IEM section of the MIP. For advance planning and scheduling of maintenance to take place, it is necessary to determine and identify the extent to which unit or Ship’s Force personnel will conduct PMS during an inactive period. MIPs in each WC will be reviewed to determine if equipment has IEM coverage (e.g., LU, PM, SU and OT), if the coverage is adequate, and what procedures to follow if there is no IEM coverage on the MIP in question or provided coverage appears inadequate. The DH is responsible for determining equipment IEM status. When placing a system or equipment in IEM status, the DH will also determine the IEM start date to be reflected in SKED. The IEM end date will not be applied in SKED until the system or equipment is ready to be brought out of IEM status. All SU and OT checks will be completed before taking the system or equipment out of IEM in SKED. All periodic PMS scheduled at the end of IEM should be reviewed for applicability, with applicable maintenance accomplished prior to operating equipment. (2) IEM procedures are listed on MIPs and separated from operational PMS by a horizontal line. The IEM section is titled “Inactive Equipment Maintenance” and is prefaced by the following statement: “The following requirements will be scheduled when equipment is inactivated for periods of prolonged idleness.” When there are no IEM requirements the words “None required” will appear under the Inactive Equipment Maintenance Section of the MIP. When IEM procedures are inadequate, submit an FBR. The unit or ship should consider all factors that affect equipment deterioration and take necessary precautionary measures. These factors include environmental conditions, equipment location, susceptibility to damage or other factors that cannot be anticipated when IEM procedures were originally developed by the cognizant ISEA or design activity. (3) The lack of IEM requirements on a MI P does not prohibit placing that system or equipment into an inactive state. Additionally, certain locations require precautions and maintenance not required force-wide. The unit or ship should consider all factors that affect equipment deterioration and take necessary precautionary measures. The LCPO is responsible for identifying factors that

p. 708

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-19

are inadequate and may require additional preparation and maintenance of the inactive equipment while reporting it to the DH for approval. Factors may include environmental conditions, equipment location or susceptibility to damage. For those actions that are recurring in nature, the WC should submit a FBR for possible MRC development. c. IEM Scheduling. SKED provides the capability to perform IEM scheduling. (1) Status I. The scheduling of main tenance for Status I inactive equipment utilizes conventional PMS scheduling techniques. LU checks will automatically be added to the schedule at the beginning of IEM by SKED. The WCS will manually add PM checks to the schedule for the period of IEM following the guidelines of the MIP. At the conclusion of IEM, SU checks and routine PMS will automatically be added to the schedule by SKED. SU checks must be accomplished the week IEM ends. All periodic checks added at the end of IEM, can be moved to the right, not to exceed the allowable date range. Since the MRC date range cannot be applied to the left (into the IEM period), the MRC date range can only be moved to the right and therefore only the plus value of the specific range, (i.e., the date range for a monthly is 21-41 days). The requirement can only be moved (scheduled) 10 days to the right and will not go into “alert” until after the 10th day. This allows the WCS scheduling flexibility within the plus side of the date range of the MRC. (2) Status II. The scheduling of mainte nance for Status II inactive equipment utilizes conventional PMS scheduling techniques, however, not all scheduled IEM PMS may need to be accomplished by the unit or Ship’s Force. LU checks will automatically be added to the schedule at the beginning of IEM by SKED and may be marked “NA” if the LU check did not support the equipment being removed from the ship or unit or “Accomplished by Higher Authority” symbol if completed by the intermediate or depot level maintenance activity. PM checks may be required to be scheduled during the IEM period. At the conclusion of IEM, SU checks and routine PMS will automatically be added to the schedule by SKED. SU checks must be accomplished the week IEM ends and may be marked with the “Accomplished by Higher Authority” symbol if they were completed by the intermediate or depot level maintenance activity. Routine PMS added at the end of IEM may also be marked with the “Accomplished by Higher Authority” symbol if they were completed by the intermediate or depot level maintenance activity. All periodic checks added at the end of IEM, can be moved to the right, not to exceed the allowable date range. Since the MRC date range cannot be applied to the left (into the IEM period), the MRC date range can only be moved to the right and therefore only the plus value of the specific range, i.e., the date range for a monthly is 21-41 days. The requirement can only be moved (scheduled) 10 days to the right and will not go into “alert” until after the 10th day. This allows the WCS scheduling flexibility within the plus side of the date range of the MRC. 19-6.4.8 Assessment Procedure MRCs. Assessment Procedure (AP) MRCs are not required to

p. 709

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-20

be scheduled in SKED, but they will be maintained “active” through the FR and TFR process. Assessment personnel or Ship’s Force need only print AP MRCs on an “as needed” basis for use. The record of completed AP MRCs by off-ship personnel is recorded on the work candidate and Ship’s Force participation is recorded in their completion remarks of that work candidate. There is no need for recording Ship’s Force participation in an assessment event on their PMS schedule within SKED. FBRs submitted requesting deletion of a MIP that only contains AP MRCs would be disapproved and returned to the originator. 19-6.4.9 Scheduling. PMS is a portion of the command’s 3-M Program that provides, in one authoritative system, the scheduling information and technical procedures governing planned maintenance. PMS provides a simple method for scheduling and documenting the execution of planned maintenance procedures. NOTE: WHERE THE GOAL OF 100 % ACCOMPLISHMENT CANNOT BE REACHED, THE UNIT’S COC MUST BE KEPT INFORMED OF THE CIRCUMSTANCES THAT PREVENT ACCOMPLISHMENT OF SCHEDULED MAINTENANCE. a. Situational maintenance scheduling will be managed utilizing the tools provided by the computer-based PMS scheduling software employed by the activity. All event driven situational requirements will be “triggered” when required and performed per reference (a). b. A plus sign (+) on the MIP to the right or under the MRC indicates this procedure is primarily intended to be scheduled for accomplishment by off-ship maintenance personnel for those classes of ships (e.g. LCS, DDG 1000) that utilize off-ship personnel for PMS. c. The MP will be assigned prior to co mmencing the week and must complete the maintenance as directed. If a different person is required, the WCS will reassign the PMS accordingly. d. Pre-Deployment Global Triggers: Forwar d Deployed Naval Force ships are forward and continuously deployed with no clear definition of deployment. 3MCs will trigger the Pre-Deployment global trigger after successful completion of a TYCOM Light Off Assessment. For non-Forward Deployed Naval Force, a deployment is defined as any underway greater than 90 days. e. H-coded MRCs will be listed as individua l SKED equipment maintenance items. The instrument serial number must match the Calibration Requirements List system designator (i.e. AHP-100-GA-001). All “H” coded MRCs will be considered overdue based on the due date annotated on the calibration label regardless of MRC date ranges allowed by reference (b). f. Standard entries will be utilized for all SKED 3.2 check note and alert note under the following circumstances. (1) SKED 3.2 check note that defers maintenance will begin with out of periodicity, non-accomplished, lost, or Not Applicable (NA) for situational checks.

p. 710

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-21

(a) Each MRC completed with tag-out flag will have check note containing the tag out serial number or no tag-out required. (b) List the Petty Officer In Charge when more than one MP is assigned. (c) Cent sign (¢) entries will begi n with “Performed by” followed by detailed information of the organization completing the maintenance, Job Sequence Number (JSN), work order, or applicable documentation. Proof of completion will be maintained in the WC PMS File. The SMMO will utilize PIN in SKED 3.2 to document the completion MRs by outside activities after reviewing the check note ensuring the LCPO has annotated satisfactory completion of the installation and update. These Cent sign (¢) checks can be spot checked to ensure proof of Quality Assurance documentation and all work was completed. (d) Check notes for completed checks can be used to document JSN if discrepancies noted or anything the command deems appropriate. (e) Check note entry is required when rescheduling a PMS check to a later week outside of the week originally scheduled. (2) SKED 3.2 alert note is required once a check is out of periodicity and will begin with out of periodicity and include a brief plan of action when the maintenance will be accomplished. This will be updated weekly until the maintenance is accomplished. The WCS or LCPO will add a brief description for each Alert Note for non-accomplished categories: (a) System or Equipment Failure. Syst em or equipment is not operational or in a reduced operational status thus preventing maintenance from being accomplished. CSMP JSN required in additional text description. (b) Inadequate Maintenance Procedur es. MRC procedure or steps cannot be accomplished to a point where the maintenance can be considered accomplished. FBR number required in additional text description. (c) Ship Operational Requirements. Operations prevent the maintenance from being accomplished. Requires additional text description. (d) System or Equipment Operationa l Requirements. Required operation of system or equipment prevents maintenance from being accomplished. Requires additional text description. (e) Lack of Hazardous Material. Co rrect HAZMAT not available at the time maintenance was to be performed. CSMP JSN required in additional text description. (f) Missing or Incorrect TPMTE. Co rrect or calibrated TPMTE was not available at the time maintenance was to be performed. CSMP JSN required in additional text description. (g) Other requires additi onal text description.

p. 711

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-22

(3) After the FR is approved, the 3MC w ill conduct “quarter” archival to maintain one completed quarter, one current quarter, and at least two future quarters. This permits the ability to review past records and forecasting of upcoming maintenance actions. 19-6.4.10 Accomplishing PMS. Maintenance personnel use MRCs to accomplish assigned planned maintenance as described below. a. From SKED “My Task” view , review the 13-Week Report. b. Determine maintenance task(s) assigned. c. Determine when the maintenance task(s) are due. d. Determine what TPMTE or supplies are need ed. For MRCs that contain inspections and then maintenance actions based upon the inspection findings, the TPMTE needed to perform the follow-on maintenance caused by the inspection findings does not need to be obtained prior to performing the MRC but rather, may be obtained as needed. e. Perform the maintenance on schedule. f. Notify the WCS immediately whenever one or more of the following conditions exist: (1) Anything on an MRC is not fully unders tood, appears to be incorrect or cannot be accomplished as written. (2) TPMTE prescribed by the MRC is not av ailable, is not correct or questions about substitutions arise. (3) Any doubt exists about your capabilit y, training, or experience to properly perform the maintenance requirement as prescribed. (4) Factors exist which would make perf ormance of the maintenance requirement unwise or dangerous (e.g., disassembly of equipment needed for operations, radiation when prohibited, situations causing safety hazard to exist, etc.). (5) Equipment deficiencies or casualties are discovered. (6) Any provisions or requirements on the MRC cannot be accomplished as prescribed. g. If an MRC can be completed step by step as written, then the maintenance action can be signed off as completed. Report completed planned maintenance actions to the WCS, update the PMS schedule to reflect the completed maintenance, annotate and sign the 13-Week Report (if applicable). If multiple personnel are assigned to a single maintenance action, the most senior knowledgeable person assigned must update the PMS schedule, annotate, and sign the 13-Week Report or check note if using SKED 3.2 electronic accountability. h. If inspection criteria or a threshold insp ected by the MRC does not meet the intended criteria, then those maintenance actions cannot be signed off as completed until the discrepancies are corrected. The only allowable maintenance actions that can be signed off as complete are those discrepancies where the PMS documents (MRC or

p. 712

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-23

MIP) have an actual statement that directs a CSMP entry(s) to be made if there are discrepancies. The statement to inform the WCS of discrepancies, by itself, is not sufficient to sign the maintenance action as complete when discrepancies exist. Maintenance actions not fully completed will be reported to the WCS. However, if material deficiencies or casualties, which are unrelated to that MR, are discovered, the MR can be checked off (provided the MR was fully completed) but the discrepancy must be reported via the MDS. 19-6.4.11 Non-Accomplished Categories. The WCS or LCPO will add a brief description for each check note or alert for non-accomplished categories using subparagraphs below. a. System or Equipment Failure. System or equipment is not operational or in a reduced operational status thus preventing maintenance from being accomplished. CSMP JSN required in additional text description. b. Inadequate Maintenance Procedures. MRC procedure or steps cannot be accomplished to a point where the maintenance can be considered accomplished. FBR number required in additional text description. c. Ship or Unit Operational Requirements. Operations prevent the maintenance from being accomplished. Requires additional text description. d. System or Equipment Operational Require ments. Required operation of system or equipment prevents maintenance from being accomplished. Requires additional text description. e. Lack of Hazardous Material. Corre ct HAZMAT not available at the time maintenance was to be performed. CSMP JSN required in additional text description. f. Missing or Incorrect TPMTE. Correct or calibrated TPMTE was not available at the time maintenance was to be performed. CSMP JSN required in additional text description. g. Other requires additi onal text description. 19-6.4.12 Accountability. The credibility of the Navy PMS program relies heavily on the individual accomplishing the maintenance. The required dedication and integrity of that individual cannot be overstressed. a. To maintain accountability, personnel ar e required to sign for the completion of assigned maintenance in an Accountability Log (if applicable). The WCS is required to review and sign the Accountability Log weekly to verify the accuracy and completeness of entries. Accountability sheets will be maintained in the WC PMS File for a period of not less than 13 weeks. b. When outside activity completes PMS, th e SMMO will utilize the SKED PIN feature to sign for the check. Prior to acknowledging competition, the SMMO will review all required Quality Assurance documentation and verify maintenance was complete. A check note will be entered stating, “Check performed by” followed by the activity that completed the maintenance. c. Ships employing SKED 3.2 will utilize electr onic accountability. When an individual updates the disposition of a check, this is the same as signing and dating a check

p. 713

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-24

completion on a 13-Week Accountability Sheet. The disposition of a check will become permanent when the weekly closeout is performed. All PMS maintenance assigned to a MP is presented to them immediately upon SKED 3.2 log-on and CoC review can be tracked on the Weekly Closeout Signature Sheet. Therefore, there is no need to print and sign the 13-Week Accountability Form. 19-6.4.13 Force Revision Implementation. In addition to the requirements of reference (a), the following steps ensure the most efficient and thorough implementation of an FR: a. MRC deletions on MIPs must be marked to indicate the reason for deletion. (1) Scheduling aids. Indicate appl icable scheduling aid (e.g. SA-#). (2) Split MIP. Indicate responsible WC (e .g. “EA01”) if the MRC is applicable to the ship, the responsible WC designation must be used versus a scheduling aid. (3) “Other” to include approved res ponses to FBRs, ACNs (e.g. “NSWORK CENTERLTR SER 4790.005.”), Message Date Time Group (e.g. “NUWORK CENTER R124535Z AUG 05.”). Indicate guiding notation for deletion: “SA- 1” or “Note 1”, configuration change number. b. The FR will be completed on or before th e first Monday of the new calendar quarter. Work centers no longer need to be approved on the same day, and can be approved once Department Head has reviewed work center’s revision. When operational schedules do not provide adequate time to implement the revision prior to the start of the quarter, the XO may direct an alternate implementation date with TYCOM N43 Force 3MC (via email) approval. This deferred FR will be reported to the Surface Force 3-M Representative. If two or more FRs were not available while the unit was deployed, only the most recent FR will be installed and implemented. c. It is advisable to complete the FR process through DH approval before conducting quarterly audits by a Chief or more senior. d. The 3MC will: (1) Maintain copies of the current FR NAVY PMS DVD, LOEP for every WC, changes issued between FRs in their original format and Classified Maintenance Requirement Cards (MRC). Digital copies are allowed unless there have been changes between FRs. (2) Review the Service Brief. (3) Enter the FR number from the Auto matic Library issued Document in the CSAL. (4) Update PMS and TFR data into SKED prior to routing the change documentation to WCs. (5) Route the TFR Guide to WCs for implementation. e. The WCS, upon receipt of the ch ange document from the 3MC, will: (1) Apply changes to the WC PMS sche dule utilizing SKED Revision Editor.

p. 714

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-25

(2) Verify all MIPs are active in SKED by reviewing LOEP report. (3) Verify all FBRs have been updated, notify 3MC if issues are discovered. (4) Route revision changes to division LCPO for review and concurrence. f. The LCPO will: (1) Solely responsible for placing Work Center in Revision Mode. (2) Review applied LOEP for streamline implementation. (3) Verify that all PMS changes have be en properly applied to the WC schedule utilizing SKED Revision Editor. (4) Review lineouts on MIPs and MRCs. Electronically approve such lineouts to indicate concurrence. (5) Review LOEP report and any MIPs listed “Not on LOEP, in WC” or “On LOEP, not in WC” needs to verify that FBRs have been submitted and approved for addition or removal from WC LOEP. (6) Submit PMS schedule to DIVO for review and concurrence. g. The DIVO will: (1) Verify that all PMS changes have be en properly applied to the WC schedule utilizing SKED Revision Editor. (2) Review LOEP report and any MIPs listed “Not on LOEP, in WC” or “On LOEP, not in WC” needs to verify that FBRs have been submitted and approved for addition or removal from WC LOEP. (3) Review lineouts on MIPs and MRCs. (4) Submit PMS schedule to DH for review and approval. h. The DH will: (1) Verify that all PMS changes have be en properly applied to the WC schedule utilizing SKED Revision Editor. (2) Review LOEP report and any MIPs listed “Not on LOEP, in WC” or “On LOEP, not in WC” needs to verify that FBRs have been submitted and approved for addition or removal from WC LOEP. (3) Review and approve WC PMS Schedules. i. The WCS completes the PMS Change Documentation Routing Memorandum and returns it to the 3MC. j. The 3MC updates the CSAL and notifies the XO that the FR has been installed after receiving all FR PMS Change Documentation Routing Memorandums from the WCs. 19-6.4.14 Planned Maintenance System Feedback Reports. PMS FBRs are used to identify problems with PMS documentation or to request the addition or deletion of PMS coverage. Issues with the periodicity, rates, man-hours, TPMTE and procedure may all be reported via FBR. FBR is also used to request copies of classified MRCs, request the addition or deletion of

p. 715

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-26

an MRC (maintenance requirement) to or from a MIP, splitting a MIP between WCs when MIP is not reflected in perspective WC, shifting of maintenance responsibility or to request PMS coverage for newly installed systems or equipment. The following paragraphs provide amplifying information dealing with the issues that may prompt the submission of an FBR. a. Periodicity. FBRs can be used to reques t the increase or decrease in the frequency of a maintenance action, i.e., MRC. However, the originator needs to keep in mind that the ship or unit has the prerogative to increase the frequency because of harsh weather, unusual operating conditions or corrective maintenance and associated testing requirements. (Example: “A DDG flight II submitted a FBR requesting the frequency of cleaning a specific electronics cabinet filter be increased from quarterly to monthly. Research revealed this MRC was applicable to all DDG Class units and no other ship had submitted a similar request. In fact, two other units had requested the frequency be decreased to semi-annual. It was determined that the submitting unit was in an extended upkeep period and increased foot traffic by shipyard personnel near the electronic cabinet was the most likely cause of the filter becoming clogged. The ship was authorized to increase the frequency to support the extended upkeep period and the periodicity of the MRC was not changed.)” b. Rates. The Rates block on the MRC repr esents the developer’s recommendation of the skill level (rate and rank) best suited to accomplish the maintenance action. The key word is recommendation. Qualified personnel other than the rate and ranking specified may be assigned. When a Damage Control Petty Officer, Safety Petty Officer (SPO), or NEC is assigned, substitution of other personnel is not allowed other than those exceptions as noted in reference (a). An FBR requesting the rate on a MRC be changed from an ET2 to a FT2 will not pass TYCOM screening, yet a FBR requesting the addition or deletion of personnel will generally pass to the cognizant technical activity for review. c. Man-hours. The MRC reflects the average time per equipment, per person. It does not reflect or account for gathering and putting away tools, tag-outs or time removing and replacing interferences. From a maintainer’s perspective, this is not an accurate representation of the time required to accomplish the maintenance action. The Future of Sailor Maintenance (FoSM) initiative will attempt to do a better job of accounting for this additional time but until then, FBRs should be submitted only when the allotted time per equipment is significantly uncoordinated with the actual time required. (Example, an MRC calls out 0.5 man-hours per equipment, but it actually takes 1.0 man-hours.) d. Tools, Parts, Material and Test Equipm ent. TPMTE FBRs should be submitted when the procedure calls for an item not listed in the TPMTE block or when the TPMTE block lists an item not called out in the procedure. e. Procedure. Procedures are written at a level of detail based on the assumption maintenance personnel are trained, qualified, and supervised by experienced leadership to execute the maintenance consistently and expertly. MRCs exist to provide standardized proven procedures, specify consistent acceptance criteria and to communicate warnings and cautions relative to the specific maintenance action. They are not intended to specify every possible action of the maintainer. There may be

p. 716

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-27

instances where an obvious typographical error exists on the MRC (example: Turn switch to ON; however, switch may already be ON and the intent of the step is to turn unit off, the card should read Turn switch to OFF). This type of error should not prevent the scheduling or performance of maintenance. However, in this situation, the accomplishment of the MRC is not possible until the DIVO or LCPO reviews the error and concurs that it is safe to proceed. A temporary notation including the reason for the correction must be made on the MRC, initialed by the LCPO and an FBR submitted. Extreme caution will be taken when reviewing MRCs for this type of error. Errors must be obvious typographical errors and a PMS FBR must be submitted immediately upon discovered. Do not permanently alter the MRC until authorized by the applicable System Command (SYSCOM), ISEA or NAVSEALOGCEN Detachment. If a step is missing that is necessary to complete the task, and that step is not obvious to the MP, submit an FBR to have it added. FBRs submitted to request procedural changes should include the originators contact information and supporting rationale or justification. If, however, a step is missing that is clearly common sense (a ladder was used to install a fixture but steps were not provided to put the ladder back in stowage) an FBR only serves to overload a process that should be focused on more technical issues. f. Duplicate MRCs. Unclassified MIPs a nd MRCs are now available from the DVD. Copies of classified MRCs still require an FBR request due to handling requirements. g. Addition or Deletion of an MRC. During the life cycle of a system, equipment, or component it may become necessary to add a maintenance action to prevent an age- related functional failure or to delete a maintenance action due to inherent reliability not foreseen during maintenance development. An FBR submitted to request the addition or deletion of an MRC should include the originator’s contact information and supporting rationale or justification. h. Newly Installed or Removed Equipment. While an FBR request for PMS, coverage will provide initial maintenance coverage or deletion of MIP(s) because of equipment removal, submission of an OPNAV 4790/CK is still required to initiate the rest of the logistic support change process. This point cannot be overstressed; the submission of the FBR does not relieve the ship or unit from initiating a CK. The CK initiates supply support, Configuration Data Managers Database – Open Architecture (CDMD-OA) changes; ship selected record drawing updates and class maintenance plan updates. i. Splitting a MIP. There are instances in which a MIP includes MRCs for more than one WC to perform. When this occurs, a decision is required by the command as to whether the MIP will be split or will be scheduled singly by one WC. Only the XO can authorize the splitting of a MIP if an MRC requires another WC to perform the entire maintenance action. If the decision is made not to split the MIP, then the MRs will be accomplished through the coordination of WCs. (1) If the MIP is split, the following procedures apply: (a) Submit to the XO a non-technical PMS FBR requesting approval to split the maintenance responsibility.

p. 717

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-28

(b) Upon receipt of the XO’s concurrence, the 3MC will make an annotation in the remarks block of the FBR stating, “XO concurs with splitting MIP maintenance responsibility”. (c) For LCS class ships, LCSRON N4 (vice the unit’s XO) provides concurrence with the splitting of maintenance responsibility and the FBR must be so annotated. (2) Upon receipt of the FBR approval: (a) Utilizing the SKED Revision Edito r, delete the MRC from the MIP and show the reason for deletion as the designation of the WC assuming responsibility (e.g., EE01). (b) If the WC assuming responsibil ity does not reflect the MIP and maintenance items, utilize the SKED Revision Editor to add them. Schedule only the MRC(s) that pertain to the WC reflecting remaining as deleted with reason for deletion the designation of the parent (lead) WC (e.g., EA01). (3) If the situation occurs where a WC removes a split MIP, the following procedures apply: (a) Submit an XO approved, non-technical PMS FBR reporting the decision to remove the split maintenance responsibility. Upon receipt of the XO’s concurrence, the 3MC will make an annotation in the remarks block of the FBR “XO concurs with removing split MIP maintenance responsibility”. For LCS class ships, LCSRON N4 (vice the unit’s XO) approves the removal of splitting maintenance responsibility and the FBR must be so annotated. (b) Upon receipt of FBR approval, utilize the SKED Revision Editor; remove the MIP, MRC(s) and maintenance item(s) from the WC no longer involved. Ensure that the lead WC assumes full responsibility for the MIP and MRC(s) and annotates their schedules accordingly. j. Shift of Maintenance Responsibility. Indi vidual ships or units sometimes consider it necessary to shift maintenance responsibility from one WC to another, to combine two or more existing WCs or to split an existing WC. These requests for changes of PMS maintenance responsibility require XO concurrence and may require final approval by the applicable TYCOM. Due to the considerable administrative burden, requests for this type of change should not be submitted to accommodate a temporary situation such as short-term assignment of two WCs to one supervisor. (1) The following factors should be carefully considered before submitting such requests: (a) Composition of WCs by size and ratings. (b) Scope of maintena nce responsibilities. (c) WC workload.

p. 718

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-29

(d) Ease of administration of a WC as a cohesive maintenance group. (e) Importance of WC grouping to equipment maintenance responsibilities, PMS scheduling, MDS reporting and CSMP listings. (2) When changes in maintenance respon sibility are considered necessary, the following procedures apply: (a) Submit a PMS FBR (non-technical) . Indicate from which WC(s) equipment is to be deleted and to which it is to be transferred. Upon receipt of the XO’s concurrence, the 3MC will make an annotation in the remarks block of the FBR “XO concurs with the shift of maintenance responsibility.” For LCS class ships, LCSRON N4 (vice the unit’s XO) provides concurrence with the shifting of maintenance responsibility and the FBR must be so annotated. (b) WC or equipment changes will also be reported in the Organizational Maintenance Management System (OMMS) or AWN system via a configuration change request (4790/CK) through the CSMP up-line reporting process in OMMS or through Wrong in Model-Not in Model in AWN. (3) Upon receipt of the FBR approval, perform the following actions: (a) The PMS Master File is updated to reflect deletion of the MIP from one WC and addition to the WC receiving the responsibility. The originating FBR serial number is annotated on the affected line item on the LOEP for both WCs. The PMS Master File must contain a record of deleted equipment until the change is reflected in a future FR. (b) Utilizing the SKED Revision Editor, load the affected MIP(s) and MRC(s) to the WC receiving maintenance responsibility. Delete the MIP(s) and MRC(s) from WC shifting responsibility. (c) Utilizing SKED, perform a revisi on to move the equipment from the original WC’s current schedule to the WC receiving the maintenance responsibility. Data is exported from one and imported to the other maintaining equipment history. k. MRC Changes Not Requiring Feedback Reports. The only MRC modifications shipboard or unit personnel may make without submitting a PMS feedback report are as listed in subparagraphs below. (1) TPMTE. (a) Common hand tools, administra tive or office supplies and basic housekeeping items may be substituted or added by the WCS. The WCS may add notes to the MRC to reflect these substitutions. In the case where specific common tools are called out by description, substitutions are not authorized. For example, substitutions such as using synthetic fiber brushes in place of animal hairbrushes or rags and

p. 719

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-30

paper towels in place of lint free cloths are not allowed. (b) Approved parts, materials and miscellaneous item substituted from the supply system, technical manual, or Military Specification (MIL- SPEC), etc., which meet or exceed the requirements may be used. Ensure that substitutions satisfy both the basic maintenance and safety requirements of the MRC. If there is any doubt, a PMS FBR should be submitted specifying substitution desired and reason. (c) Test equipment or certified tools, which meet or exceed the Sub- Category (SCAT) code requirement, may be used. (d) When an MRC pertains to multiple configurations of equipment and the TPMTE block contains tools, parts, test equipment and materials for each unique configuration, the TPMTE block may be tailored for the unit’s specific configuration by lining out the items that do not pertain to equipment held. 1 Exception to TPMTE block change : If an item listed in the TPMTE block is not called for in the procedures block, submit an FBR explaining the circumstances. 2 Conversely, if a tool, piece of test equipment, part or material is called for in the procedure block and is not listed in the TPMTE block an FBR should be submitted. (2) In the procedure block, WCSs may lineout the non-applicable line items (alternate procedures) that do not pertain to current equipment or configuration when the step includes the words “if applicable” or a note identifies steps to be omitted. These items must be reviewed and approved by the division LCPO. As these changes are WC and maintenance item specific, submission of an FBR is not required. If a step or steps in the procedure block have been lined out and tools, parts, materials, or test equipment in the TPMTE block pertain only to that step or steps, then they will be lined out as well with a reference to the step or steps lined out and approved by the division LCPO. Warnings, Cautions and Notes associated with the lined out step or steps will also be lined out. l. Delivery Methods for Feedback Reports. Feedback reports will be delivered to the ship in one of two methods: (1) Internal. Feedback reports that originate from SKED. These feedback reports will be generated, tracked, and implemented within the SKED program within time limit set from 19-6.4.14.s. of this chapter. (2) External. These feedback reports come from NAVSEALOGCEN for all MIP holders for review and implementation. The following steps are required upon receipt of an NAVSEALOGCEN feedback report: (a) 3MC will review the validity (MIP/MRC) to the command. (b) If applicable, 3MC will log TFBR serial number and origination into

p. 720

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-31

the Command Feedback report tracker. (c) 3MC will notify affected Work Center. (d) Work Center will implement Feedback report as directed within time limit set from 19-6.4.14.s. of this chapter. (e) Command will generate TFBR implementation memo to 3MC. (f) 3MC records TFBR implementation date into the command Feedback report tracker and maintains feedback report memo until the SKED database reflects the update via a Force Revision. m. Types of Feedback Reports. There are two types of FBRs, technical and non- technical: (1) Technical. These FBRs are used to report technical discrepancies inhibiting PMS performance. Technical feedbacks normally adjudicated by an ISEA responsible for the system or equipment covered by the PMS documentation require all the supporting information the originator can provide. The originator should identify the issue, providing as much supporting technical information (Allowance Parts List (APL), Reparable Identity Code (RIC), drawing or Hierarchical Structure Code (HSC)) as available and a proposed response or solution if known. Most importantly, provide point of contact information (Name and phone number) so that the ISEA can contact the originator should they have questions. Bottom line, the FBR must be accurate and complete to “stand alone”, that is, the FBR will be understood without additional explanation. The better the FBR describes the problem, the more likely the originator will receive a timely response. There are two sub- categories of technical FBRs: (a) Routine. An FBR will be consid ered routine when it relates to the technical requirements of PMS. It is used to report technical discrepancies or request clarification of procedures. (b) Urgent FBR. An FBR will be considered urgent when it relates to the technical requirements of PMS and involves safety of personnel, safety of ship or the potential for equipment damage. Urgent FBRs will be forwarded by naval message containing a PMS Feedback Serial Number, to both NAVSEALOGCEN Detachments Norfolk and San Diego, with info to the cognizant SYSCOM, TYCOM and the Naval Safety Center. The message must describe the unsafe procedure(s) or condition(s), must identify the MIP and MRC involved and reflect the serial number of the FBR generated in SKED or Planned Maintenance System-Management Information System (PMS-MIS). Once the message has been sent, include the date time group of the message in the FBR and submit. (2) Non-technical. These FBRs are intende d to support PMS requests that do not require technical review, including WC changes (shift of maintenance responsibility). Non-technical FBRs are submitted to request classified or

p. 721

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-32

other PMS documentation, which cannot be obtained locally, or to request clarification of issues not of a technical nature. n. Feedback Report Submission. All SKED users will submit FBRs via SKED using the Feedback Report Wizard. Non-SKED users may submit FBRs via the PMS-MIS web site at https://pmsmis.navy.mil by selecting the Feedback Tab and Feedback Report Wizard from the drop-down tab. Non-SKED users accessing this web site for the first time will need to request an account. Click on File Manager and select New User Account Request. This displays options to select a form and readme file, which can be downloaded, filled out and sent via e-mail as directed in the readme file. An e-mail will be sent confirming your account and providing access to the main screen. The Anchor Desk web site can also be used to submit FBRs. o. Feedback Report Screening (Shipboard or Activity). (1) The originator accomplishes initial sc reening or WCS who is responsible for ensuring all data is accurate and complete. (2) The division LCPO or DIVO accomp lishes the second level screening and verifies the content and validity of the FBR within 3 days of origination. (3) The DH, next to screen the FBR, is responsible for verifying the content and validity of the FBR and digitally signing FBRs within 4 days of origination. (4) The 3MC is responsible for screen ing, serializing, and forwarding FBRs within 7 days of origination. The 3MC will also: (a) Maintain accountability for all PM S FBRs submitted and actions taken until updated PMS documentation is received. (b) Ensure that the originator and all applicable WCs are kept apprised of action taken and ensure the originating and other applicable WCs implement the changes or corrections when received. (c) 3MC will maintain a PMS-MIS account. p. Feedback Report Screening (External to Hu ll or Activity). FBRs are next processed by the TYCOM. The TYCOM will verify the content and validity of the FBR and either return the document to the originator or pass it on for further processing and resolution. Naval Surface Force FBRs are reviewed following TYCOM policy. q. Feedback Processing Activities: (1) The central control points for processing FBRs are the Planned Maintenance System Coordinating Activities (PMSCA). Depending on the type of FBR and level of technical authority necessary to answer the FBR, the PMSCA will either respond to the originator with a resolution or forward the FBR to the appropriate technical authority for action. (2) ISEAs are those activi ties designated by NAVSEA as the technical experts for specific systems or equipment. Naval Surface Warfare Center, Philadelphia Detachment (NAVSURFWARCEN-PD) is the ISEA for the majority of non- nuclear hull, mechanical and electrical equipment installed on most ships.

p. 722

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-33

ISEAs under the direction of the NAVSEA Technical Warrant Holder adjudicate the FBR request and forward the response to the PMSCAs. The PMSCA provide the final response to the originator and update the PMS database to reflect ISEA changes. PMS changes are issued with the next available FR. r. Feedback Processing. FBRs are processed per NAVSEA policy: (1) Urgent FBRs. (a) The PMSCA will provide a message response to all urgent FBRs within 1 working day of receipt. If the FBR is forwarded to a Design Activity or ISEA for resolution, then the Design Activity or ISEA will provide a message response informing the originator of specific actions or required changes because of the adjudication of the FBR within 1 working day of receipt. This message response must be addressed to the originator and distributed to all TYCOMs and units holding the affected documentation. (b) The PMSCA will distribute revised PMS documentation to all affected users within 30 calendar days of receipt of the FBR, via special issue or ACN. (2) Routine FBRs. (a) The PMSCA will perform technical review, research, and provide a response to routine FBRs where resolution does not require technical authority action. (b) FBRs that the PMSCA cannot resolve will be sent to the cognizant Design Activity or ISEA. The cognizant Design Activity or ISEA will provide the response to the appropriate PMSCA describing the action taken. The PMSCA will provide the response to the originator by electronic means. (c) Distribution of the revised MRC to the originator and other affected users will be accomplished via ACN or the next available FR. (d) NAVSEA’s existing policy calls fo r technical review activities and ISEAs to provide FBR responses in less than 21 working days from time of receipt. In addition, NAVSEA has established a goal of providing answers to FBRs in one day. While some FBRs will require extensive research and days, weeks or in some cases months to resolve, the vast majority of FBRs can and should be answered much sooner. One day may be overly optimistic, but the intent is to put the emphasis back on the timely resolution of FBRs. (e) If no revision to PMS documenta tion is required, pertinent comments will be provided in the response to the PMSCA. When not concurring with the feedback report, the rationale for the non-concurrence must be provided to the PMSCA.

p. 723

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-34

NOTE: IT IS POSSIBLE AN FBR RESPON SE MAY NOT MAKE A SPECIFIC FR BASED ON THE DATE THE RESPONSE WAS RECEIVED BY PMSCA. PROCESSING TIME AND HANDLING MAY CAUSE THE REVISED DOCUMENTATION TO MISS AN FR CUTOFF DATE. HOWEVER, SINCE ALL FRS ARE NOW RECEIVED QUARTERLY, IF A REVISION MISSES THE CURRENT FR CUTOFF WINDOW, THE REVISED DOCUMENTATION WILL BE AVAILABLE WITHIN THE NEXT THREE MONTHS. s. Feedback Response Implementation. Work Center Supervisors will implement responses to FBRs based on the category and content as determined by the unit’s 3MC. LCPOs will verify Feedback report implementation. (1) Urgent FBR - within 24 hours of receipt of FBR response. (2) Urgent FBR with an ACN - within 24 hours of receipt, the ship will implement an administrative change to incorporate the new PMS documentation. These revised documents will be utilized to conduct maintenance until the revised PMS document is incorporated into the next FR. (3) Routine FBR: (a) Technical - The response deals with content such as a revision to technical specifications, tolerances, test equipment, materials, acceptance criteria or the sequence of procedural steps. These changes need to be implemented within two weeks of receipt of the FBR response or prior to the next scheduled accomplishment date should that date fall within the two-week window. (b) Administrative - The response deals with issues that do not affect the technical content or procedural steps. Administrative changes might be added steps to provide a better degree of clarity, formatting revisions to tables or figures that do not change technical content, or updating of Notes, Warnings or Cautions that do not influence the performance of the MRC. These changes do not need to be implemented prior to receipt of the next FR. If the next FR does not reflect the revised documentation, implementation is required before the next scheduled accomplishment date of the MRC. (4) Routine FBR with an ACN: (a) Technical - These changes need to be implemented via an administrative change within two weeks of receipt of the FBR response or prior to the next scheduled accomplishment date should that date fall within the two-week window. These revised documents will be utilized to conduct maintenance until the revised PMS document is incorporated into the next FR. (b) Administrative - These changes do not need to be implemented prior to receipt of the next FR. If the next FR does not reflect the revised documentation, implementation is required via an administrative

p. 724

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-35

change before the next scheduled accomplishment date of the MRC. 19-6.4.15 PMS Spot Check Program. Each unit is required to have an aggressive spot check program involving all levels of the chain of command from the LPO to the CO. Individual Maintenance Requirement (MR) will be spot checked periodically to determine the effectiveness of PMS accomplishment and to ensure the maintenance was completely and correctly performed. All CPO and above will conduct historical or monitored maintenance spot checks. All FCPO will only conduct monitored maintenance spot checks. Work Centers will only perform one Khaki and one FCPO spot check weekly, except ER09, which will have an additional historical spot check conducted by the 3MC and Command Master Chief. Detailed spot check criteria used to evaluate the completion of the MR is located at https://flankspeed.sharepoint-mil.us/sites/CPF- CNSP-HQ/engineering/3m. a. Types of Spot Checks. There are three types of spot checks utilized by the Surface Fleet. While the standard operating procedure is that E-7 or above personnel will conduct Historical Spot Checks and E-6 and below will conduct Monitored maintenance, it is up to the 3MC to decide how to best run their program. (Example. If a 3MC decides to do more monitored checks when coming out of the shipyard to ensure maintenance is being done correctly, that is the command’s decision.) The CO and XO will perform Spot Check Program effectiveness reviews by Spot Checking the Spot Checker defined below. (1) Historical Spot Checks. This main tenance check has been accomplished and signed for in the 13-week accountability log. The spot checker will have the maintenance person walk through the check and ensure all steps were followed as per the intent of the step. The spot checker WILL NOT utilize a “verbatim compliance” methodology. Maintenance Cards were not written to cover every possible scenario. (2) Monitored Maintenance Spot Chec ks. A real time evaluation of a maintenance check. A monitored maintenance spot check will always be graded at 100% as the spot checker is using the opportunity to train the Sailor while the check is being performed. (3) Spot Check the Spot Checker. C onducting a spot check on a maintenance (historical or monitored maintenance) action that has previously been spot- checked. The purpose is to ensure the spot check program is effective at recognizing and correcting discrepancies identified during previously conducted spot checks. The primary focus of this inspection is the person that previously conducted the spot check, but the Sailor’s performance will also be evaluated. Spot Check the Spot Checker forms cannot be documented in SKED. Paper copies will be retained for 13 weeks. b. Spot Check Program Execution. The 3MC will generate weekly PMS spot check assignment matrix for Officers, CPOs, and FCPOs using the guidance listed in Table 19-6-2 and Table 19-6-3 of this chapter for work centers with maintenance completion. The spot check assignments can be assigned so that personnel are conducting spot checks within their respective departments, divisions, or cross

p. 725

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-36

departmentally. Cross-departmental spot checks are valuable in training maintenance personnel in the performance of a spot check by personnel they are not familiar with. (1) LCS and DDG 1000 class Spot Check Gu idance. Each unit is required to have an aggressive spot check program involving all levels of the CoC from the FCPO to the CO. Individual maintenance requirements will be spot checked periodically to determine the effectiveness of PMS accomplishment and to ensure the maintenance was completely and correctly performed. All CPO and above will conduct historical or maintenance validation spot checks. All FCPO will conduct monitored maintenance spot checks. WCs will only perform one Khaki and one FCPO spot check weekly. This requirement will be based on each command’s manning, at no time will Khaki or FCPOs be doubled up on weekly spot checks. If a command does not have enough Khaki or FCPOs to cover each WC weekly, then those WCs will not have a spot check for that particular week. The intent of this is to have quality spot checks being performed, not quantity. Detailed spot check criteria used to evaluate the completion of the maintenance requirement is located at: https://flankspeed.sharepoint-mil.us/sites/CPF-CNSP-HQ/engineering/3m.

Periodicity Date Range Daily None 2 Days None 3 Days None Weekly None 2 Weeks 9-19 Days 3 Weeks 14-28 Days Monthly 21-41 Days 2 Months 41-83 Days Quarterly 61-121 Days 4 Months 83-165 Days Semi-Annually 121-243 Days 8 Months 165-331 Days 9 Months + or – 90 days from Scheduled Date Annual + or – 90 days from Scheduled Date Multi-Month after Annual + or – 90 days from Scheduled Date Table 19-6-1

Management Level # of Spot Checks Spot Check Type CO One Spot Check the Spot Checker XO One Spot Check the Spot Checker

p. 726

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-37

*CMC/SEA One Spot Check the Spot Checker One (ER09) Historical *3MC One Historical One (ER09) Historical E-7 and Above One Historical E-6 One Monitored *CMC/SEA and 3MC will conduct a Spot Check the Spot Checker on one of the week’s Spot Checks. Table 19-6-2 (Surface Force Spot Checks)

Management Level # of Spot Checks Interval Spot Check Type CO One Bi-Weekly Spot Check the Spot Checker XO One Bi-Weekly Spot Check the Spot Checker CMC or SEA One Bi-Weekly Spot Check the Spot Checker 3MC One Weekly Spot Check the Spot Checker E-7 and Above One Weekly Historical E-6 One Bi-Weekly Monitored Table 19-6-3 (DDG 1000 and LCS Spot Checks) (2) Spot Check Scheduling Guidance. (a) Utilize the Spot Check Randomizer located in the Weekly Virtual Snap-Shot Report. Use is mandated unless Sailor or equipment is unavailable in which 3MC will select another Spot Check to be conducted. (b) Do not schedule spot checks in advance. (c) Upon completion of spot checks doc ument checks using the spot check function in SKED. (d) Paper copies are not required to be retained when completed spot checks are entered in SKED 3.2 with exception of Spot Check the Spot Checker. (e) Spot check discrepancies will be tracked to completion. (f) Only the assessor is to enter the completed spot check results. (3) Spot Check the Spot Checker Guidance. (a) Spot Checks will be selected util izing SKED, Spot Check - All Report, or the Virtual Snap-Shot Report. (b) 3MC will collect completed spot check results and compare to previously recorded spot checks.

p. 727

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-38

(c) Discrepancies between the spot checks will be adjudicated at the command level. (d) A spot check the spot checker that results in a failed spot check not previously documented will be reported to the CO and XO as an attachment in the weekly report. (e) Spot check the spot checker resu lts cannot be entered in SKED and must be retained for a period of 13 weeks. c. Spot Check Randomizer. The Spot Check Randomizer is the last section of the Virtual Snap-Shot Report. It produces a list of random spot checks based upon criteria such as periodicity, troubled systems, and when the check was accomplished. The program will reduce the number of times the same maintenance check is selected. The list of spot checks is for the next week. The program will choose a single check for each work center but will not assign a spot checker. 3MC will still create a list of spot checkers and assign the work center they are to inspect. The spot checker will then conduct a spot check on the maintenance action selected by the program. The 3MC will ensure that spot checkers are inspecting checks selected by the program. d. Failed Spot Checks. All failed spot checks will be reported to the Executive Officer and Commanding Officer via the Virtual Snap-Shot. The 3MC will report the maintenance deficiency and corrective action needed or taken. If it was determined during the course of a spot check that the intent of the maintenance check was not achieved, the maintenance check will be rescheduled at the earliest convenience of the command. 19-6.4.16 Corrective Maintenance. a. Maintenance Management Automated Information System (MMAIS) Management. As Navy MMAIS applications (MDS, AWN, Electronic Tag Out (eTagOut) and Electronic Shift Operations Management Solution programs) evolve into a connected group of systems, criteria for the management of unit, shipboard and ashore databases and a process for submitting account requests for these MMAIS systems is hereby established. b. Operating Policy for Unit or Shipboard Databases afloat. (1) Will be managed locally by an assigned and designated administrator. (2) Account structures and role or priv ileges will utilize the TYCOM approved Privilege Matrix which is maintained by the TYCOM. (3) Systems settings will be set to loca l time not Zulu time for all processing. (4) No outside activity will be allowed di rect access to the databases. Database copies require prior written TYCOM N43 approval. (5) All work candidate, job, JSN, pre-2K to 2K review and approvals along with sending of parts requests to supply will be conducted by the ships force, no outside activities will approve work candidate, job, JSN, pre-2K to 2K or shipboard parts. No outside activity will write work candidates directly into a ships force MDS system. All outside activity reporting or finding

p. 728

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-39

discrepancies will produce the required “bulkload” per this manual. c. Operating Policy for Unit or Shipboard Databases ashore. (1) All user access levels and accounts will be tracked by the activity creating the account. (2) Every TYCOM will have at a minimum a primary and secondary account manager. Account manager names will be provided to the Navy 311 or Navy Enterprise Service Desk (NESD) help desk. (3) Users with accounts missing the requir ed forms will be deactivated until the required documentation is presented to the Navy 311 or NESD help desk, and the account is approved by the TYCOM. d. Organizational Maintenance Management System - Next Generation (OMMS-NG). Organizational Maintenance Management System - Next Generation is the shipboard program used to document and track material deficiencies in the command. Only active jobs are maintained in the database and are tracked to completion. 3MC will upline a minimum of twice a week to VSB via the RADWEB service. While the OMMS database contains all active jobs for the ship, “L” and “Z” jobs will not display in the ships database. “L” jobs are work candidates the Port Engineer wrote for work to be completed on the ship. “Z” jobs are ICMP task to be accomplished by outside activities. (1) Up-line Reporting. Up-line reportin g via Revised Alternative Data Flow Website (RADWEB) is required at a minimum of twice per calendar week. Platforms on any other MDS, units will verify twice a week that automatic data transfer is occurring. (2) Automated Shore Interface Processi ng. Automated Shore Interface (ASI) download and processing is required when the ASI record count in RADWEB is 3,000 records for Guided Missile Cruiser (CG), Guided-Missile Destroyer (DDG), Mine Countermeasure Ship, Littoral Combat Ship (LCS), Amphibious Transport Dock, Dock Landing Ship, Patrol Craft (PC), or shore facilities. For Amphibious Assault Ships, Landing Helicopter Dock and Amphibious Command Ships class ASI download and processing is required when the ASI record count in RADWEB is 10,000 records. ASI download and processing for all MDS, of all available ASI records in RADWEB is required when the unit is getting underway for a period of two weeks or longer, monthly at a minimum, and as directed by the TYCOM. Ship’s ASIs available in RADWEB will be downloaded and processed into the ship’s MDS within seven days of ASI creation. (3) Bulkloads and Database Transfer. A bulkload is a CSMP load (work candidate(s) provided as an external file to be loaded into the ship’s CSMP) by the 3MC produced by any outside activity (any person not ships force, no activity will leave a list of material discrepancies or tell the ship to write the work candidate/jobs.). Bulkload files are sent to the 3MC by TYCOM N43. COMNAVSURFPAC or COMNAVSURFLANT N43 3-M is the only

p. 729

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-40

authorizing activity for bulkload reviews. Commands will not transfer, copy, or allow the direct access to or copying of the MDS and or supply database by any outside activity. COMNAVSURFPAC or COMNAVSURFLANT N43 3- M will direct via written permission for database copies. Upon completion of bulkload, the command must review all work candidates to ensure the recommended solution and type availability are accurate. If not accurate, the command should assign to the appropriate TA Code (1-Depot, 2-IMA, 3-Tech Assist) and update the recommended solution. f. Automated Work Notification - AWN is th e shipboard program used to document and track material deficiencies in the command. All active jobs and jobs closed within the last year are maintained in the database and are tracked to completion. Upline in AWN are not required as the program uplines automatically. (1) Verifying AWN health. To ensure auto matic replication from ship to shore in AWN, utilize TYCOM provided AWN health process guide. AWN health should be verified daily, a minimum of twice weekly, in the shore AWN (ATM) program. (2) AWN Parts Approval for LCS Units . Although parts request, queue, and approval are conducted on the ship, parts will not be ordered until the Work Candidate is approved (changed from pre 2-Kilo to 2-Kilo) in the Shore ATM Database. Once the Work Candidate is made a 2-Kilo, material requisitions can be released to R-Supply Ashore. (3) Automated Shore Interface Processing. Ship’s ASIs available in RADWEB will be downloaded and processed into the ship’s AWN and R-Supply within seven days of ASI creation. For LCS unit, ASI will be processed into the ship’s AWN, shore AWN (ATM), and R-Supply within 7 days of ASI creation. (4) AWN Bulkload process. TYCOM N43 w ill load Bulkload files directly to Ashore AWN (ATM). The uploaded jobs wills replicate to the AWN database upon completion. Ship’s 3MC is to monitor the AWN database to ensure the bulkloaded files are received on the ship. f. Validation Screening and Brokering. Th e master CSMP database for all US Navy ships. The program utilized by Port Engineers to screen and broker or refer work as required. VSB is updated by OMMS and provides status updates to the Open Architecture and Retrieval System (OARS). All jobs TA 1 - 4 are reported to VSB although only TA 1 - 3 will be screened by the Port Engineer. The status of all jobs in VSB are annotated by the “WN Status” field. g. Open Architecture and Retrieval System (O ARS). The 3-M history file for all US Navy ships and shore commands. All jobs written by the ship or outside activity will be maintained within the OARS database from the time the command is commissioned until decommissioning. A weekly report from OARS is generated and

p. 730

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-41

disbursed to ship via a SPEAR file. The SPEAR file will contain a list of all active jobs and ICMP task assigned to the unit. 19-6.4.17 Life Cycle Of A Work Candidate. A Work candidate is created either on the ship by ship’s force or by an outside maintenance activity. When a job is created by a maintenance activity or inspection team, they create a list of jobs and send them to TYCOM for review. After TYCOM review, the job will be sent to the ship via bulkload to update the ship’s CSMP. A ship uploads the jobs to VSB via upline where the Port Engineer will screen and broker work to the maintenance activities during availabilities as shown in Figure 19-6-1 of this chapter. 19-6.4.18 Key Component Of A Work Candidate. a. Maintenance and Modernization Business Unit (MMBU) Code. A MMBU code (also known as Job Originator Values) is used to identify the outside activity that originated the job. It is identified by the first character in the job sequence number. For example, Job CA01-L001 has a MMBU code of “L” which identifies the Port Engineer as the originator of the job. CA01-R001 has a MMBU code of “R” which identifies an INSURV inspection as being the originator of the job. A list of all MMBU code can be found in the NAVSEALOGCEN website https://oars.nslc.navy.mil/oars/docs/mmbureferencelisting.html. b. Type Availability Code (TA Code). (1) TA Code 1. Depot level work candidate . When a unit receives or initiates a TA 1 job, the ship is accountable for ensuring the job is screened and brokered. The Port Engineer is responsible for the action of screening and brokering but the ship will track all TA 1 jobs to ensure they are scheduled for the next convenient availability. The status of all TA 1 jobs for the ship are identified in the Virtual Snap-Shot Report for commands visibility. (2) TA Code 2. IMA level work. When a unit receives or initiates a TA 2 job, the ship is accountable for ensuring the job is screened and brokered. The Port Engineer is responsible for the action of screening and brokering but the ship will track all TA 2 jobs to ensure they are scheduled for the next convenient availability. The status of all TA 2 jobs for the ship are identified in the Virtual Snap-Shot Report for commands visibility. (3) TA Code 3. Technical Assistance jobs. When a unit receives or initiates a TA 3 job, the ship is accountable for ensuring the job is screened and referred. The Port Engineer is responsible for the action of screening and referred but the ship will track all TA 3 jobs to ensure the jobs are brokered to a maintenance activity so the requested technical assistance can be provided. The status of all TA 3 jobs for the ship are identified in the Virtual Snap-Shot Report for commands visibility. (4) TA Code 4. CSMP work notifications that are within ship’s force capability to complete. A TA 4 job can originate from on the ship or an outside inspection team such as an INSURV or Total Ship’s Readiness Assessment. TA 4 jobs will be sent to VSB via CSMP upline but the Port Engineer may not have visibility of the jobs. Additionally, a job may have been written by the

p. 731

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-42

ship as a TA 1 - 3 and the Port Engineer may screen the job as a TA 4. This will be reflected by the SPEAR Report or during the monthly CSMP Reconciliation Process. If a job is screened as a TA 4 the ship will change the TA Code of the job to 4. If the ship still desires an outside activity to perform the work, the Port Engineer should be notified. c. Equipment Status Code (ESC) and Equi pment Operational Code (EOC). The ESC and EOC will reflect the actual condition of the equipment at the time the Work Candidate is created. The ESC from OMMS-NG units is used to compute the EOC which is a major factor in determining the mission operational capabilities of the ship. d. Safety Code. A safety Code will be added to all CSMP work candidates. If the job has no effect on the safety to personnel and/or equipment, a Safety Code of “0” will be utilized. The following safety codes are authorized for use: (1) “X”. Enter an "X" or applicable safety code if the maintenance action describes a problem or condition which has caused, or has the potential to cause serious injury to personnel or material. A brief explanation must be included in the Remarks/Description field (Block 35). For example: "RE- INSPECTION OF SEPARATOR FOR PRESENCE OF OIL AFTER RINSE. MRC A-27 EVIDENTLY NOT DONE. PRESENCE OF OIL RESULTED IN FIRE IN HP AIR SYSTEM WHEN COMPRESSOR OPERATED UNDER LOAD. FIRE BADLY BURNED VALVE AHP-287, REQUIRING REPLACEMENT." (2) “1”. Critical safety or hea lth deficiency. Correct Immediately. (3) “2”. Serious Safety or Health defi ciency. Suspension of Equipment, System or Space use is required. (4) “3”. Moderate Safety or health defi ciency. Waiver of Equipment, System or Space use is granted pending correction of the item. (5) “4”. Minor safety or health deficiency. (6) “5”. Negligible safety or health deficiency. (7) “0”. Maintenance action is not safety related. e. Block 10. TYCOM directs units to utilize bl ock 10 as an attribute for jobs that have one or more of the characteristics below. If a corrosion or environmental job is found during a zone inspection, the corrosion or environmental status takes precedence. (1) “C”. All Corrosion jobs will be annotated with a “C” in Block 10. (2) “E”. All jobs having an environmen tal impact will have a “E” in block 10. (3) “Z”. All jobs discovered during Zone Inspection will annotated with a “Z” in block 10.

p. 732

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-43

f. Availability ID Code. A four-digit Alpha numeric code used to identify the availability a particular job has been assigned to. If the Availability ID Code is blank, it means the job has not yet been screened to an availability. 19-6.4.19 NTCSS Failure And Recovery. a. NTCSS Failure. Report failure to Su rface Force 3-M Representative and TYCOM 3MC. b. NTCSS Recovery. Conduct recovery pro cess per NIWC directive and guidance. c. All ASIs and TYCOM bulkloads received during the outage will be installed per emailed files from TYCOM 3-M. If bulkloads cover a Total Ship’s Readiness Assessment event, those must be loaded by daily sequence files. 19-6.4.20 Equipment Validations. The correct equipment configuration is the basis for all maintenance and supply support programs. Ship’s Force is in the best position to identify and make corrections to inaccuracies in equipment records when compared to the actual installed equipment. a. Each WC will perform equipment validations per the following priority and guidance. Corrective Maintenance. Prior to writing a work candidate, WCS will verify when the equipment was last validated. If not validated in the past 36 months, MP will validate the equipment record using validation aid provided by WCS. Ships that are Pre-commission or in Service Life Extension Program will validate all equipment onboard to establish correct configuration until sail away for new construction or upon completion of Service Life Extension Program. b. Shipboard personnel will conduct validati ons by printing a hard copy validation aid from the installed MDS system unless full electronic devices are available. Validation aids contain information about the equipment including the WC owning the equipment for maintenance purposes, location, serial number, or Positional Reference Identification number. In addition, APL header data is included. These copies, if required, will be kept for 13 weeks or until electronic MDS system is verified correct. c. Paperless Equipmen t Validation process. (1) WCSs will print Equipment Validati on Aid from OMMS-NG. (If command has portable laptops or hand-held computers then this can be disregarded.) (2) The MP will utilize th e Equipment Validation Aid (if applicable) and conduct sight validation. (a) MP will locate equipment and veri fy APL Header data and Component Characteristics information (RIC information located on the left-hand side of validation aid). Any disparity will require a change in configuration request or Wrong in Model-Not in Model request to add the correct APL for equipment. If unable to verify due to missing label plate information, inaccessible, lagged over etc. equipment validation code will be sight validated without RIC and select correct reason why. If APL or characteristic data is correct, the equipment

p. 733

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-44

record will be sight validated with RIC. (b) MP will verify serial number is co rrect or annotate discrepancies. If serial number is not available, then utilize Positional Reference Identification. (c) MP will verify that the correct WC is listed, annotate discrepancies. (d) MP will verify the equipment is correctly associated to the correct PMS and the MIP and all associated MRCs will be annotated. (e) MP will sign and date validation aid. (If using portable laptop or hand-held computer, disregard.) (f) MP will return Equipment Validation Aid to WCS (if applicable). MP or WCS (if using portable laptop or hand-held computer MP will update the record) can update configuration record notes section to ensure all annotations on the validation aid are transcribed over to the MDS record, along with MP name who conducted sight verification and the date in which the sight validation was conducted. PMS MIP and all associated MRCs will be annotated in the notes section of record as well. If PMS is required but not assigned to unit, then submit an FBR requesting additional coverage and document the FBR number in the notes section of the record. If no PMS is required, annotate No Maintenance Required in the notes section of the record. (3) The WCS will take the validation aid (i f applicable) and ensure all information on validation aid is entered correctly in the notes section of the configuration record. (If portable laptop or hand-held computers utilized, the WCS will verify record). (4) CoC will review and approve all equipment configuration record changes. (5) The 3MC will be able to view all completed validations from the MDS via reports or list function in the applicable MDS.

p. 734

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-45

Figure 19-6-1 19-6.5 PLANNING BOARD FOR MAINTENANCE 19-6.5.1 PB4M Meeting. Each unit will have a formally structured PB4M which should meet twice per month at a minimum. This forum provides a review of open Casualty Reports, current planned off-ship and organizational maintenance, CSMP quality and accuracy, future maintenance and modernization planning, and fiscal concerns. The objective of PB4M is to ensure clarity of intent for both the ship’s efforts and the shore infrastructure with respect to total ship maintenance, operational schedules, and other concerns affecting ship material readiness. The PB4M must include the CO (who will chair the meeting), XO, 3MC, all DH, SMMO, Port Engineer (PE), and additional personnel as desired (e.g., TYCOM Rep). 19-6.5.2 PE Responsibilities. Quarterly the PE will assist the ship’s CO in conducting the PB4M meetings, including agenda development. The SMMO will prepare the ship input to the PB4M agenda in support of the PE to include COMNAVSURFOR reconciliation tool and self- Sufficiency report results. 19-6.5.3 PB4M Timing, Periodicity, And Agenda. Flexible to support the priorities of the individual ship and meet the unique maintenance requirements of each phase of the TYCOM Operational Fleet Response Plan. However, the Maintenance Team will have reviewed the CSMP in detail prior to PB4M, then discuss the CSMP during routine PB4Ms and prior to every maintenance availability. 19-6.6 3M 365 CONTINUOUS MONITORING 19-6.6.1 Pillars Of Performance. There are four Pillars of Performance within the 3-M program. While the pillars may affect one another, each pillar must be evaluated independently. For units with multiple crews, all 3-M 365 Pillars of Performance will be measured by hull. a. Maintenance Accomplishment Rate (MAR). The Maintenance Accomplishment Rate is the amount of the scheduled or unscheduled maintenance that was accomplished.

p. 735

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-46

Scheduled maintenance is performed on a periodic basis while situational maintenance is performed based upon an event such as those identified in the Major Events Listing or when required while conducting a periodic check. b. Spot Check Program. The Spot Check Progr am is the Quality Assurance program for the maintenance conducted at subordinate commands. The purpose is to ensure the right maintenance is conducted on the right equipment safely and effectively. c. Consolidated Ship’s Maintenance Pr ogram. The CSMP program is the Navy’s process of documenting discrepancies to spaces and equipment. The program entails Equipment configuration, discrepancy identification, screening or brokering work, and recording when deficiencies have been corrected. d. Knowledge, Skills, and Experience. Th e KSE model is a way to gauge the knowledge, skills, and experience of the crew members that make up a work center, department, or command. This model creates a unit of measurement to ensure personnel have both the training and qualifications to execute the assigned duties. Additionally, the performance portion of the model identifies the “end result” of the KSE model. Although a Sailor may be trained and qualified, an evaluation of 3-M programs and activities will measure how well the responsibilities are executed. For units with multiple crews, a specific Multi-Crew KSE will be utilized. The multi- Crew KSE form will be identical to the single crew KSE except each 3-M position will have two names. 19-6.6.2 Periodic Reports. a. Virtual Snap-Shot Report (1) Overview. The Virtual Snap-S hot Report is a CNSF produced excel workbook that creates a 20-page graphical representation for the health of the MAR and Spot Check program pillars of performance. The report uses a drill down method to identify strengths and weaknesses with the two pillars. (2) Periodicity. This report is to be conducted weekly by all commands. (3) Required Documents. (a) PMS Analysis Spreadsheet. The PMS Analysis Spreadsheet is an excel workbook that contains a list of all periodic checks, situational checks, and alerts the command has recorded in SKED for the past quarter. The report is generated from the SKED Admin tab. The period of report will be period of 13 weeks, beginning on a Monday and ending on a Sunday. (b) Spot Check - All Report. The Spot Check - All Report from sked contains a list of all spot checks conducted during the last quarter with the associated grades for each of the spot checks. The report is generated from the Reports tab. The period of report will be period of 13 weeks, beginning on a Monday and ending on a Sunday. (4) Virtual Snap-Shot Report Breakdown (a) Cover Sheet. The cover sheet auto matically fills in the ship’s name

p. 736

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-47

and date. The user will enter the following information for the command’s 3-M Program: 1 FR#. Enter the current Force Revision the SKED implemented at the commands. (Ex. 4-21, 1-22, 2-22) 2 3-M Cert Date. Enter the date for the last 3-M certification event. If the certification date is not known, contact your Fleet’s Afloat Training Group unit to provide. 3 CSMP Reconciliation Date. Ente r the date of your last CSMP Reconciliation Report. 4 Number of Reconciliation Discre pancies. The total number of discrepancies identified during the last CSMP Reconciliation. 5 MAR Pillar. An automatically populated block that records the Maintenance Accomplishment Rate for the command. 6 Spot Check Pillar. An automatically populated block that records the Spot Check Accomplishment Rate for the command. 7 CSMP Pillar. A manually populated block to record the CSMP Management Score for the command. The CSMP Management Score can be found on the cover page of the CSMP Self-Sufficiency Report. 8 KSE. A Manually populated block to record the Knowledge, Skills, and Experience Score located on the Dashboard of the KSE Tool. This block is only applicable for commands that have transitioned from legacy 3-M Certification criteria to the 3-M 365 Continuously Monitored and Continuously Certified program. 9 Attachments. There are two mandatory attachments that must be submitted with the Virtual Snap-Shot Report: a IEM Details Report b Additional Attachments. Contains three empty spaces for voluntary attachments. 10 Acknowledgment blocks. Contains a place for the CO and XO to initial stating they have received the document and provides an area for comments if desired. b. PMS Performance Rate (PPR). The PPR page provides an overview of both the command’s MAR and Spot Check Average to create a PPR for the command and each of the departments within. c. Maintenance Accomplishment Summar y. The Maintenance Accomplishment Summary provides a three-page executive level evaluation of the MAR for the command. The major sections of the report as follows:

p. 737

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-48

(1) Maintenance Accomplishment by Week Graph. A graphical representation of the MAR for the last 13 weeks. The graph provides a trend analysis for the command’s maintenance accomplishment. The Fleet requirement of 80% is identified by a red dotted line on the graph. (2) Departments for the Last Quarter. Each department at the command has the maintenance accomplishment number identified. The following metrics are used for evaluation: (a) # COMPL. The number of check s the Department has completed within the last 13 weeks. (b) # ALERTS. The number of alerts re presents the number of checks that were rescheduled due to non-accomplishment. Each alert signifies one check that was not accomplished. (c) # LOST. Checks that were schedule d and lost due to the inability to reschedule. Daily checks, or situationally required checks are unable to be rescheduled. (d) # NA. The number of checks that were scheduled and marked as Not Applicable. While NA checks do not affect the commands 3-M score, caution should be taken to ensure there actually were not applicable and not maintenance that should have been accomplished. (e) TOTAL # CHKS. This number is the sum of all checks completed, lost, and alerted during the 13-week period. (f) PAR%. The PAR Score is the Pe riodic Accomplishment Rate. The PAR Score represents the amount of periodically scheduled maintenance that was accomplished. (g) SAR%. The SAR Score is the Situational Accomplishment Rate. The PAR Score represents the amount of situationally scheduled maintenance that was accomplished. (h) WEIGHT%. The portion of overall command maintenance accomplished within a given Department. This weight is also used to determine the effect on the command MAR. (i) MAR%. The departments Maintenance Accomplishment Rate for the last 13 weeks. (3) Work Centers for the Last Quarter. This section is identical to the department section except data is for a specific Work Center over the last 13 weeks. (4) Alerts Report. A two-page section that graphically displays the command’s alerts over the last 13 weeks. It is important to understand that a check will not start alerting until the check is beyond its maximum scheduling range. For example, an A-1 check will not alert as soon as the check is due. The check can still be moved out 6 months. After 18 months the check will start alerting. The following sections are used to evaluate the command’s alerts:

p. 738

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-49

(a) Alerts by Week. A graphical repr esentation for the number of alerts within the command over the last 13 weeks. This graph is used for trend analysis. (b) Number of alerts per Work Center . This is the number of alerts by work center for the previous week only. If the cell next to the work center is blank, it means that work center had no alerts for the previous week. If the cell next to the work center has a number and another number in parenthesis, than the first number is the number of alerts for the previous week and the number in parenthesis represents the number of alerts that have been out of periodicity for 13 weeks in a row. Adding up the number of alerts for each of the work centers will equal the number of alerts for the last week as identified in the alerts by week graph. (c) Top 50 longest running alerts. This a list of alerts at the command that have been out of periodicity the longest. This may not be all of the alerts. Each alert has the following information: 1 # weeks alerted. This is the num ber of weeks in a row that the check has been out of periodicity. A 13 in the cell does not mean that the check has only been alerting for 13 weeks. Because the report only utilizes 13 weeks of data this is the maximum number that can be displayed. 2 WC. The Work Center that has responsibility for the maintenance check. 3 MIP. The Maintenance Index Page of the Check that is out of periodicity. 4 Periodicity. The periodicity of the check as identified by the maintenance card. 5 Equipment name. The equipmen t name as listed in the SKED equipment file. If equipment in SKED is properly associated to the CDMD-OA file, the equipment name will match between the two. d. Lost Checks Report. A two-page secti on that graphically displays the command’s lost checks over the last 13 weeks. The following sections are used to evaluate the command’s lost checks: (1) Lost Checks by Week. A graph displa ying the number of lost checks per week for the last 13 weeks. This graph is utilized for trend analysis purposes. (2) Lost Checks by Work Center. The nu mber of lost checks by work center for the last 13 weeks. This data enables commands to identify which work centers are not able to complete daily and situational maintenance checks. (3) Top 50 Equipment items with the most lost checks. This is a list of the top 50 lost checks based upon the equipment and work center. Some equipment has

p. 739

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-50

more than one daily check or situational check associated to it. Below is a description of what the list provides: (a) WC. The work center that owns the piece of equipment that has lost checks associated to it. (b) # times lost. The number of daily or situational checks that have been lost for the piece of equipment. (c) Equipment. This is the equipm ent name as identified by the SKED equipment file. If the equipment is properly associated, the equipment name will be the same as the CDMD-OA database. (4) NA Checks Report. A two-page sec tion that graphically displays the command’s Not Applicable checks over the last 13 weeks. Although NA checks are not counted against the command’s Maintenance Accomplishment Rate, the command should be aware of the checks marked NA as it could indicate maintenance that should have been accomplished and was not. The following sections are used to evaluate the command’s Not Applicable checks: (a) NA Checks by Week. A graph di splaying the number of checks marked as not applicable over the last 13 weeks. This graph is used to show trend analysis for the command. (b) NA Checks by Work Center. The number of checks marked NA by work center over the last 13 weeks. (5) Top 50 Equipment items with the most NA checks. This is a list of the top 50 NA checks based upon the equipment and work center. Below is a description of what the list provides: (a) WC. The work center that owns the piece of equipment that has NA checks associated to it. (b) # times NA. The number of check s that have been marked as Not Applicable for the piece of equipment. (c) Equipment. This is the equipm ent name as identified by the SKED equipment file. If the equipment is properly associated, the equipment name will be the same as the CDMD-OA database. e. Spot Check Analysis Report. A summary of the Spot Check Program health via actionable metrics. Below is a description for each section of the report. (1) Number of Spot Checks per Week. A gr aph that displays the number of Spot Checks conducted at the command over the last 13 weeks. The number includes both historical Spot Checks and Monitored Maintenance Spot Checks. (2) Department Spot Check Program Healt h. A list of each department and their respective Spot Check metrics. The fields are listed below: (a) Department. The Department Name.

p. 740

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-51

(b) # Spot Checks. The number of Spot Checks conducted within a given department for the last 13 weeks. This is a rollup metric for each of the work centers within a department. (c) # Fail. The number of spot check s that were marked as failures in SKED in the last 13 weeks. (d) Pass %. The percentage of S pot Checks that passed within a department. While commands may naturally desire a high pass percentage, a very high score may indicate Spot Checkers are not utilizing a critical eye. (e) Weight %. Weighting is used to calculate the weight of a given department score on the commands overall Spot Check Average. Weighting is based upon the amount of spot checks conducted in that department. (f) AVG Score %. The average spot check score achieved during the last 13 weeks. (3) Work Center Spot Check Program Hea lth. A list of each Work Center and their respective Spot Check metrics. The fields are listed below: (a) Work Center. The Work Canter name. (b) # Spot Checks. The number of Spot Checks conducted within a given Work Center for the last 13 weeks. (c) # Fail. The number of spot check s that were marked as failures in SKED in the last 13 weeks. (d) Pass %. The percentage of Spot Checks that passed within a Work Center. (e) Weight %. Weighting is used to calculate the weight of a given Work Center score on the commands overall Spot Check Average. Weighting is based upon the amount of spot checks conducted in that Work Center. (f) AVG Score %. The average spot check score achieved during the last 13 weeks. (4) Top 10 Spot Checks Conducted. A list of the maintenance checks that were spot checked the most in the last 13 weeks. The “# of SCs” block indicates the number of times a spot check was completed. Line items highlighted in green indicate a troubled system check as specified by TYCOM. These are checks mostly identified as leading to INSURV inspection discrepancies. (5) Toughest Spot Checkers. This list co ntains the names of the 10 personnel that have failed the most spot checks. The list will only contain the names of Spot Checkers that have conducted more than the average number of spot checks for the command and have failed at least one spot check. (6) The 100% Club. A list of Spot Check ers that have conducted the over the

p. 741

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-52

average number of spot checks and have found zero discrepancies. While grading one or more spot checks at 100% may be legitimate, this list may indicate personnel that need to have a more critical eye during spot checks. (7) Partial Spot Checkers. A list of pe rsonnel that have conducted one or more spot checks with a partial grade. CNSF does not authorize partial grading during spot checks. Each attribute on the Spot Check form is an all or nothing score. For Example, an attribute worth 10 points will either be 10, 0, or NA as applicable. A grade of 1 through 9 will not be used for any reason for this attribute. f. List of Failed Spot Checks. This is a lis t of spot checks that failed during the last week and the reason the check failed. Reason may be blank if the spot checker did not provide a comment. Because of the hard kill attributes on the spot check form, a person that partially grades a spot check may show up on this list even though they were unaware the spot check failed. g. Spot Check Completion Report. A list of the command spot checkers and the number of spot checks the personnel conducted for each week for the last 13 weeks. Because this list is derived directly from SKED data, the personnel paygrade is unavailable. Due to this limitation, the list is sorted based upon the number of historical checks conducted in the last 13 weeks. h. Spot Check Randomizer. A list of randomly selected checks to be spot checked for each work center that has conducted maintenance in the last 13 weeks. Checks are randomly selected based upon periodicity, troubled system status, when the check was accomplished, and how many times the spot check was previously conducted. All units are directed to utilize the Spot Check Randomizer to the maximum extent possible. If a maintenance person or equipment is unavailable and the randomly selected check cannot be performed, the spot checker will select another check within that work center with a moderate level of difficulty. 19-6.6.3 CSMP Reconciliation Report (OMMS). a. Overview. This report is used to identif y discrepancies between the alignment of the OMMS and VSB databases. Alignment of the databases is critical to CSMP management to ensure the command and Port Engineer have the same situational awareness for the status of on-ship and off-ship work candidates. The results of the CSMP Reconciliation will be forwarded to the Surface Force 3-M Representative upon completion. b. Periodicity. The CSMP Reconciliation w ill be completed by all commands monthly by the fifth day of each month. c. Required Documents: (1) OMMS CSMP Export. A copy of active JSN residing on ship. (2) VSB Export. An export of the gl obal report in VSB named “CNSF CSMP Reconciliation Report”.

p. 742

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-53

d. CSMP Reconciliation Report Breakdown: (1) Cover Sheet. The cover sheet of the report provides an executive level overview for alignment between the units OMMS database and the VSB database utilized by the Port Engineer to screen and broker work. Below are the sections of the report: (a) Total Number of Jobs in the Ship ’s CSMP. The total number of active jobs in the ship’s CSMP. (b) Total Number of Jobs in VSB. The total number of active jobs in VSB. (c) CSMP Reconciliation Score. A cal culation that represents how closely aligned the OMMS and VSB database are aligned. (2) CSMP Reconciliation Summary. A su mmary of discrepancies identified during the reconciliation process. Each discrepancy type has a independent list of jobs by JSN and Work Center that fall into the category. Below is a list of the discrepancies effect, the cause, and the corrective action needed: (a) Closed in VSB. The number of jobs separated by those generated on- ship and off-ship that are closed in VSB but active on the ship’s CSMP. Jobs that show closed in VSB are no longer being updated by the Port Engineer. 1 Possible Cause. Jobs may have been reported to the Port Engineer and closed to reflect that status. 2 Corrective action. Ship’s force s hould review the job validity. If the job has been completed, the job should be marked as complete in OMMS. If the job is still active and needs to be complete, the Port Engineer will need to resurrect the job so it can be screened and brokered as needed. (b) Not in VSB. The number of jobs separated by those generated on-ship and off-ship that reside in the ship’s CSMP but are not in VSB. If a job is not in VSB than the Port Engineer does not see the job and it will not be screened or brokered. 1 Possible Cause. The unit may have inactivated and archived prior to performing an upline via RADWEB to VSB. If this happens, jobs will be archived and any updates will not be reflected in VSB. Jobs may be awaiting approval and have not made it to the 3MC. 2 Corrective Action. Ship’s Force should review the job for validity. If the job is still valid, the job will need to be “tickled” so the job will be sent to VSB during the next upline. “Tickling” the job means to make an update to the job. (c) Mismatch. The number of jobs separated by those generated on-ship and off-ship that are listed as TA 1-3 on the ship but are listed as TA 4

p. 743

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-54

in VSB. This type of error leads the unit to believe that an outside activity will complete the work but the Port Engineer has stated that ship’s force will complete the work. 1 Possible Cause. Ship’s force wrote the job as a TA 1-3 and the Port Engineer screened the job back to ship’s force. 2 Corrective Action. Ship’s force will need to change the TA code in OMMS to a TA 4 or communicate why the job is not within ship’s force capability and have the Port Engineer rescreen the job back to a TA 1-3. (d) TA 4 Not in OMMS. The number of TA 4 jobs separated by those generated on-ship and off-ship that reside in VSB but are not listed on the ship’s CSMP. 1 Possible Cause. The unit may have inactivated and archived prior to performing an upline via RADWEB to VSB. If this happens, jobs will be archived and any updates will not be reflected in VSB. Another possible cause is that a bulkload was sent to the ship from CNSF and was not loaded into OMMS. 2 Corrective Action. The job will need to be reviewed for validity. If the job is still valid, the job will need to be rewritten. Additionally, the Port Engineer will need to close the job in VSB. (e) TA 1-3 Not in OMMS. The number of TA 1-3 jobs separated by those generated on-ship and off-ship that reside in VSB but are not listed on the ship’s CSMP. 1 Possible Cause. The unit may have inactivated and archived prior to performing an upline via RADWEB to VSB. If this happens, jobs will be archived and any updates will not be reflected in VSB. Another possible cause is that a bulkload was sent to the ship from CNSF and was not loaded into OMMS. 2 Corrective Action. The job will need to be reviewed for validity. If the job is still valid, a list of the job/jobs missing will need to be sent to TYCOM 3-M team to generate a bulkload containing the missing jobs. (f) P.E. Action Needed. The number of jobs separated by those generated on-ship and off-ship that were reported to VSB as being customer completed and awaiting closure in VSB. TA 1-3 jobs are dual close jobs and require both the ship and the outside activity to report completion prior to the job closing in VSB. 1 Possible Cause. The ship has marked the job as complete and

p. 744

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-55

reported that status to VSB via an upline. The outside activity has not yet reported the job as complete. 2 Corrective Action. Notify the Port Engineer that the jobs have been closed by ship’s force so they can get an updated status from the activity that completed the work. Port Engineer will need to close the job in VSB once activity reports status. (g) P.E. No Screening Required. The number of jobs separated by those generated on-ship and off-ship that are listed as TA 1-3 but have a WN status of “No Screening Required”. This means the job will not be screened or brokered by the Port Engineer. 1 Possible Cause. The job stat us was changed from “Screening Required” to “No Screening Required” in VSB. 2 Corrective Action. Notify the Port Engineer so they can change the job WN status back to “Screening Required” and screen/broker as needed. 19-6.6.4 CSMP Reconciliation Report. a. Overview. This report is used to identif y discrepancies between the alignment of the AWN, ATM and VSB databases. Alignment of the databases is critical to CSMP management to ensure the command and Port Engineer have the same situational awareness for the status of on-ship and off-ship work candidates. The results of the CSMP Reconciliation will be forwarded to the Surface Force 3-M Representative upon completion. b. Periodicity. The CSMP Reconciliation w ill be completed by all commands monthly by the fifth day of each month. c. Required Documents: (1) AWN CSMP Export. A copy of all JSNs residing on ship. (2) ATM CSMP Export. A copy of all JSNs residing on ship. (3) VSB Export. An export of the gl obal report in VSB named “CNSF CSMP Reconciliation Report”. d. CSMP Reconciliation Report Breakdown. (1) Cover Sheet. The cover sheet of the report provides an executive level overview for alignment between the units AWN database, the shore ATM database, and the VSB database utilized by the Port Engineer to screen and broker work. Below are the sections of the report: (a) Total Number of Jobs in the AWN. The total number of active jobs in the ship’s CSMP. (b) Total Number of Jobs in the ATM. The total number of active jobs in the AWN ashore CSMP. (c) Total Number of Jobs in VSB. The total number of active jobs in

p. 745

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-56

VSB. (d) Number of CSMP Discrepancies. A summation of the total number of discrepancies between all three CSMP databases. (2) CSMP Reconciliation Summary. A su mmary of discrepancies identified during the reconciliation process. Each discrepancy type has an independent list of jobs by JSN and Work Center that fall into the category. Below is a list of the discrepancies effect, cause, and corrective action needed: (a) Duplicate Jobs Same Problem. This is a list of jobs that are duplicated in the ATM database and have the same job description. Only one of these jobs’ statuses are being reflected in VSB. 1 Possible Cause. The most co mmon cause is the Maintenance Figure of Merit system created a new job after ship’s force updates the status of a job. For example, a job gets closed by ship’s force but ATN creates a new duplicate job with the status of closed versus changing the status of an existing job. 2 Corrective action. Ship’s force should review the job validity. If the job has been completed, the job should be marked as complete in ATM. (b) Duplicate Jobs Different Description. A list of JSNs in ATM that have been duplicated by represent different corrective actions. Because there is a delay in transferring data between AWN and ATM, if jobs are being written directly to ATM there is a chance that ship’s force is writing a job in AWN at approximately the same time. This will create two jobs with the same JSN that have different corrective actions. (c) In AWN Missing from VSB and ATM. A job that resides on the ship in the AWN database but has not replicated in ATM. 1 Possible Cause. AWN Health was not monitored and connectivity loss led to data not being replicated off ship. 2 Corrective Action. Updating th e job in AWN will allow the job to attempt replication off-ship. (d) In ATM missing from VSB and AWN. These are typically bulkloaded (Off-Ship) jobs that did not replicate from the ATM database. 1 Possible Cause. Not maintaining AWN health and connectivity will prevent ATM from replicating to AWN. 2 Corrective Action. The job will need to be updated in ATM to force replication to AWN and VSB. (e) In ATM and AWN missing from VSB. Jobs from ATM did not replicate to VSB 1 Possible Cause. ATM may have loss connectivity or servers

p. 746

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-57

were down when upload was attempted. 2 Corrective Action. The job will need to be updated in either AWN or ATM to force replication to VSB. (f) In VSB missing from ATM and AWN. Jobs that reside in VSB but are not contained in either the AWN or ATM databases. 1 Possible Cause. Jobs may have been closed in AWN or ATM but the information did not reflect in VSB. Jobs may show as “Customer Completed” in VSB. TA 1-3 jobs require dual closure from both the command and maintenance activity. 2 Corrective Action. Notify the Port Engineer that the jobs have been closed by ship’s force so they can get an updated status from the activity that completed the work. Port Engineer will need to close the job in VSB once activity reports status. (g) In VSB and AWN missing from ATM. A job that is still active in AWN and VSB but not in ATM. 1 Possible Cause. The job was somehow closed in ATM but did not replicate to AWN or VSB. 2 Corrective Action. Modify the j ob in AWN to force replication to ATM. If the job still does not replicate than the existing job will need to be closed and rewritten. If the job is TA 1-3 and brokered by the Port Engineer to an active availability, the job can be bulkloaded back from VSB by TYCOM. (h) In VSB and ATM missing from AWN. A job that is still active in both VSB and ATM that does not reside in the command’s CSMP. 1 Possible Cause. AWN health prevented the ship from receiving updates from ATM. 2 Corrective Action. Check AWN Health and modify the job in ATM. This will force the job to replicate back to AWN. (i) Active in AWN closed in ATM. A job that is still active in AWN but shows closed or canceled in ATM. 1 Possible Cause. The job was closed in ATM but the job status did not replicate to AWN. 2 Corrective Action. If the job is verified to be complete, close the job in AWN. If the job is verified to still be open, close the job in AWN and rewrite the job. (j) Active in ATM closed in AWN. A job that was closed in AWN but the information did not replicate to ATM. 1 Possible Cause. AWN health prevented ATM from receiving AWN updates.

p. 747

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-58

2 Corrective Action. If the job is verified to be complete, close the job in ATM. (k) Active in AWN closed in VSB. A job that is still active in the command’s CSMP but has been closed or canceled in VSB. 1 Possible Cause. The job was clos ed in VSB. This job will no longer receive updates in VSB. 2 Corrective Action. If the job is still open and valid than a new work candidate will need to be rewritten for the job. (l) Active in VSB closed in AWN. A job that is still active in the Port Engineer’s CSMP but has been closed or canceled by the command. 1 Possible Cause. A command not verifying AWN health may have led to AWN not replicating off ship and VSB not receiving updates. 2 Corrective Action. The command w ill need to verify the work has been completed and work with the Port Engineer to close the job in VSB. (m) Active in ATM closed in VSB. A job that still shows open and active in the AWN Ashore CSMP but has been closed or canceled by the Port Engineer in VSB. 1 Possible Cause. The job was clos ed in VSB. This job will no longer receive updates in VSB. 2 Corrective Action. If the job is still open and valid, the job will need to be closed in ATM and rewritten in AWN. (n) Active in VSB closed in ATM. A job that is still active in the Port Engineer’s CSMP but has been closed or canceled by the command. 1 Possible Cause. A command not verifying AWN health may have led to ATM not reporting to VSB that the job was complete. 2 Corrective Action. The command w ill need to verify the work has been completed and work with the Port Engineer to close the job in VSB. (o) TA 4 in VSB, TA1-3 in ATM and TA 4 in VSB, TA1-3 in AWN. A job that the command is expecting outside assistance with but the Port Engineer believes that the command will correct. 1 Possible Cause. Although the command requested outside assistance, the Port Engineer changed the job status to being within the command’s capability. 2 Corrective Action. The comma nd will need to communicate with the Port Engineer to identify the reason the job was

p. 748

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-59

changed to a TA 4. If the job is determined to not be within the command’s capability the Port Engineer will need to change the WN Status Code to “Screening Required” and broker as needed. If determined that the command will correct the discrepancy, the command will need to update the TA Code to 4 in AWN and take corrective action as needed. (p) TA 1-3 with No Screening Required. A job that has a TA Code of 1-3 in VSB but displays “No Screening Required” as the WN Status. 1 Possible Cause. Multiple update s to a job led to a discrepancy between the TA Code and WN Status. The Port Engineer may not see this job and corrective action will not occur. 2 Corrective Action. The Port Engi neer will need to update the WN Status to “Screening Required” and screen/broker as needed. 19-6.6.5 CSMP Self-Sufficiency Report. a. Overview. This Report provides an executive level understanding of the unit’s CSMP management. This report evaluates the CSMP Management Team as whole, to include the Port Engineer. The report is separated into two sections off-ship and on-ship CSMP management. b. Periodicity. This report is required monthly for all units. c. VSB Export. The VSB export for this repo rt utilizes the same export as the CSMP Reconciliation tool. VSB is the only data used for this report making the reconciliation process critical for the accuracy of this report. d. CSMP Self-Sufficiency Report Breakdown. (1) Cover page. The top of the page is dedicated to providing overall assessment scores for CSMP Management. (a) CSMP Self-Sufficiency Score. A percentage that combines the off- ship self-sufficiency score and on-ship self-sufficiency score with a weight of 30% and 70% respectively. On-ship CSMP management is held with a higher weight due to ship’s force being solely responsible for the TA 4 jobs within the CSMP. (b) Off-Ship CSMP Score. This scor e represents the management of TA 1-3 work candidates. The ability for a unit to ensure off-ship work is screened by the Port Engineer and brokered or referred to an active availability. (c) On-Ship CSMP Score. This sc ore represents a unit’s ability to efficiently manage TA 4 work candidates. A heavy focus is placed on the length of time between when a TA 4 job is written to when the job is accomplished. Additional weighting is placed on jobs identified as safety related.

p. 749

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-60

(d) Departments CSMP Scores. Each department is independently evaluated for their respective ability to manage off-ship and on-ship work candidates. (2) Off-ship CSMP Self-Sufficiency Scor es. The first page of this section evaluates each of the department’s ability to manage off-ship CSMP work candidates. From left to right TA 1, 2, and 3 codes are separately analyzed. Each TA code has the same categories for evaluation: (a) Actively Screened. This is the number of active TA 1, 2, or 3 work candidates within a department. (b) Awaiting screening. This is the number of active TA 1, 2, or 3 work candidates within a department that are waiting for screening by the Port Engineer. Only jobs that have been waiting for screening over 30 days are counted. Commands should use this to initiate discussion with the Port Engineer to find out why jobs in the CSMP are still needing to be screened. (c) Assigned to Past Avails. This is the number of active TA 1, 2, or 3 work candidates within a department that are assigned to availabilities that have ended over 90 days from when the report was generated. A 90-day buffer was added to provide time for the Port Engineer to collect financials and close out the avail. Before the 90-day mark, the Port Engineer should move the job to another availability so the work can be completed. (d) Unfunded avail. An unfunded availa bility is a temporary availability created in VSB to provide port engineers a place to store jobs until they can be assigned to an active availability. This is an approved procedure and the number of jobs in unfunded availabilities will not be held against the command. The number is displayed to allow a unit visibility into unfunded availability process. Jobs placed in an unfunded availability are not actively being worked. If a unit believes that the work should be assigned to an active availability, the Port Engineer should be notified for action. (e) Availabilities that have ended and still have active jobs assigned. This list provides a list of availabilities that have ended over 90 days from the date of report generation and the number of active jobs assigned to them. Commands with jobs assigned to availabilities that have ended should coordinate with the Port Engineer to move the jobs to active availabilities. Each availability has the following information: 1 Avail ID. The availability ID number is a unique identifier for that availability. 2 Start Date. The day the Availability started. 3 End Date. The day the availability ended.

p. 750

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-61

4 Location. The location the av ailability was conducted. 5 L and Z jobs. This is the number of ICMP tasks and Port Engineer created jobs that are active and assigned to the availability. These jobs do not penalize the command as they do not reside in the OMMS database. This is called out for situational awareness only. 6 TA 1. The number of TA 1 jobs still assigned to the availability. 7 TA 2. The number of TA 2 jobs still assigned to the availability. 8 TA 3. The number of TA 3 jobs still assigned to the availability. (f) On-Ship CSMP Self-Sufficiency Sc ore. An evaluation of all TA 4 jobs in a unit’s CSMP. The score represents the commands ability to create, plan, and execute discrepancies documented in the CSMP. 1 # TA 4 Jobs. The number of active TA 4 jobs residing in VSB. 2 # TA 4 Jobs Closed. The number of TA 4 jobs that have been closed within the last 90 days since the report was generated. 3 # > 90 Days Old. The number of active TA 4 jobs that are between 90 and 179 days old. 4 # > 180 days old. The number of active TA 4 jobs that are between 180 and 364 days old. 5 # > 12 Months Old. The number of active TA 4 jobs that have been in the CSMP 12 months or longer. 6 # Safety Jobs. The number of active TA 4 jobs that have a safety code of 1, 2, 3, or 4. 7 # Safety > 90 Days. The number of active TA 4 jobs that have a safety code of 1, 2, 3, or 4 and have been in the CSMP for 90 days or longer. 8 Avg Job Age. The Average age of active TA 4 jobs. 9 Avg Comp Job Age. The average age of TA 4 jobs that have been completed within the last 90 days from when the report was generated. 10 Weight %. The weight for grad ing that a department or work center has on the command. 11 Grade. A final score that re presents a department or Work Center’s ability to manage their CSMP. Each Department or Work Center will use the following calculation to determine the score.

p. 751

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-62

(g) Command Level Effectiveness Review (CLER). The Surface Force 3- M Representative will conduct a CLER quarterly and submit to TYCOM for each assigned command. CLER can be found on the COMNAVSURFPAC 3-M SharePoint Site at https://flankspeed.sharepoint-mil.us/sites/CPF-CNSP- HQ/engineering/3M. 19-6.6.6 3-M 365 Program Validation. A program validation will occur on all newly commissioned units that have completed Obligated Work Limiting Date (OWLD) or units that have 6 consecutive months below TYCOM standards on any of the four pillars of performance. A program validation is a more detailed look and validation of the 3-M 365 reports provided to a chain of command on a weekly or monthly basis. The program validation will constitute a “Truth in Reporting” evaluation. All Pillars of Performance are evaluated utilizing the 3-M Assessment Tool. The Command Total Score is a weighted average of the four Pillars of Performance and each of the pillars grading criteria is defined Table 19-6-4 of this chapter. a. Command Total Score. The Command Total Score is calculated utilizing the weighted score of the four Pillars of Performance. Weighting is described in the Table 19-6-4 of this chapter. Pillar of Performance Weight MAR 35% CSMP 35% Spot Check Program 20% KSE 10% Table 19-6-4 b. Maintenance Accomplishment Rate (MAR). The MAR is displayed in the Virtual Snap-Shot Report. During an assessment omitted checks will be reviewed and an Omitted Check Penalty Score is created. The MAR will be reduced by the Omitted Check Penalty Score (represents the amount of maintenance the command failed to schedule) to create the final MAR%. All omitted checks will be categorized into one of the categories identified in Table 19-6-5 of this chapter and weighted according to the category. Omitted Check Penalty Score = Σ ((omitted checks/total number of checks) * Penalty Score). Omitted Category Penalty Check Not Triggered (Globally) 1.4 Check Not Triggered (Local) 1.4 Equipment Not in SKED 0.5 Check Not Tied to State 0.8 Check Marked “N/A” 2.0 Mandatory Related Maintenance 2.0 Active Equipment in IEM 3.0 LU/PM/OT/SU Not Scheduled 1.0

p. 752

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-63

Unauthorized Line-out (MIP) 2.0 Unauthorized Line-out (MRC) 2.0 Unauthorized Line-out (Split-MIP) 2.0 On LOEP but not in Work Center 2.0 Table 19-6-5 19-6.6.7 Spot Check Program. The Spot Check Program score is based on three metrics, identified as ensuring the command is conducting the minimum number of spot checks, the commands spot check average, and the Spot Check Effectiveness Score. The weight for each metric and scoring methodology is defined in Table 19-6-6 of this chapter. Spot Check Program Metric Weight % Minimum Number of Spot Checks 25% Spot Check Average Score 30% Spot Check Efficiency Score 45% Table 19-6-6 a. Minimum Number of Spot Checks. The Virtual Snap-Shot Report provides a summary of the number of Spot Checks conducted per week for the unit. The Score is calculated by using the number of weeks the minimum number of spot checks met divided by 13 (number of weeks in the report). For example, a unit that meets the minimum number of spot checks for 12 of the 13 weeks will receive a score of 92.3%. b. Command Spot Check Average. The averag e grade for each spot c heck conducted at the command over the last 13 weeks. c. Spot Check Effectiveness Score. The assessor will use the 3-M Assessment Tool to randomly select 50% of the command spot checkers. A spot check that the spot checker previously conducted will be chosen and the same spot check reassessed. The Spot Check Delta will be calculated based upon the number of attribute differences between the first spot check and the one reassessed. The total number of attribute discrepancies divided by total number attributes assessed will create the command Spot Check Effectiveness Score. 19-6.6.8 CSMP Management Pillar. The CSMP Pillar measures the command’s ability to manage and maintain a CSMP that accurate reflects the material condition of the ship or unit. There are four metrics used to evaluate the CSMP, identified in Table 19-6-7 of this chapter as Off-Ship CSMP Self-Sufficiency Score, On-Ship CSMP Self-Sufficiency Score, Active TA 4 Work Notification Review, and Completed TA 4 Work Notification Review. CSMP Management Metric Weight % Off-Ship CSMP Self-Sufficiency Score 30% On-Ship CSMP Self-Sufficiency Score 30% Active TA 4 Work Candidate Review 30% Completed TA 4 Work Candidate Review 10%

p. 753

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-64

Table 19-6-7 a. Off-Ship CSMP Self-Sufficiency Score. The score reflects the management of all active TA 1-3 work candidates. This score can be found on the cover page of the CSMP Self-Sufficiency Report generated monthly. b. On-Ship CSMP Self-Sufficiency Score. The score reflects the management of all active TA 4 work candidates. This score can be found on the cover page of the CSMP Self-Sufficiency Report generated monthly. c. Active TA 4 Work Candidate Review. A validation of work candidates within the CSMP. Four Percent of the active TA 4 jobs will be randomly selected to be assessed for accuracy and management. If any block has a “N” result that job is annotated as fail. The Active TA 4 Work Candidate Review score is calculated using (number of jobs that pass / total number jobs inspected). Each job will be evaluated on the following criteria: (1) Job listed in MDS. If the job is list ed on the ship in either OMMS or AWN, enter “Y” in the block. Otherwise enter “N”. (2) Validated in the last 36 months. If the ship’s equipment validation file shows the equipment was validated 36 months prior to job being entered or later than enter a “Y” in the block. If the job was written by an outside activity, enter “NA”. Otherwise enter “N”. (3) Correct parts on order with a valid stat us. If the job does not require parts, enter “NA”. If the correct parts are on order and the parts status is valid, enter “Y”. Otherwise enter “N”. (4) Job still valid. This block determines if the work candidate reflects a material condition that still needs to be corrected. If the job was completed or is written in a way that the job will not be completed, enter a “N”. Otherwise enter “Y”. d. Completed TA 4 Work Candidate Revi ew. A validation of work candidates completed in the last 90 days within the CSMP. Four Percent of the completed TA 4 jobs will be randomly selected to be assessed for accuracy and management. If any block has a “N” result that job is annotated as fail. The Completed TA 4 Work Candidate Review score is calculated using (number of jobs that pass / total number jobs inspected). Each job will be evaluated on the following criteria: (1) Job Completed or another job written to supersede. Used to determine if the job that was closed reflects work that has been completed. If the work the job was written for was complete or another job written to cover the scope of work can be produced, enter a “Y”. Otherwise enter “N”. (2) Parts on Order. If the job was clos ed and there are active parts on order for the job, enter “Y”, Otherwise enter “N”. e. The KSE provides a numerical value to PQS accomplishments, Training, amount of experience in a 3-M position, and unique events for individual sailors. This

p. 754

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023

VI-19-6-65

numerical value is combined at the Work Center, Division, Department, and Command. The KSE model will develop over time and currently consist of PQS and Maintenance University training events. There are two measurements for the KSE with each being equal: (1) PQS Qualifications. A percentage that represents the number of 3-M positions at a command and the number of those positions that are held by a Sailor qualified for the appropriate level. Each 3-M position is weighted depending upon the amount of maintenance performed by a Work Center or Department. (2) Maintenance University Attendance. A percentage that represents the number of 3-M positions and at a command and the number of those positions that are held by a Sailor that has attended the appropriate level of Maintenance University Training. Additionally, an evaluation is conducted based upon the amount of maintenance performed by a Work Center or Department. f. 3-M Surface Force Representative Trai ning. Training conducted by the Surface Force 3-M Representative will satisfy the Maintenance University attendance requirements.

p. 755

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-1 VOLUME VI CHAPTER 19-7 MAINTENANCE DATA SYSTEM AFLOAT AND ASHORE GENERAL REQUIREMENTS REFERENCES. (a) NAVSEAINST 4790.8 - Ships’ Maintenance a nd Material Management (3-M) Manual (b) CNAL/CNAP N432 OMMS-NG Users Guide (c) NAVSEA S9213-45-MAN-000(U) - Naval Nuclear Material Management Manual (d) COMNAVAIRPAC/COMNAVAIRLANTINS T 3500.3 – CVN Readiness and Project Management Strategies for Planning and Execution of Planned Incremental Availabilities (PIA) and Docking Planned Incremental Availabilities (DPIA) (e) Ship’s Force Resource Manual for Aircraft Carrier Availability Planning Management Guide (f) SCLSIS TECHNICA L SPECIFICATION 9090-700 (g) NAVSEA TECHNICAL SPECIFICA TION 9090-310 - Ship Alteration Accomplishment by Installation Teams (h) NAVAIR 00-80T-124 - Airf ield Operations Manual (i) TL130-A1-HBK-010 - MSC Pr ocedures Manual and Handbook (j) COMNAVAIRFORINST 4700.2 - Ship’s Force Resource Manual LISTING OF APPENDICES. A Standard Work Center Codes for Master Job Catalog Items B Job Originator Values C Preparation Instructions Configur ation Change Form (OPNAV 4790/CK) D Preparation Instructions Main tenance Action Form (OPNAV 4790/2K) E Preparation Instructions S upplemental Form (OPNAV 4790/2L) F Shipyard Alteration Certification Letter Example G Ship’s First Endorsement On Alte ration Certification Letter Example H Work Candidate and JSN Log Example 19-7.1 PURPOSE. The Maintenance Data System (MDS), per the requirements of reference (a), provides maintenance and material managers throughout the Navy with the means to plan, acquire, organize, direct, control and evaluate man-power and material resources expended or planned for expenditure in support of maintenance. It allows for information collected by maintenance personnel to be recorded only once, and thereafter, the maintenance database will provide information to all who have a need for it. Organizational (O-level) MDS requirements require the reporting of maintenance actions and configuration changes on all categories of equipment. Reference (b) provides specific guidelines for aircraft carriers. 19-7.2 SPECIFIC REQUIREMENTS AND POLICY. a. Standard Force Work Center Number ing System. The production of automated products in support of the Ships’ Maintenance and Material Management (3-M) system, as well as the various automated maintenance information systems, dictate that a standard force work center (WC) organization be maintained. Commanding

CHAPTER 19-7

p. 756

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-2 Officers (CO) will designate their command organization and applicable WC codes as reflected on the Joint Fleet Maintenance Manual (JFMM) website at https://www.navsea.navy.mil/Home/SUBMEPP/Products/JFMM/ under TYPE Commander (TYCOM) Documents and Forms. Additionally: (1) Commands must not allow the use of any WC codes not authorized by this manual. (2) Requests to change WC designation c odes will not be approved unless they are applicable to all ships of a class and supported by detailed justification. WC change requests are routed to and approved by the U.S. Fleet Forces 3-M Requirements Management Board. This does not affect the re-assignment of a Maintenance Index Page (MIP) to another WC to effect shift of maintenance responsibility. Reference (a) and the feedback section of each TYCOM 3-M subchapter provide guidance for the shift of maintenance responsibility. (3) Small boat, tug, receiver, and service craft managers will use the specific WCs identified on the JFMM website at https://www.navsea.navy.mil/Home/SUBMEPP/Products/JFMM/ for MDS documentation. However, for Planned Maintenance System (PMS) management they may assign a “**00” WC to consolidate Periodic Force Revisions, MIPs, scheduling, etc., (e.g., PY30 through PY84 may consolidate PMS under WC PY00 or PY01-Mechanical, PY02-Electrical, etc.). The Unit Identification Code (UIC) will be that of the parent command. (4) Standard Master Job Catalog (MJC ) assigned WC codes (surface force and submarines only) are reflected in appendix A of this subchapter. b. Job Control Number. The Job Control Nu mber (JCN) is the key identifier for maintenance actions and related supply documents. The JCN is used to identify a maintenance action and to relate all parts used when a ship reports a maintenance action complete. The JCN allows for consolidated reporting of all associated actions taken for the specific maintenance action. The JCN is comprised of three blocks as defined by the ship’s 3-M Manual. (1) Block 1 is the ship’s UIC (5 numeric characters). (2) Block 2 is the WC (4 alphanumer ic characters, left justified). (3) Block 3 is the Job Sequence Number (JSN), usually 4 numeric characters. c. Job Sequence Number. The first position of the JSN is used to identify the tool or organization that created the “Preparation Instructions Maintenance Action Form (OPNAV 4790/2K)” (2-Kilo). If an outside activity creates a job for a ship, e.g., an Intermediate Maintenance Activity (IMA) creates an I-level repair action for a ship, the first character of the JSN will be an “Alpha” character. The control over which organizations or tools “OWN” which “ALPHA” character(s) is provided by the job originator values, appendix B of this subchapter, developed within the Maintenance and Modernization Business Unit and is available through the Naval Sea Logistics Center (NAVSEALOGCEN) web site under Maintenance and Modernization

p. 757

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-3 Business Unit look up tables. The specific value contained within the first position of the JSN provides enhanced data mining capabilities and facilitates data aggregation and analysis. 19-7.3 CONFIGURATION DATA MANAGER. A Configuration Data Manager (CDM) is designated as the control authority for accuracy and completeness of the configuration information for each unit. A CDM may perform this function for multiple units. Prior to MDS delivery, the System Command (SYSCOM) and the delivering activity are responsible for reviewing and ensuring the initial accuracy and completeness of configuration data provided to the CDM. After delivery, which is the initial CDM validation, each unit will maintain and update its configuration data in the Weapons System File through the submission of configuration change reports. 19-7.4 CONFIGURATION WORTHY ITEM. An item is a configuration worthy item if one or more of the following criteria are met: a. The item is procured from an outside activity. b. The item, including software ha s a separate specification. c. The item has a separate drawing. d. The item is a separate line item or s ub line item on a purchase order or contract. e. The item has or requires any form of separate technical or logistics document. f. The item is included in a table of allowance. g. The item is required to support software tracking. 19-7.5 DATABASES. Automated systems have been developed to reduce the administrative workload associated with shipboard reporting of maintenance. These databases provide users with responsive and flexible systems for on-line management of maintenance and to improve the accuracy and timeliness of existing up-line reporting. As Navy Maintenance Management Automated Information System (MMAIS) applications (such as the MDS, Organizational Maintenance Management System Next Generation (OMMS-NG), Automated Work Notification (AWN), Electronic Tag Out and Electronic Shift Operations Management Solution programs) evolve into a connected group of systems, criteria for the management of unit, shipboard and ashore databases and a process for submitting account requests for these Navy MMAIS is established in volume II, part II, chapter 1 of this manual. a. 3-M System Central Database. The NSLC 3-M System Database is the focal point for receipt and distribution of unclassified maintenance and material data. Each reporting activity must ensure that narrative data sent up-line to this database does not contain any classified or Navy Nuclear Propulsion Information (NNPI). b. Configuration Data Managers Database – Open Architecture (CDMD-OA). This database serves as the Navy’s central repository for Ship Configuration and Logistic Support Information System (SCLSIS). Updates via the Automated Shore Interface (ASI) are made available to the ship on a continuous basis and enables the supply department to easily maintain its Consolidated Shipboard Allowance List (COSAL) and order repair parts as an automated process. The CDMD-OA database identifies all the items, components, equipment, subassemblies, assemblies, sub-systems, and

p. 758

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-4 systems requiring integrated logistics support. Automated and non-automated units maintain a copy of their own configuration and logistics database. This database is the same as the unit’s section of the master CDMD-OA database. The two databases are kept in synchronization through the SCLSIS management process. c. Ship Configuration and Logist ics Support Information System (1) The SCLSIS process enables ships to maintain an on-line source of their configuration information allowing them to locate and determine configuration, logistics and supply data associated with all installed equipment. This information can then be used to fill in OPNAV 4790/2K and OPNAV 4790/CK forms without having to refer to a series of manuals or off- line reference books and files. The on-line system also allows maintenance personnel to identify the repair parts associated with the equipment and systems that they are maintaining and to order these parts on-line. Since the configuration data in the OMMS-NG database is provided, shipboard or unit personnel need only select the correct equipment and report the information relevant to the actual maintenance of the equipment. (2) OMMS-NG and Propulsion Organizationa l Maintenance Management System (P-OMMS) have been established as the CVN 3-M Reporting Data System for both topside (OMMS-NG) and propulsion (P-OMMS) systems. Naval Supply Systems Command, Weapons System Support Bechtel Plant Machinery Inc. and the P-OMMS Carrier Application Administrator Guide Insert 1 as per reference (c), govern operation of P-OMMS. (a) The OMMS-NG program will be used as a tool to assist in the management of all shipboard availabilities. 1 Chief of Naval Operations (CNO) availabilities will be planned and executed as per reference (a) and this manual. 2 Non-CNO availabilities a nd Ship’s Force self-repair availabilities will be planned and executed as per references (d) and (e). (b) Reference (a) contains detailed li stings and descriptions of reports available. Depending on the overall maintenance schedule of the ship, reports will be generated as required for usage within the ship. d. Propulsion Organizational Maintenance Mana gement System. Ships equipped with P-OMMS should use reference (c) for P-OMMS operating requirements. e. Air Traffic Control Community Websit e (ATC Web). Per reference (h), all Commander Naval Installations Command (CNIC) Airfield Operations Department maintenance organizations will use the CDM tools for configuration management provided on the ATC Web at: https://atc.navy.mil/atc/home.aspx 19-7.6 DATA. Reported maintenance action information is used for material history purposes and is the basis for the material and logistics support necessary to maintain equipment. Maintenance and material information in numerous reports and formats is available through the

p. 759

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-5 3-M System Database. These reports yield information concerning equipment maintainability, reliability, man-hour expenditures, material usage, costs, and material condition. Refer to reference (a), Section III Chapter 1, for information on obtaining 3-M data reports from NSLC. The accuracy of the ship’s configuration information affects the quality of the logistics support that the ship receives. Inaccurate data will result in the ship being supplied with incorrect component parts or technical documents necessary for the operation and maintenance of equipment. This will ultimately hinder battle damage repair efforts. 19-7.7 REPORTING. Reference (a) requires all afloat activities to report deferred and completed maintenance actions, configuration changes and configuration file corrections. Ashore 3-M WCs are to report corrective maintenance and configuration changes on all installed shipboard-identical equipment and equipment installed in service crafts and boats. One work candidate (OPNAV 4790/2K or equivalent) will be submitted for each job action. Do not bundle multiple pieces of equipment on one work candidate. Reporting methods are as described in paragraph 19-7.7.a. and b of this chapter. NOTE: THE MAINTENANCE PLANNING AND ESTIMATING FORM IS USED ALONG WITH THE OPNAV 4790/2K FOR DEFERRING MAINTENANCE TO BE DONE BY AN IMA. AS THIS DOCUMENT IS PRIMARILY USED BY THE IMA TO SCREEN AND PLAN THE JOB IN DETAIL, REFER TO REFERENCE (A) IF FURTHER INFORMATION IS REQUIRED. a. Non-Automated. Appendix C provide s preparation guidelines for documenting configuration changes (CKs), Appendix D provides preparation guidelines for documenting maintenance actions (2Ks), and Appendix E provides preparation guidelines for providing supplemental information (2Ls). The configuration and maintenance forms used for manual reporting are: (1) Configuration Change Form OPNAV 4790/CK (2) Maintenance Action Form OPNAV 4790/2K (3) Supplemental Form OPNAV 4790/2L (4) Maintenance Planning and Estimation Form OPNAV 4790/2P b. Automated (1) MDS automated data reporting is basi cally the same as in the non-automated 3-M Program. The terms “2K”, “CK” and “Work Candidate” are perpetuated in supporting software even though the paper forms are not filled out (the exception being the OPNAV 4790/2L). Transactions are entered into the computer and up-line reported using applicable software. (2) Software instructions are devel oped and distributed by the 3-M Central Design Activities. Commander Naval Air Forces Atlantic developed an OMMS-NG user guide, reference (b). In the past, this guide has been provided to the other TYCOMs to use and distribute at their discretion. Options are available in the system to print simulated 2Ks, CKs or work candidates when desired. Check the applicable system’s user manual or ON- LINE HELP for additional information.

p. 760

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-6 (3) With an automated information sy stem, the computer will provide on-line access to the data for identifying equipment and ordering parts. When documenting requirements, many of the data elements required for corrective maintenance and configuration change reporting such as the Allowance Parts List (APL), Equipment Identification Code (EIC), equipment name and location, are pre-filled and displayed when the subject equipment is identified. Reference (a), Appendix C provides the data elements and allowed values for each type of reporting. 19-7.8 CONFIGURATION CHANGE FORM OPNAV 4790/CK. a. Ship or Unit Responsibility. To ensure timely receipt of accurate configuration logistics support, COSAL, and supply support data, ship and activity personnel must: (1) Promptly report equipment installed, removed, or modified using an OPNAV 4790/CK. Navy Expeditionary Combat Command (NECC) commands will use OMMS-NG to process CKs. Per reference (h), all CNIC Airfield Operations Department maintenance organizations will use the method developed by Naval Information Warfare Center Atlantic and provided on the ATC Web to process automated CKs. CNIC Port Operations and Security Department maintenance organizations will utilize non-automated process in accordance with this instruction. For temporary issue of equipment exceeding six consecutive months, a CK will be processed by the releasing and gaining commands. (2) Review all configuration change maintenance actions, equipment file corrections and logistics support transactions in a timely manner and transmit them for processing. (3) Process all ASI data promptly by following the SCLSIS Technical Specification and as described in 19-7.8.a.(3)(a) and (b) of this chapter. (a) Surface Force. Surface force ship ASI download, and processing is required when the ASI record count in Revised Alternative Dataflow Website (RADWEB) is 4,500 records for Guided Missile Cruisers, Guided-Missile Destroyers (DDG and DDG 1000), Mine Countermeasure ships, Amphibious Transport Dock ships, Dock Landing Ships, Patrol Craft, or shore facilities. Download and processing for Landing Helicopter Assault, Landing Helicopter Dock, and Amphibious Command ships is required when the ASI record count in RADWEB reaches 10,000 records. Littoral Combat Ships will download and process ASI records monthly, at a minimum. Download and processing of all available ASI records in RADWEB is required when the unit is getting underway for a period of two weeks or longer, monthly at a minimum, or as directed by the TYCOM. Ship’s ASI data, available in RADWEB, will be downloaded and processed into the ship’s MDS within seven days of ASI creation. (b) NECC. NECC requires processing of all ASI data into their automated system promptly following the SCLSIS technical specification. Units

p. 761

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-7 must report configuration changes to COMNECC via the respective Immediate Superior in Command (ISIC) in the form of a completed OPNAV 4790/CK Configuration Change form. Units will conduct up- line reporting at a minimum of twice per month and ASI processing within seven working days of the ASI posting to RADWEB. (c) COMNAVAIRFOR. ASI pro cessing and equipment validation requirements are being conducted by Maintenance Support Center (MSC) personnel only per reference (i). All additional validations conducted by work centers will be coordinated with the MSC for OMMS-NG data updates. (4) Report equipment or component changes detected or accomplished by Ship’s Force, unit personnel, and IMAs. While the equipment technical authority is responsible for reporting Alteration Installation Team installations, the ship or unit is ultimately responsible for its own configuration accuracy. If Alteration Installation Team configuration changes have not been properly reported by the technical authority, the ship or unit is responsible for reporting them. b. Shipyard Installed Alterations. A certification of alteration accomplishment is provided by the Navy Supervising Activity to the recipient ship and the appropriate CDM when the shipyard accomplished the installation. This certification includes the WC JSN assigned to the alteration and the final action taken. The certification will be in the format shown in Appendix F. The ship will endorse the shipyard’s certification letter and forward to the support activity managing the unit’s master Current Ship’s or Shore Maintenance Project (CSMP). The endorsement provides authorization for information transmitted to be processed as completed deferrals in the master CSMP. Refer to Appendix G. This eliminates the need for documenting multiple configuration changes to close the CSMP deferral. c. Alteration or Configuration Change Related Completed Maintenance Action (1) For the purpose of reporting configura tion changes, all alterations, deletions, turn-ins, modifications, additions, installations or replacement of equipment are included in the term “maintenance action” whether the corrective maintenance is performed or not. (2) The responsibility for identifying and reporting configuration changes exists at all levels of the command. For emergent requirements, when an Integrated Logistics Support requirements waiver has been granted by higher authority, and the installing activity has not pre-loaded the data in CDMD-OA, the installing activity will provide the ship or unit with properly filled out and complete OPNAV 4790/CKs and will promptly report the completion of the installation to the CDM. (3) During depot availabilities, the in stalling activity must ensure that configuration changes are promptly and properly reported. Alteration certification letters must be provided to the ship by the depot-level activity. Reporting is required for the: (a) Addition, installation, or ownership changes of any equipment.

p. 762

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-8 (b) Deletion, removal or turn-in of any installed equipment. (c) Replacement or exchange of any equipment. Non-serialized exact replacements do not change configuration records or logistics support and do not require a configuration change to be reported unless required by an alteration directive. Emphasis must be placed on “form, fit, function” equipment. Replacements such as any change in manufacturer, model or part number or serial number requires configuration change reporting. (4) Modification of any installed or in-u se equipment. A modification occurs when a maintenance action alters the design or operating characteristics of the equipment. Equipment is considered modified, and reporting is required when non-standard replacement parts (not identified on the APL or in the technical manual) are used in the accomplishment of the maintenance. A Departure from Specification (DFS) may be required as specified in Volume V, Part I, Chapter 8 of this manual. (5) Relocation of any equipment to a differe nt deck, frame, or compartment or, if it affects ship drawings or other logistic support data. Any other relocation of equipment is considered a maintenance action and requires a completed maintenance action to be reported (for non-automated ships or commands, use the OPNAV 4790/2K Form). (6) Re-designation of any space or compartment. (7) Accomplishment of any alteration. NOTE: FOR NON-AUTOMATED ACTIVITIES, THE OPNAV 4790/CK CONFIGURATION CHANGE FORM IS USED TO REPORT THE ACCOMPLISHMENT OF MAINTENANCE ACTIONS THAT ARE RELATED TO AN ALTERATION OR RESULT IN A CONFIGURATION CHANGE. REFER TO REFERENCE (A), APPENDIX A FOR THE DATA ELEMENTS AND ALLOWED VALUES AND APPENDIX C FOR THE INSTRUCTIONS FOR MANUALLY COMPLETING THE OPNAV 4790/CK. NOTE: REPORTING OF REACTOR PLANT CONFIGURATION CHANGES AND MODIFICATIONS PERFORMED TO EQUIPMENT OR COMPONENTS UNDER NAVSEA (SEA 08) COGNIZANCE ARE REPORTED PER REFERENCES (C) AND (D), AND VOLUME VI, CHAPTER 3 OF THIS MANUAL.

p. 763

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-9 d. Configuration File Corrections. In a ddition to reporting configuration changes because of accomplishment of a maintenance action, it is necessary to correct deficiencies in the configuration file to obtain support for equipment that is onboard but is not identified in the COSAL, or to delete from the COSAL equipment that is not onboard but is supported. There are six categories of actions that must be reported. A configuration change record is submitted to: (1) Correct ship-controlled data elements in an existing record of the ship’s configuration baseline. For additional information concerning the data elements, refer to reference (f), part B. (2) Correct erroneous data previously submitted. (3) Obtain support for equipment that is onboard, but not identified as such. (4) Identify equipment that is supported but is not onboard. (5) Report the turn-in or receipt of Portable Electrical and Electronic Test Equipment. (6) Report the completion of Ship’s For ce equipment configuration validations. NOTE: FOR NON-AUTOMA TED SITES, THE OPNAV 4790/CK IS USED. IF USING THIS FORM REFER TO APPENDIX C FOR FORM PREPARATION INSTRUCTIONS. FOR AUTOMATED SITES, REFER TO THE APPLICABLE SYSTEM’S USER MANUALS OR GUIDES FOR THE PROCEDURES USED TO CHANGE, ADD, OR DELETE FILE INFORMATION. 19-7.9 MAINTENANCE ACTION FORM OPNAV 4790/2K OR WORK CANDIDATE. a. When Required. A 4790/2K or fleet approved equivalent is required: (1) To document a material deficiency. (2) For a class maintenance plan maintenance action. (3) When ordering parts or materials. (4) For Selected Level Reporting (SLR). (5) When requesting special support or test equipment (hydrostatic pumps, rigging equipment, etc.). (6) For documenting a completed maintenance action (corrective or planned). (7) When submitting a Casualty Report (CASREP). (8) When submitting a temporary DFS. (9) For documenting the results of an inspection or assessment. (10) For installation of a Ship Alteration (SA). (11) For support services duri ng a maintenance availability. (12) When requesting help from outside activities (technical assistance, repair, calibration, etc.).

p. 764

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-10 b. Work Candidate Documentation (1) Generic Requirements (a) Problem Description and Recommended Solution. Problem description must give a detailed description of what the problem is and why it is being deferred. The recommended solution will describe, in detail, what and who will be required to correct the deferred maintenance. For CVN ships, the noun name, serial number, Positional Reference Identification, and location of the equipment shall be included in the problem description block for all jobs written for outside activity maintenance level to ease the TYCOM’s screening, validation and brokering process. (b) Maintenance Level Assignment. The maintenance level assigned to the work candidate will match the maintenance activity requirements of the problem description and recommended solution. Maintenance level assignment is sometimes referred to as the “level of effort”. (c) First and Second Contact. The firs t contact field will contain the name of the senior person engaged in the maintenance action. The second contact field will contain the name of the supervisor of the first contact or maintenance person. (d) Work Candidate or CSMP Summary. The work candidate summary is a condensed summary of the problem. It will not contain the recommended solution, the equipment name, identification or serial number, or compartment location. (e) Deadline Date. All work candidate s which require assistance from a type 2 or 3 maintenance activity will have a valid deadline date assigned. If a deadline date is used on a Type 1 Or Type 4 work candidate, the deadline date will be a valid date. (f) Priority Code. Reference (a), appendix C contains guidance for assigning appropriate priority codes. (g) Configuration. Work candidates mu st be written against the correct ship’s configuration item. (h) Equipment Status Code. The Equipment Status Code and Equipment Operational Code (EOC) will reflect the actual condition of the equipment at the time the work candidate is created. The Equipment Status Code from OMMS-NG units is used to compute the EOC, which is a major factor in determining the mission operational capabilities of the ship. (i) Safety Hazard Code. When used, the Safety Hazard Code must have a supporting write up in the Problem Description field. The Safety Hazard Code is used in determining the mission operational capabilities of the ship, as reported off ship to Defense Readiness Reporting System-Navy.

p. 765

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-11 (j) Deferral Reason Code. The Deferral Reason Code must have a supporting write up in the Recommended Solution field. For CVN ships, use the local TYCOM guidance during selecting the correct deferral reason to use. (k) For CVN ships, all Ship’s Force written JSNs with originating work center maintenance level shall be resolved within 180 days of creation with the exemption of JSNs when awaiting for outstanding parts. (2) Submarine Specific Requirements. Cla ssified information or NNPI is not to be included on any work candidate entered in OMMS-NG. P-OMMS will be utilized for NNPI work candidates. Should classified information be required to adequately document a material deficiency, the following action will be taken: (a) Create a job in OMMS-NG. (b) For the Block 35 narrative (pr oblem description), indicate the unclassified summary and Date Time Group of a classified message that fully describes the problem. (c) Transmit a classified message to the appropriate activities to supplement the work candidate. (3) Naval Air Force Specific Requirement s. Certain work candidates will be submitted to be accomplished by the ship’s repair work centers. Those work candidates will initially be entered by the parent Reactor Department work center into P-OMMS using the correct configuration item and assigned as O- Level (type 4B). Once the work candidate has been approved at ship level in P-OMMS: (a) The P-OMMS coordinator will manually enter jobs into TOPSIDE OMMS-NG using APL or XRIC (XCOMPARTMNT, XSYSTEMITEM, XSERVICEITM, etc.) as appropriate for the Reactor Department work center requesting the work. (b) The P-OMMS coordinator will document the TOPSIDE OMMS-NG JSN at the beginning of the work candidate problem description field in P-OMMS in following format: OMMS: JSN. Example: OMMS:RC011324. (A “blank space” must be placed after the JSN). (c) The P-OMMS coordinator will document the P-OMMS JSN at the beginning of the work candidate problem description field in Hull Mechanical and Electrical (TOPSIDE OMMS in the following format: P-OMMS:JSN. Example: P-OMMS:RC01002A. (A “blank space” must be placed after the JSN). (d) Upon completion of repairs, the repair WC will document their man- hours and close the work candidate in TOPSIDE OMMS-NG.

p. 766

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-12 (e) The P-OMMS coordinator will approve the completed job in TOPSIDE OMMS-NG at the Department Head level. (f) The P-OMMS coordinator or originating WC will close the job in P- OMMS. (g) The P-OMMS coordinator will send status of the Repair Department work candidates in TOPSIDE OMMS-NG to Reactor Department at least weekly. (h) Only the P-OMMS coordinator and assistants will write Reactor Department jobs for repair WCs in TOPSIDE OMMS-NG. (i) Those work candidates written fo r Ship’s Force Organizational level requires Repair Officer’s screening and approval prior to assignment of shop responsible as lead and assist work center. Ships Force will follow reference (j) for the execution of JSN screening and approval. (j) When generating work candidate for galley and laundry equipment, the repair work center responsible for the corrective and planned maintenance of the equipment will be responsible in documenting the JSN under the repair work center. The galley watch captains and laundry supervisors can contact the repair work center via ship’s Trouble Call program to submit the trouble calls. (4) Nuclear Command, Control, and Co mmunication Specific Requirements. Nuclear Command, Control, and Communication Navy system information is classified, and requires protection not afforded by unclassified maintenance data systems. Classified information documenting failure or status of Nuclear Command, Control, and Communication Navy equipment or NNPI is not to be included on any work candidate entered in MDS. Should this information be required to adequately document a material deficiency, the following action will be taken: (a) Create a work candidate in MDS. (b) For the Block 35 narrative (pr oblem description), indicate the unclassified summary and Date Time Group of a classified message that fully describes the problem. (c) Transmit a classified message to the appropriate activities to supplement the work candidate.

p. 767

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-13 (5) CNIC Specific Requirements. Per reference (h), Airfield Operations Department work candidates will be submitted and tracked using the Maintenance Data Analysis Tool (MDAT) provided on the ATC Web. Port operations and security department work candidates will utilize the non- automated process in accordance with this instruction. c. Deferred Maintenance Action. (1) Criteria. A deferred maintenance act ion is a maintenance requirement that meets one or more of the following criteria: (a) Requires assistance from an activity external to the ship to accomplish (for example, IMA, depot, technical support unit, etc.), or is a Ship’s Force job requiring assistance from outside the originating WC (for example parts required). (b) Is not expected to be accomplishe d by Ship’s Force within seven days. (c) Is an uncorrected deficiency reported by Board of Inspection and Survey (INSURV); refer to Section II Chapter 1 of reference (a) or other inspecting activity (CMAT, C5RA, TSRA, OSAR, MRA etc.). (d) Is required to correct a condition that has caused or has the potential to cause injury to personnel or damage to material. (e) Repair Parts are required. NOTE: FOR NON-AUTOMATED SITE S, THE OPNAV 4790/2K IS USED TO REPORT A DEFERRED MAINTENANCE ACTION. REFER TO APPENDIX D FOR MANUALLY COMPLETING THE 4790/2K. FOR AUTOMATED SITES, REFER TO THE APPLICABLE SYSTEM’S USER MANUALS AND GUIDES. (2) NECC Unique Requirements and Po licy. Whenever creating a deferred maintenance action ensure the blocks listed in paragraph 19-7.9.c.(5)(a) through (c) of this chapter contain the following information. (a) Block 6: The When Discovered Co de identifies when the need for maintenance was discovered. Typically, deferred maintenance actions are written to document defects or failures on the command’s equipment. However, deferred maintenance actions are also required to procure materials in support of PMS. To assist in data collection, all deferred maintenance actions generated in support of PMS will use option code “9 -No Failure, PMS Accomplishment Only”. The correct use of this field will greatly enhance NECC’s ability to distinguish between maintenance actions that are written due to equipment defects or failures and those written to procure materials in support of PMS. (b) Block 35: Will begin with the serial number of the equipment and a complete description of the malfunction. Next a detailed statement stating the required actions to correct the malfunction. For Civil

p. 768

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-14 Engineering Support Equipment, an additional entry of miles or hours of the equipment at the time of failure will be documented. (c) Block 37: Will be a short description of the problem. (3) CNIC Unique Requirements and Policy. All deferred maintenance actions be accurately documented, in MDAT by Airfield Operations Department, by approved non-automated means by Port Operations and Security departments and reported with a CASREP when applicable per reference (a). d. Completed Maintenance Action. The ship is responsible for submitting a completed maintenance action to report: (1) Completion of maintenance actions previ ously deferred. If no further work is required by Ship’s Force, higher authority may allow an outside activity to report its completion. This is referred to as an “automatic close-out”. (2) Completion of maintenance act ions not previously deferred. (3) Completion of maintenance actions for SLR equipment. See reference (a) for the definition of SLR. (4) Accomplishment of an alteration, i. e., SA, Ordnance Alteration (OA), Field Change (FC), etc. Policy and implementation are provided in reference (g). (5) Addition of any new equipment or system. (6) Reporting the relocation of any equipment. (7) Reporting the replacement or exchange of any equipment. (8) Deletion, removal or turn-in of any installed equipment. (9) Completion of maintenance actions cons idered significant for material history purposes such as: (a) Maintenance actions that alter th e design or operating characteristics of an equipment or system. (b) Other maintenance actions or condi tions that are considered significant for future reference purposes. (10) Accomplishment of mainte nance that required parts. NOTE: FOR NON-AUTOMATED SITE S, THE OPNAV 4790/2K IS USED TO REPORT A COMPLETED MAINTENANCE ACTION. REFER TO REFERENCE (A), APPENDIX C FOR THE DATA ELEMENTS AND ALLOWED VALUES AND APPENDIX D FOR THE INSTRUCTIONS FOR MANUALLY COMPLETING AN OPNAV 4790/2K.

p. 769

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-15 e. Documenting Changes. Documenting change s, additions, or deletions to previously reported maintenance actions. Any information previously reported on a deferred maintenance action, except for the JCN and the deferral date, can be added, deleted, or changed. Care should be taken not to make changes to jobs that have already been reported up-line. This will require additional screening by outside activities. Automated sites may have additional fields that cannot be modified. Deletion once a JCN or JSN is created is forbidden. Once a JSN is created, completion, cancelation, or pass to history is the only option. Closing or cancelling a JSN using a closure or cancel codes of 4, 5 or 6 will freeze Validation, Screening and Brokering (VSB). Do not use those 4, 5 or 6 codes when closing or canceling jobs. NOTE: ONCE A JCN DEFERRAL HAS BEEN PROCESSED, IT REMAINS ON EACH PROCESSING ACTIVITY’S CSMP (I.E., SHIP’S FORCE OMMS, THE ISIC, SUBMARINE SQUADRON SUPPORT UNIT OR REGIONAL SUPPORT GROUP MAINTENANCE RESOURCE MANAGEMENT SYSTEM (MRMS) OR REGIONAL MAINTENANCE AUTOMATED INFORMATION SYSTEM (RMAIS), THE TYCOM MASTER CSMP AND THE OPEN ARCHITECTURAL RETRIEVAL SYSTEM (OARS) DATABASE) UNTIL THE COMPLETED DEFERRAL IS PROCESSED. WHEN THE 3-M COORDINATOR (3MC), ISIC, REGIONAL MAINTENANCE CENTER (RMC) MAINTENANCE DOCUMENT CONTROL OFFICE, OR AFLOAT READINESS REPORTING SYSTEM (ARRS) SHIP SUPERVISOR PERSONNEL “DELETE OR PURGE”, THE JCN WILL REMAIN ON ALL OTHER AFFECTED CSMPS IF THE REPORTING COMPLETION OR CANCELLATION IS NOT REPORTED UP-LINE. 19-7.10 CURRENT SHIP’S AND STATION’S MAINTENANCE PROJECT. The purpose of the CSMP is to provide shipboard and ashore maintenance managers with a consolidated listing of deferred maintenance that reflects the material condition of the ship or station. Each WC is to maintain a current paper CSMP and Repair Parts Petty Officer Log, ensuring it reflects the actual condition of a WC’s spaces and outstanding maintenance, if the data is not available in OMMS or AWN. The master CSMP is held in the shore MDS (i.e., RMAIS (being replaced by VSB)). For CNIC CSMP management, Airfield Operations department will utilize MDAT per reference (h), Port Operations and Security departments will utilize approved non-automated means. a. CSMP Content. The CSMP includes, but is not limited to: (1) The “automated CSMP” is the computer-produced listing of deferred maintenance and alterations that have been identified through the submission of OPNAV 4790 documents. In addition to the maintenance actions added by Ship’s Force, outside activities may request that they be allowed to add items to the CSMP. (2) The suspense file documents maintenance items that have been submitted but are not reflected in CSMP reports or have not appeared in the MDS Transaction and Error Identification Report as having been accepted.

p. 770

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-16 (3) The work candidate or JSN Log whic h is the WC’s list of all material discrepancies to be corrected either by Ship’s Force or an outside activity. All non-automated units or ships use work candidate or JSN logs. The Work Center Supervisor (WCS) will maintain a work candidate or JSN Log using the format as shown in appendix H. The UIC and WC Code must be entered on each page of the log. A separate JSN for each maintenance action reported from that WC must be assigned. The JSNs must be in sequential order. The WCS will ensure that the JCN assigned to a specific maintenance action is reflected on any material request associated with that maintenance action. b. Surface Force Unique Requirements. (1) Surface Force ship unique requirements and policy for bulk loads and database transfer are as follows. A bulk load is a CSMP load (work candidate(s) provided as an external file to be loaded into the ship’s CSMP) produced by any outside activity (e.g., Combat Systems, Command, Control, Communication, Computer Readiness Assessment (CSRA), INSURV, SURFPAC Enhanced Capability to Assess Programs (SECAP), or Total Ship Readiness Assessment (TSRA). COMNAVSURFPAC or COMNAVSURFLANT N43 3-M will review and approve all bulk loads prior to being loaded into any afloat or ashore database. COMNAVSURFPAC or COMNAVSURFLANT N43 3-M is the only authorizing activity for bulk load reviews. Commands will not transfer, copy, or allow the direct access to or copying of the MDS database by any outside activity without COMNAVSURFPAC or COMNAVSURFLANT N43 3-M written permission. (2) CSMP management. CSMP is the pr imary source for documenting material discrepancies, ordering repair parts, and planning maintenance for the unit, whether it is being accomplished by Ship’s Force or by an outside agency. CSMP fundamentals are delineated below: (a) Priority for the work candidate will be determined based upon the material condition and current situation of the command vice casualty reporting requirements. All priority level changes or any updates to the work candidates will be documented in block 35 “recommended solution” of the work candidate. Every work candidate starts with a priority level of four “DESIRABLE”. Priority of work candidates will be determined using the guidance in Figure A-1 of reference (c). During the review and approval process, the Division Officer (DIVO) or Leading Chief Petty Officer (LCPO) may raise the priority to a three “HIGHLY DESIRABLE” but no higher. The next level of review and approval is the Department Head (DH) who may raise the priority level to two “ESSENTIAL” but no higher. Priority level one “MANDATORY” is assignable by the 3MC upon direction of the unit CO. (b) Work Candidate Review. The DH will ensure all work candidates in the departmental CSMP are reviewed and have an updated status of

p. 771

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-17 current actions being taken in block 35 or comment section of AWN (examples: availability brokered to, parts status, troubleshooting efforts, date scheduled for organizational work or any detail that will inform Chain Of Command (CoC) with the current status) on or before 90 days and every 90 days thereafter; utilize the weekly 3MC CSMP Ad Hoc query to identify JSNs that have not been updated. The specific detailed update can be entered by the LCPO or DIVO and normal approval of the updates is required. If any Type Availability (TA) TA-4 work candidates exceed unit’s capability or capacity, the TA code will be changed to TA-2. Enter “Exceeds unit’s capability or capacity” into block 35. (c) CSMP will reflect the actual mate rial condition and workload of the unit. (d) CSMP quality control is the daily responsibility of the Leading Petty Officer, LCPO, DIVO, and DH via the review and approval process. (e) Do not close or cancel jobs based on age. If valid, jobs will remain on CSMP. (f) The CoC must review work candi dates before the Planning Board for Maintenance. Incorporate departmental work and maintenance plans into CNO availabilities and Continuous Maintenance Availability planning. (g) Commands will review the CSMP to ensure work candidates written for corrosion control, environmental, or zone or space inspections contain “C”, “E”, or “Z” in Block 10, respectively. (h) Up-line Reporting. Up-line reportin g via revised alternative data flow website (RADWEB) is required at a minimum of twice per calendar week. Platforms on Automated Work Network (AWN), units will verify twice a week that automatic data transfer is occurring and “RSupply” batch jobs (JSL341/340) are running and executed. c. Naval Air Force Unique Requirements. Aircraft Carrier unique requirements and policy for bulk loads and database transfer are as follows. (1) A bulk load is a CSMP load (work candi date(s) provided as an external file to be loaded into the ship’s CSMP) produced by any outside activity (e.g., CSRA, INSURV, or Inspections, Certifications, Assessments and Assist Visits. (2) COMNAVAIRLANT or COMNAVAI RPAC N432 MDS managers will review and approve all bulk loads prior to being loaded into any afloat or ashore database. (3) COMNAVAIRLANT or COMNAVAIRPAC N432 MDS managers are the only authorizing activities for bulk load reviews.

p. 772

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-18 (4) CSMP management. CSMP is the primary source for documenting material discrepancies, ordering repair parts, and planning maintenance for the unit, whether it is being accomplished by Ship’s Force or by an outside agency. CSMP fundamentals are delineated below: (a) Priority for the work candidate will be determined based upon the material condition and current situation of the command vice casualty reporting requirements. All priority level changes or any updates to the work candidates will be documented in block 35 “recommended solution” of the work candidate. Every work candidate starts with a priority level of four “DESIRABLE”. Priority of work candidates will be determined using the guidance in reference (c), figure A-1. During the review and approval process, the DIVO or LCPO may raise the priority to a three “HIGHLY DESIRABLE” but no higher. The next level of review and approval is the DH who may raise the priority level to two “ESSENTIAL” but no higher. Priority level one “MANDATORY” is assignable by the 3MC upon direction of the unit CO. The verbiage “CASREP” will be annotated at the beginning of the recommended solution block when priority is raised to HIGHLY DESIRABLE or above. (b) Work Candidate Review. The DH will ensure all work candidates in the departmental CSMP are reviewed on or before 90 days and every 90 days thereafter; utilize the weekly 3MC CSMP Ad Hoc query to identify JSNs that have not been updated. All ship’s force written JSNs with “Originating Work Center” maintenance level shall be resolved within 180 days of creation with the exemption of JSNs that are awaiting for outstanding parts. (c) Review and Approval Process. The DH will ensure newly written candidates are approved at DH level within seven days of creation. All JSN intended for Organizational level will need to be screened and approved by Repair Officer prior to upline off-ship. All JSN intended for Outside Activity repairs will need to be screened and approved by Ship’s Maintenance Manager prior to SHIP level of approval and upline. Ship’s force will not make any changes any JSN that were already brokered by TYCOM to a certain availabilities. If needed, changes need to be coordinated with the assigned Automated Work Package manager Maintenance Project Manager. Refer to reference (j) for details. (5) Repair Officer is responsible in ma intaining the ship repair availability scheduling. (6) Commands will not transfer, copy, or allo w the direct access to or copying of the MDS database by any outside activity without COMNAVAIRLANT or COMNAVAIRPAC N432 MDS manager written permission.

p. 773

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-19 (7) There will be no paper Automated Work Requests given to the ship by any external source for entry into the CSMP. (8) 3-M PQS qualified maintenance personnel will be granted OMMS-NG access for the purpose of adding, modifying, and completing a work candidate within the respective WCs. d. Submarine Force Unique Requirements. S ubmarines operate in varied environments and circumstances, which may result in a ship’s inability to comply with reference (a) and certain paragraphs of this subchapter. Paragraphs 19-7.10.d.(1) through (6) of this chapter provides amplifying direction. (1) The 3MC will perform CSMP up-lines as follows: (a) Whenever a CASREP is transmitted, the corresponding CSMP JSN must be up-lined at the same time. (b) Whenever a job is walked-t hrough during an availability, the corresponding CSMP JSN must be up-lined at the same time. (c) OMMS-NG up-lines will be perf ormed a minimum of once a week regardless of availability or operational status, this includes running the “inactivate” and “archive” functions. (d) P-OMMS-NG up-lines will be pe rformed a minimum of monthly regardless of availability or operational status, this includes running the inactivate and archive functions. (2) For OMMS-NG only, CSMP up-line files (.uru) must be accompanied by the corresponding parts utilization files (.pts). The Maintenance Document Control Office will reject any .uru up-line file that does not include the corresponding .pts file. (3) The CSMP will not be replaced with any software required for use by a repair activity to track material condition of the ship or ongoing work. When use of these systems is required, the CSMP will be maintained parallel to the other required system. (4) As the Master CSMP resides asho re and is maintained by the local maintenance support activity, the shipboard CSMP and shore CSMP must be reconciled quarterly. (5) The 3MC will ensure all documented ma terial or sound discrepancies or work candidates are assigned to a PMS WC and tracked to completion. (6) To ensure proper documentation of mate rial deficiencies that are within the Submarine Safety (SUBSAFE), Fly-by-Wire (FBW), or Scope of Certification (SOC) boundaries, the following guidance is provided. Annotate all material deficiencies that are within the SUBSAFE, FBW or SOC boundaries in the CSMP using the Special Requirements Tab in OMMS-NG or RMAIS as appropriate. Additionally, SUBSAFE, FBW or SOC must be entered into the beginning of the CSMP Summary.

p. 774

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-20 (a) The maintenance brokers will ensure the SUBSAFE, FBW and SOC work candidates are appropriately marked in RMAIS following up- lines. (b) ISICs will verify the ships are appropriately using the Special Requirements Tab to annotate the SUBSAFE, FBW and SOC deficiencies in the CSMP during the 3-M Inspection using Subchapter 19F, Appendix B, Section IV-A2, CSMP Validity Factor form. e. Unit or Ship Use. The CSMP is utilized as follows: (1) The ship’s CO and Executive Officer use CSMP reports to: (a) Determine the effects of deferred maintenance that limit the ship’s capability. (b) Evaluate potential CASREP situations. (c) Evaluate the material co ndition of each individual WC. (d) Determine what kind and how much outside assistance is needed to complete the deferred maintenance. (e) Evaluate weaknesses or shortages in skill levels or resources required to do the deferred maintenance. (f) Determine the type of upkeep and propulsion plant shutdown requirements needed for the accomplishment of maintenance. (2) The DH or DIVO uses the CSMP reports for the same information as the CO and Executive Officer but are primarily interested in their specific department or division rather than the entire ship. CSMP reports can assist them in determining plans of action for accomplishing the deferred maintenance and evaluating the performance of WCSs in the management of their WCs. (3) The WCS uses the CSMP reports for managing WC maintenance. Each WCS is responsible for ensuring that the CSMP accurately describes the material condition of the WC. NECC WCSs are responsible for the review of their CSMP on a weekly basis, ensuring that completed jobs are closed, new equipment failures are properly documented and that materials required to repair or maintain equipment are on order. (4) NECC requires that any open job in th e CSMP that exceeds six months must be researched by the CoC. The appropriate actions will be taken to expedite the repair or replacement of the equipment. Any job that exceeds six months and cannot be resolved at the command level will be forwarded to the ISIC for assistance and direction. (5) CNIC requires any open corrective action item exceeding six months that impacts mission capability and cannot be resolved at the command level, or supported by CASREP, be reported to the appropriate ISIC or regional commander for assistance and direction to expedite resolution.

p. 775

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-21 f. CSMP Reports. Current automated syst ems produce both summary and detail printed CSMP reports. Since software applications may differ, check the applicable system’s user manuals and guides for available report formats. CSMP reports are produced in a variety of options with selected sequences and totals. Summary reports are single- line summaries of the uncompleted deferred maintenance actions in the CSMP and are available by type of availability, WC, INSURV number, safety-related deficiencies and EIC. Detail reports show the complete record for these actions. CSMP detail reports can be sorted by JCN, EIC or Ship(s) Work Authorization Boundary (SWAB). (1) Summary Reports. CSMP Report 1 (pr oduced in seven options). Each option presents a single line summary of each non-completed deferred maintenance action: (a) Summary by Type Availability is provided on an as requested basis. This report provides a single-line description of each deferred maintenance action sequenced by ship, WC, type availability and JSN. A WC summary line on the CSMP provides the number of man-hours by IMA, depot, and Ship’s Force. At the end of the report is a summary of estimated man-hours by type availability for each WC and department and a line for the ship total. (b) Summary by WC, available on an as requested basis, contains the same information as option (a), but sorted by ship, WC and JSN. (c) Summary by INSURV Number is provided routinely to the ship as directed by TYCOM after an INSURV inspection. It is restricted to only those items on the CSMP that have been assigned an INSURV number. Sequenced by ship, INSURV number, WC and JSN. It contains similar information to option (a). Man-hour estimates and summaries are not shown. (d) Summary by Safety Related Defici encies, available on an as requested basis, is restricted to only those actions listed on the CSMP which have been assigned a safety hazard code. Sequenced by ship, WC, type availability and JSN, it contains the same information as option (a) for safety related deferred maintenance actions. No man-hour estimates, summaries or list of additions and deletions are shown. (e) Summary by EIC, available on an as requested basis, is sequenced by ship, EIC, WC, JSN and contains the same information as option (a). This report includes man-hour estimates summarized in EIC sequence at the system level. (f) Summary by INSURV Number and Type Availability, available on an as requested basis, contains the same information as option (c) sorted in ship, INSURV number and type of availability sequence. (g) Summary by SWAB or Ships Wo rk List Item Number (SWLIN), available on an as requested basis, contains the same information as option (a) including only those JCNs that have a SWAB or SWLIN

p. 776

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-22 assigned. The information is sorted by ship, SWAB or SWLIN and WC or JSN. (2) Detailed Reports. CSMP Report 2 (produced in three options). Each option presents detailed information regarding the ship’s deferred maintenance. (a) Detail Listing by JCN displays a de tailed record of the ship’s deferred maintenance by JSN within the WC. If a deferred maintenance action has been documented as a safety hazard, “SAF HAZ” appears in the comment column. If the maintenance action has been assigned an INSURV Number, this number will appear in the “comment” column. (b) Detail Listing by SWAB displays a detailed record of the ship’s deferred maintenance by SWAB. If a deferred maintenance action has been documented as a safety hazard, the words “SAF HAZ” appear in the “comment” column. If the maintenance action has been assigned an INSURV Number, this number will appear in the “comment” column. (c) Detail Listing by EIC is sequenced by JSN within a WC within an EIC.

p. 777

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-A-1 APPENDIX A APPENDIX A STANDARD WORK CENTER CODES FOR MASTER JOB CATALOG ITEMS Submarine Forces: Description Code Overhaul, SRA, Baseline Routines EXSY NAVSEA Issued Ship Alterations *XSA NSWCPD Machinery Alteration *XMA NAVSEA Issued Field Changes *XFC NAVSEA Issued Engineering Changes *XEC NAVSEA Issued (TYCOM Managed) Temporary Alterations **TA TYCOM Issued Alterations *XTY DIRSSP Issued Strategic Systems Program Alterations (SSBN, SSGN) **SP TYCOM Directed and Funded Grooms and Certifications **TY Submarine Extended Operating Cycle PMRs **JC Test and Measurement System Repair Routines **CR MJC Service Routines **MC *=Department **=Department or Division Surface Forces: Description Code Overhaul, SRA, Baseline Routines EXSY NAVSEA and TYCOM Issued Alterations EXSA Engineering Cycle **EC First character identifies the requesting Department. Second character identifies the Administrative Procedure (“X”). Third character indicates catalog routine (“C”). Last character denotes the maintenance source code as: A - Planned Maintenance Subsystem B - Unassigned C - Corrective D - Upkeep E - Miscellaneous

p. 778

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-B-1 APPENDIX B APPENDIX B JOB ORIGINATOR VALUES JOB ORIGINATOR OBS BRKR SEQ SORT CODE FG FG JOB ORIGINATOR TEXT SHORT TEXT 25 1 A 0 0 ACCCIT (AIR)/DC (SURF) TSRA HM&E (SUBS) LOCAL TYCOM 26 7 B 0 0 C5RA (AIR) CSAT/MAPAI (SUBS); CBR INSPECTION (SURF) LOCAL TYCOM 27 2 C 0 0 LCS/DDG 1000 (SURF) TSRA COMBAT SYSTEMS (SUBS) LOCAL TYCOM 28 8 D 0 0 CABLEWAY (AIR) I-LVL DEPARTURE (S UBS);Self-Assessment & Groom Training (SURF) LOCAL TYCOM 42 42 E 0 0 ELEVATOR SUPPORT UNIT (AIR);SSRNM (SURF) LOCAL TYCOM 46 46 F 0 0 INSURV (NATIONAL) INSURV-N 29 9 G 0 0 ERAT, IRAT, TMIT (SURF) LOCAL TYCOM 30 10 H 0 0 EQOL/FSL (AIR); 2K-FTA (SURF) LOCAL TYCOM 43 43 I 0 0 NAVSEALOGCEN RESERVED NAVSEALOGCEN 37 17 J 0 0 POET’S (AIR); ICAS (SURF) LOCAL TYCOM 31 11 K 0 0 TSRA/CSC C5RA (SURF) LOCAL TYCOM 40 40 L 0 0 PORT ENGINEER WRITTEN JSNs NATIONAL 39 39 M 0 0 MicroPMR (MPMR)/MSWP (SUB) LOCAL TYCOM 41 41 N 0 0 CORROSION CONTROL (SURF) LOCAL TYCOM 32 12 P 0 0 PEPSI (AIR)/SECAP (SURF); PMT OSAR (SUBS) LOCAL TYCOM 15 15 Q 0 1 CREATED BY RMAIS (NATIONAL) RMAIS-N 16 16 R 0 0 INSURV (NATIONAL) INSURV-N 33 13 S 0 0 CEMAT (AIR) SHIP SEMAT (SURF); SAIL DEFICIENCIES (SUBS) LOCAL TYCOM 45 45 T 0 0 TYCOM (AIR, SURF, SUBS) LOCAL TYCOM 38 18 U 0 0 TOOLSET FOR INSPECTIONS (BOILERS, DIESELS, ETC.) OPNAVINST 9220.3 44 6 V 0 0 ALRE ICAV (AIR), UNSCHEDULED INSPECTION/ASSESSMENT TASKS (SURF) LOCAL TYCOM 34 14 W 0 0 BAWP (AIR)/ICMP; IMF TSRA; ICAS; RMC TSRA (SURF) LOCAL TYCOM 35 15 X 0 0 BAWP (AIR) LOCAL TYCOM 36 16 Y 0 0 AIR/MST (SURF); BAWP (AIR) LOCAL TYCOM 23 5 Z 0 0 MST/CLASS MAINTENANCE PLANS (SURF) CLASS MAINTENANCE PLANS (NATIONAL) MST/M&SWP LOCAL TYCOM 999,999 999,999 ? 0 0 Invalid Invalid

p. 779

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-C-1 APPENDIX C APPENDIX C PREPARATION INSTRUCTIONS CONFIGURATION CHANGE FORM (OPNAV 4790/CK) 1. CONFIGURATION CHANGE FORM (OPNAV 4790/CK) a. The OPNAV 4790/CK Form is used to re port completion (or partial completion) of alterations, maintenance actions that resulted in a configuration change and to correct discrepancies and errors in the configuration files. b. Three blocks at the top of the form are us ed to specify what type of action is being reported (a configuration file correction “CONFIG FILE CORR” a completed maintenance action that had no prior deferral “COMP M/A NO DEFL” and a completed deferred maintenance action “COMP DEFL”). The rest of the form is separated into four sections. c. The OPNAV 4790/CK is available to download in PDF format at: https://navalforms.documentservices.dla.mil/formsDir/_OPNAV_4790_CK_540.pdf d. The OPNAV 4790/CK Continuation form is av ailable to download in .pdf format at https://navalforms.documentservices.dla.mil/formsDir/_OPNAV_4790_CK_C_3277. pdf 1.1 Section I - Job Identification: This section identifies the system or equipment involved in the configuration action. If a component or sub-unit is being reported, the Job Identification in this section must be that of the highest assembly. Components and sub-units are reported in Section III. 1.2 Section II - Job Description and Remarks: This section contains remarks relating to the accomplishment of the action. In some cases, an alteration directive will specify that certain information be documented. 1.3 Section III - Component Configuration Change Identification: This section contains information on the component(s) affected by the maintenance (configuration change) action. The Job Identification Level (section I) will be completed to the highest assembly directly affected by the change. The sub-units (components) are reported to the individual Allowance Parts List (APL) level in Section III. An OPNAV 4790/CK allows only one component (sub- unit) to be reported per form. When multiple sub-units need to be reported, “CONTINUATION SHEET(s)” OPNAV 4790/CK(C), that can report up to four components per Form can be attached. The same Job Control Number (JCN) as assigned to the higher level assembly maintenance action recorded in SECTION I is to be continued on each component reported. 1.4 Section IV - Special Purpose: This section is filled in onboard, with the exception of Block 30 (is no longer applicable). NOTE: EXAMPLES OF COMPLETED OPNAV 4790/CK FORMS FOR VARIOUS REPORTING SITUATIONS CAN BE FOUND AT THE END OF THIS APPENDIX AS FIGURES G1 THROUGH G8.

p. 780

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-C-2 APPENDIX C 2. PROCEDURES FOR REPORTING CONFIGURATION CHANGE (OPNAV 4790/CK FORM) - Place an “X” in the appropriate block at top of form to indicate the type of action being reported, “COMP M/A NO DEFL” or “COMP DEFL”. 2.1 Section I - Job Identification. 2.1.1 Job Control Number (Blocks 1 - 3): a. Block 1 - UIC: Enter the Unit Identificat ion Code (UIC) of the activity receiving the maintenance action. b. Block 2 - WORK CENTER: Enter the code of the Work Center responsible for the equipment. For Ships, a four-position Work Center code will be entered. For repair departments of IMAs, RMCs and other IMAs, a three-digit code will be entered. The three-digit code is entered left-to-right leaving the right most position blank. Appendix C of this chapter provides a listing of authorized Work Center codes (Submarine Tenders have been converted to a four position Work Center code). c. Block 3 - JOB SEQ. NO. (JSN): Enter the four character JSN assigned by the Work Center Supervisor. This is an entry assigned sequentially from the SFWL or JSN Log. NOTE: (BLOCKS 1, 2, 3): IF THE CONFIGURATION CHANGE BEING REPORTED IS NOT AN ALTERATION AND CLOSES A JOB PREVIOUSLY DEFERRED AND ON THE CURRENT SHIP’S MAINTENANCE PROJECT (CSMP), ENTER THE JCN OF THE OPENING DEFERRAL. IF THE MAINTENANCE ACTION IS THE ACCOMPLISHMENT OF AN ALTERATION, ENTER THE JCN FROM THE ALTERATION RECORD (E.G., EXSA2134, OXTY1016, WXSP1124). 2.1.2 Alteration Identification. a. Block 4 - ALTERATIONS (Ship Alterati ons (SHIPALTs), Field Changes (FCs), Etc.): If applicable, enter the alteration number from the authorizing directive. (1) For SHIPALTs, enter the alteration id entification exactly as it appears on the SHIPALT Record. Record the alteration type “SA” in the first two positions, ship type starting in position three, and the alteration number starting in the 7th position of the block (e.g., SASSBNf342130). Enter the title code from the alteration record in the last right-hand position of the block. (2) For all other alteration types, enter the alteration type character code in the first two positions of the block. Enter the alteration number starting in position four (e.g., OAf96999, FC 29, TY 0132). If an alteration identification number is not provided with the alteration record, leave blank. Table 1 reflects the authorized alteration prefix codes:

p. 781

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-C-3 APPENDIX C Table 1 - Alteration Prefix Codes Code Descriptions SA Ship Alteration OA Ordnance Alteration BA Boat Alteration FC Field Change MA Machinery Alteration SI SYSCOM Command Instruction EC Engineering Change HI Habitability TY TYCOM Direction TD Technical Directive SP Strategic Systems Project Office Alteration SC Service Change TR Trident Alteration EP Engineering Change Proposal MO Crypto Equipment Modification AR Alteration Request May be originated by a ship to request an alteration design. Enter and left justify the authorized prefix “AR” followed by a blank space, any number the ship assigns for its own control. 2.1.3 Block A - Enter Command’s Name. 2.1.4 Block B - Enter Ship’s Hull Number (if applicable). 2.1.5 Block 5 - EIC: Enter the Equipment Identity Code (EIC) for the equipment identified in the Equipment Noun Name field (Block 7). EICs are listed in the Ship Configuration Logistic Support Information System (SCLSIS) Index Report or Ship’s 3-M Reference CD or DVD. NOTE: WHEN DOCUMENTING 3-M REQUESTS FOR FLEET AND DEPOT ASSISTANCE, A SPECIAL EIC OF “ZOZZ” FOR NAVSEA 08 AND “ZOYY” FOR DIRSSP MUST BE USED AND THE REMAINING DATA MUST BE UNCLASSIFIED. 2.1.6 Block 6 - ACT: Enter the appropriate Action Taken code from the lower section of the OPNAV 4790/CK form or from the list provided in Table 2. NOTE: THE LIST OF “ACTION TAKE N” CODES CHANGES OCCASIONALLY. VERIFY CURRENT “ACTION TAKEN” CODES AT THE FOLLOWING WEB SITE: HTTPS://OARS.NSLC.NAVY.MIL/OARS/DOCS/REF/ INDEX.HTML

p. 782

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-C-4 APPENDIX C Table 2 - Action Taken Code Code Descriptions 5A Partially Completed Alteration. The IMA must describe in the Job Description/Remarks section what was done and the O-level that remains to be done. 5B Fully Completed Alteration. 5C Fully Completed Equivalent to Alteration. 5D Alteration Directive Not Applicable. NOTE: USE OF A NUMBER 5( ) CODE REQUIRES AN ENTRY IN BLOCK 4 “ALTERATION IDENTIFICATION”. 1 Maintenance Action Completed; Parts Drawn from Supply. 2 Maintenance Action Completed; Required Parts Not Drawn from Supply (local manufacture, pre-expended bins, etc.). 3 Maintenance Action Completed; No Parts Required. NOTE: THE FOLLOWING SECOND CHARAC TER CODES CAN BE USED WITH THE ACTION TAKEN CODES 1, 2, OR 3 AS DIRECTED BY THE TYCOM: A Maintenance Requirement Could Have Been Deferred. B Maintenance Requirement Was Necessary. C Maintenance Requirement Should Have Been Done Sooner. M High Cost Repairs. T The Equipment Being Reported Had a Time Meter. 2.1.7 Block 7 - EQUIPMENT NOUN NAME: If the maintenance action is as the result of the accomplishment of a SHIPALT, enter the equipment Noun Name from the SHIPALT record. Otherwise, enter the equipment nomenclature and description of the equipment or system on which the maintenance was performed. If the maintenance action affects several components, enter the name and designator of the highest assembly. For HM&E equipment, enter the noun name. For electronics equipment, enter the Army-Navy type designator or commercial model number. For ordnance equipment, enter the system or equipment nomenclature, followed by the Mark and Mod numbers, e.g., Launch System 36/1. 2.1.8 Block 8 - MHRS EXP: Enter the total number of man-hours expended by Ship’s Force, not previously reported,) in completing and documenting the maintenance action. Man-hours expended by others tasked to perform equipment maintenance are to be documented separately. 2.1.9 Block 9 - ACT: Actual Maintenance Time used for Selected Equipment List (SEL) equipment only. Enter the total number of clock hours expended to complete the maintenance. 2.1.10 Block 10 - COMP. DATE: Enter the Julian date the maintenance action was completed. 2.1.11 Block 11 - M/R (Meter Reading): Enter an “X” if the equipment or any of the equipment components or sub-units to be identified in Section III have time meters installed. 2.2 Section II - Job Description/Remarks Block 12: Enter any information and remarks relating to the accomplishment of the action. In some cases, an alteration directive will specify that

p. 783

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-C-5 APPENDIX C certain information be documented. If an “X” is entered in Block 11, identify in Block 12 each equipment followed by “M/R” and the time meter reading. 2.3 Section III - Component Configuration Change Identification. 2.3.1 Block 13 - COMPONENT NOUN NAME: Enter the noun name of the component removed, installed, or modified. For HM&E equipment, enter the noun name. For electronics equipment, enter the “AN” type designator or commercial model number. For ordnance equipment, enter the system or equipment nomenclature, followed by the Mark and Mod numbers, e.g., Launch System 36/1. 2.3.2 Block 14 - QUANTITY: Enter the number of like components or sub-units identified in Block 13 that were, removed, installed, or modified. The quantity must be “001” if a component identification number is entered in Block 16, or a serial number is entered in Block 17 (see 2.3.5.). 2.3.3 Block 15 - CA (Component Action): Enter the code identifying whether the equipment in Block 13 was, removed (R), installed (I) or modified (M). When reporting a configuration file action vice a maintenance action, enter (A) for an Add, (D) for a Delete or (C) for a Correction. 2.3.4 Block 16 - COMPONENT IDENTIFICATION: Enter the local identification number(s) such as station number or valve mark of the equipment identified in Block 13. This information must be consistent with the quantity entered in Block 14. For electronic (ELEX) equipment, enter the model number, and if available, enter the serial number in Block 17. 2.3.5 Block 17 - COMPONENT SERIAL NUMBER: Enter the manufacturer’s serial number of the equipment identified in Block 13. If the serial number is not available, enter “NONE”. 2.3.6 Block 18 - COMPONENT APL/AEL: Enter the Component Allowance Parts List or Allowance Equipage List (APL/AEL) of the component identified in Block 13. If not available, the unit’s supply department should assign a temporary APL. 2.3.7 Block 19 - LOCATION (DECK/FRAME/SIDE): Enter the location (compartment number, deck, frame, or side notation), that best describes the location of the equipment identified in Block 13. If none of the mentioned location identifications are appropriate, enter a descriptive term of the onboard location (e.g., FANTAIL, FLIGHT DECK, etc.). 2.3.8 Block 20 - EIC: Enter the Equipment Identity Code (EIC) that best describes the component identified in Block 13. 2.3.9 Block 21 - NEXT HIGHER ASSEMBLY: Enter the nomenclature and serial number of the next higher assembly. No entry is required when the component identified in Block 13 is the highest assembly. 2.3.10 Block 22 - SAC: Enter the Service Application Code (SAC) of the component identified in Block 13. SAC codes can be obtained from the supply department. 2.3.11 Block 23 - WORK CENTER: Enter the code (Work Center Responsible for Equipment (WCRE)) of the Work Center having primary maintenance responsibility for the component identified in Block 13. 2.3.12 Block 24 - NAMEPLATE DATA: Enter the Contract Number or Procurement Document Number, Part Number or Model Number or Drawing Number, and if available, the

p. 784

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-C-6 APPENDIX C Commercial and Government Entity, formerly called Federal Supply Code for Manufacturers. Additional information, if available, such as physical characteristics and manufacturer’s identification is useful. No entry is required for modifications and deletions if an APL is listed in Block 13. 2.3.13 Block 25 - MIP: Enter the Maintenance Index Page (MIP) covering the component identified in Block 13 for removals, modifications, changes, and deletions. If not available, enter “N/A”. 2.3.14 Block 26 - EOSS: (Engineering Operation Space Sequence) For HM&E equipment, enter the Engineering Operation Space Sequence (EOSS) Document Code and Control Number of the primary EOSS procedure affected. If more than a component level document is affected, enter only the EOSS component procedure. NOTE: ENTRY NOT REQUIRED WHEN REPORTING ELECTRONIC OR ORDNANCE CONFIGURATION CHANGE ACTIONS. 2.3.15 Block 27 - TM: For removal and modifications, enter the Technical Manual (TM) covering the affected component. For like equipment installations, enter the TM covering the equipment. For new installations, enter the TM when available; if not available, enter N/A. 2.4 Section IV - Special Purpose. 2.4.1 Block 28 - RIN: Enter the Record Identification Number (RIN) as listed in part I, section C of the COSAL, for deletions, removals, and modifications. For installations and additions, leave blank. 2.4.2 Block 29 - Automated Integrated Language System Identification Number: Enter the Automated Integrated Language System Identification Number assigned by the CDM, Platform Manager or Item Manager. For Electronic equipment, no entry is required unless directed by TYCOM. (Commander Naval Installations Command, Commander Naval Surface Pacific, Commander Naval Surface Atlantic, Commander Naval Information Forces, Commander Submarine Force Atlantic And Commander Submarine Force Pacific have no requirement.) 2.4.3 Block 30 - SECAS OFFICE USE: Block is no longer used. 3. PROCEDURES FOR USING CK CONTINUATION PAGES: The JCN entry must beper paragraph 2.2.1 of this Appendix. Up to four components can be reported on the same continuation form, with each separate component block considered a separate continuation page with its own page number. Assign page numbers consecutively. If applicable, check the block at the top of each component identification section to indicate that all data to be entered per paragraph 2.2.1 of this Appendix, except for that data entered in the component identification section. An arrow* pointing up should be placed in the first block of each blank field to indicate that it is per paragraph 2.2.1 of this Appendix. For each component reported, the required entries on the continuation pages are the JCN, page number, equipment alteration number (if applicable) and those component identification data elements which differ from Section III (original CK). * On the electronic form this is accomp lished by holding down the “Alt” key and on the number key-pad typing in 2 and then 4. This will produce an up arrow in the block selected.

p. 785

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-C-7 APPENDIX C 4. PROCEDURES FOR REPORTING CONFIGURATION FILE CORRECTIONS AND UPDATING THE COORDINATED SHIPBOARD ALLOWANCE LIST. 4.1 Correct errors in a previous submission: Check the block “CONFIG FILE CORR” at the top right portion of the CK form. Enter the exact JCN (Blocks 1, 2, and 3) and page number of the CK which was submitted in error. Enter action code “C”, which indicates “correction” in Block 15. If the entire configuration data submitted on the previous CK is in error, fill in ALL the blocks with the corrected data. Otherwise, fill in only the applicable blocks with the correct data. 4.2 Correct a Data Element Error in the Ship’s COSAL or COSAL Indexes, or Other Such Documents: Check the block (CONFIG FILE CORR) at the top right portion of the CK form. In SECTION I, enter a new JCN in Blocks 1, 2 and 3. In SECTION II, Block 12 for “JOB DESCRIPTION” insert the words “CORRECTION OF COSAL”, or a description of the type of correction. If the APL is to be corrected, enter the words “CHANGE APL FROM ______” and enter the incorrect APL number. In Section III, enter in Block 13 the component noun name from the SCLSIS Index report, COSAL, etc. Enter in Block 15 code “C” for “correction”. Enter the EIC of the component in Block 20. If the correction is for HM&E equipment, also enter the APL in Block 18. Enter the applicable RIN in Block 28. In addition to the corrected data these are the only required data elements that need to be reported. 5. REPORT AN EQUIPMENT RECORD ADDITION/DELETION: Complete the CK as described for “CORRECTING A DATA ELEMENT IN THE SHIP’S COSAL” in the previous paragraph, with the following exceptions: In SECTION II, Block 13 enter the words “ONBOARD - NOT COSAL SUPPORTED” or “NOT ONBOARD - COSAL SUPPORTED”, as appropriate. In Section III Block 15, enter action code “A” for equipment onboard but not COSAL supported, or action code “D” for equipment that is not onboard but is COSAL supported. For an equipment “ADD”, also provide as much additional information as possible (e.g., Serial Number, Next Higher Assembly, if applicable, Location, Work Center, EIC, Nameplate Data, MIP, TMs, etc.). For equipment DELETE, provide the RIN in Block 28 if applicable. 6. REPORT THE TURN-IN OR RECEIPT OF PORTABLE ELECTRICAL/ELECTRONIC TEST EQUIPMENT (PEETE): Check the CK Block for “CONFIG FILE CORR” and then follow standard procedures described for “CORRECTING A DATA ELEMENT IN THE SHIP’S COSAL” in the previous paragraph. 7. HANDLING PROCEDURES: The completed CK form is submitted to the Work Center Supervisor and then to the Division Officer, each of whom reviews the form for completeness and accuracy and initials in the appropriate blocks at the bottom of the form. The Division Officer then forwards the CK to the supply department. Supply department personnel verify or enter data such as APL/AEL, SAC and RIN and will resolve any discrepancies noted with the Work Center Supervisor prior to further routing. Supply department personnel will initial the appropriate block at the bottom of the form and ensure the sequence number first digit is the last digit of the current calendar year. The remaining four digits indicate the chronological sequence of CK forms being submitted by the ship or activity for the year. Supply department personnel will ensure the Work Center entered in Block 23 as the correct Work Center having primary maintenance responsibility for the equipment (not the supply department Work Center). The Supply Department should then forward the CK to the 3-M Coordinator. After reviewing for completeness, initialing, and dating in the appropriate block, the 3-M Coordinator submits the

p. 786

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-C-8 APPENDIX C CK to the 3-M ADP facility serving the activity. A copy is to be maintained in the Work Center as a suspense copy. The following figures are provided: Figure 1 Configuration Change Form for Component Removal Maintenance Action Figure 2 Configuration Change Form for Component Install (continuation) Figure 3 Configuration Change Form Resulting from an Alteration Figure 4 Configuration Change Form for an Alteration Install (continuation) Figure 5 Configuration Change Form for a Correction to a Previously Submitted Change Figure 6 Configuration Change Form for Location Correction Figure 7 Configuration Change Form for COSAL Add Figure 8 Configuration Change Form for COSAL Delete

p. 787

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-C-9 APPENDIX C Figure 1 Configuration Change Form for Component Removal Maintenance Action

p. 788

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-C-10 APPENDIX C Figure 2 Configuration Change Form for Component Install (continuation)

p. 789

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-C-11 APPENDIX C Figure 3 Configuration Change Form Resulting from an Alteration

p. 790

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-C-12 APPENDIX C Figure 4 Configuration Change Form for an Alteration Install (Continuation)

p. 791

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-C-13 APPENDIX C Figure 5 Configuration Change Form for a Correction to a Previously Submitted Change

p. 792

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-C-14 APPENDIX C Figure 6 Configuration Change Form for Location Correction

p. 793

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-C-15 APPENDIX C Figure 7 Configuration Change Form for COSAL Add

p. 794

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-C-16 APPENDIX C Figure 8 Configuration Change Form for COSAL Delete

p. 795

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-D-1 APPENDIX D APPENDIX D PREPARATION INSTRUCTIONS MAINTENANCE ACTION FORM (OPNAV 4790/2K)

1. MAINTENANCE ACTION FORM (OPNAV 4790/2K). The OPNAV 4790/2K Form is used for reporting deferred maintenance actions, and the completion of maintenance actions that do not result in a configuration change. Two blocks at th e top of the form are used to specify what type of maintenance action is being reported, a deferral “DEFL” or a completion “COMP”. The rest of the form is separated into six sections. A partially completed maintenance action which results in a configuration change or a complete or partially accomplished alteration should be reported using the OPNAV 4790/CK Form. Refer to the instructions for using the OPNAV 4790/CK Form, appendix C. 1.1 Section I - IDENTIFICATION: This section is used to identify the equipment or system on which maintenance actions are being reported. 1.2 Section II - DEFERRAL ACTION: This section, filled in when reporting a deferral of a maintenance action, indicates man-hours expended up to the time of deferral, the date of deferral, man-hours remaining and required completion date (if necessary). 1.3 Section III - COMPLETED ACTION: This section is filled in when reporting the completion of a maintenance action and contains blocks used when reporting maintenance actions on selected equipment. 1.4 Section IV - REMARKS/DESCRIPTION: This section is filled in when reporting the deferral of a maintenance action. The type of information recorded includes remarks that describe what is wrong, what caused the failure or malfunction, maintenance to be performed, the names of personnel involved in the maintenance action, a priority and availability assignment and signatures by management personnel who screened the maintenance action. 1.5 Section V - SUPPLEMENTARY INFORMATION: This section completed by the reporting activity provides information pertaining to required maintenance actions or onboard reference material (e.g., technical manuals, blueprints, etc.). This section is also used by the repair activity in planning, scheduling and controlling the repair activity work. 1.6 Section VI - REPAIR ACTIVITY PLANNING/ACTION: This section is used by the repair activity for planning, estimating and scheduling purposes and can be used to report work accomplished by an internal department Work Center or by an external activity not under an ADP system. NOTE: EXAMPLES OF COMPLETED OPNAV 4790/2K FORMS FOR VARIOUS REPORTING SITUATIONS CAN BE FOUND AT THE END OF THIS APPENDIX: Figure 1 Maintenance Action Form for a Deferred Maintenance Action Figure 2 Maintenance Action Form for a Completed Maintenance Action without Prior Deferral

p. 796

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-D-2 APPENDIX D Figure 3 Maintenance Action Form for Changes to a Previously Submitted Deferred Maintenance Action Figure 4 Maintenance Action Form for Add-on Remarks to a Previously Submitted Deferred Maintenance Action 2. PROCEDURES FOR DOCUMENTING A DEFERRED MAINTENANCE ACTION - PLACE AN “X” IN THE BLOCK TITLED “DEFL” AT TOP OF FORM. 2.1 Section I - IDENTIFICATION a. JOB CONTROL NUMBER (Blocks 1 - 3): (1) Block 1 - UIC: Enter the UIC of th e activity initiating the maintenance action. (2) Block 2 - WORK CENTER: Enter the Work Center code of the Work Center initiating the maintenance action. For Ships, a four-position Work Center code will be entered. For repair departments of, IMAs, RMCs and other IMAs, a three-digit code will be entered. The three-digit code is entered left-to-right leaving the right most position blank. Appendix C of this chapter provides a listing of authorized Work Center codes. (Submarine Tender Repair Work Centers have been converted to four position work center codes) (3) Block 3 - JOB SEQ. NO.: Enter the job sequence number assigned by the Work Center Supervisor. This is an entry assigned sequentially from the SFWL/JSN Log. b. Block 4 - APL/AEL (Allowance Parts List /Allowance Equipment List): Enter the APL/AEL of the equipment being reported. These numbers are found in the COSAL or SCLSIS Index Report. An example of an APL would be “882170236” and an AEL would be “2-260034096.” c. Block A - Enter COMMAND’S NAME d. Block 5 - EQUIPMENT NOUN NAME: Enter the equipment nomenclature and description on which maintenance is being reported. The equipment nomenclature and description should be the same as that identified by the EIC and is limited to 16 positions. Standard abbreviations can be used if clarity is retained. For electronic equipment having an Army-Navy (AN) designation, it will be substituted for the equipment nomenclature. e. Block B - Enter SHIP’S HULL NUMBER (if applicable). f. Block 6 - WHEN DISCOVERED (WND): Enter the code (Table 1) that best identifies when the need for maintenance was discovered.

p. 797

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-D-3 APPENDIX D Table 1 - When Discovered Codes Code Description 1 Lighting Off or Starting 2 Normal Operation 3 During Operability Test 4 During Inspection 5 Shifting Operational Modes 6 During PMS 7 Securing 8 During AEC (Assessment of Equipment) Program 9 No Failure, PMS Accomplishment Only 0 Not Applicable (use when re porting printing services, etc.) g. Block 7 - STATUS (STA): Enter the code (Table 2) that most accurately describes the effect of the failure or malfunction on the operational performance capability of the equipment when the need for maintenance was first discovered. Table 2 – Status Codes Code Description 1 Operational 2 Non-Operational 3 Reduced Capability 0 Not Applicable (use if re porting printing services, etc.) (1) OPERATIONAL must be selected when the system or equipment is operational with only minor discrepancies that do not impact performance. (Similar to EOC 0.8 – 1.0: See chapter 5, appendix A of this volume) (2) NON-OPERATIONAL must be selected when the system or equipment is totally inoperative or is severely degraded with major operation restrictions and may be a threat to personnel safety. (Similar to EOC 0.0 - 0.4: See chapter 5, appendix A, of this volume) (3) REDUCED CAPABILITY mu st be selected when the system or equipment is operational with discrepancies that could potentially impact performance or has minor operational restrictions that are not a threat to personnel safety. (Similar to EOC 0.5 - 0.7: See chapter 5, Appendix A, of this Volume) (4) NOT APPLICABLE (Equivalent to EOC 1.0: See chapter 5, Appendix A, of this Volume) must be selected:

p. 798

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-D-4 APPENDIX D (a) When ordering parts for PMS. (b) When updating a 4790/2K and the obj ect has been repaired but the JCN cannot be closed due to awaiting parts. (c) When requesting services such as printing, plaques, special support equipment, test equipment, etc. (d) For data reporting. (e) For SHIPALTs/Ship Change Documents. (f) For system or equipment configuration changes (4790/CK). (g) When requesting support servi ces in a maintenance availability. (h) For future time directed CMP and PMS maintenance tasks. h. Block 8 - CAUSE (CAS): Enter the code (Tab le 3) that best describes the cause of the failure or malfunction when the need for maintenance was first discovered. (Refer to reference (a), Appendix A, Table A-6 data element “CAUSE” for an expanded definition of the allowable codes or values). Table 3 - Cause Codes Code Description 1 Abnormal Environment 2 Manufacturer or Installation Defects 3 Lack of Knowledge or Skill 4 Communication Problem 5 Inadequate Instruction or Procedure 6 Inadequate Design 7 Normal Wear and Tear 0 Other or No Malfunction i. Block 9 - DEFERRAL REASON (DFR): Enter the deferral reason code (Table 4) which best describes the reason the maintenance cannot be done at the time of deferral. (Refer to reference (a), Appendix A, Table A-7 data element “DEFERRAL REASON” for an expanded definition of the allowable codes or values). Table 4 – Deferral Codes Code Deferral Reason 1 Due to Ship’s Force, Unit’s Work Backlog or Operational Priority 2 Lack of Material 3 No Formal Training on this Equipment 4 Formal Training Inadequate for this Equipment

p. 799

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-D-5 APPENDIX D Code Deferral Reason 5 Inadequate School Practical Training 6 Lack of Facilities or Capabilities 7 Not Authorized for Ship’s Force or Unit Accomplishment 8 For Ship’s Force or Unit Overha ul of Availability Work List 9 Lack of Technical Documentation 0 Other - or Not Applicable (explain in block 35) j. Block 10 - This Block is reserved fo r TYCOM directed applications. Refer to TYCOM instruction for use. k. Block 11 - This Block is reserved for TYCOM directed applications. Refer to TYCOM instruction for use. l. Block 12 - This Block is reserved fo r TYCOM directed applications. Refer to TYCOM instruction for use. m. Block 13 - IDENT/EQUIPMENT SERIAL NUMBER: Enter the identification or serial number of the equipment or system on which maintenance is being deferred. For HM&E equipment, enter the Valve Mark or Electric Symbol Number (ESN) or Primary Identification Number. For electronic equipment, enter the manufacturer’s serial number of the equipment or system on which maintenance is being deferred. n. Block 14 - EIC: Enter the Equipmen t Identification Code of the component, equipment, subsystem, or system for which the maintenance is being reported. o. Block 15 - SAFETY HAZARD: Enter an “X” or applicable safety code (Table 5) if the maintenance action describes a problem or condition which has caused or has the potential to cause serious injury to personnel or material. A brief explanation must be included in the Remarks/Description field (Block 35). For example: “Reinspection of separator for presence of oil after rinse. MRC A-27 evidently not done. Presence of oil resulted in fire in HP air system when compressor operated under load. Fire badly burned valve AHP-287, requiring replacement.” NOTE: THE SHIP’S OR UNIT’S 3-M COORDINATOR WILL FORWARD A COPY OF ALL OPNAV 4790/2K DOCUMENTATION HAVING AN ENTRY IN THIS FIELD TO THE SAFETY OFFICER FOR REVIEW. (REFER TO REFERENCE (A), APPENDIX A, TABLE A-14, DATA ELEMENT “SAFETY HAZARD” FOR AN EXPANDED DEFINITION OF THE ALLOWABLE CODES OR VALUES).

p. 800

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-D-6 APPENDIX D Table 5 - Safety Hazard Codes Code Description 1 Critical Safety or Health De ficiency-Correct Immediately 2 Serious Safety or Health Defi ciency-Suspension of Equipment, System or Space Use is required 3 Moderate Safety or Health De ficiency-Waiver of Equipment, System or Space Use is granted Pending Correction of the Item 4 Minor Safety or Health Deficiency 5 Negligible Safety or Health Deficiency 0 Maintenance Action is Not Safety Related NOTE: CODES “6” THRO UGH “9” MAY BE LOCALLY ASSIGNED BY TYCOMS IF ADDITIONAL SAFETY CODES ARE REQUIRED. p. Block 16 - LOCATION: Enter the locati on (compartment number, deck, frame, or side notation), that best describes the location of the equipment requiring maintenance as identified in Block 13. If none of the mentioned location identifications are appropriate, enter description of the location (e.g., FANTAIL, FLIGHT DECK, etc.). q. Block 17 - WHEN DISCOVERED DATE: Ente r the Julian date when the equipment or system failure or malfunction was discovered. r. Block 18 - ALTERATIONS (SHIPALT, OR DALT, Fld. Chg., etc.): If reporting the deferral of an alteration: (1) SHIPALT - Enter the alteration identification exactly as it appears on the SHIPALT Record. Record the alteration type “SA” in the first two positions, ship type starting in position three, and the alteration number starting in the 7th position of the block (i.e., SASSBNf342130). Enter the title code from the alteration record in the last right-hand position of the block. (2) OTHER Alteration Types - Enter the a lteration type character code (Table 6) in the first two positions of the block. Leave the third position blank and enter the alteration number starting in position four (i.e., OA f96999, FC 29, TY 0132). If an alteration identification number is not provided with the alteration record, leave blank.

p. 801

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-D-7 APPENDIX D Table 6 - Alteration Type Codes SA Ship Alteration OA Ordnance Alteration BA Boat Alteration FC Field Change MA Machinery Alteration SI SYSCOM Command Instruction EC Engineering Change HI Habitability TY TYCOM Direction TD Technical Directive SP Strategic Systems Project Office Alteration SC Service Change TR Trident Alteration EP Engineering Change Proposal MO Crypto Equipment Modification AR Alteration Request May be originated by a ship to request an alteration design. Enter and left-justify the authorized prefix “AR” followed by a blank space any number the ship assigns for its own control. s. Blocks 19 through 24 - FOR INSURV USE - no entries required. See Section 2 of NAVSEAINST 4790.8C for specifications. 2.2 Section II - DEFERRAL ACTION. a. Block 25 - MAN-HOURS EXPENDED (MHRS. EXP.): Enter the total man-hours (to the nearest whole hour) expended by personnel of all Work Centers involved in the maintenance action up to the time of deferral (include documentation time which should not exceed one hour). b. Block 26 - DEFER. DATE: Enter the Juli an date when the maintenance action was deferred. An example of a deferral on 11 January 1994 would be “4011”. c. Block 27 - MAN-HOURS REMAINING (M HRS. REM.): Enter the estimated number of man-hours remaining to complete the maintenance action. Round off to the nearest whole hour. If the TYCOM allows an automated close out of the deferral by the IMA, the letters “AUTO” will be entered. This is a request to the IMA to complete the maintenance action with no further documentation from the shop after the job has been accepted by the originator (authorized signature). If the originating

p. 802

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-D-8 APPENDIX D command does not receive CSMP support from the IMA doing the work, do not use the “AUTO” close out feature. d. Block 28 - DEADLINE DATE: (1) Depot (shipyard or ship repair facility) (T/A-1) the Deadline Date is required. The date entered is the end of the scheduled maintenance availability. (2) Intermediate Maintenance Activity (t ender, repair ship, etc.) (T/A-2) the Deadline Date is required. The date entered is the end of the scheduled maintenance availability. (3) TYCOM Support Unit (floating dry doc k, etc. or technical assistance from Systems Command, organic technical agents, or contractor representative) (T/A-3) is required. Date entered is the entry date plus a realistic estimated time to repair. Update to the Deadline Date is required if the estimate changes. (4) Ship’s Force or Unit (T/A-4) is require d. Date entered is the entry date plus a realistic estimated time to repair. Updates to Deadline Date are required if the estimate changes. 2.3 Section III - COMPLETED ACTION. a. Blocks 29 through 33 - USED FO R REPORTING THE COMPLETION OF A MAINTENANCE ACTION. b. Block 34 - METER READING: If the e quipment has a time meter and is on the Selected Equipment List (SEL), the reading (to the nearest whole hour) at the time of failure is entered in this block. If the equipment has more than one meter, designate the meter being recorded in Block 35 “REMARKS” using the letters “METRED” followed by the meter designator. An asterisk (*) must precede and follow the meter designation. Example: *METRED-1A2M1*. 2.4 Section IV - REMARKS/DESCRIPTION. a. Block 35 - REMARKS/DESCRIPTION: En ter remarks relating to the maintenance action. These remarks should be brief, but complete and meaningful. Remarks should state what is wrong, what caused the failure (if known) and what must be done to correct the problem. Separate the two statements with “XXX”. For example, “HIGH PITCHED SQUEAL OF PUMP SHAFT, GAUGE READING ABOVE RED LINE ON #2 PUMP, SSG CASING IS EXTREMELY HOT. XXX INVESTIGATE AND REPAIR AS NECESSARY.” If more space is needed, check Block 36 “CONT. SHEET” and continue the remarks on a second form using the same JCN. Include the statement “2L USED” if Supplemental Form OPNAV 4790/2L is used for drawings or other supplemental information. The remarks should not include statements explaining what has been coded in another place of the form; i.e., “DEFERRAL REASON 2 = LACK OF MATERIAL”. Classified or Navy Nuclear Power Information is prohibited from being entered into the Work Candidate. If a full description of the material deficiency requires the use of classified information, a separate message should be generated with the required data and the message referred

p. 803

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-D-9 APPENDIX D to in Block 35 by message Date Time Group. The following are minimum requirements for Block 35: (1) Depot (shipyard or ship repair facility) (T/A-1): (a) Concisely describe the failure or malfunction and what caused it. Include how and when the casualty was discovered. Provide description of the casualty to include information on operating configuration symptoms and indications. (b) Concisely describe the actions ta ken by Ship’s Force or Unit personnel and outside activities to troubleshoot and correct the failure or malfunction. Include initial follow-up and troubleshooting, Ship’s Force or Unit repair efforts or technical assistance received. (c) Include any test re sults from troubleshooting. (d) Include the reason for deferral to an off ship maintenance activity. (2) Intermediate Maintenance Activity (tender, repair ship, etc.) (T/A-2): (a) Concisely describe the failure or malfunction and what caused it. Include how and when the casualty was discovered. Provide description of the casualty to include information on operating configuration symptoms and indications. (b) Concisely describe the actions taken by the command and outside activities to troubleshoot and correct the failure or malfunction. Include initial follow-up and troubleshooting, command repair efforts or technical assistance received. (c) Include any test re sults from troubleshooting. (d) Include the reason for deferral to an off ship maintenance activity. (3) Technical Assistance in troubleshooting (T/A-3): (a) Concisely describe the failure or malfunction and what caused it. Include how and when the casualty was discovered. Provide description of the casualty to include information on operating configuration symptoms and indications. (b) Concisely describe the acti ons taken by command personnel to troubleshoot and correct the failure or malfunction. Include initial follow-up and troubleshooting, command’s repair efforts or previous technical assistance. (c) Include any test re sults from troubleshooting. (d) Clearly specify the type of out side assistance and the time frame desired by the activity. (4) Technical Assistance in obtaining special support or test equipment (T/A-3): (a) Describe the special support or test equipment required by the activity.

p. 804

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-D-10 APPENDIX D (b) Describe the maintenance action for which the equipment will be used. (c) Include any assistance the activity may need from the requesting activity (e.g., training, assistance in operating the equipment, etc.). (d) Clearly specify the dates the equipment is needed and estimated time the equipment will be returned. (5) Technical Assistance documenting the results of an inspection or assessment (T/A-3): (a) The inspection or assessment activ ity must provide the activity with a maintenance ready 4790/2K. (b) Documentation of assessment re sults by the equipment Subject Matter Expert will include all the technical data needed to complete a 4790/2K as specified in chapter 42 of this volume. (6) Technical Assistance in obtaining support services during a maintenance availability (T/A-3): (a) Describe the support serv ice required by the activity. (b) Describe the maintenance action for which the support services will be used. (c) Include any assistance the activity may need from the requesting activity (e.g., training, assistance in operating the equipment, etc.). (d) Clearly specify the dates the suppor t services are needed and estimated time the support services will no longer be required. (7) Ship’s Force and Unit maintenance action (T/A-4): (a) Concisely describe the failure or malfunction and what caused it. Include how and when the deficiency was discovered. Provide description of the deficiency to include information on operating configuration symptoms and indications. (b) Concisely describe the actions taken by command personnel to correct the failure or malfunction. Include initial follow-up and troubleshooting, command personnel repair efforts or previous technical assistance. (c) Include any test results from either troubleshooting or post repair testing. b. Block 36 - CONT. SHEET: Enter an “X ” in this block if the “REMARKS” are continued on additional 2K forms. No more than three additional OPNAV 4790/2K forms can be used. NOTE: WHEN USING OPNAV 4790/2K CONTINUATION PAGES FOR THE CONTINUATION OF “REMARKS”, ENTER THE JCN OF THE FIRST FORM AND CONTINUE WITH THE REMARKS IN SECTION IV. IN

p. 805

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-D-11 APPENDIX D THE TOP MARGIN OF EACH CONTINUATION PAGE, INSERT THE WORDS “PAGE 2”, “PAGE 3”, ETC. c. Block 37 – CSMP SUMMARY: Enter a c ondensed description of the problem. The Work Center Supervisor is to ensure the summary succinctly captures the meaning of the Block 35 REMARKS/DESCRIPTION narrative. The CSMP summary conveys to management the significance of the JCN (maintenance action). The CSMP summary is displayed on management reports, as opposed to the entire narrative of the REMARKS blocks. d. Block 38 - FIRST CONTACT/MAINT. MAN: Printed name of the senior person knowledgeable in the specifics of the JCN (maintenance action). e. Block 39 - RATE: Enter the rate of the first contact or maintenance person. Examples are: Table 7 – Rank or Rate Codes Rank or Rate Code Entry Officers OFF ET1 ET1 Civilian CIV GMG2 GMG2 FTGSN FTGN FN FN f. Block 40 - SECOND CONTACT/SUPERVISOR : Printed name of the supervisor of the first contact or maintenance person after screening the maintenance action for completeness and accuracy. g. Block 41 - PRI: Enter the appropriate prior ity code (Table 8). Refer to reference (a) Appendix A, Table A-12 for an expanded definition of the allowable codes or values. Table 8 – Priority Codes Code Description 1 Mandatory 2 Essential 3 Highly Desirable 4 Desirable h. Block 42 - TA: Enter the Type Availabi lity (T/A) code (Table 9) for the type availability recommended for performance of the deferral.

p. 806

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-D-12 APPENDIX D Table 9 - Type Availability Codes Code Description 1 Depot (shipyard or sh ip repair facility) 2 Intermediate Maintenance Activity (tender, repair ship, etc.) 3 Fleet Technical Support. TYCO M Support Unit (floating dry dock, etc., or technical assistance from NAVSEA or Regional Maintenance Centers or contractor representative) 4 Ship’s Force or Unit (Originating Work Center, Organizational Level) 0 Not Applicable U (Mission Degrading) (entered on 2K) Used by INSURV. Field identifies certain deficiencies which are considered as preventing the activity from carrying out some part of its mission. NOTE: TABLE 10 PROVIDES GUIDANCE ON USING AVAILABILITY CODES. Table 10 – Type Availability Codes Scenario or Issue Use T/A Code When requesting technical assistance from off-hull activities. 3 When requesting repair (industrial) from outside activities. 1 or 2 When requesting calibration from outside activities. 1 or 2 When ordering parts or materials for Ship’s Force or Unit use. 4 For data reporting. 3 When requesting special support or test equipment (hydrostatic pumps, rigging equipment, etc.). 3 Completed without prior deferral. 4 When submitting a CASREP. 1, 2, 3 or 4 When submitting a temporary DFS. 1, 2 or 4 For any change in system or equipment configuration. 3 For documenting the results of an inspection or assessment. 3 For installation of a SHIPALT or Ship Change Document. 1, 2 or 4 For support services during a maintenance availability. 3 For a CMP maintenance action. 1 , 2, 3 or 4

p. 807

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-D-13 APPENDIX D i. Block 43 - INTEGRATED PRIORITY: If th e maintenance is to be done by an outside activity, the Command’s Engineer may rank departmental deferrals by integrated priority. A sequential number may be placed in this block to indicate its priority relative to other deferred work for a given availability. (1) Block C - DIV. INIT: Initialed by the Division Officer after screening the document. (2) Block D - DEPT. INIT: Initialed by the Department Head after screening the document. (3) Block E - COMMANDING OFFICER’ S SIGNATURE: Required on all deferrals for outside assistance, the Commanding Officer or authorized representative must sign the deferral. (4) Block F - TYCOM AUTHORIZATION: This block is reserved for the signature of the TYCOM representative screening the deferral. This is usually applicable when direct routing from command to TYCOM for Depot emergent work is employed. j. Blocks 44 through 46 are not completed at the time of deferral. Entries are made by the next level of management after leaving the command (IUC and TYCOM during the screening process). 2.5 Section V - SUPPLEMENTARY INFORMATION. Block 47 - BLUEPRINTS, TECH. MANUALS, PLANS, ETC.: Enter any TMs, blueprints, etc., which might be of use to a repair activity providing assistance. Indicate with an “X” in the “AVAILABLE ON BOARD” – “YES/NO” block if the TM is onboard or not. 3. PROCEDURES FOR DOCUMENTING INTERNAL WORK REQUESTS - When it is necessary to obtain assistance from other departments within the organizational level, the OPNAV 4790/2K Form can be used as an internal work request. If more than a single assisting Work Center is required, multiple copies will be prepared using the same JCN on each request. The requesting Work Center prepares the number of copies required for internal control. The words “INTERNAL WORK REQUEST” is written at the top of each copy to be sent to the assisting Work Center(s). The following blocks are used: 3.1 Section I - IDENTIFICATION: Document all of this section. See “Procedures for Documenting a Deferred Maintenance Action” paragraph 4.1. 3.2 Section IV - REMARKS/DESCRIPTION. Block 35 - REMARKS/DESCRIPTION: Describe the tasks required of the Assisting Work Center (AWC). 3.3 Section VI - REPAIR ACTIVITY PLANNING/ACTION. a. Block 49 - REPAIR WORK CENTER (W/C): Enter the AWC’s code. b. Block 55 - REPAIR ACTIVITY UIC: Enter the organization unit’s UIC. This will be the same as Block 1 except when the ship is being assisted by a non-reporting outside activity, in this case, the outside activity’s UIC will be entered. c. Block 56 - WORK REQ. ROUTINE: Enter the appropriate Expanded Ship Work Breakdown Structure, SWAB, SWLIN, etc., as directed by the TYCOM.

p. 808

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-D-14 APPENDIX D 4. PROCEDURES FOR DOCUMENTING SCREENING INFORMATION ON DEFERRED MAINTENANCE ACTIONS - Used by other activities, such as IUCs, TYCOM representatives and IMAs for screening, planning, and scheduling. 4.1 Section IV - REMARKS/DESCRIPTION. a. Block F - TYCOM AUTHORIZATION: This block is reserved for the signature of the TYCOM representative screening the deferral. b. Block 44 - IUC: The IUC or designated re presentative screening the deferral enters the recommendation as to the action to be taken. See the allowable codes (Table 11). Table 11 - Action to be Taken Codes Code Description 1 Depot (shipyard or ship repair facility) Accomplish 1A Depot Assisted by Ship’s Force or Unit Personnel 1S Ship to Shop 1M Accomplish with Modification 2 IMA (tender or repair ship, etc.) Accomplish 2A IMA Assisted by Ship’s Force or Unit Personnel 2S Ship to Shop 2M Accomplish with Modification 3 Fleet Technical Support. TYCOM Support Unit (floating dry dock, etc.) accomplished or Technical Assistance from NAVSEA, Regional Maintenance Center or Contractor Representative. 3A TYCOM Support Un Assisted by Ship’s Force or Unit Personnel 3S Ship to Shop 3M Accomplish with Modification 4 Ship’s Force or Unit Personnel Accomplish 5 Deferred 5A Insufficient Time in the Ava ilability to Complete the Task 5B Lack of Shipyard Capability 5C Lack of Material 5D Lack of Funds 5E Not Required During this Availability 5F General 6 Not Authorized

p. 809

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-D-15 APPENDIX D Code Description 6A Not Technically Justified 6B Covered by an Existing Ship Alteration 6C Duplicate of Another Job Control Number (JCN) 6D Not Cost Effective 6E General 8* Disapproved. * This screening code disapproves the accomplishment of a work item by an outside activity. It does not prevent entry of the deferral into the CSMP, which is the decision of the Commanding Officer 9** Remove from Current Ship’s or Unit Maintenance Project (CSMP). Pass to history (to be assigned by TYCOM only). ** This screening code is restricted to the removal of INSURV items from the CSMP for which, in the opinion of the Ship’s or Unit’s IUC and TYCOM, the ship has no responsibility for accomplishment. NOTE: THE FIRST CHARACTE R OF THE UIC OR TYCOM SCREENING CODE SHOULD BE ENTERED IN THE APPROPRIATE FIELD. THE SECOND CHARACTER, WHEN USED, SHOULD BE ENTERED IN THE SPACE JUST BELOW IT.

c. Block 45 - TYCOM: The TYCOM or designa ted representative screening the deferral will enter the action to be taken. See the allowable codes (Table 11). d. Block 46 (A-L) - SPECIAL PURPOSE: Use of these codes are optional and indicates that quality control and quality assurance standards may be required. Special purpose blocks 46A through 46H and 46K will be used when directed by TYCOM. (1) Block 46A - The Department Head may enter the KEY EVENT code from the ISIC provided Key Event Schedule. (2) Block 46B – Optional, if used Subm arines will enter code “SS” if the job requires work within SUBSAFE boundaries or involves SUBSAFE materials. Surface Ships may enter S1 for “PARTS ON HAND or PARTS NOT REQD,” S2 for “PARTS ON ORDER-DEF DEL DT,” S3 for “CONT PROCURE PARTS,” S4 for “WORK COMPL PREVIOUSLY.” (3) Block 46C – Optional, if used, enter the code “L1” if the job requires work within Level I boundaries or involves Level I material. (4) Block 46D – Optional, if used, enter the code “08” if the job is associated with nuclear equipment. Refer to NAVSEAINST 9210.4A (NOTAL).

p. 810

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-D-16 APPENDIX D (5) Block 46E - Optional, if used, en ter the code “RC” if the job requires radiological controls (RADCON). (Refer to NAVSEA Technical Publication S9213- 33-MMA-000/(V). (6) Block 46F - Optional, if used, enter the code “DD” if the job requires Dry Docking to accomplish. (7) Block 46G - Optional, if used, en ter the code “NC” for critical noise deficiencies or “NP” for potential radiated noise deficiencies. (8) Block 46H - The following codes are us ed in MFOM VSB for work screening: GC (Contract), IC (Indefinite Delivery, Indefinite Quantity), CC (Commercial Industrial Services), RC (Regional Maintenance Center Contracting Officer), TC (Type Commander Contracting), BC (Blanket Purchase Agreement/Basic Ordering Agreement), TV (Tanks & Voids), CS (Crane Services), NS (NAVSEA), DV (Diver Services) or AC (AVCERT). (9) Block 46I - Reserved for future use. (10) Block 46J - Reserved for future use. (11) Block 46K - Optional, if used, enter the appropriate code: FB for Fly-By-Wire Certification Boundary (FBW Certification Blue Boundary), SF for Submarine Flight Critical Component (SFCC Red Boundary) or DS for Deep Submergence System-Scope of Certification (DSS-SOC). (12) Block 46L - Enter the code assigned to the visiting activity. This will identify the visiting activity as the originator of the deferral. 4.2 Section V - SUPPLEMENTARY INFORMATION. a. Block 47 - BLUEPRINTS, TECHNICAL MANUALS, PLANS, ETC: The repair activity can use this block during the work request planning in much the same manner as the originator. Information that might be of use in the accomplishment of the maintenance can be entered (e.g., TMs, blueprints, etc.). b. Block 48 - PREARRIVAL/ARRIVAL CO NFERENCE ACTION/REMARKS: The repair activity may enter any remarks considered necessary to facilitate repairs. 4.3 Section VI - REPAIR ACTIVITY PLANNING/ACTION. a. Block 49 - REPAIR W/C: Enter the charac ter code of the lead Work Center assigned to the job. Refer to reference (a) appendix A, Table A-10 data element “IMA REPAIR WORK CENTER” for a listing of IMA Work Center codes. b. Block 50 - EST. MHRS.: Enter the total number of estimated man-hours required by the lead Work Center to complete the job. c. Block 51 - ASST. REPAIR W/ C: Enter the three or four character code of the first Work Center assigned to assist the lead Work Center on the job being planned. If more than one assist Work Center is required, check Block 36 to indicate a continuation page is being used. On the continuation page (new 2K form), fill in Blocks 1, 2, 3 with the same JCN of the original 2K. In Block 51, enter the second

p. 811

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-D-17 APPENDIX D assist repair Work Center’s code. No more than two assist Work Centers (two supplemental 2K forms) can be submitted. d. Block 52 - ASST. EST. MHRS: Enter the total number of estimated man-hours required by the assist Work Center to complete its portion of the job. e. Block 53 - SCHED. START DATE: Enter th e Julian date that work on the job is to begin. f. Block 54 - SCHED. COMP. DATE: Enter th e Julian date that all work on the job is scheduled to be completed by the repair activity. g. Block 55 - REPAIR ACTIVITY UIC: Ente r the UIC of the repair activity performing the work for the originating command. h. Block 56 - WORK REQ. RO UTINE: Enter the appropriate Expanded Ship Work Breakdown Structure , Ship Work Authorization Boundary (SWAB), Ship Work Line Item Number (SWLIN), etc., as directed by the TYCOM. i. Blocks 57 through 63: - Used to identif y Depot estimates on individual CSMP items from the Master Job Catalog. These blocks may also be used as directed by TYCOM instruction. (1) Block 57 - EST. MAN-DAYS: Enter an estimate of the total number of man- days required to complete the job. If the estimate is less than one, enter 1. (2) Block 58 - EST. MAN-DAY COSTS: Enter an estimate of the total man-day costs required to complete the job. (3) Block 59 - EST. MATERIAL COSTS: Enter an estimate of the total material costs required to complete the job. (4) Block 60 - EST. TOTAL COST: Enter an estimate of the total cost required to complete the job (Add Blocks 58 and 59). (5) Block 61 - JOB ORDER NUMBER: Ente r Job Order Number assigned by the activity performing the work. (6) Block 62 - LEAD P&E CODE: Enter th e code assigned to the lead planning and scheduling organization. (7) Block 63 - DATE OF EST: Enter the date that the repair activity’s planning action was completed. 5. PROCEDURES FOR DOCUMENTING A COMPLETED MAINTENANCE ACTION PREVIOUSLY DEFERRED: Blocks A, B, and applicable Blocks 1 through 47 have previously been filled. The maintenance person must report completion of a previously deferred maintenance action by using the copy of the OPNAV 4790/2K retained onboard when the maintenance action was deferred. If there is no record (paper) copy of the original 2K and the maintenance action is on the CSMP, enter the JCN on a blank 2K form, and without providing all the deferred maintenance information, enter the completion data in Section III. If the word

p. 812

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-D-18 APPENDIX D “AUTO” has been entered in Block 27 as directed by the TYCOM, submission of a completed maintenance action by the originating ship may not be necessary. 5.1 Section III - COMPLETED ACTION. Block 29 - ACT. TKN: Enter the code (Table 12) that best describes the action taken to complete the maintenance. NOTE: THE LIST OF “ACTION TAKEN” CODES CHANGES OCCASIONALLY. VERIFY CURRENT “ACTION TAKEN” CODES AT THE FOLLOWING WEB SITE: Error! Hyperlink reference not valid.HTTPS://OARS.NSLC.NAVY.MIL/OARS/DOCS/REF/INDEX.HTML

p. 813

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-D-19 APPENDIX D Table 12 - Action Taken Codes Code Description 1 Maintenance Action Complete d; Parts Drawn from Supply 2 Maintenance Action Completed; Re quired Parts Not Drawn from Supply (local manufacture, pre-expended bins, etc.) 3 Maintenance Action Completed; No Parts Required NOTE: THE FOLLOWING SE COND CHARACTER CODES CAN BE USED WITH THE ACTION TAKEN CODES 1, 2, OR 3 AS DIRECTED BY THE TYCOM: A Maintenance Requirement Could Have Been Deferred B Maintenance Requirement Was Necessary C Maintenance Requirement Should Have Been Done Sooner M High Cost Repairs T The Equipment Being Reported Had a Time Meter 4 Canceled (When this code is used, the deferral will be removed from the CSMP). This code is not to be used with INSURV, Safety, or Priority 1 or 2 deferrals screened for accomplishment by the TYCOM or IUC. 7 Maintenance Action Completed; 2- M (Miniature and Micro-Miniature Electronic Modules) Capability Utilized. NOTE: THE FOLLOWING SE COND CHARACTER CODES CAN BE USED WITH ACTION TAKEN CODE 7 TO BETTER DESCRIBE THE ACTION TAKEN: A Parts Drawn from Supply Utilized B Parts Not Drawn from Supply Utilized C Automatic Test Equipment (ATE) Utilized D ATE and Parts Drawn from Supply Utilized E ATE and Parts Not Drawn from Supply Utilized 8 Periodic Time Meter or Cycle Count er reporting. (This code is not applicable to the “FINAL ACTION” code reported by the repair activity.) 9 Maintenance Action Completed; 3-M Fiber Optic Repair NOTE: THE FOLLOWING SE COND CHARACTER CODES CAN BE USED WITH ACTION TAKEN CODE 9 TO BETTER DESCRIBE THE ACTION TAKEN: A FOTE, multimode ST MQJs utilized

p. 814

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-D-20 APPENDIX D Table 12 - Action Taken Codes Code Description B FOTE, multimode heavy duty MQJs utilized C FOTE, multimode rotary mech anical splice MQJs utilized D FOTE, single mode ST MQJs utilized E FOTE, single mode heavy duty MQJs utilized F FOTE, multimode specialty MQJs utilized G FOTE, single mode sp ecialty MQJs utilized H FOTE, not available I Standard MQJs not available J Specialty MQJs not available 0 None of the Above b. Block 30 - MHRS: Enter the total man- hours (to the nearest whole hour) that was expended doing the maintenance after submitting the deferral. This includes man- hours expended for reinstallation, witnessing of tests, etc. (include documentation time which should not exceed 1 hour). c. Block 31 - COMPLETION DATE: Enter th e Julian date the maintenance action was completed. d. Block 32 - ACT. MAINT. TIME: Enter th e total clock hours (to the nearest whole hour) during which maintenance was performed. This should the include time for troubleshooting, but not delays. e. Block 33 - TI: Enter a single numeral (1 through 9) to indicate, to the nearest 10%, the percentage of active maintenance expended in troubleshooting. For example, if no troubleshooting is involved, enter “f”, “2” for 20%, “3” for 30%, “7” for 70%, etc. f. Block 34 - METER READING: There is no entry required on the completed deferral action. (Refer to Block 34 instructions for DOCUMENTING A DEFERRED MAINTENANCE ACTION). g. Block 35 - REMARKS/DESCRIPTION: Wh en the “what must be done” statement on the original deferral accurately describes the work which was done, no further entries are required. If remarks in addition to the original remarks entered are needed to describe the work done, refer to paragraph 7 of this appendix for “Documenting Changes, Additions and Deletions to Previously Submitted Maintenance Actions.” Describe what was done and any additional information considered significant. If additional space is needed for the completed action description, use up to three continuation pages.

p. 815

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-D-21 APPENDIX D 5.2 Section IV - REMARKS/DESCRIPTION - (Used by the Repair Activity when Reporting a Completed Maintenance Action): This type of completed work request is to be provided to the ship for 3-M processing. Block 64 - FINAL ACT.: Enter the code that best describes the final action taken to complete the maintenance. (Refer to Block 29 for “ACTION TAKEN” allowable codes or values). In addition, the following codes (Table 13) can be used: NOTE: THE LIST OF “ACTION TAKEN” CODES CHANGES OCCASIONALLY. VERIFY CURRENT “ACTION TAKEN” CODES AT THE FOLLOWING WEB SITE: HTTPS://OARS.NSLC.NAVY.MIL/OARS/DOCS/REF/INDEX.HTML Table 13 - Action Taken Codes Code Description 5A Partially Completed Alteration 5B Fully Completed Alteration 5C Fully Completed Equivalent to Alteration 5D Alteration Directive Not Applicable 6 Rejected Work Request NOTE: ADD THE FOLLOWI NG SECOND CHARACTER CODE WITH ACTION TAKEN CODE 6 TO BETTER DESCRIBE THE ACTION TAKEN: A Ship’s Force or Unit Standard Stock Item B Excessive Ship Workload or Insufficient Availability C Lack of Skills D Lack of Facilities E Lack of Test or Calibration Equipment F Lack of Parts or Material G Lack of Documentation H Lack of Funds I Other (record the explanation in “Remarks”) b. Block 65 - MHRS. EXPENDED: Enter th e man-hours expended on the last day the Repair Work Center is involved in the Work Request, not the total man-hours of the work request. c. Block 66 - DATE COMPLETED: Enter the Ju lian date the work request is completed and signed off by the requesting command.

p. 816

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-D-22 APPENDIX D (1) Block G - COMPLETED BY: The si gnature and rank and rate of the individual authorized by the repair activity to verify the acceptability of work performed is entered in this block. (2) Block H - ACCEPTED BY: The signatu re and rank and rate of the individual authorized by the command to verify the acceptability of work performed. Completion of this block is mandatory when a 2K is used to report completion of a previously deferred maintenance action. 6. PROCEDURES FOR DOCUMENTING A COMPLETED MAINTENANCE ACTION WITHOUT PRIOR DEFERRAL: Place an “X” in the block titled “COMP” at top of form. 6.1 Section I – IDENTIFICATION. a. JOB CONTROL NUMBER (Blocks 1 - 3): (1) Block 1 - UIC: Enter the Unit Identification Code (UIC) of the activity initiating the maintenance action. (2) Block 2 - WORK CENTER: Enter the c ode of the Work Center initiating the maintenance action. For Ships, a four-position Work Center code will be entered. For repair departments of IMAs, RMCs and other IMAs, a three-digit code will be entered. The three-digit code is entered left-to-right leaving the right most position blank. Appendix C of this chapter provides a listing of authorized Work Center codes (Submarine Tenders have been converted to a four position Work Center code). (3) Block 3 - JOB SEQ. NO. (JSN): En ter the four character JSN assigned by the Work Center Supervisor. This is an entry assigned sequentially from the SFWL/JSN Log. b. Block 4 - APL/AEL (Allowance Parts List /Allowance Equipment List): Enter the APL/AEL of the equipment being reported. These numbers are found in the COSAL or SCLSIS Index Report. An example of an APL would be “882170236” and an AEL would be “2-260034096.” c. Block A - Enter COMMAND’S NAME. d. Block 5 - EQUIPMENT NOUN NAME: Enter the equipment nomenclature and description on which maintenance is being reported. The equipment nomenclature and description should be the same as that identified by the EIC and is limited to 16 positions. Standard abbreviations can be used if clarity is retained. For electronic equipment having an Army-Navy (AN) designation, it will be substituted for the equipment nomenclature. e. Block B: - Enter SHIP’S HULL NUMBER (if applicable). f. Block 6 - WHEN DISCOVERED (WND): Enter the code (Table 14) that best identifies when the need for maintenance was discovered.

p. 817

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-D-23 APPENDIX D Table 14 - When Discovered Codes Code Description 1 Lighting Off or Starting 2 Normal Operation 3 During Operability Test 4 During Inspection 5 Shifting Operational Modes 6 During PMS 7 Securing 8 During AEC (Assessment of Equipment) Program 9 No Failure, PMS Accomplishment Only 0 Not Applicable (use when re porting printing services, etc.) g. Block 7 - STATUS (STA): Enter the code (Table 15) that most accurately describes the effect of the failure or malfunction on the operational performance capability of the equipment when the need for maintenance was first discovered. Table 15 - Status Codes Code Description 1 Operational 2 Non-Operational 3 Reduced Capability 0 Not Applicable (use if re porting printing services, etc.) h. Block 8 - CAUSE (CAS): Enter the code (T able 16) that best describes the cause of the failure or malfunction when the need for maintenance was first discovered. (Refer to reference (a), Appendix A, Table A-6 data element “CAUSE” for an expanded definition of the allowable codes or values).

p. 818

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-D-24 APPENDIX D Table 16 - Cause Codes Code Description 1 Abnormal Environment 2 Manufacturer or Installation Defects 3 Lack of Knowledge or Skill 4 Communication Problem 5 Inadequate Instruction or Procedure 6 Inadequate Design 7 Normal Wear and Tear 0 Other or No Malfunction i. Block 9 - DEFERRAL RE ASON (DFR): Leave blank. j. Block 10: - Block is reserved for TYCO M directed applications. Refer to TYCOM instruction for use. k. Block 11: - Block is reserved for TYCO M directed applications. Refer to TYCOM instruction for use. l. Block 12: - Block is reserved for TYCO M directed applications. Refer to TYCOM instruction for use. m. Block 13 - IDENT./EQUIPMENT SERIAL NUMBER: Enter the identification or serial number of the equipment or system on which maintenance is being deferred. For Hull, Mechanical & Electrical (HM&E) equipment, enter the Valve Mark or Electric Symbol Number (ESN) or Primary Identification Number. For electronic equipment, enter the manufacturer’s serial number of the equipment or system on which maintenance is being deferred. n. Block 14 - EIC: Enter the Equipmen t Identification Code of the component, equipment, subsystem, or system for which the maintenance is being reported. o. Block 15 - SAFETY HAZARD: Enter an “X” or applicable safety code (Table 17) if the maintenance action describes a problem or condition which has caused, or has the potential to cause, serious injury to personnel or material. A brief explanation must be included in the REMARKS/DESCRIPTION field (Block 35). For example: “Reinspection of separator for presence of oil after rinse. MRC A-27 evidently not done. Presence of oil resulted in fire in HP air system when compressor operated under load. Fire badly burned valve AHP-287, requiring replacement.” NOTE: THE SHIP’S OR UNIT’S 3-M COORDINATOR WILL FORWARD A COPY OF ALL OPNAV 4790/2K DOCUMENTATION HAVING AN ENTRY IN THIS FIELD TO THE SAFETY OFFICER FOR REVIEW. (REFER TO REFERENCE (A), APPENDIX A, TABLE A-14, DATA

p. 819

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-D-25 APPENDIX D ELEMENT “SAFETY HAZARD” FOR AN EXPANDED DEFINITION OF THE ALLOWABLE CODES OR VALUES). Table 17 - Safety Hazard Codes Code Description 1 Critical Safety or Health De ficiency-Correct Immediately 2 Serious Safety or Health Defi ciency-Suspension of Equipment, System or Space Use is required 3 Moderate Safety or Health De ficiency-Waiver of Equipment, System or Space Use is granted Pending Correction of the Item 4 Minor Safety or Health Deficiency 5 Negligible Safety or Health Deficiency 0 Maintenance Action is Not Safety Related NOTE: CODES “6” THROUGH “9” MAY BE LOCALLY ASSIGNED BY TYCOMS IF ADDITIONAL SAFETY CODES ARE REQUIRED. p. Block 16 - LOCATION: Enter the locati on (compartment number, deck, frame, or side notation), that best describes the location of the equipment requiring maintenance as identified in Block 13. If none of the mentioned location identifications are appropriate, enter description of the location (e.g., FANTAIL, FLIGHT DECK, etc.). q. Block 17 - WHEN DISCOVERED DATE: Ente r the Julian date when the equipment or system failure or malfunction was discovered. r. Block 18 - ALTERATIONS: Leave bla nk. If the completed maintenance action resulted in a configuration change or alteration, refer to the instructions for submitting an OPNAV 4790/CK form Appendix C. s. Blocks 19 through 24 - FOR INSURV USE: No entries required. See Section 2 for details. 6.2 Section II - DEFERRAL ACTION (Block 25 - 28): Leave blank. 6.3 Section III - COMPLETED ACTION. a. Block 29 - ACT. TKN: Enter the code (T able 18) that best describes the action taken to complete the maintenance. NOTE: THE LIST OF “ACTION TAKEN” CODES CHANGES OCCASIONALLY. VERIFY CURRENT “ACTION TAKEN” CODES AT THE FOLLOWING WEB SITE: Error! Hyperlink reference not valid.HTTPS://OARS.NSLC.NAVY.MIL/OARS/DOCS/REF/INDEX.HTML

p. 820

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-D-26 APPENDIX D Table 18 - Action Taken Codes Code Description 1 Maintenance Action Complete d; Parts Drawn from Supply 2 Maintenance Action Completed; Required Parts Not Drawn from Supply (local manufacture, pre-expended bins, etc.) 3 Maintenance Action Completed; No Parts Required NOTE: THE FOLLOWING SECOND CHARACTER CODES CAN BE USED WITH THE ACTION TAKEN CODES 1, 2, OR 3 AS DIRECTED BY THE TYCOM: A Maintenance Requirement Could Have Been Deferred B Maintenance Requirement Was Necessary C Maintenance Requirement Should Have Been Done Sooner M High Cost Repairs T The Equipment Being Reported Had a Time Meter 4 Canceled (When this code is used, the deferral will be removed from the CSMP). This code is not to be used with INSURV, safety, or priority 1 or 2 deferrals screened for accomplishment by the TYCOM or IUC. 7 Maintenance Action Completed; 2-M (Miniature and Micro-Miniature Electronic Modules) Capability Utilized. NOTE: THE FOLLOWING SECOND CHARACTER CODES CAN BE USED WITH ACTION TAKEN CODE 7 TO BETTER DESCRIBE THE ACTION TAKEN: A Parts Drawn from Supply Utilized B Parts Not Drawn from Supply Utilized C Automatic Test Equipment (ATE) Utilized D ATE and Parts Drawn from Supply Utilized E ATE and Parts Not Drawn from Supply Utilized 8 Periodic Time Meter or Cycle Counter reporting. (This code is not applicable to the “FINAL ACTION” code reported by the repair activity.) 9 Maintenance Action Completed; 3-M Fiber Optic Repair NOTE: THE FOLLOWING SE COND CHARACTER CODES CAN BE USED WITH ACTION TAKEN CODE 9 TO BETTER DESCRIBE THE ACTION TAKEN: A FOTE, multimode ST MQJs utilized B FOTE, multimode heavy duty MQJs utilized

p. 821

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-D-27 APPENDIX D C FOTE, multimode rotary mech anical splice MQJs utilized D FOTE, single mode ST MQJs utilized E FOTE, single mode heavy duty MQJs utilized F FOTE, multimode specialty MQJs utilized G FOTE, single mode sp ecialty MQJs utilized H FOTE, not available I Standard MQJs not available J Specialty MQJs not available 0 None of the Above b. Block 30 - MHRS: Enter the total man- hours (to the nearest whole hour) that were expended completing the maintenance. This includes man-hours expended for reinstallation, witnessing of tests, etc. (include documentation time, which should not exceed 1 hour). NOTE: BLOCKS 32, 33, AND 34 ARE ONLY TO BE REPORTED, IF THE EQUIPMENT HAS BEEN SEL DESIGNATED. c. Block 31 - COMPLETION DATE: Enter th e Julian date the maintenance action was completed. d. Block 32 - ACT. MAINT. TIME: Enter th e total clock hours (to the nearest whole hour) during which maintenance was performed. This should include time for troubleshooting, but not delays. e. Block 33 - TI: Enter a single numeral (1 through 9) to indicate, to the nearest 10 percent, the percentage of active maintenance expended in troubleshooting. For example, if no troubleshooting is involved, enter “f”, “2” for 20%, “3” for 30%, “7” for 70%, etc. f. Block 34 - METER READING: Enter the time meter reading (to the nearest whole hour) at the time of failure. If the equipment has more than one meter, designate the meter being recorded in Block 35 “REMARKS” using the letters “METRED” followed by the meter designator. An asterisk (*) must precede and follow the meter designation. Example: *METRED-1A2M1*. g. Block 35 - REMARKS/DESCRIPTION: En ter remarks relating to the maintenance action. These remarks should be brief, but complete and meaningful. Remarks should state what was wrong, what caused the failure (if known) and what was done to correct the problem. If “SAFETY HAZARD” (Block 15) is checked, a description of the condition creating the hazard should be inserted in “REMARKS”. If more space is needed, check Block 36 “CONT. SHEET” and continue the remarks on a second form using the same JCN.

p. 822

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-D-28 APPENDIX D 7. PROCEDURES FOR DOCUMENTING CHANGES, ADDITIONS, AND DELETIONS TO PREVIOUSLY SUBMITTED MAINTENANCE ACTIONS: Place an “X” in the block titled “CORRECTION” at the top of the form. Enter the exact JCN (Blocks 1, 2, and 3) of the original 2K previously processed. Enter only the information to be added, deleted, or changed in the applicable blocks. If the selected data elements are to be deleted, without deleting the entire document, enter dashes (one dash per tic mark) within the data block to be deleted. When changing Block 35, REMARKS/DESCRIPTION, the entire narrative must be entered so that the correct information is included. It is not possible to change just a word or two. 8. PROCEDURES TO ADD-ON REMARKS TO THE CSMP: To add to the remarks as originally submitted, place an “X” in the block titled “ADD-ON REMARKS” at the top of a new 2K Form. Place an “X” in the “DEFL” block at the top of the form and enter in Blocks 1, 2 and 3 the JCN of the original 2K. In Block 35 “REMARKS/DESCRIPTION”, enter the initials of the activity adding on to the remarks followed by a dash (-). For example, CINCPACFLT would be entered as “CPF-”. Following the dash (-) enter the additional information. If it is necessary to rewrite, or change the narrative as originally submitted, use the procedures for “DOCUMENTING CHANGES, ADDITIONS, and DELETIONS” in paragraph 7. 9. HANDLING PROCEDURES: The 2K is required for documenting a maintenance action that did not result in a configuration change. The 2K must be forwarded to the automated data processing facility serving the command. A copy is submitted when reporting the completion of that maintenance action. A second copy is retained until completion of the maintenance action results in its removal from the CSMP; then it may be destroyed.

p. 823

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-D-29 APPENDIX D Maintenance Action Form for a Deferred Maintenance Action Figure 1 Maintenance Action Form for a Completed Maintenance Action without Prior Deferral

p. 824

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-D-30 APPENDIX D Figure 2 Maintenance Action Form for a Change to a Previously Submitted Deferred Maintenance Action

p. 825

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-D-31 APPENDIX D Figure 3 Maintenance Action Form for Add-on Remarks to a Previously Submitted Deferred Maintenance Action

p. 826

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-D-32 APPENDIX D Figure 4 Maintenance Action Form for Add-on Remarks to a Previously Submitted Deferred Maintenance Action

p. 827

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-E-1 APPENDIX E APPENDIX E PREPARATION INSTRUCTIONS SUPPLEMENTAL FORM (OPNAV 4790/2L) 1. SUPPLEMENTAL FORM (OPNAV 4790/2L). a. This form is used to provide amplifyi ng information (such as drawings and listings) related to a maintenance action, reported on an OPNAV 4790/2K (2L) form. The 2L may be used to list multiple item serial numbers and locations for which identical maintenance requirements exist from an outside activity; or to provide a list of drawings and sketches that would be helpful in the accomplishment of the maintenance. b. The OPNAV 4790/2L (2L) form is retained with the suspense copy of the corresponding 2K form that deferred the maintenance action. The 2L is never submitted to the ADP facility servicing the activity, as the data on the 2L will never be entered into the computer. However, the 2L can be attached to the original 2K or computer produced (simulated) 2K when submitted to an assisting activity. 2. SPECIAL APPLICATION. a. If a MJC routine has been added to the CSMP for service routines or for IMA manufacturing of sheet metal enclosures, structures or flex hoses, multiple OPNAV 4790/2Ls may be used for the same JCN. Each 2L would result in an additional task being added to the JCN, thus accounting for man-hour expenditure for each task. Similarly, the 2L could be used to request critical hose manufacturing by referencing the MJC number and using the activity’s own JCN, thus precluding the necessity to submit multiple complete OPNAV 4790/2Ks. b. The form is separated into three sections: (1) SECTION I “IDENTIFICATION” (2) SECTION II “REMARKS/SKETCHES” (3) SECTION III “AUTHENTICATION” NOTE: WHEN USING THE 2L, ALL SECTIONS OF THE FORM ARE TO BE FILLED OUT. ON THE OPNAV 4790/2K FORM, BE SURE TO ENTER THE NOTATION “2L USED” IN THE “REMARKS/DESCRIPTION” SECTION, BLOCK 35. NOTE: FIGURES 1 AND 2 PROVID E AN EXAMPLE OF COMPLETED OPNAV 4790/2L FORMS. Figure 1 Supplemental Form Containing an Equipment Listing. Figure 2 Supplemental Form Containing a Sketch or Drawing.

p. 828

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-E-2 APPENDIX E 3. PROCEDURES FOR PROVIDING ADDITIONAL INFORMATION USING THE 2L. 3.1 Section I – Identification. a. Block A: - Enter the Command’s Name. b. Block B: - Enter the Ship’s Hull Number (if applicable). c. JOB CONTROL NUMBER: - Enter the same JCN (Command’s UIC, Work Center, and Job Sequence Number) assigned to the original maintenance action (OPNAV 4790/2K or equivalent) in Blocks C, D and E. d. Block F - CONTINUATION FOR: Enter an “X ” in one of the blocks to indicate that this 2L is a continuation of either an OPNAV 4790/2K, 4790/2L or a 4790/2P Form. 3.2 Section II - Remarks/Sketches. Block G: - En ter the information that is desired to be provided such as a list of serial numbers and locations for which identical maintenance requirements exist or sketches or drawings that may be useful in the accomplishment of the maintenance action. 3.3 Section III – Authentication. a. Block H - FIRST CONTACT/MAINTEN ANCE MAN: The maintenance person preparing the form prints his or her name in this block. b. Block I - DATE (YR/DAY): Enter the Ju lian date the document is prepared. c. Block J - SECOND CONTACT/SUPERVISOR : The Work Center Supervisor prints his name following his review of the document in the block. d. Block K - DATE: The Work Center Supe rvisor enters the Julian date the document was reviewed.

p. 829

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-E-3 APPENDIX E Figure 1 Supplemental Form Containing an Equipment Listing

p. 830

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-E-4 APPENDIX E Figure 2 Supplemental Form Containing a Sketch or Drawing

p. 831

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-F-1 APPENDIX F APPENDIX F SHIPYARD ALTERATION CERTIFICATION LETTER EXAMPLE

4720 Ser/Org Code Date:

From: (Originating Activity) To: Commanding Officer, USS (Ship’s Name and hull number) Subj: CERTIFICATION OF ALTERATION INSTALLATION DURING AVAILABILITY (include data range of availability) Ref: (a) NAVSEAINST 4790.8(Series) 1. The following alterations are certified installed. The listed alterations meet the requirements of the issuing agency as instructed and include all required Logistics Support documentation. 3-M WC/JSN ALTERATION NO. DESCRIPTION A/T (For example): DXSA 0054 SADDG 0045 K MI SSLE LAUNCH INSTL 5B EXSA 3994 SADDG 01003 K SSTG INSTL 5B EXSA 4007 SADDG 01675 K HPAC RPLCMNT 5B

//Signature// By direction

Copy to: (Cognizant TYCOM) NAVSEA (Cognizant Code)

p. 832

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-G-1 APPENDIX G APPENDIX G SHIP’S FIRST ENDORSEMENT ON ALTERATION CERTIFICATION LETTER EXAMPLE

4720 Ser/Org Code Date:

FIRST ENDORSEMENT on NSY ltr 4720 Ser/Orig Code of (Date of ltr) From: Commanding Officer, USS (Ship’s Name and hull number) To: (Supporting Activity, e.g., IUC, Regional Support Group, etc.) Subj: CERTIFICATION OF ALTERATION INSTALLATION DURING AVAILABILITY (include data range of availability) Ref: (a) NAVSEAINST 4790.8 - Ships’ Maintenance and Material Management (3-M) Manual 1. Request the alterations reported completed by basic correspondence be processed as completed deferrals in the Master CMSP.

//Signature// By direction

Copy to: (Cognizant TYCOM) NAVSEA (Cognizant Code)

p. 833

COMUSFLTFORCOMINST 4790.3 REV D CHG 3 07 Nov 2023 VI-19-7-H-1 APPENDIX H APPENDIX H WORK CANDIDATE AND JSN LOG EXAMPLE

p. 834

COMUSFLTFORCOMINST 4790.3 REV D CHG 2 31 MAR 2022

VI-20-1 VOLUME VI CHAPTER 20 WEIGHT AND MOMENT CONTROL FOR SUBMARINES REFERENCES. (a) NAVSEA S9086-C6-STM-010 - NSTM Chapter 096 (Weights and Stability) (b) NAVSEA T9096-AA-INS-010 - We ight and Stability Requirements for Active Submarines LISTING OF APPENDICES. A Sample Ship Message to ISIC Concerning Removal or Reinstallation of Cargo Ballast B Sample Ship Message to ISIC Concer ning Audit of Cargo Ballast Documentation 20.1 PURPOSE. This chapter provides basic information and guidance concerning submarine ballast changes, including mandatory authorization and reporting requirements. a. The use of solid ballast is important for submarine stability and the ability to maintain submerged equilibrium for all design conditions. Ballast lead typically, is installed in submarines for the following purposes: (1) To maintain adequate stability. (2) To correct for inherent transverse moments that would otherwise create list. (3) To permit submarines to submerge with neutral buoyancy and zero trim for all design equilibrium conditions. (4) To compensate for future installed alterations. b. An inclining experiment and all-stop trim dive are performed per the requirements of reference (a). These experiments provide the basic data concerning weight and center of gravity for use in all considerations of stability, reserve buoyancy, equilibrium and in determining compliance with the requirements of the weight control program. An inclining experiment is the only satisfactory method of accurately determining the location of the vertical center of gravity of the submarine. The trim dive is the only satisfactory method of determining the load to submerge and the final ballasting solution. Inclining experiments are conducted on each submarine in new construction, after the Post Shakedown Availability, unless waived by Naval Sea Systems Command (NAVSEA), and when authorized by Naval Sea Systems Command (NAVSEA) for some Chief of Naval Operations (CNO) availabilities. Trim dives are performed during delivery sea trials, prior to each CNO availability, after each CNO availability with a duration of 18 months or longer and under specific circumstances to address ballasting issues reported by Ship’s Force. Trim dives are also performed periodically prior to smaller availabilities to identify weight growth. c. Initial ship design provides for adequate st ability and equilibrium for all expected loading conditions. Service life margin, in the form of permanent lead ballast in excess of that needed to